10 Project Proposal Format 2019 08 07-2.pdf
PDF 1 MB Posted
- Solicitation number
- 47PH0818R0004
About this file
This solicitation requests proposals for an indefinite delivery indefinite quantity construction contract for General Services Administration Public Buildings Service Region 7. Services include general construction, repair, alteration, design-build, and incidental abatement. The contract has a maximum order limitation of $5 million annually and covers facilities in Arkansas, Louisiana, New Mexico, Oklahoma, and Texas. Awards will be made to six small businesses per zone through a competitive best value process evaluating technical merit and price. The base term is one year with four one-year options, for a potential five-year period of performance. Task orders will range from $2,000 to $3.5 million for repairs and projects up to the single task order limit of $3.5 million.
View the file
Other files
Show 40 more
Latest 50 of 338 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Price Proposal Format Instructions Contractors must use RSMeans line items (such as hardcopy, online version, other software, etc.) to prepare task order proposals using the Facilities Construction and Facilities Maintenance & Repair Open Titles.
To ensure consistency in the way proposals are provided, create price proposals in the following format...
LeeAWhite Typewritten Text See more explanatory notes on last page
Include on Proposal • Division line number
• Description of what is included in the line item
• Quantity
• Unit of measure
• Total Material cost
• Total Labor cost
• Total Material +
Labor
• Contractor’s divisional factor
• General Contractor’s totals by division
Note: Overhead, indirect costs and profit are already included in the divisional factors and should not be listed as separate line items. The factors should be calculated against the RSMeans Bare Cost, using the zip code of the project location.
Custom inputs not contained in the RSMeans database can be included as Non-scheduled items
SA
M
PL
E
O N
LY
LeeAWhite Typewritten Text RSMeans
LeeAWhite Typewritten Text Bare
LeeAWhite Typewritten Text Cost
LeeAWhite Stamp
Include on Proposal • Division line number
• Description of what is included in the line item
• Quantity
• Unit of measure
• Total Material cost
• Total Labor cost
• Total Material +
Labor
• Contractor’s divisional factor
• General Contractor’s totals by division
Note: The RSMeans factors which are initially proposed for the basic IDIQ should be used in the hypothetical project price proposal(s), even if the RSMeans factors are later changed through discussions.
SA
M
PL
E
O N
LY
LeeAWhite Typewritten Text RSMeans
LeeAWhite Typewritten Text Bare
LeeAWhite Typewritten Text Cost
LeeAWhite Stamp
LeeAWhite Rectangle
Rectangle
SAMPLE ONLY
Stamp
LeeAWhite Typewritten Text See explanatory notes on next page
Stamp
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .