This document package includes construction drawings and specifications for renovations to federal courthouse spaces, along with details of an associated multiple award indefinite-delivery indefinite-quantity task order contract opportunity. The drawings depict demolition plans, new floor plans, casework details, and electrical/data plans for office suites. Renovation work includes carpet, flooring, paint, casework and other finishes replacement, along with electrical and low-voltage upgrades. The solicitation seeks bids for construction, repair, alteration and design-build task orders across five states, to be awarded as fixed-price IDIQ contracts for one base year and four option years. Awards will be made to six small businesses per geographic zone. Task order values range from $2,000 to $3,500,000 and maximum contract values are set based on assignment to small or large project pools. Evaluation emphasizes past performance and responses to sample project scenarios.
View the file
Other files
Show 40 more
Latest 50 of 338 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale: 1/16" = 1'-0"
Partial Sixth Floor Plan
DRAWING INDEX:
G001 Cover Sheet & Project Data
D101 Suite 690 - Demolition Floor Plan
D102 Suite 610 - Demolition Floor Plan
A101 Suite 690 - Floor Plan
A102 Suite 610 - Floor Plan
A201 - Details
A202 - Details
E101 Suite 690 - Elec. & Data Plan
E102 Suite 610 - Elec. & Data Plan
Chambers Renovation
Hypothetical Federal
Courthouse
DEMOLITION KEYED NOTES:
1. Demo all VCT and wall base in this room.
2. Remove and salvage granite door threshold.
3. Remove and salvage wood wall base.
4. Demo all sheer and ornamental curtains, hardware to remain.
5. Demo all horizontal mini-blinds.
6. Sheer curtains to remain.
7. Remove paper towel dispenser for relocation.
8. Remove coat hook for relocation.
9. Demo resilient transition strip.
10. Demo broadloom carpet and pad throughout (entire suite except two restrooms and galley).
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. Demo all horizontal blinds in the entire suite.
Scale: 1/8" = 1'-0"
Suite 690 - Demolition Plan de mo cp t de mo vc t de mo cp t de mo vc t
18'-9 1/2" VIF
demo.
cpt de mo cp t demo cpt de mo cp t
11. Historically significant mural location
Scale: 1/8" = 1'-0"
Suite 610 - Demolition Plan
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. Demo all horizontal blinds in the entire suite.
DEMOLITION KEYED NOTES:
1. Demo all VCT and wall base in this room.
2. Remove and salvage wood wall base.
3. Demo all sheer and ornamental curtains, hardware to remain.
4. Demo all horizontal mini-blinds.
5. Demo broadloom carpet and pad throughout (entire suite except two restrooms and galley).
6. Remove paper towel dispenser for relocation.
7. NOT USED
8. Remove coat hook for relocation.
9. Demo resilient transition strip.
10.Demo sheer curtains and hardware.
de mo cp t de mo vc t de mo cp t de mo vc demo.
cpt demo cpt de mo cp t de mo cp t
11. Historically significant mural location
FLOOR PLAN KEYED NOTES:
1. Provide 1" horiz. alum. mini-blinds. Inset in bottom and middle rows of alum. storefront in Conf. Room
B625. Upper row of alum. storefront to be open.
Typ. of 22 blinds.
2. Provide continuous 1" horiz. alum. mini-blinds, surface mount and full height. Each blind to match width of storefront mullion spacing behind.
Existing window head is 9'-0" AFF.
3. Provide sheer curtains and ornamental drapes, install onto existing hardware. Existing curtain track is +9'-2" AFF.
4. Provide 4" x 0.125 vinyl resilient cove base, typ.
5. Provide LVT flooring (Mannington Spacia or equal) and coordinated transition strip at doorways, typ.
6. Provide stained and sealed oak threshold to match dimensions of removed granite. Supply a min. 6" length finished sample for approval prior to installation.
7. NOT USED
8. Provide a surface-mounted plastic laminate
3-door medicine cabinet in Restroom B611. See detail 1/A202.
9. Relocated coat hook in Closet B602.
10.
11.
12. Provide plastic laminate wall-mounted 30" wide x
15" deep x 6" tall back & sidesplash microwave shelf, match existing casework. Bottom of shelf to align with bottom of existing upper cabinet.
13. Provide 30" x 12'-9" L.F. (VIF) plastic laminate upper cabinets over existing and new base cabinets, match existing cabinets.
14. Provide 4'-6" L.F. (VIF) plastic laminate base cabinet and countertop/backsplash, match existing adjacent finish and height.
15. Provide stained and sealed full-height (9'-0" VIF) adjustable book shelves, match existing wood millwork. Provide finish sample for approval prior to installation.
16. Patch, repair & refinish existing 1x4 wood baseboard throughout suite, approximately 350
L.F.
17. Relocated paper towel dispenser above (e) waste receptacle.
18. Install Government-furnished dishwasher.
19.
20.
Provide 42 oz. plush broadloom nylon carpet and pad in areas where carpet was removed.
Provide 3 coat (1 prime and 2 finish), zero VOC, latex, roller-applied smooth-finish paint throughout suite interior.
Suite 690 - Floor Plan
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. Repair and refinish all wood doors, wood baseboard and wood casework within area of work to match existing. Style of doors is slab and casing is 1x4.
G. Patch and repair all gyp. board finishes disturbed by demolition & construction.
H. Provide shop drawings for all casework and submittals/samples for all finishes. Note: for this hypothetical project and IDIQ proposal, this is not a required submittal.
cp t.
vc t cp t.
vc
Provide stained and sealed oak wood veneer shelf to match existing wood shelf.
Refrigerator (NIC). Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator for future ice-maker. Route water line inside partitions.
Suite 610 - Floor Plan
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. Repair and refinish all wood doors, wood baseboard and wood casework within area of work to match existing. Style of doors is slab, and casing is 1x4.
G. Patch and repair all gyp. board finishes disturbed by demolition & construction.
H. Provide shop drawings for all casework and submittals/samples for all finishes. Note: for this hypothetical project and IDIQ proposal, this is not a required submittal.
FLOOR PLAN KEYED NOTES:
1. Provide 1" horiz. alum. mini-blinds. Inset in bottom and middle rows of alum. storefront in Conf. Room
B625. Upper row of alum. storefront to be open.
Typ. of 22 blinds.
2. Provide continuous 1" horiz. alum. mini-blinds, surface mount and full height. Each blind to match width of storefront mullion spacing behind.
3. Provide sheer curtains and ornamental drapes, install onto existing hardware.
4. Provide 4" x 0.125 vinyl resilient cove base, typ.
5. Provide LVT flooring (Mannington Spacia) and coordinated transition strip at doorways, typ.
6. Relocated paper towel dispenser above waste receptacle.
7. (not applicable)
8. Provide a surface-mounted plastic laminate
2-door medicine cabinet in Restroom B611. See detail 2/A202.
9. Provide custom wall-mounted plastic laminate coffee mug rack, see 4/A201. Mount mug shelf to match bottom of existing adjacent upper cabinets.
10. Provide stained and sealed wood veneer shelf to match existing, 12" above existing wood shelf.
11. Refrigerator (NIC). Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator for future ice-maker. Route water line inside partitions.
12. Provide plastic laminate wall-mounted 30" wide x
15" deep x 6" tall back & sidesplash microwave shelf, match existing casework. Bottom of shelf to align with bottom of existing upper cabinet.
13. Provide 30" x 12'-9" L.F. (VIF) plastic laminate upper cabinets over existing and new base cabinets, match existing cabinets.
14. Provide 4'-6" L.F. (VIF) plastic laminate base cabinet and countertop/backsplash, match existing.
15. Provide stained and sealed full-height (9'-0" VIF) adjustable book shelves, match existing wood millwork. Provide finish sample for approval prior to installation.
16. Patch, repair & refinish existing wood baseboard throughout suite, approximately 350 L.F.
17. Relocated coat hook.
18. Relocated paper towel dispenser above (e) waste receptacle.
19. Install Government-furnished dishwasher.
ex ist cp t.
vc t ex ist cp t.
vc
A201
A201 opp opp
Scale: 1/2" = 1'-0"
Suite 690 - Galley East Elev.
Scale: 1/2" = 1'-0"
Suite 690 - Galley South Elev.
3'- 0"
V
IF
4" 1'-
8" 2'-
6"
7'-6 3/4" VIF 1'-1" 5'-6"26'-0"
Existing PLam base cabinet
4" PLam backsplash to match existing cabinet
PLam upper cabinet w/ wire pulls and adjustable melamine shelf, match existing
Existing PLam base cabinet
4" PLam backsplash to match existing cabinet
PLam upper cabinet w/ wire pulls and adjustable melamine shelf, match existing
PLam base cabinet to match existing
1'-6" 1'-6" 1'-6"
6" 2'-
0 1 /2"
Existing PLam base cabinet beyond
Scale: 1" = 1'-0"
Mug Shelf
1'-9"
2'- 0"
EQ
EQ
EQ
Stained and sealed 1x solid wood trim cap with eased edge. Finish TBD.
7" deep PLam mug shelf with back, match existing PLam cabinets.
Scale: 1" = 1'-0"
Medicine Cabinet - Suite 690
2'- 0"
2'-0" EQ EQ EQ
6" deep PLam med. cab. w/ adj. shelvesPLam doors with soft-close hinges and 3" wire pulls.
Scale: 1" = 1'-0"
Medicine Cabinet - Suite 610
2'- 0"
2'-0"
6" deep PLam med. cab. w/ adj. shelvesPLam doors with soft-close hinges and 3" wire pulls.
SYMBOL LEGEND:
Suite 690 - Elec. & Data Plan
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. All devices shown are new unless noted otherwise.
FLOOR PLAN KEYED NOTES:
1. Provide one (1) duplex receptacle at shelf for microwave (NIC).
2. Provide dedicated duplex receptacle and tel/data outlet for copier.
3. NOT USED
4. NOT USED
5. Recircuit existing quad receptacle from building emergency to building standard.
6. Run power (quad) and data (3) along sill of aluminum storefront in small aluminum raceway and terminate as shown. Legrand AL3300 or equal to match existing storefront.
7. NOT USED
8. Convert existing duplex to quad GFCI receptacle, verify location with GSA.
9. Provide duplex receptacle above cabinet, verify location with GSA.
Existing duplex receptacle
Existing quad receptacle
Duplex receptacle
Quad receptacle
Combo data outlet
Relocated FA Device
FLOOR BOX NOTES:
1. Provide two (2) replacement covers to the (2) existing floor boxes in suite 690. Existing floor boxes to remain, remove and replace entire cover.
New cover to match existing floor box, flanged to overlap on carpet. Solid flush cover style (no carpet inset), die-cast aluminum construction with brushed aluminum finish. Legrand wiremold floorport service fitting #FPBTCAL, or approved equal. Confirm finish prior to ordering.
Suite 610 - Elec. & Data Plan
GENERAL NOTES:
A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.
B. Protect, repair and clean up upon completion.
C. General Contractor must maintain emergency egress for occupants during demolition and construction.
D. All applicable P100 guidelines must be followed. ttps://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.
F. All devices shown are new unless noted otherwise.
SYMBOL LEGEND:
Existing duplex receptacle
Existing quad receptacle
Duplex receptacle
Quad receptacle
Combo tel/data outlet
Exist. FA Device
FLOOR BOX NOTES:
1. Provide two (2) replacement covers to the (2) existing floor boxes in suite 690. Existing floor boxes to remain, remove and replace entire cover.
New cover to match existing floor box, flanged to overlap on carpet. Solid flush cover style (no carpet inset), die-cast aluminum construction with brushed aluminum finish. Legrand wiremold floorport service fitting #FPBTCAL, or approved equal. Confirm finish prior to ordering.
FLOOR PLAN KEYED NOTES:
1. Provide one (1) duplex receptacle at shelf for microwave (NIC).
2. Provide dedicated duplex receptacle and tel/data outlet for copier.
3. NOT USED
4. NOT USED
5. Recircuit existing quad receptacle from building emergency to building standard.
6. Run power (quad) and data (3) along sill of aluminum storefront in small aluminum raceway and terminate as shown. Legrand AL3300 or equal to match existing storefront.
7. NOT USED
8. Convert existing duplex to quad GFCI receptacle, verify location with GSA.
9. Provide duplex receptacle above cabinet, verify location with GSA.