2 - Appendix C Revision Log - FEB-03-2025.pdf

PDF 286 KB Posted

Attached to
Amendment # 5 70FB8025R00000018 - DHS FEMA Manufactured Housing Units (MHUs) 2025
Solicitation number
70FB8025R00000018
Issued by

About this file

The document is a Revision Log for Appendix C, detailing document update history from 03/09/21 to 02/03/25. The log tracks updates to specific document sections, including cover page date changes, updates to C-40.F001 through F003, C-40.F101 through F107, and C-40.F501 through F504, all related to sprinkler revisions. The most recent revision on 02/03/25 involved updating the cover page date, revising the index page, and removing an extra copy of FEMA Additional Requirements from Appendix C.

View the file

Other files

File Type Posted
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx Rev. 2_August 3, 2025.xlsx XLSX spreadsheet
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx_Rev. 2_August 3, 2025.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0005.pdf PDF
Sol_70FB8025R00000018_Amd_0004.pdf PDF
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx_Rev. 1_August 1, 2025.xlsx XLSX spreadsheet
2.1.1+Attachment+12+MHU+Solicitation+and+Comment+Matrix+02.20.25_August 1, 2025.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0003.pdf PDF
Amendment 2_ 2.1.1 Attachment 12 MHU Solicitation and Comment Matrix 02.20.25_Responses July 8 2025_AC.xlsx XLSX spreadsheet
Sol_70FB8025R00000018_Amd_0002.pdf PDF
Sol_70FB8025R00000018_Amd_0001.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final_Rev2_June 27, 2025.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final_Rev1.pdf PDF
2.1.1 Attachment 3 - 1BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 9 Acronyms NextGen Rev 2.20.25.pdf PDF
2 - Appendix C - FEB-03-2025.pdf PDF
2.1.1 Attachment 12 MHU Solicitation and Comment Matrix 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 8 MHU First Article Inspection Checklist (2.11.20) Rev 02.20.25.pdf PDF
2.1.1 Attachment 6 MHU Delivery Schedule and Daily Production Report Template 02.20.25.xlsx XLSX spreadsheet
2 - Appendix B Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 14 NextGen Warranty Repairs In The Field List 02.26.25.pdf PDF
2 - Appendix A Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 2 BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3 BR NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2 - Appendix A Typical NextGen MHU Details - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 13 DAPIA Concurrence Letters Rev 02.20.25.pdf PDF
2.1.1 Attachment 11 MHU_Past Performance Questionnaire 02.20.25.docx DOCX document
2.1.1 Attachment 3 - 1BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 70FB8025R00000018_MHU Soliciation 2025_Final.pdf PDF
2.1.1 Attachment 15 Misc Parts and Materials 02.26.25.pdf PDF
2 - Appendix B Typical NextGen Cut Sheets - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 3BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express Cal Wildfire HVAC Wall Mounted Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - Express NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 2BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 5 NextGen MFG_shipment_Notification 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 7 Invoice-Sample_Blank 02.20.25.xlsx XLSX spreadsheet
2.1.1 Attachment 3 - 1BR Cal Wildfire NextGen CAD Drawings HVAC Wall Mounted - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 1 NextGen MHU Pricing Structure (for Offerors) 02.26.25.xlsx XLSX spreadsheet
2 - FEMA NextGen MHU Additional Requirements - Version 1 - FEB-03-2025.pdf PDF
2.1.1 Attachment 10 MHU_Quality_Assurance_Plan 28July2020 Rev.1 02.20.25.pdf PDF
1.1.3 Attachment 2 NextGen Statement of Work - Final.pdf PDF
2 - FEMA NextGen MHU Additional Requirements - Version 1 Revision Log - FEB-03-2025.pdf PDF
2.1.1 Attachment 3 - 1BR NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - Express NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 3 - 3BR Cal Wildfire NextGen CAD Drawings Furnace-AC System - FEB-03-2025 PE Sealed.pdf PDF
2.1.1 Attachment 4 MHU Intake-Transfer Inspection Checklist (08.04.22) Rev 02.20.25.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Description

03/09/21

1. C-1 Cover page date updated.

2. C-40.F001 thru F003 Updated with Sprinkler revisions received by Larry on 09-30-2020.

3. C-40.F101 thru F107 Updated with Sprinkler revisions received by Larry on 09-30-2020.

5. C-40.F501 thru F504 Updated with Sprinkler revisions received by Larry on 09-30-2020.

06/16/22

1. C-1 Cover page date updated.

2. C-40.F001 thru F003 Updated with Sprinkler revisions

3. C-40.F101 thru F107 Updated with Sprinkler revisions

5. C-40.F501 thru F504 Updated with Sprinkler revisions

02/03/25

1. C-1 Cover page date updated.

2. C-2 Index revision page updated.

3. Removed extra copy of FEMA Additional Requirements from the Appendix C.

2 - Appendix C Revision Log

2/5/2025 1 of 1

File details come from the government source that posted it. Updated .