Boiler Vessel Integrity Inspection

Closed Solicitation Posted

Solicitation number
FA460024Q0009
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Offutt AFB, Nebraska 68113, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for boiler vessel integrity inspection services for Boiler 3 located at an Air Force facility. The scope of work involves removing jacketing and insulation from the boiler, cleaning and testing the vessel to verify structural integrity, and replacing insulation and returning the boiler to operational service if it passes inspection. Offerors must provide pricing split into two conditional scenarios according to the performance work statement. Proposals are due by March 14, 2024. The soliciting agency is the Department of the Air Force Air Combat Command.

This opportunity is set aside for total small business concerns. The primary NAICS code is 238210 and PSC code R499. The place of performance is Offutt AFB, NE. Offerors must complete work within one calendar month, with potential extensions for delays beyond contractor control. The boiler vessel is approximately 181.5 inches long and 73 inches in diameter, currently insulated with mineral wool and fiberglass per OEM specifications.

Notice text

5 versions

Update #5 · Latest ·

The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario.  See Performance Work Statement (PWS) for additional information.

Technical questions are due by 6 March 2024 by 11:00 AM CST.

Answers to questions will be available by 8 March 2024 at 11:00 AM CST.

Quotations are due by 14 March 2024 at 11:00 AM CST.

***AMENDMENT 0003***

This amendment is to incorporate the Questions and Answers as well as a visual description of the boiler, and to remove the Site Visit MFR and NCIC Screening and Pass Request from the current version of this solicitaiton.  Amendment date 7 March 2024.

***AMENDMENT 0002***

This amendment is to incorporate additional requirements in the Performance Work Statement (PWS).  Please see the PWS for additional information.  Amendment date 29 February 2024.

***AMENDMENT 0001***

A site visit is being incorporated.  The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304.  Refer to Page 1 of "FA460024Q0009 Combo Solicitation".  For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.

Update #4 ·

The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario.  See Performance Work Statement (PWS) for additional information.

Technical questions are due by 6 March 2024 by 11:00 AM CST.

Answers to questions will be available by 8 March 2024 at 11:00 AM CST.

Quotations are due by 14 March 2024 at 11:00 AM CST.

***AMENDMENT 0002***

This amendment is to incorporate additional requirements in the Performance Work Statement (PWS).  Please see the PWS for additional information.  Amendment date 29 February 2024.

***AMENDMENT 0001***

A site visit is being incorporated.  The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304.  Refer to Page 1 of "FA460024Q0009 Combo Solicitation".  For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.

Update #3 ·

The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario.  See Performance Work Statement (PWS) for additional information.

Technical questions are due by 6 March 2024 by 11:00 AM CST.

Answers to questions will be available by 8 March 2024 at 11:00 AM CST.

Quotations are due by 14 March 2024 at 11:00 AM CST.

***AMENDMENT 0001***

A site visit is being incorporated.  The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304.  Refer to Page 1 of "FA460024Q0009 Combo Solicitation".  For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil

Update #2 ·

The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario.  See Performance Work Statement (PWS) for additional information.

Technical questions are due by 6 March 2024 by 11:00 AM CST.

Answers to questions will be available by 8 March 2024 at 11:00 PM CST.

Quotations are due by 14 March 2024 at 11:00 AM CST.

***AMENDMENT 0001***

A site visit is being incorporated.  The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304.  Refer to Page 1 of "FA460024Q0009 Combo Solicitation".  For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil

Update #1 ·

The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario.  See Performance Work Statement (PWS) for additional information.

Files

File Type Posted
BOILER SERVICE QUESTIONS AND ANSWERS.docx DOCX document
Superior Boiler Seminole 6-X-750 150 PSI.pdf PDF
PWS B304 Boiler 3 vessel integrity NEW.docx DOCX document
Site Visit MFR.pdf PDF
NCIC Screening and Pass Request.pdf PDF
FA460024Q0009 Combo Solicitation.pdf PDF
SCA Wage Determination.pdf PDF
PWS Boiler 3 Vessel Integrity.docx DOCX document
52.212-2.docx DOCX document
52.212-1.docx DOCX document
FA460024Q0009 Combo Solicitation.pdf PDF
Show all 11

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Boiler Maintenance Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Gas Line Repair Offutt AFB, Nebraska 68113, United States · NAICS 23712 Air Combat Command Total Small Business
J045--Annual Boiler Maintenance RMR VAMC Department of Veterans Affairs Rocky Mountain Regional Vamc Aurora CO 80045, United States · NAICS 238220 Veterans Integrated Service Network 19 No set-aside
J041--Building 2 Steam Station Replacement West Haven Vamc West Haven CT 06516 · NAICS 238220 Veterans Integrated Service Network 1 Service-Disabled Veteran-Owned Small Business
As-39 turbines open and inspect NAICS 811310 Military Sealift Command Total Small Business