Hypothetical Project A SOW 2019 09 20.pdf
PDF 168 KB Posted
- Solicitation number
- 47PH0818R0004
About this file
This statement of work outlines requirements for a renovation project involving two judges' chambers at a federal courthouse. The project includes demolition of existing finishes and fixtures as well as installation of new flooring, casework, lighting, and other items. Renovations will include new resilient flooring and wall base in copy rooms, mini blinds, draperies, bookshelves, cabinets, countertops, carpeting, and fresh coats of paint. Mechanical work involves new electrical outlets for appliances, relocation of devices, and plumbing for dishwashers. The schedule requires substantial completion within 60 days of notice to proceed.
This multiple award task order contract solicitation seeks proposals for construction, repair, alteration, design-build, and abatement services across counties in five states. The small business set-aside contract has a one year base and four one year options, not to exceed five years total. Task orders will range from $2,000 to $3.5 million and the maximum order is $5 million annually per zone. Evaluation factors are past performance and hypothetical projects, with award to up to six contractors per zone providing best value. The pre-proposal conference date and submission deadline are stated in the solicitation, which is available electronically with amendments posted online.
View the file
Other files
Show 40 more
Latest 50 of 338 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
Public Buildings Service
Greater Southwest Region
Statement of Work Hypothetical Project A
1. Project Title: Judges’ Chambers Renovations
2. Project Location: Hypothetical Federal Courthouse 123 Hypothetical Street
Austin, TX 78701 6th Floor Judges’ Chambers
3. Building Location Hours: All work is to be performed during normal working hours.
Normal working hours for this building are from 8:00AM to 5:00PM, Monday through Friday, except for Federal holidays.
4. Purpose: This project is the renovation to two (2) United States District Court (USDC) Judge’s Chambers (610 & 690) on the 6th floor. This project work area is within space designated as historically sensitive. Protection is required for the murals in Rooms B625 and A624.
5. Points of Contact:
5.1 Contracting Officer (CO): Hypothetical GSA Contracting Officer
5.2 Project Manager (PM): Hypothetical GSA Project Manager
5.3 Contracting Officer Representative (COR): Hypothetical GSA COR
6. Notice to Proceed:
6.1 The Contracting Officer is the ONLY individual from the Government that can give the Contractor a Notice to Proceed (NTP).
6.2 Before any of the work within the scope of the contract is started, the Contractor shall confer with the Contracting Officer’s Representative (COR) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications; the locations of temporary partitions; eating spaces and other spaces for Contractor’s employees.
6.3 After a NTP is given, the Contractor shall provide the schedule for the project within seven (7) days. Note: for this hypothetical project and IDIQ proposal, the schedule is required at the time the proposal is submitted. This schedule must be submitted in GANTT or CPM format.
Greater Southwest Region
7. Period of Performance: For the purpose of this solicitation, Notice to Proceed (NTP) will be issued no later than 45 calendar days after date of Task Order Award. Substantial Completion shall be achieved no later than 60 calendar days after the date of NTP.
Project Completion shall be achieved no later than 14 calendar days after date of Substantial Completion.
8. Description of Work: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined in Contract documents.
8.1 General Notes
8.1.1 Protect adjacent historic building elements including walls, doors and floors, as required. Provide a quality control plan as a submittal prior to commencement of work. Note: for this hypothetical project and IDIQ proposal, a quality control plan submittal is not required.
8.1.2 Existing framing is light gauge non-structural metal.
8.1.3 Ceiling heights are 9’-0”
8.1.4 The floor substrate is concrete fill on steel decking.
8.1.5 Ceiling throughout is 2x2 suspended acoustic tile
8.1.6 Assume electrical closet is outside the work area adjacent to the space and is the origination point for electrical devices, and that J-hooks should be included.
8.1.7 Satin wire is to be used for all casework pulls.
8.2 Suite 690
8.2.1 Demolition
8.2.1.1 Demo VCT flooring and resilient wall base in Galley/Copy Room.
8.2.1.2 Remove six (6) granite door thresholds and salvage.
8.2.1.3 Remove and salvage for recycling wood wall base in preparation for installation of new full-height bookshelves in Hallway.
8.2.1.4 Demo sheer and ornamental curtains in Judge’s chamber.
8.2.1.5 Demo 22 existing horizontal mini-blinds along suite perimeter.
8.2.1.6 Demo all broadloom carpet and pad.
8.2.2 Renovation:
8.2.2.1 Provide twenty-two (22) 1” aluminum horizontal mini-blinds (11 @ 2’-10 x 3’-0” tall, 11 @ 2’10” x 4’-0” tall), inset into bottom and middle rows of storefront system (leave top row open) in Conference Room.
8.2.2.2 Provide twenty-two (22) 3’-0” x 9’-0” 1” aluminum horizontal full-height mini-blinds, surface mounted to storefront/ceiling along suite perimeter
8.2.2.3 Provide 9’-2” tall pleated sheer curtains and ornamental drapes in Judge’s Chamber.
8.2.2.4 Provide 4” x 0.125” resilient cove wall base in Galley/Copy Room.
8.2.2.5 Provide 4” x 36” LVT flooring in Galley/Copy Room. Basis of design is
Mannington Commercial Spacia - Bleached Elm SS5W2516.
8.2.2.6 Provide five (5) stained & sealed oak door thresholds to match door frame width, adhered.
8.2.2.7 Provide a surface mounted plastic laminate 3-door medicine cabinet (approx. 6” deep x 24” wide x 24” tall) in restroom.
8.2.2.8 Relocate coat hook in Judge’s Robing Room.
8.2.2.9 Provide stained & sealed 1” x 12” wood shelf 12” above existing wood shelf in Judge’s Robing Room. Cut and remove 1/2 of steel clothes rod to allow for refrigerator (NIC).
8.2.2.10 Provide plastic laminate wall-mounted microwave shelf in Galley/Copy Room to match existing casework.
8.2.2.11 Provide 12’-9” L.F. plastic laminate upper cabinets in Galley/Copy Room over existing base cabinet, to match existing.
8.2.2.12 Provide 4’-6” L.F. plastic laminate base cabinets and countertop in Galley/Copy Room, to match existing.
8.2.2.13 Provide 30” stained & sealed cherry veneer adjustable full-height (9’-0”) book shelves in entry hallway of suite.
8.2.2.14 Patch / repair / refinish existing wood baseboard throughout suite.
Approximate total length is 350 L.F.
8.2.2.15 Provide 42 oz plush broadloom nylon carpet and pad in areas where carpet was removed. Level A
8.2.2.16 Provide 3 coat, zero VOC, latex, roller-applied smooth-finish paint throughout suite.
8.2.2.17 Install Gov’t. furnished dishwasher.
8.2.3 Mechanical / Electrical / Comm / Security:
8.2.3.1 Provide dishwasher plumbing connections in existing casework opening adjacent to sink. Include dishwasher drain pipe; sink drain with dishwasher connection; dual outlet angle stop to hot water sink supply with 10’ of ⅜” copper tubing with connectors.
8.2.3.2 Provide one (1) GFCI duplex receptacle (not shown on plans) under countertop for dishwasher. 70 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 15 amp breaker, 220 LF
8.2.3.3 Provide one (1) GFCI duplex receptacle at shelf for microwave.One (1) 20 amp outlet, #10THHN 165 LF; 50 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 20 amp breaker,
8.2.3.4 Provide one (1) 20A dedicated duplex receptacle and dual voice/data outlet for copier in Galley/Copy Room.One (1) 20 amp outlet, #10THHN 250 LF; Cat 5e plenum rated, 250’; 80 LF ¾” conduit, one (1) receptacle box,one Combo 20amp outlet/ RJ49 jack; one (1) 20 amp breaker, Leave drop in data room for agency IT to connect.
8.2.3.5 Provide one (1) duplex receptacle for refrigerator (NIC) in Judge’s Robing Room. 15A duplex receptacle, 50 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 15 amp breaker, 165 LF
#12THHN
8.2.3.6 See drawing D101 and E101 for providing/relocating existing power, data and telecomm as required to accommodate furniture layouts.
Assume relocation of 5 terminals; 20 ft each.
8.2.3.7 Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator in Galley for future ice-maker. Route water line inside partitions.
8.2.3.8 No work anticipated to Fire Suppression systems.
8.3 Suite 610
8.3.1 Demolition
8.3.1.1 Demo VCT flooring and resilient wall base in Galley/Copy Room.
8.3.1.2 Remove and salvage wood wall base in preparation for installation of new full-height bookshelves in Hallway.
8.3.1.3 Demo sheer and ornamental curtains in Judge’s Chamber.
8.3.1.4 Demo 22 existing horizontal mini-blinds along suite perimeter.
8.3.1.5 Demo all broadloom carpet and pad.
8.3.2 Renovation:
8.3.2.1 Provide twenty-two (22) 1” aluminum horizontal mini-blinds (11 @ 2’-10 x 3’-0” tall, 11 @ 2’10” x 4’-0” tall), inset into bottom and middle rows of storefront system (leave top row open) in Conference Room.
8.3.2.2 Provide twenty-two (22) 3’-0” x 9’-0” 1” aluminum horizontal full-height mini-blinds, surface mounted to storefront/ceiling along suite perimeter
8.3.2.3 Provide 9’-2” tall pleated sheer curtains and ornamental drapes in Judge’s Chamber.
8.3.2.4 Provide 4” x 0.125” resilient cove wall base in Galley/Copy Room.
8.3.2.5 Provide 4” x 36” LVT flooring in Galley/Copy Room. Basis of design is
Mannington Commercial Spacia - Bleached Elm SS5W2516.
8.3.2.6 Provide a surface mounted plastic laminate 3-door medicine cabinet
(approx. 6” deep x 24” wide x 24” tall) in restroom.
8.3.2.7 Relocate Paper Towel Dispenser above Waste Receptacle in Judge’s
Restroom.
8.3.2.8 Provide stained & sealed 1” x 12” wood shelf 12” above existing wood shelf in Judge’s closet (B602). Cut and remove 1/2 of steel clothes rod to allow for refrigerator (NIC).
8.3.2.9 Provide plastic laminate wall-mounted microwave shelf in Galley/Copy Room to match existing casework.
8.3.2.10 Provide custom wall-mounted plastic laminate coffee mug rack in Galley/Copy Room.
8.3.2.11 Provide 12’-9” L.F. plastic laminate upper cabinets in Galley/Copy Room over existing base cabinet, to match existing.
8.3.2.12 Provide 4’-6” L.F. plastic laminate base cabinets and countertop in Galley/Copy Room, to match existing.
8.3.2.13 Provide 30” stained & sealed cherry veneer adjustable full-height (9’-0”) bookshelves in entry hallway of suite.
8.3.2.14 Patch / repair / refinish existing wood baseboard throughout suite.
Approximate total length is 350 L.F.
8.3.2.15 Provide 42 oz plush broadloom nylon carpet and pad in areas where carpet was removed. Level A
8.3.2.16 Provide 3 coat, zero VOC, latex, roller-applied smooth-finish paint throughout suite.
8.3.2.17 Install Gov’t. furnished dishwasher.
8.3.3 Mechanical / Electrical / Comm / Security:
8.3.3.1 Provide dishwasher plumbing connections in existing casework opening adjacent to sink. Include dishwasher drain pipe; sink drain with dishwasher connection; dual outlet angle stop to hot water sink supply with 10’ of ⅜” copper tubing with connectors.
8.3.3.2 Provide one (1) GFCI duplex receptacle under countertop for dishwasher.70 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 15 amp breaker, 220 LF #12THHN
8.3.3.3 Provide one (1) GFCI duplex receptacle at shelf for microwave.One (1) 20 amp outlet, #10THHN 165 LF; 50 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 20 amp breaker,
8.3.3.4 Provide (1) 20A dedicated duplex receptacle and dual voice/data outlet for copier in Galley/Copy Room. 75 LF ¾” EMT conduit elect, 230 LF THHN #12, outlet, box. 85 LF ¾” EMT conduit comm, CAT 6, outlet, box
8.3.3.5 Provide one (1) duplex receptacle for refrigerator (NIC) in Judge’s closet (Rm B602).15A duplex receptacle, 80 LF ¾” conduit, one (1) receptacle box, one (1) duplex outlet, one (1) 15 amp breaker, 165 LF
#12THHN
8.3.3.6 See drawing D101 and E101 for providing/relocating existing power, data and telecomm as required to accommodate furniture layouts.
Assume relocation of 5 terminals; 20 ft each.
8.3.3.7 Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator in Galley for future ice-maker. Route water line inside partitions.
8.3.3.8 No work anticipated to Fire Suppression systems.
9. Liquidated Damages: $200.00 per day.
10. Sustainability:
10.1 Green Purchasing: See Attachment 1: Green Purchasing Requirements
10.2 Waste Diversion: Note: for this hypothetical project and IDIQ proposal, see
Attachment 2. Fourteen days from Notice to Proceed, the Contractor shall submit to the Project Manager an updated Non-Hazardous Solid Waste Management Plan Attachment 2: Waste Diversion Plan, to include (but is not limited to):
a) List of materials Contractor will reuse.
b) List of materials the Contractor will donate and name and address of donation recipient.
c) List of materials the Contractor will recycle and the name and address of the recycler. If Contractor receives recycling revenue, Contractor shall keep revenue and provide receipt for GSA for reference.
d) Name and location of solid waste landfill for non-diverted material.
11. Other Requirements: Note: This section does not require any action for this hypothetical project.
11.1 All on-site workers shall have an active HSPD-12 security clearance.
11.2 Use of the loading dock shall be coordinated with the GSA Property Manager.
12. Submittals:
12.1 Waste Diversion Submittal: Preconstruction Note: for this hypothetical project and
IDIQ proposal, a partial waste diversion plan is required at the time the proposal is submitted, using Attachment 2 to indicate which categories will be tracked. No weights or methods or separate written plan are required for this hypothetical project’s proposal.
12.2 Waste Diversion Submittal: Post Construction Note: for this hypothetical project and IDIQ proposal, a post-construction waste diversion submittal is not required.
12.3 Green Purchasing items Note: for this hypothetical project and IDIQ proposal, a draft green purchasing submittal is required. Provide a list of the items from Attachment 1 which are involved in this hypothetical project.
12.4 As Built Drawings Note: for this hypothetical project and IDIQ proposal, as-built drawings are not required.
12.5 Product Data, Color and Material Samples & Shop Drawings. Note: for this hypothetical project and IDIQ proposal, product data/samples/shop drawings are not required.
12.6 Project Schedule including required inspections. Note: for this hypothetical project and IDIQ proposal, a project schedule is required at the time the proposal is submitted. Schedule must be in GANTT or CPM format.
12.7 Historic elements protection quality control plan. Note: for this hypothetical project and IDIQ proposal, a historic elements quality control plan is not required.
13. Attachments: The following items will become part of the Scope of Work.
13.1 Attachment 1: Green Purchasing.
13.2 Attachment 2: Waste Diversion Plan.
13.3 Drawings and Layout.
14. Closeout Plan: Note: This section does not require any action for this hypothetical project.
14.1 Customer Acceptance Letter.
14.2 Final Punch list complete.
14.3 Financial Closeout.
Attachment 1, Project A: Green Purchasing
Sustainability:
● Green Purchasing:
o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.
o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.
a) Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.
b) Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e. SCAQMD Rule 1113 standard).
c) Gypsum Board: Greenguard Gold Standard.
d) Acoustical Ceiling Tiles: Meets California Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and Environmental Product Declaration (EPD) available.
e) Concrete (ready-mix and site-mix): > 15% fly ash or > 25% ground granulated blast-furnace (GGBF) slag
A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.
B. If the KSP materials listed above are 1) not reasonably available within a reasonable period of time; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.
Note: for this hypothetical project and IDIQ proposal, a draft green purchasing submittal is required. Provide a list of the items from Attachment 1 above which are involved in this hypothetical project.
Attachment 2 Project A: Waste Diversion Plan
1. Submittal Type: Pre-Construction or Final (Circle Appropriate Type)
2. ePM Number: __Hypothetical ePM Number XXXXXXXX____
3. Field Office: Circle Appropriate Field Office: (Oklahoma City, Tulsa, New Mexico, Little Rock, Shreveport, Tyler, New Orleans, Baton Rouge, Dallas, Fort Worth, Lubbock, Houston, Austin, San Antonio, McAllen, El Paso)
4. GSA Project Manager: ___Hypothetical GSA Project Manager______
5. Contract Number:_______Hypothetical Contract Number XXXXXXXXXX____
6. Categories to Track: (Circle)
6.1 Carpet: (rolled or tiled) Weight(lbs):_____ Recover Method:___________
6.2 Architectural:(doors,windows,frames,millwork) Weight(lbs):_____ Recover Method:___________
6.3 Ferrous Metals: (structural steel, studs, rebar) Weight(lbs):_____ Recover Method:___________
6.4 Non-Ferrous: (wire, piping, duct) Weight(lbs):_____ Recover Method:___________
6.5 Aggregate: (concrete,brick,blocks) Weight(lbs):_____ Recover Method:___________
6.6 Plumbing Fixtures: (sinks,toilets,urinals) Weight(lbs):_____ Recover Method:___________
6.7 Furniture: (Systems, casual, equip.) Weight(lbs):_____ Recover Method:___________
6.8 Ceiling/Wall: (gypsum, tiles) Weight(lbs):_____ Recover Method:___________
6.9 Roofing: (Shingles, Paper, membrane) Weight(lbs):_____ Recover Method:___________
7. Landfill Hauler:___________________
8. Landfill Waste:____________________
Note: for this hypothetical project and IDIQ proposal, a partial Waste Diversion Plan is required at the time the proposal is submitted, using this attachment to indicate which categories above will be tracked. No weights, methods, or landfill information is required for this hypothetical project’s proposal, and no separate written plan is required.