2 - Appendix B Revision Log - FEB-03-2025.pdf

PDF 287 KB Posted

Attached to
Amendment # 5 70FB8025R00000018 - DHS FEMA Manufactured Housing Units (MHUs) 2025
Solicitation number
70FB8025R00000018
Issued by

About this file

The document is an Appendix B Revision Log detailing document updates from 3/9/2021 to 2/3/2025 for a federal contract opportunity related to Manufactured Housing Units (MHUs). The revision log tracks changes to various sections, including cover page and index updates, and additions of installation instructions for specific components such as:

  • Metal register updates per vendor questions (3/9/2021)
  • New page additions for B-10.1.1 and B-10.1.2 (6/3/2022)
  • Addition of Alternate Truss (11/15/2023)
  • Optional Santa-Fe UltraMD33 Dehumidifier Installation Instructions (11/15/2023)
  • Oliver OTI Adjustable Outrigger Installation Instructions (2/3/2025)

View the file

Other files

File Type Posted
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx Rev. 2_August 3, 2025.xlsx XLSX spreadsheet
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx_Rev. 2_August 3, 2025.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0005.pdf PDF
Sol_70FB8025R00000018_Amd_0004.pdf PDF
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx_Rev. 1_August 1, 2025.xlsx XLSX spreadsheet
2.1.1+Attachment+12+MHU+Solicitation+and+Comment+Matrix+02.20.25_August 1, 2025.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0003.pdf PDF
Amendment 2_ 2.1.1 Attachment 12 MHU Solicitation and Comment Matrix 02.20.25_Responses July 8 2025_AC.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0002.pdf PDF
Sol_70FB8025R00000018_Amd_0001.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final_Rev2_June 27, 2025.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final_Rev1.pdf PDF
2.1.1 Attachment 3 - 1BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 9 Acronyms NextGen Rev 2.20.25.pdf PDF
2 - Appendix C - FEB-03-2025.pdf PDF
2.1.1 Attachment 12 MHU Solicitation and Comment Matrix 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 8 MHU First Article Inspection Checklist (2.11.20) Rev 02.20.25.pdf PDF
2.1.1 Attachment 6 MHU Delivery Schedule and Daily Production Report Template 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 14 NextGen Warranty Repairs In The Field List 02.26.25.pdf PDF
2 - Appendix A Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 2 BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3 BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2 - Appendix A Typical NextGen MHU Details - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 13 DAPIA Concurrence Letters Rev 02.20.25.pdf PDF
2.1.1 Attachment 11 MHU_Past Performance Questionnaire 02.20.25.docx DOCX document
2 - Appendix C Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 1BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final.pdf PDF
2.1.1 Attachment 15 Misc Parts and Materials 02.26.25.pdf PDF
2 - Appendix B Typical NextGen Cut Sheets - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 3BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express Cal Wildfire HVAC Wall Mounted Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - Express NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 5 NextGen MFG_shipment_Notification 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 7 Invoice-Sample_Blank 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 3 - 1BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx XLSX spreadsheet
2 - FEMA NextGen MHU Additional Requirements - Version 1 - FEB-03-2025.pdf PDF
2.1.1 Attachment 10 MHU_Quality_Assurance_Plan 28July2020 Rev.1 02.20.25.pdf PDF
1.1.3 Attachment 2 NextGen Statement of Work - Final.pdf PDF
2 - FEMA NextGen MHU Additional Requirements - Version 1 Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 1BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 4 MHU Intake-Transfer Inspection Checklist (08.04.22) Rev 02.20.25.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Description

3/9/2021

1. B-1 Cover page date updated.

2. B-2 Index page updated.

3. B-10.2 thru .4 Updated to metal register per Vendor question.

5. B-10.5 & .6 Added reserve page

6/3/2022

1. B-1 Cover page date updated.

2. B-2 Index page updated.

3. B-10.1.1 - Added page

4. B-10.1.2 - Added page

11/15/2023

1. B-1 Cover page date updated.

2. B-2 Index page updated.

3. B-70.3 - Added Alternate Truss

4. B-130.1 thru B-130.21 - Added Optional Santa-Fe UltraMD33 Dehumidifier Installation Instructions.

2/3/2025

1. B-1 Cover page date updated.

2. B-2 Index page updated.

3. B-140.1 - Added Oliver OTI Adjustable Outrigger Installation Instructions.

2 - Appendix B Revision Log

2/5/2025 1 of 1

File details come from the government source that posted it. Updated .