This scope of work document outlines requirements for an initial space alteration project to renovate office space in a federal building located in New Orleans, Louisiana. The contractor will provide all labor, materials, and equipment to complete tasks including installing power, phone, and data outlets for modular furniture. Submittals such as a project schedule, waste diversion plan, and green purchasing list are required from offerors. Work must be completed within specified durations after notice to proceed and liquidated damages will apply for delays. The project falls under normal business hours and the contracting officer is the sole authority to issue notice to proceed.
The federal contract opportunity posting is a solicitation for multiple award indefinite-delivery indefinite-quantity construction contracts for General Services Administration Region 7 covering facilities in Arkansas, Louisiana, New Mexico, Oklahoma, and Texas. The contracts have a maximum value of $5 million annually and will provide general construction, repair, alteration, and incidental abatement services. Offerors will be evaluated on past performance and responses to hypothetical project scenarios. The Government intends to award up to six contracts per geographic zone through 2021 with options to extend through 2025.
View the file
Other files
Show 40 more
Latest 50 of 338 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
Public Buildings Service
Greater Southwest Region
1.
2.
3.
4.
5.
6.
Statement of Work Hypothetical Project B
Project Title: Initial Space Alteration (ISA) for Federal Agency
Project Location:
Hypothetical Federal Building 123 Hypothetical Street
New Orleans, LA 70130 1st Floor Room
Building Location Hours: All work is to be performed during normal working hours.
Normal working hours for this building are from 8:00AM to 5:00PM, Monday through Friday, except for Federal holidays.
Purpose: This project is to renovate and prepare the location for offices. Work consists of interior finishes, doors, windows, power, phone and data for modular furniture.
Points of Contact:
5.1 Contracting Officer (CO): Hypothetical GSA Contracting Officer
5.2 Project Manager (PM): Hypothetical GSA Project Manager
5.3 Contracting Officer Representative (COR): Hypothetical GSA COR
Notice to Proceed:
6.1 The Contracting Officer is the ONLY individual from the Government that can give the contractor a Notice To Proceed (NTP).
6.2 Before any of the work within the scope of the contract is started, the Contractor shall confer with the COR (Contracting Officer Representative) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications; and the location partitions, eating spaces for spaces for Contractor’s employees and the like.
6.3 After a NTP is given, the Contractor shall provide the schedule for the project within
7 days. Note: for this hypothetical project and IDIQ proposal, the schedule is required at the time the proposal is submitted. This schedule must be submitted in GANTT or CPM format.
Greater Southwest Region
7. Period of Performance: Notice to Proceed (NTP) will be issued no later than 45 calendar days after date of Task Order award. Substantial Completion shall be achieved no later than 30 calendar days after date of NTP. Project Completion shall be achieved no later than 14 calendar days after date of Substantial Completion.
8. Description of Work: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined in contractor documents. Construction shall be accomplished per the attached drawing A 1 01. Work consists of renovating existing space on the fourth floor of the Hypothetical Federal Building. Modular furniture will be installed by the Agency under a separate contract. Contractor shall provide and install power, phone and data for the furniture install: (3 each) ¾” EMT 50 LF, with 90’s; #12 THHN copper, outlet boxes, 6’of ¾: flexible metal conduit with box connectors. Modular furniture requires three (3) whip connections and three (3) 30 amp circuits. Furniture layout on A 1 01 is only for example purposes. Project on-site supervision will be commensurate with the complexity of work.
9. Liquidated Damages: $96.00 per day
10. Sustainability:
10.1 Green Purchasing: See attachment 1: green purchasing requirements
10.2 Waste Diversion: Note: for this hypothetical project and IDIQ proposal, see
Attachment 2. Fourteen days from Notice to Proceed, the Contractor shall submit to the Project Manager an updated Non-Hazardous Solid Waste Management Plan attachment 2: Waste Diversion Plan, to include (not limited to):
a) List of materials Contractor will reuse
b) List of materials the Contractor will donate and name and address of donation recipient.
c) List of materials the Contractor will recycle and the name and address of the recycler. If Contractor receives recycling revenue, Contractor shall keep revenue and provide receipt for GSA for reference.
d) Name and location of solid waste landfill for non-diverted material.
11. Other Requirements: Note: This section does not require any action for this hypothetical project.
11.1 All on-site workers shall have an active HSPD-12 security clearance.
11.2 Use of the loading dock shall be coordinated with the GSA Property Manager.
11.3 Use of the service elevator shall be coordinated with the GSA Property Manager.
12. Submittals:
12.1 Project Schedule including all required inspections. Note: for this hypothetical project and IDIQ proposal, a project schedule is required at the time the proposal is submitted. Schedule must be in GANTT or CPM format.
12.2 Waste Diversion Submittal: Pre-construction Note: for this hypothetical project and IDIQ proposal, a partial waste diversion plan is required at the time the proposal is submitted, using Attachment 2 to indicate which categories will be tracked. No weights or methods or separate written plan are required for this hypothetical project’s proposal.
12.3 Waste Diversion Submittal: Post-construction Note: for this hypothetical project and IDIQ proposal, a post-construction waste diversion submittal is not required.
12.4 Green Purchasing items Note: for this hypothetical project and IDIQ proposal, a draft green purchasing submittal is required. Provide a list of the items from Attachment 1 which are involved in this hypothetical project.
12.5 As Built Drawings Note: for this hypothetical project and IDIQ proposal, as-built drawings are not required.
12.6 Product Data, Color and Material Samples & Shop Drawings for:
12.6.1 Resilient Wall Base- product data & samples
12.6.2 Carpet & Pad- product data & samples
12.6.3 Paint- product data & mockup
12.6.4 Wood doors, frames and finish hardware- shop drawings, product data & finish samples
12.6.5 Horizontal Blinds- product data & samples
12.6.6 Transaction window- shop drawings
Note: for this hypothetical project and IDIQ proposal, product data/samples/shop drawings are not required.
13. Attachments: The following items will become part of the Scope of Work.
13.1 Attachment 1: Green Purchasing
13.2 Attachment 2: Waste Diversion Plan
13.3 Drawing Sheet A101.
14. Closeout Plan: Note: This section does not require any action for this hypothetical project.
14.1 Customer Acceptance Letter.
14.2 Final Punch list complete.
14.3 Financial Closeout.
Attachment 1, Project B: Green Purchasing
Sustainability:
● Green Purchasing:
o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.
o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.
a) Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.
b) Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e. SCAQMD Rule 1113 standard).
c) Gypsum Board: Greenguard Gold Standard.
d) Acoustical Ceiling Tiles: Meets California Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and Environmental Product Declaration (EPD) available.
e) Concrete (ready-mix and site-mix): > 15% fly ash or > 25% ground granulated blast-furnace (GGBF) slag
A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.
B. If the KSP materials listed above are 1) not reasonably available within a reasonable period of time; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.
Note: for this hypothetical project and IDIQ proposal, a draft green purchasing submittal is required. Provide a list of the items from Attachment 1 above which are involved in this hypothetical project.
Attachment 2 Project B: Waste Diversion Plan
1. Submittal Type: Pre-Construction or Final (Circle Appropriate Type)
2. ePM Number: __Hypothetical ePM Number XXXXXXXX____
3. Field Office: Circle Appropriate Field Office: (Oklahoma City, Tulsa, New Mexico, Little Rock, Shreveport, Tyler, New Orleans, Baton Rouge, Dallas, Fort Worth, Lubbock, Houston, Austin, San Antonio, McAllen, El Paso)
4. GSA Project Manager: ___Hypothetical GSA Project Manager______
5. Contract Number:_______Hypothetical Contract Number XXXXXXXXXX____
6. Categories to Track: (Circle)
6.1 Carpet: (rolled or tiled) Weight(lbs):_____ Recover Method:___________
6.2 Architectural:(doors,windows,frames,millwork) Weight(lbs):_____ Recover Method:___________
6.3 Ferrous Metals: (structural steel, studs, rebar) Weight(lbs):_____ Recover Method:___________
6.4 Non-Ferrous: (wire, piping, duct) Weight(lbs):_____ Recover Method:___________
6.5 Aggregate: (concrete,brick,blocks) Weight(lbs):_____ Recover Method:___________
6.6 Plumbing Fixtures: (sinks,toilets,urinals) Weight(lbs):_____ Recover Method:___________
6.7 Furniture: (Systems, casual, equip.) Weight(lbs):_____ Recover Method:___________
6.8 Ceiling/Wall: (gypsum, tiles) Weight(lbs):_____ Recover Method:___________
6.9 Roofing: (Shingles, Paper, membrane) Weight(lbs):_____ Recover Method:___________
7. Landfill Hauler:___________________
8. Landfill Waste:____________________
Note: for this hypothetical project and IDIQ proposal, a partial Waste Diversion Plan is required at the time the proposal is submitted, using this attachment to indicate which categories will be tracked. No weights, methods, or landfill information is required for this hypothetical project’s proposal, and no separate written plan is required.
Please circle the categories above which will be tracked under this hypothetical project.
File details come from the government source that posted it. Updated .