Requirement_C_PWS_Addendum_Final.docx

DOCX document 143 KB Posted

Attached to
Detention Services for California Federal contract opportunity
Solicitation number
70CDCR20R00000002
Issued by
Immigration and Customs Enforcement

About this file

This document outlines the requirements for detention services for an opportunity with Immigration and Customs Enforcement in California. The opportunity involves providing detention and transportation services across three areas of responsibility in California, requiring facilities within 75 miles of Bakersfield, Fresno, Sacramento, San Francisco, Stockton, Morgan Hill, or Redding. The estimated detainee population would include 950 males, 200 females, and no juveniles or families, with risk levels ranging from 25% for each of low, medium-low, and medium-high to 25% for high risk. The requirements include specified administrative space for ICE staff, video teleconferencing rooms for court proceedings, and parking for ICE employees and visitors. Additional needs involve meeting certain medical and mental healthcare standards, furnishing replacement schedules, electronic equipment such as phone lines and video conferencing, and transportation services for approximately 117,757 to 118,069 miles per year.

Updated PWS Requirement C Addendum

View the file

Other files for this federal contract opportunity

Other files attached to Detention Services for California, newest first.
File Type Posted
Attachment_19_PPQ.doc DOC document
SECTION_B_10252019.docx DOCX document
Solication_Sections_D-M_FINAL_10252019.docx DOCX document
California_Wide_PWS_-_10252019_Final.docx DOCX document
Requirement_A_PWS_Addendum_updated_10252019.docx DOCX document
Requirement_B_PWS_Addendum_-_updated_10252019.docx DOCX document
Solicitation_70CDCR20R00000002_Questions_Part_3.docx DOCX document
Attachment_13-_Cost_and_Pricing_Summary_updated_10252019.docx DOCX document
Attachment_14_ICE_Dedicated_DSCS_OCT252019.xlsx XLSX spreadsheet
Solicitation_RFP_70CDCR20R00000002_Questions_and_ICE_Responses_Part_2.docx DOCX document
RFP_70CDCR20R00000002_Questions_and_Government_Answers_Part_1.pdf PDF
Solication_Sections_D-M_10232019.docx DOCX document
PWS_Addendum_D_CDR_Attachment.docx DOCX document
ICE_Dedicated_DSCS_(V-17OCT2019)v.xlsx XLSX spreadsheet
Solicitation_Sections_D-M_Final.docx DOCX document
California_Wide_PWS_-_10222019_FINAL.docx DOCX document
PWS_Addendum_Requirement_D_Final.docx DOCX document
PWS_Addendum_D_PRS_Attachment_1.docx DOCX document
PPQ.doc DOC document
Addendum_B_ICE_EOIR_Design_Standards.pdf PDF
Solication_Sections_D-M_10_16_2019_.pdf PDF
RFP_Attachment_13-_Cost_and_Pricing_Summary.docx DOCX document
Requirement_A_PWS_Addendum.docx DOCX document
Attachment_14A_-_ICE-Dedicated_DSCS_Handbook_vFinal.pdf PDF
Combined_Synopsis_Solicitation_Notice.pdf PDF
Addendum_A_-_ICE_Design_Standards_for_CDFs.pdf PDF
Attachment_14_ICE_Dedicated_Detention_Services_Cost_Statement.xlsx XLSX spreadsheet
SECTION_B_Final.docx DOCX document
Attachment_17_Franco_settlement-agreement.pdf PDF
Addendum_D1_IHSC_Design_Standards_Supplement.pdf PDF
Zip_1_-_California_PWS_Attachments.zip ZIP file
Addendum_C_-_Structured_Cable_Plant_Standards.pdf PDF
RFP_Attachment_18_-_Franco-Gonzalez_Health_Form.docx DOCX document
Addendum_D-_Health_Service_Design_Standards_3-11-05_07-12-2019_(002).pdf PDF
Requirement_B_PWS_Addendum.docx DOCX document
Requirement_D_PWS_Addendum.docx DOCX document
RRU_Attachment_15_-_Preparation_of_NEPA_Document_10.16.19.docx DOCX document
RFP_Section_A.pdf PDF
Requirement_C_PWS_Addendum_.docx DOCX document
California_Wide_PWS_-_10162019.pdf PDF
Attachment_16_Lyons_Settlement_Agreement.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirement C PWS Addendum

Location Requirements
These detention services will be performed in the location/locations specified for Requirement C in the RFP.

Estimated Population Size

Male
950
Female
200
Juvenile
0
Family
0
Special Management unit for administrative and discipline segregation
Yes, the estimated need is approximately 3-5% across overall population at facility/facilities.

Expected Risk Detainees

Level 1 (Low)
Approximately 25%
Level 1.5 (Medium Low)
Approximately 25%
Level 2 (Medium High)
Approximately 25%
Level 3 (High)
Approximately 25%

Estimated percentages based on overall population at facility/facilities.

Facility, Detention and Administrative Space Requirements

ICE
Administrative and support space for ICE staff to be determined based on detainee population at facility/facilities.

Approximate total work space needed across facility/facilities for use by 30 Government (ICE employees) staff.

Work space for this estimated staffing includes:

18 Offices 12 Cubicles 2 VTC rooms

Estimates are approximate and will be based on total bed space across facility/facilities.

U.S. Citizenship and Immigration Services (USCIS)
No need for physical CIS presence known at this time.

Executive Office for Immigration Review (EOIR) Space

Approximate total of 15 VTC capable rooms across facility/facilities for use by EOIR is needed.

Additional Administrative/Common area requirements
Per the ICE -ERO CDF Design Standards including but not limited to:

· Break room with kitchenette

· Storage/Secure File Room

· Interview Room

· Conference Room (with VTC capability)

· Secure File Room

· Copier/Fax/Printer/Shredder Area

· Male Restroom (not used/shared with detainees/inmates)

· Female Restroom (not used/shared with detainees/inmates)

Furniture Requirements
· Furniture and flooring will be in accordance with the ICE-ERO Design Standards for Contract Detention Facilities (CDF) and is to be replaced at a maximum 5-year life cycle

· Cut sheets for proposed furniture must be submitted to the COR for approval. A proposed scheduled for flooring replacement and cleaning will need to be provided with the life cycle not to exceed 5 years.

Additional Electronic Requirements
At least:

· Estimated 30 Phone numbers/lines/extensions #

· Estimated separate 5 fax numbers/lines/extensions #

· Estimated 2 VTC lines (PRI/T1) for two VTC systems per facility

· Estimated 1 Copier (fax/scan capable) and all necessary supplies (such as paper and ink) per facility. Contractor is responsible for maintenance and/or replacement of copiers in the event of failure.

Estimates are approximates based on total bed space across facility/facilities.

Parking
Approximate total of 35 secured/onsite parking spaces with controlled ingress and egress at facility/facilities used exclusively for 30 Government (ICE employees) as well as 5 ICE visitors.*

*Estimates based on anticipated ICE staffing presence at facilities/facilities.

Additional Facility Requirements

· Facility/Facilities medical unit must meet Franco settlement (see RFP attachment 17) dealing with mental health intake screening as well as care for detainees meeting said criteria.

· Facility/Facilities must meet LYON agreement (see RFP attachment 16) standards

Transportation Requirements

The transportation requirements/needs will be determined based on the location/locations proposed. Note that proposed location/locations must be within 75 miles from Bakersfield, Fresno, Sacramento, San Francisco, Stockton, Morgan Hill, or Redding cities to maximize transportation and manpower efficiencies.

The Contractor shall assign, at a minimum, two-person teams of transportation officers, with at least one officer being a female, whenever necessary throughout a 24-hour period, 7 days a week, including weekends and holidays.

Transportation Routes
Estimated needs include, but are not limited to, transportation to/from proposed facility and nearby sub office(s).

“Based upon the establishment of an up to 1,150 bed facility/facilities, at 90% capacity, located within 75 miles of the cities described above and in Section F of the Solicitation, ERO estimates, in accordance with the attached route list, that the offeror will provide detainee transportation for approximately 117,757 – 118,069 miles per year within the SFR AOR. This projection is based on an estimated facility location, an evaluation on the trip types and locations within the AOR (e.g. airports, other facilities, hospitals), as well as data from the national average number, duration, and length of trips. This mileage estimate is also based on the movement of an estimated 175 - 200 detainees per month. This information shall not constitute a guaranteed minimum number of beds, detainees nor miles, nor shall it constitute a maximum number of miles required under any forthcoming contract.”

For estimate purposes only as outlined above :

Note this estimate is only as a reference and shall not constitute a minimum or maximum under any forthcoming contract.

Any transportation routes will need to be finalized once facility/facilities location(s) have been determined.

Transportation Guaranteed Minimum mileage
N/A

Guard Services

Minimum Hours

Required postings/patrols

Training

The Contractor shall submit a training forecast and lesson plans to the COR or ICE designee at least 30 days prior to all training.

DTS Contractor

ICE DTS Contractor Information:

DTS

Talton Communications 910 Ravenwood Dr.

Selma, AL 36701

Robin Hall Mike Oslund Customer Relations Manager Operations Manager

(334) 375-7842 (334) 375-4200 robin@taltoncommunications.com michael@taltoncommunications.com image1.png image2.png

File details come from the government source that posted it. Updated .