Boiler Vessel Integrity Inspection
Closed Solicitation Posted
- Solicitation number
- FA460024Q0009
- Agency
-
Air Combat Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Offutt AFB, Nebraska 68113, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for boiler vessel integrity inspection services for Boiler 3 located at an Air Force facility. The scope of work involves removing jacketing and insulation from the boiler, cleaning and testing the vessel to verify structural integrity, and replacing insulation and returning the boiler to operational service if it passes inspection. Offerors must provide pricing split into two conditional scenarios according to the performance work statement. Proposals are due by March 14, 2024. The soliciting agency is the Department of the Air Force Air Combat Command.
This opportunity is set aside for total small business concerns. The primary NAICS code is 238210 and PSC code R499. The place of performance is Offutt AFB, NE. Offerors must complete work within one calendar month, with potential extensions for delays beyond contractor control. The boiler vessel is approximately 181.5 inches long and 73 inches in diameter, currently insulated with mineral wool and fiberglass per OEM specifications.
Notice text
5 versions
Update #5 · Latest ·
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 AM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0003***
This amendment is to incorporate the Questions and Answers as well as a visual description of the boiler, and to remove the Site Visit MFR and NCIC Screening and Pass Request from the current version of this solicitaiton. Amendment date 7 March 2024.
***AMENDMENT 0002***
This amendment is to incorporate additional requirements in the Performance Work Statement (PWS). Please see the PWS for additional information. Amendment date 29 February 2024.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.
Update #4 ·
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 AM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0002***
This amendment is to incorporate additional requirements in the Performance Work Statement (PWS). Please see the PWS for additional information. Amendment date 29 February 2024.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.
Update #3 ·
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 AM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil
Update #2 ·
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 PM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil
Update #1 ·
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Files
| File | Type | Posted |
|---|---|---|
| BOILER SERVICE QUESTIONS AND ANSWERS.docx | DOCX document | |
| Superior Boiler Seminole 6-X-750 150 PSI.pdf | ||
| PWS B304 Boiler 3 vessel integrity NEW.docx | DOCX document | |
| Site Visit MFR.pdf | ||
| NCIC Screening and Pass Request.pdf | ||
| FA460024Q0009 Combo Solicitation.pdf | ||
| SCA Wage Determination.pdf | ||
| PWS Boiler 3 Vessel Integrity.docx | DOCX document | |
| 52.212-2.docx | DOCX document | |
| 52.212-1.docx | DOCX document | |
| FA460024Q0009 Combo Solicitation.pdf |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Boiler Maintenance | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business | |
| J045--FY27 Boilers Maintenance & Testing | Veterans Integrated Service Network 8 | Service-Disabled Veteran-Owned Small Business | |
| White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years (offers are now due on 11/13/2026) | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business | |
| Nitrogen piping replacement for plasma spray booth | Air Force Sustainment Center | Total Small Business | |
| Nitrogen Piping Replacement for Plasma Spray Booth | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity