BOILER SERVICE QUESTIONS AND ANSWERS.docx
DOCX document 15 KB Posted
- Attached to
- Boiler Vessel Integrity Inspection
- Solicitation number
- FA460024Q0009
About this file
This document provides questions and answers regarding a boiler service scope of work for a federal agency. The period of performance is one calendar month, with potential extensions for delays outside the contractor's control. The boiler vessel is approximately 181.5 inches long and 73 inches in outer diameter. It currently has a hard mineral wool/fiberglass insulation and jacketing per the original equipment manufacturer's specifications. Photographs of the boiler are unavailable, but supplemental documentation is provided.
The related federal contract opportunity is soliciting proposals to remove insulation and jacketing from Boiler 3, perform non-destructive testing to verify the structural integrity of the vessel, and replace the insulation and jacketing if integrity is confirmed. The scope also includes combustion tuning and inspections upon reassembly. Offerors are to submit pricing for the work in two conditional phases. The soliciting agency is the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Superior Boiler Seminole 6-X-750 150 PSI.pdf | ||
| PWS B304 Boiler 3 vessel integrity NEW.docx | DOCX document | |
| Site Visit MFR.pdf | ||
| NCIC Screening and Pass Request.pdf | ||
| FA460024Q0009 Combo Solicitation.pdf | ||
| PWS Boiler 3 Vessel Integrity.docx | DOCX document | |
| 52.212-2.docx | DOCX document | |
| SCA Wage Determination.pdf | ||
| 52.212-1.docx | DOCX document | |
| FA460024Q0009 Combo Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOILER SERVICE QUESTIONS AND ANSWERS
1. What is the Period of Performance (PoP) for this job scope?
Answer - The Period of Performance is one calendar month. Extensions can be accommodated if necessity is proven (lead times for parts, unexpected issues beyond contractor or government control, etc.).
2. If additional work is required, what type of insulation is required?
Answer - Insulation replaced on the boiler and/or piping connected to the boiler shall be like-for-like to the existing insulation (OEM mfg requirements for boiler and industry standard for pipe size/type and medium type).
3. What is the length and OD of this boiler vessel?
Answer - Length ~ 181.5”, OD ~73”. This includes the jacketing. Please refer to the attached drawing on the SAM.gov solicitation page for more information.
4. What kind of insulation is currently on the boiler vessel?
Answer - Hard jacketing and mineral wool/fiberglass liner inside jacketing, per OEM mfg spec.
5. Can you share some pics of the boiler vessel with us?
Answer - The government is currently unable to provide photographs of the boiler. Please refer to the attached “Superior Boiler Seminole 6-X-750 150 PSI” document on the SAM.gov solicitation page for more information.