About this file

This solicitation package requests proposals for multiple award indefinite-delivery indefinite-quantity construction contracts for General Services Administration Public Buildings Service Region 7. The scope of work includes general construction, repair, alteration, design-build, and incidental abatement services for government-owned and leased facilities in Arkansas, Louisiana, New Mexico, Oklahoma, and Texas. The NAICS code is 236220 with a $36.5 million size standard. Awards will be made for one-year base periods plus four one-year options, not to exceed five years total. The maximum order limitation is $5 million per zone annually. Evaluation factors are past performance and hypothetical projects, with technical merit significantly more important than price. The government intends to award up to six contracts per zone. The closing date is TBD.

View the file

Other files

File Type Posted
10 Round 9 SF30 Amendment 47 2022 08 03.pdf PDF
10 Round 9 Zonal Agreement Louisiana 2022 3 31.pdf PDF
10 SF30 Amendment 46 2022 03 31.pdf PDF
10 SF30 Amendment 45 2022 03 21 .pdf PDF
10 Past Performance Questionnaire 2022 03 01.pdf PDF
10 SF30 Amendment 44 2022 03 14.pdf PDF
Pre Proposal Conference Agenda 2022 03 10.pdf PDF
Hypothetical Project A SOW 2019 09 20-2.pdf PDF
10 Round 9 Zonal Agreement Louisiana 2022 3 01.pdf PDF
10 Solicitation Response Form.xlsx XLSX spreadsheet
10 Amendment 43 Form 1442 2022 03 02.pdf PDF
Questions and Answers to Date-2.pdf PDF
Hypothetical Project B Drawing 2019 09 20-2.pdf PDF
10 Louisiana Solicitation 2022 03 02.pdf PDF
10 GSA527-21 2022 03 01.pdf PDF
10 Zonal IDIQ SOW 2022 03 01.pdf PDF
Pricing Proposal Form 2022 xx xx.xlsx XLSX spreadsheet
10 Courthouse Carpet Policy 2019 09 20.pdf PDF
10 Project Proposal Format 2019 08 07-2.pdf PDF
10 Zonal Map.pdf PDF
10 Subcontractor Consent Template 2022 03 01.docx DOCX document
Hypothetical Project B SOW 2019 09 20-2.pdf PDF
10 Form C301 2022 03 01.pdf PDF
10 GSA Region 7 Field Offices 2022 03 01.pdf PDF
10 SF30 Amendment 42 2021 09 22.pdf PDF
10 SF30 Amendment 41 2021 07 22.pdf PDF
10 SF30 Amendment 40 2021 01 27.pdf PDF
Houston Zone Questions and Answers.pdf PDF
Houston Pre-Proposal Conference Agenda 2021 01 06.pdf PDF
10 Solicitation Response Form 2021 01 12.xlsx XLSX spreadsheet
10 47PH0818R0004 Amendment 39 SF30.pdf PDF
Pricing Proposal Form 2020 12 17.xlsx XLSX spreadsheet
GSA Region 7 Field Offices 2019 09 20.pdf PDF
10 Round 8 Zonal Agreement Houston 2020 12 17 MD.pdf PDF
Hypothetical Project B SOW 2019 09 20.pdf PDF
05 Houston WDs - Combined - 2020 12 16.pdf PDF
10 Project Proposal Format 2019 08 07.pdf PDF
Questions and Answers to Date.pdf PDF
Form 1442 2020 12 21.pdf PDF
10 Solicitation Response Form 2020 12 17.xlsx XLSX spreadsheet
Form GSA527 2019 09 20.pdf PDF
10 Form C301 2019 07 03.pdf PDF
Courthouse Carpet Policy 2019 09 20.pdf PDF
10 Round 8 Zonal Map 2019 01 06.pdf PDF
10 Round 8 Zonal IDIQ SOW 2020 12 03.pdf PDF
10 Past Performance Questionnaire 2020 12 17.pdf PDF
10 Subcontractor consent template 2020 12 17.docx DOCX document
Hypothetical Project B Drawing 2019 09 20.pdf PDF
Hypothetical Project A Drawings 2019 09 20.pdf PDF
Hypothetical Project A SOW 2019 09 20.pdf PDF
Show 40 more

Latest 50 of 338 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scale: 1/16" = 1'-0"

Partial Sixth Floor Plan

DRAWING INDEX:

G001 Cover Sheet & Project Data

D101 Suite 690 - Demolition Floor Plan

D102 Suite 610 - Demolition Floor Plan

A101 Suite 690 - Floor Plan

A102 Suite 610 - Floor Plan

A201 - Details

A202 - Details

E101 Suite 690 - Elec. & Data Plan

E102 Suite 610 - Elec. & Data Plan

Chambers Renovation

Hypothetical Federal

Courthouse

DEMOLITION KEYED NOTES:

1. Demo all VCT and wall base in this room.

2. Remove and salvage granite door threshold.

3. Remove and salvage wood wall base.

4. Demo all sheer and ornamental curtains, hardware to remain.

5. Demo all horizontal mini-blinds.

6. Sheer curtains to remain.

7. Remove paper towel dispenser for relocation.

8. Remove coat hook for relocation.

9. Demo resilient transition strip.

10. Demo broadloom carpet and pad throughout (entire suite except two restrooms and galley).

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. Demo all horizontal blinds in the entire suite.

Scale: 1/8" = 1'-0"

Suite 690 - Demolition Plan de mo cp t de mo vc t de mo cp t de mo vc t

18'-9 1/2" VIF

demo.

cpt de mo cp t demo cpt de mo cp t

11. Historically significant mural location

Scale: 1/8" = 1'-0"

Suite 610 - Demolition Plan

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. Demo all horizontal blinds in the entire suite.

DEMOLITION KEYED NOTES:

1. Demo all VCT and wall base in this room.

2. Remove and salvage wood wall base.

3. Demo all sheer and ornamental curtains, hardware to remain.

4. Demo all horizontal mini-blinds.

5. Demo broadloom carpet and pad throughout (entire suite except two restrooms and galley).

6. Remove paper towel dispenser for relocation.

7. NOT USED

8. Remove coat hook for relocation.

9. Demo resilient transition strip.

10.Demo sheer curtains and hardware.

de mo cp t de mo vc t de mo cp t de mo vc demo.

cpt demo cpt de mo cp t de mo cp t

11. Historically significant mural location

FLOOR PLAN KEYED NOTES:

1. Provide 1" horiz. alum. mini-blinds. Inset in bottom and middle rows of alum. storefront in Conf. Room

B625. Upper row of alum. storefront to be open.

Typ. of 22 blinds.

2. Provide continuous 1" horiz. alum. mini-blinds, surface mount and full height. Each blind to match width of storefront mullion spacing behind.

Existing window head is 9'-0" AFF.

3. Provide sheer curtains and ornamental drapes, install onto existing hardware. Existing curtain track is +9'-2" AFF.

4. Provide 4" x 0.125 vinyl resilient cove base, typ.

5. Provide LVT flooring (Mannington Spacia or equal) and coordinated transition strip at doorways, typ.

6. Provide stained and sealed oak threshold to match dimensions of removed granite. Supply a min. 6" length finished sample for approval prior to installation.

7. NOT USED

8. Provide a surface-mounted plastic laminate

3-door medicine cabinet in Restroom B611. See detail 1/A202.

9. Relocated coat hook in Closet B602.

10.

11.

12. Provide plastic laminate wall-mounted 30" wide x

15" deep x 6" tall back & sidesplash microwave shelf, match existing casework. Bottom of shelf to align with bottom of existing upper cabinet.

13. Provide 30" x 12'-9" L.F. (VIF) plastic laminate upper cabinets over existing and new base cabinets, match existing cabinets.

14. Provide 4'-6" L.F. (VIF) plastic laminate base cabinet and countertop/backsplash, match existing adjacent finish and height.

15. Provide stained and sealed full-height (9'-0" VIF) adjustable book shelves, match existing wood millwork. Provide finish sample for approval prior to installation.

16. Patch, repair & refinish existing 1x4 wood baseboard throughout suite, approximately 350

L.F.

17. Relocated paper towel dispenser above (e) waste receptacle.

18. Install Government-furnished dishwasher.

19.

20.

Provide 42 oz. plush broadloom nylon carpet and pad in areas where carpet was removed.

Provide 3 coat (1 prime and 2 finish), zero VOC, latex, roller-applied smooth-finish paint throughout suite interior.

Suite 690 - Floor Plan

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. Repair and refinish all wood doors, wood baseboard and wood casework within area of work to match existing. Style of doors is slab and casing is 1x4.

G. Patch and repair all gyp. board finishes disturbed by demolition & construction.

H. Provide shop drawings for all casework and submittals/samples for all finishes. Note: for this hypothetical project and IDIQ proposal, this is not a required submittal.

cp t.

vc t cp t.

vc

Provide stained and sealed oak wood veneer shelf to match existing wood shelf.

Refrigerator (NIC). Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator for future ice-maker. Route water line inside partitions.

Suite 610 - Floor Plan

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. Repair and refinish all wood doors, wood baseboard and wood casework within area of work to match existing. Style of doors is slab, and casing is 1x4.

G. Patch and repair all gyp. board finishes disturbed by demolition & construction.

H. Provide shop drawings for all casework and submittals/samples for all finishes. Note: for this hypothetical project and IDIQ proposal, this is not a required submittal.

FLOOR PLAN KEYED NOTES:

1. Provide 1" horiz. alum. mini-blinds. Inset in bottom and middle rows of alum. storefront in Conf. Room

B625. Upper row of alum. storefront to be open.

Typ. of 22 blinds.

2. Provide continuous 1" horiz. alum. mini-blinds, surface mount and full height. Each blind to match width of storefront mullion spacing behind.

3. Provide sheer curtains and ornamental drapes, install onto existing hardware.

4. Provide 4" x 0.125 vinyl resilient cove base, typ.

5. Provide LVT flooring (Mannington Spacia) and coordinated transition strip at doorways, typ.

6. Relocated paper towel dispenser above waste receptacle.

7. (not applicable)

8. Provide a surface-mounted plastic laminate

2-door medicine cabinet in Restroom B611. See detail 2/A202.

9. Provide custom wall-mounted plastic laminate coffee mug rack, see 4/A201. Mount mug shelf to match bottom of existing adjacent upper cabinets.

10. Provide stained and sealed wood veneer shelf to match existing, 12" above existing wood shelf.

11. Refrigerator (NIC). Provide 1/4" PEX water line and shut-off (locate shut-off at tap below sink) to refrigerator for future ice-maker. Route water line inside partitions.

12. Provide plastic laminate wall-mounted 30" wide x

15" deep x 6" tall back & sidesplash microwave shelf, match existing casework. Bottom of shelf to align with bottom of existing upper cabinet.

13. Provide 30" x 12'-9" L.F. (VIF) plastic laminate upper cabinets over existing and new base cabinets, match existing cabinets.

14. Provide 4'-6" L.F. (VIF) plastic laminate base cabinet and countertop/backsplash, match existing.

15. Provide stained and sealed full-height (9'-0" VIF) adjustable book shelves, match existing wood millwork. Provide finish sample for approval prior to installation.

16. Patch, repair & refinish existing wood baseboard throughout suite, approximately 350 L.F.

17. Relocated coat hook.

18. Relocated paper towel dispenser above (e) waste receptacle.

19. Install Government-furnished dishwasher.

ex ist cp t.

vc t ex ist cp t.

vc

A201

A201 opp opp

Scale: 1/2" = 1'-0"

Suite 690 - Galley East Elev.

Scale: 1/2" = 1'-0"

Suite 690 - Galley South Elev.

3'- 0"

V

IF

4" 1'-

8" 2'-

6"

7'-6 3/4" VIF 1'-1" 5'-6"26'-0"

Existing PLam base cabinet

4" PLam backsplash to match existing cabinet

PLam upper cabinet w/ wire pulls and adjustable melamine shelf, match existing

Existing PLam base cabinet

4" PLam backsplash to match existing cabinet

PLam upper cabinet w/ wire pulls and adjustable melamine shelf, match existing

PLam base cabinet to match existing

1'-6" 1'-6" 1'-6"

6" 2'-

0 1 /2"

Existing PLam base cabinet beyond

Scale: 1" = 1'-0"

Mug Shelf

1'-9"

2'- 0"

EQ

EQ

EQ

Stained and sealed 1x solid wood trim cap with eased edge. Finish TBD.

7" deep PLam mug shelf with back, match existing PLam cabinets.

Scale: 1" = 1'-0"

Medicine Cabinet - Suite 690

2'- 0"

2'-0" EQ EQ EQ

6" deep PLam med. cab. w/ adj. shelvesPLam doors with soft-close hinges and 3" wire pulls.

Scale: 1" = 1'-0"

Medicine Cabinet - Suite 610

2'- 0"

2'-0"

6" deep PLam med. cab. w/ adj. shelvesPLam doors with soft-close hinges and 3" wire pulls.

SYMBOL LEGEND:

Suite 690 - Elec. & Data Plan

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. https://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. All devices shown are new unless noted otherwise.

FLOOR PLAN KEYED NOTES:

1. Provide one (1) duplex receptacle at shelf for microwave (NIC).

2. Provide dedicated duplex receptacle and tel/data outlet for copier.

3. NOT USED

4. NOT USED

5. Recircuit existing quad receptacle from building emergency to building standard.

6. Run power (quad) and data (3) along sill of aluminum storefront in small aluminum raceway and terminate as shown. Legrand AL3300 or equal to match existing storefront.

7. NOT USED

8. Convert existing duplex to quad GFCI receptacle, verify location with GSA.

9. Provide duplex receptacle above cabinet, verify location with GSA.

Existing duplex receptacle

Existing quad receptacle

Duplex receptacle

Quad receptacle

Combo data outlet

Relocated FA Device

FLOOR BOX NOTES:

1. Provide two (2) replacement covers to the (2) existing floor boxes in suite 690. Existing floor boxes to remain, remove and replace entire cover.

New cover to match existing floor box, flanged to overlap on carpet. Solid flush cover style (no carpet inset), die-cast aluminum construction with brushed aluminum finish. Legrand wiremold floorport service fitting #FPBTCAL, or approved equal. Confirm finish prior to ordering.

Suite 610 - Elec. & Data Plan

GENERAL NOTES:

A. General Contractor is responsible for verifying all dimensions and existing conditions in the field. Note: for this hypothetical project and IDIQ proposal, no field verifications are required or possible.

B. Protect, repair and clean up upon completion.

C. General Contractor must maintain emergency egress for occupants during demolition and construction.

D. All applicable P100 guidelines must be followed. ttps://www.gsa.gov/real-estate/design-construction/architecture-engineering/facilities-standards-p100-overview E. General Contractor is responsible for cleaning the work area every day.

F. All devices shown are new unless noted otherwise.

SYMBOL LEGEND:

Existing duplex receptacle

Existing quad receptacle

Duplex receptacle

Quad receptacle

Combo tel/data outlet

Exist. FA Device

FLOOR BOX NOTES:

1. Provide two (2) replacement covers to the (2) existing floor boxes in suite 690. Existing floor boxes to remain, remove and replace entire cover.

New cover to match existing floor box, flanged to overlap on carpet. Solid flush cover style (no carpet inset), die-cast aluminum construction with brushed aluminum finish. Legrand wiremold floorport service fitting #FPBTCAL, or approved equal. Confirm finish prior to ordering.

FLOOR PLAN KEYED NOTES:

1. Provide one (1) duplex receptacle at shelf for microwave (NIC).

2. Provide dedicated duplex receptacle and tel/data outlet for copier.

3. NOT USED

4. NOT USED

5. Recircuit existing quad receptacle from building emergency to building standard.

6. Run power (quad) and data (3) along sill of aluminum storefront in small aluminum raceway and terminate as shown. Legrand AL3300 or equal to match existing storefront.

7. NOT USED

8. Convert existing duplex to quad GFCI receptacle, verify location with GSA.

9. Provide duplex receptacle above cabinet, verify location with GSA.