52.212-2.docx
FAR Clause DOCX document 21 KB Posted
- Attached to
- Boiler Vessel Integrity Inspection
- Solicitation number
- FA460024Q0009
About this file
This solicitation is for a boiler vessel integrity inspection and related work. The scope of work involves removing jacketing and insulation from Boiler 3, cleaning the vessel surface, performing NDT/NDE testing to verify structural integrity, and if satisfactory, replacing the insulation and jacketing and returning the boiler to operational service after combustion and safety inspections. The contractor must provide a proposal split into two conditional portions according to the work scope. The solicitation is issued by the Department of the Air Force Air Combat Command.
View the file
Other versions and copies of FAR 52.212-2
Show all 20
Who attaches FAR 52.212-2
Other files
| File | Type | Posted |
|---|---|---|
| BOILER SERVICE QUESTIONS AND ANSWERS.docx | DOCX document | |
| Superior Boiler Seminole 6-X-750 150 PSI.pdf | ||
| PWS B304 Boiler 3 vessel integrity NEW.docx | DOCX document | |
| Site Visit MFR.pdf | ||
| NCIC Screening and Pass Request.pdf | ||
| FA460024Q0009 Combo Solicitation.pdf | ||
| PWS Boiler 3 Vessel Integrity.docx | DOCX document | |
| SCA Wage Determination.pdf | ||
| 52.212-1.docx | DOCX document | |
| FA460024Q0009 Combo Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
52.212-2 Evaluation-Commercial Products and Commercial Services. Nov 2021 Evaluation-Commercial Products and Commercial Services (Nov 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(1) Technical Acceptability: The Vendor shall submit a plan describing how they will meet the requirements outlined in the Performance Work Statement (PWS). The Vendor shall demonstrate that they can provide all content within the PWS.
Quotes will be evaluated to be technically acceptable or not technically acceptable based on the evaluation factors listed above.
(2) Price: Initially: The quotations will be ranked according to their total evaluated price (TEP) as identified by contract line-item total pricing. Vendors will also be evaluated on their past performances either with the government or other entities, with requirements of similar nature. The Government will evaluate offers for award purposes by adding the total price for all CLINs for the required period of performance.
The offeror's price quotation will be evaluated using one or more of the procedures and techniques defined in FAR 13.106-2 and FAR 13.106-3 in order to determine price reasonableness. For a price to be reasonable, it must represent a price that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through competitive quotations as described in FAR 13.106-3.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)