2 - Appendix A Revision Log - FEB-03-2025.pdf
PDF 296 KB Posted
- Solicitation number
- 70FB8025R00000018
- Issued by
-
Federal Emergency Management Agency
About this file
The document is a Revision Log for an architectural drawing set, detailing multiple updates to various drawing pages from March 2021 through February 2025. Key revisions include updates to cover pages, modifications to specific drawing details such as sprinkler systems, annunciator panel locations, electrical receptacles, dehumidifier details, medicine cabinet dimensions, and the addition of a Professional Engineer (PE) seal box to some drawings.
Notable changes across the revision history include relocating equipment like the annunciator panel, updating elevation details, adding new pages for optional components like dehumidifiers and detachable hitches, clarifying dimensional specifications, and revising notes related to flashing materials, drip caps, and document storage cases. The most recent revisions on 11/15/23 and 02/03/25 primarily focused on adding the PE seal box, updating page indexes, and making minor dimensional and notation adjustments to various architectural drawings.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Description
03/03/21
1. A-1 Cover page date updated.
2. A-52 Sprinkler details 5 & 6 updated to match sprinkler revisions sent by Larry on 9-30-2020.
3. A-52 Drawing revision date updated.
09/01/21
1. A-1 Cover page date updated.
2. A-51 Remove old FEMA specification references.
3. A-52 Revised Detail 5 and added notes.
09/20/21
1. A-1 Cover page date updated.
2. A-1.1 Updated Index and added reserve pages A-70 thru A-74.
3. A-4 Revised 8 Wide Express elevation and removed extra countertop receptacles.
4. A-30.1 Added new page and detail F.
5. A-50 Updated plan and moved annunciator panel.
6. A-51 Moved annunciator panel double gang box and conduit. Removed old FEMA specification references.
7. A-60 Updated sprinkler riser plan - Dashed in sprinkler main above.
8. A-70 thru A-74 - Added new "Reserve" page.
10/06/21
1. A-1 Cover page date updated.
2. A-4 Revised 14 Wide MHU Sink Access Panel Elevation.
11/29/21
1. A-1 Cover page date updated.
2. A-50 Revised backers for D-Rings to match interior wall drawingsin TPS Closet Plan view.
02/25/22
1. A-1 Cover page date updated.
2. A-30 Detail A - Added note 3.
3. A-30.1 Added General Note number 1
4. A-50 Added dryer vent location on TPS Closet - Plan
5. A-52 Revised Detail 1 TPS and Sprinkler drains through perimeter rail.
06/03/22
1. A-1 Cover page date updated.
2. A-4 Section A-A - Removed 2x4 from front of kitchen sink UFAS protective screen.
2. A-50 TPS Closet Plan - Relocated Annunciator Panel. Changed TPS Alarm mounting provisions to vinyl siding mounting block and location, and revised note 4
3. A-51 Changed notes 2, 8 & 15 and Elevations 2 & 4.
4. A-52 Revised Detail B and C.
09/08/22
1. A-1 Cover page date updated.
2. A-30 Detail A notes 2 and 3 revised. Removed Dehumidfier Floor Drain Detail per TB 2021-36.
3. A-30.1 Added General Note #1 and added detail F.2
3. A-32 Revised Note 1.
4. A-50 Revised TPS Closet Note 3.
01/17/23
1. A-1 Cover page date updated.
2. A-30 Deleted Detail E.
3. A-32 Revised Note 1.
4. A-33 Added new page with detachable hitch.
5. A-34 Added new page with detachable hitch details.
6. A-50 Revised note 3.
2 - Appendix A Revision Log
2/5/2025 1 of 2
Date Description
2 - Appendix A Revision Log
11/15/23
PE seal box was added to some drawings. No changes were made to these drawings except as noted below. Existing notes and details, in some cases, were moved to accomodate the PE seal box.
1. A-1 Cover page date updated.
2. A-1.1 Added page A-35 to index page.
3. A-35 New Optional Dehumidifier page.
4. A-40 Added note 1, changed I-beam length and I-beam spacing.
5. A-51 Revised location of the "L" configuration for receptacle on Elevation 2 to match note 11.
02/03/25
1. A-1 Cover page date updated.
2. A-3 Added note 1 to Medicine cabinet & Lav Detail. Clarified mirror and bottom medicine cabinet location dimensions.
3. A-11 Revised note 2 flashing material note. Step 6 note for metal drip cap revised. Step 8 house wrap note relocated.
4. A-21 - Revised note 2 flashing material note. Step 6 note for metal drip cap revised.
5. A-30 - Revosed Rain Diverter Detail, Note 1.
6. A-35 - Revised Front Elevation to state, "See Note 13."
7. A-51 - Revised Elevation 1 dimensions for Metal MHU Document Bin (TPS Note 1) and Red sprinkler system document storage case (TPS Note 3).
2/5/2025 2 of 2
File details come from the government source that posted it. Updated .