Pricing Proposal Form 2022 xx xx.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 47PH0818R0004
About this file
This document contains a solicitation for an indefinite delivery indefinite quantity construction contract opportunity with the General Services Administration. The solicitation seeks proposals for multiple-award IDIQ task order contracts for construction, repair, alteration, design-build, and incidental abatement services within counties and parishes in Arkansas, Louisiana, New Mexico, Oklahoma, and Texas. Services will be for repair and construction of government-owned and leased facilities. The contract has a one-year base period and four one-year options, for a potential five-year period of performance. Awards will be made to small businesses and contracts are set aside exclusively for small business concerns. Evaluation factors include past performance and hypothetical projects, with technical factors significantly more important than price. The solicitation requests pricing coefficients to be applied to RSMeans pricing divisions for projects up to $3,500 and above that threshold.
View the file
Other files
Show 40 more
Latest 50 of 338 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SOLICITATION NUMBER 47PH0818R0004 | PRICING PROPOSAL FORM | ||||
| OFFEROR | Point of Contact: | Border McAllen Zone | |||
| Company: | Phone Number: | Austin Zone | |||
| UEID: | Zone: | Louisiana | |||
| All blanks are required for all offerors, regardless |
of project pool:
| PRICING COEFFICIENTS: | Projects proposed | Projects proposed | ||
| to be valued | to be valued | |||
| Provide RSMeans coeffiecients to be applied to each division, up to two decimal places. | from $3500 to SAT* | above SAT* at the | ||
| at time of RFP issuance | time of RFP issuance | |||
| DIVISION XX: EXAMPLE ONLY | x.xx | x.xx | ||
| DIVISION ZZ: EXAMPLE ONLY | x.xx | x.xx | ||
| DIVISION 01: GENERAL REQUIREMENTS | ||||
| DIVISION 02: EXISTING CONDITIONS | ||||
| DIVISION 03: CONCRETE | ||||
| DIVISION 04: MASONRY | ||||
| DIVISION 05: METALS | ||||
| DIVISION 06: WOOD, PLASTICS, & COMPOSITES | ||||
| DIVISION 07: THERMAL AND MOISTURE PROTECTION | ||||
| DIVISION 08: OPENINGS | ||||
| DIVISION 09: FINISHES | ||||
| DIVISION 10: SPECIALITIES | ||||
| DIVISION 11: EQUIPMENT | ||||
| DIVISION 12: FURNISHINGS | ||||
| DIVISION 13: SPECIAL CONSTRUCTION | ||||
| DIVISION 14: CONVEYING EQUIPMENT | ||||
| DIVISION 21: FIRE SUPPRESSION | ||||
| DIVISION 22: PLUMBING | ||||
| DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIONING | ||||
| DIVISION 25: INTEGRATED AUTOMATION | ||||
| DIVISION 26: ELECTRICAL | ||||
| DIVISION 27: COMMUNICATIONS | ||||
| DIVISION 28: ELECTRONICS, SAFETY AND SECURITY | ||||
| DIVISION 31: EARTHWORK | ||||
| DIVISION 32: EXTERIOR IMPROVEMENTS | ||||
| DIVISION 33: UTILITIES | ||||
| DIVISION 34: TRANSPORTATION | ||||
| DIVISION 41: MATERIAL PROCESSING AND HANDLING EQUIPMENT | ||||
| DIVISION 42: PROCESS HEATING, COOLING, AND DRYING EQUIPMENT | ||||
| DIVISION 44: POLLUTION CONTROL EQUIPMENT | ||||
| DIVISION 46: WATER AND WASTEWATER EQUIPMENT | ||||
| Other Than Normal Working Hours (OTNWH) rate |
| Provide one RSMeans coefficient to be applied to the total for projects proposed to be valued at equal to or less than $3500, up to two decimal places. |
| COEFFICIENT FOR TOTAL PROJECT, Projects equal to or less than $3500 |
| * SAT: Simplified Acquisition Threshold |
| Note: Negotiated factors will be applicable during the entire duration of the contract, using the RSMeans prices as of the date of Task Order RFP issuance, for the zip code of the project location, for task orders and task order modifications, when the initial Task Order RFP is limited to contractors in the primary zone. |
Divisonal RSMeans coefficient factors, and the single factor for projects proposed to be less than or equal to $3,500, must include all markups, indirect costs, profit, and overhead for both the General and Subcontractors by division factor. General Contractor overhead and profit shall not be listed as separate line items for task order proposals under this contract. Badging costs are considered overhead. Separate subcontractor markup, indirect costs, profit, or overhead within task order proposals will not be allowed.
Divisional coefficient factors and the single factor for projects proposed to be less than or equal to $3,500 should be applied to RSMeans Bare Cost pricing, not RSMeans with O&P already applied.
The Other Than Normal Working Hours (OTNWH) rate should be applied only to the value of labor hours which are proposed to be accomplished outside of normal business hours as stated/required in the task order Statement of Work. This rate will be applied after the labor value has already been burdened via the divisional coefficient factors or the single factor for projects proposed to be less than or equal to $3,500. The OTNWH rate itself does not include again the overhead, profit, or other indirect costs that are already covered by the divisional coefficient factors or the single factor for projects proposed to be less than or equal to $3,500, but can include indirect costs and profit on the OTNWH increase itself.