2.1.1+Attachment+12+MHU+Solicitation+and+Comment+Matrix+02.20.25_August 1, 2025.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 70FB8025R00000018
- Issued by
-
Federal Emergency Management Agency
About this file
The file is a Comment Matrix document for Attachment 1 of the FEMA Manufactured Housing Units (MHUs) Solicitation, specifically addressing pricing structure discrepancies. The comments focus on two key issues in the pricing matrix: Line 12 incorrectly referencing a 3-bedroom unit instead of a 2-bedroom, 1-bath CONUS Standard MHU, and Line 14 referencing a 3-bedroom, 1-bath standard unit without accompanying design specifications. The document notes that Lines 14 and 20 were intended as placeholders and have been changed to reserved lines to preserve CLIN numbering, with the acknowledgment that no 3-bedroom, 1-bathroom designs currently exist in the solicitation.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Comment Matrix
| Document Name (Solicitation, Attachment # 1, Attachment # 2, etc.) | Page # | Start Line # | End Line # | Comment | Response |
| Attachment 1 MHU Pricing Structure | 12 | 12 | Line 12 and Line 14 of the pricing matrix reference the same 3 Bedroom, 1 Bath CONUS Standard MMHU. This appears to be a duplicate. It appears that LIne 12 should read a "2 BR 1 Bath CONUS Standard MH". Freight rates on Line 33 reference the delivery of a 2 bedroom unit but the pricing schedule on line 12 under FEMA Design MHU does not reference a 2 Bedroom 1 Bath CONUS Standard MHU. Should Line 12 of the Pricing Table read "2 BR 1 Bath CS" for the CLIN Short Name and "2 Bedroom 1 Bath CONUS Standard MH" for the CLIN Description? | This is correct, line 12 should read 2 BR, 1 Bath CONUS Standard MH. | |
| Attachment 1 MHU Pricing Structure | 14 | 14 | Line 14 of the pricing matrix references pricing requested for the 3 Bedroom, 1 Bath Standard CONUS MH but no drawings or specifications have been provided to use in preparing a bill of materials and related pricing of the MHU. The Statement of Work states that the Next Gen Three Bedroom, 1 Bath MHU design package will be provided as part of the Delivery Order Requirement. Should Line 14 "Unit Cost" be marked "DO"? | Lines 14 and 20 were meant to be placeholders and was mistakenly filled with an incorrect specifciation as there is no 3 bedroom 1 bathroom designs as stated. It has been changed to reserved lines to preserve the CLIN numbering. |