47-19 Exhibit 19 Contractors Solid Resources Mgmt Plan Format.pdf

PDF 84 KB Posted

Attached to
Miscellaneous Construction Via Job Order Contracting for Los Angeles World Airports (Personal Services)
Solicitation number
0051-2024-07-RFP-228194
Issued by
Los Angeles County, California

About this file

This is a Contractor's Solid Resources Management Plan format document prepared for Los Angeles World Airports (LAWA) in support of a Miscellaneous Construction Via Job Order Contracting (JOC) Request for Proposal. The document serves as a template for contractors to outline their procedures for managing construction waste and recyclable materials on facility repair, alteration, and minor new construction projects at LAX and VNY. Contractors are required to specify their re-use, salvage, and recycling procedures by selecting from six defined methods, including hand-wrecking for salvageable materials recovery, on-site concrete and asphalt crushing for on-site or off-site use, source separation of materials for separate hauling to recyclers, and hauling mixed recyclables to dedicated facilities. The plan requires contractors to document estimated quantities of materials including concrete, asphalt, clean soils, wood/green waste, scrap metal, salvage items, and miscellaneous construction debris, along with the specific disposal or recycling facility locations where these materials will be processed.

The Solid Resources Management Plan format does not establish pricing, set-asides, or funding details. Instead, it functions as a compliance and operational document requiring contractors to demonstrate their environmental stewardship and waste management capabilities as part of their proposal submittal. The underlying JOC contract opportunity, estimated at a combined value of $6,000,000 with a three-year term, does not guarantee work assignments; rather, services will only be performed upon LAWA's issuance of individual task orders. Contractors must submit their completed Solid Resources Management Plans through the Bonfire portal registration system, with vendor discussions and updates available through the platform's designated communication channels.

View the file

Other files

File Type Posted
9-Equal Benefits Ordinance Compliance Affidavit.PDF PDF
45-17 Exhibit 17 JOC Task Order Contractors Submittal Transmittal.pdf PDF
24-Living Wage Ordinance 6-27-2025.pdf PDF
3-Alternative Fuel Vehicle Requirement Program.PDF PDF
52-00 Request for Proposals Miscellaneous Construction Via Job Order Contracting (JOC) for Los Angeles World Airports.pdf PDF
30-10 Exhibit 10 Technical Specifications.pdf PDF
5-Bidder Contribution CEC Form 55.pdf PDF
23-Vendor Identification Form.pdf PDF
27-03 Exhibit 3 Sample JOC Contract.pdf PDF
48-21 Exhibit 21 Contractors Payment and Performance Bond.pdf PDF
11-List of Other City of Los Angeles Contracts.PDF PDF
36-11 Exhibit 11 LAWA Construction Safety Program Requirements.pdf PDF
43-22 Exhibit 22 Representative Contracts Form.pdf PDF
34-08 Exhibit 8 Special Conditions (Changes to Contract General Conditions).pdf PDF
6-Bidder Contributions CEC Form 55 - Instructions.PDF PDF
17-LSBE FAQs Rev 10-20-2022.pdf PDF
15-SBE FAQs 10-20-2022.pdf PDF
14-First Source Hiring.pdf PDF
2-Affirmative Action.pdf PDF
18-SBE, LBE, LSBE Affidavit (Fillable).pdf PDF
16-LBE FAQs 10-20-2022.pdf PDF
35-09 Exhibit 9 Shop Materials, Products Equipment Subject to Inspection.pdf PDF
25-Acknowledgment Letter.pdf PDF
12-Municipal Lobbying Oridnance Bidder Certification CEC Form 50.PDF PDF
51-04.1 Exhibit 4.1 JOC Fee Proposal (Coefficients) - Submittal E.pdf PDF
37-12 Exhibit 12 CAD Standards for LAWA Projects.pdf PDF
40-15 Exhibit 15 VNY Rules and Regulations.pdf PDF
22-Vendor ID Form - Attach Back-up Documents.pdf PDF
46-16 Exhibit 16 JOC Task Order Request for Information.pdf PDF
19-Subcontractor Participation Plan.pdf PDF
39-14 Exhibit 14 LAX Rules and Regulations (No Appendix).pdf PDF
49-24 Exhibit 24 Insurance Requirements.pdf PDF
38-13 Exhibit 13 Design and Construction Handbook Chapters 1-8.pdf PDF
20-Administrative Requirements Checklist.pdf PDF
7-Child Support Obligations.pdf PDF
1-Affidavit of Non-Collusion.pdf PDF
32-06 Exhibit 6 Project Requirements.pdf PDF
21-Administrative Requirements Information.pdf PDF
31-05 Exhibit 5 Task Order Process.pdf PDF
44-23 Exhibit 23 References Form.pdf PDF
42-20 Exhibit 20 Summary of Solid Waste Diversion and Disposal Form.pdf PDF
8-Contractor Responsibility Questionnaire and Pledge of Compliance.PDF PDF
29-04 Exhibit 4 JOC Coefficient Instruction.pdf PDF
41-18 Exhibit 18 Notice of Proposed Construction or Alteration FAA Form 7460-1.pdf PDF
4-Assignment of Anti-Trust Claims.pdf PDF
28-Submittal C - Minimum Requirements.pdf PDF
26-02 Exhibit 2 Business Enterprise Program Information.pdf PDF
10-Iran Contracting Compliance Affidavit.PDF PDF
33-07 Exhibit 7 Contract General Conditions.pdf PDF
50-25 Exhibit 25 - FOS Simplebid Unit Price Book.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tons Cubic Yards Units

Example:

Concrete 4

ABC Recyclers Los Angeles 120

Asphalt Concrete Soils (clean) Wood/Green

Scrap Metal

Salvage Items Description:

Other Description

Misc. Construction Debris

Tons Cubic Yards Units

Example:

Misc. Const. Debris 60 Asphalt Concrete Soils (clean)

Wood/Green Materials Scrap Metal

Other (i.e. Cardboard, Red Clay Brick)

Please describe:

Misc. Construction Debris

Project Title and Address: T.O. Number:

Format for Contractor's Solid Resources Management Plan

Estimated Quantities

DISPOSAL OF MATERIALS

Project Title and Address: W.O. Number:

These are procedures to be used for re-using, salvaging, or recycling materials. Indicate the procedures (by number), type of materials, and estimate quantities that will be recycled or disposed in the sections below:

1. Hand-wrecking to recover salvageable materials.

2. On-site concrete and asphalt crushing for use on-site.

3. On-site concrete and asphalt crushing for use off-site.

4. Source separation of materials and separately hauling to recyclers

5. Hauling mixed recyclables to a mixed debris recycling facility.

6. Other (please describe)

RE-USE/SALVAGE/RECYCLING OF MATERIALS

CONTRACTOR'S Name

Street Address:

CITY, State, Zip:

Phone: FAX:

REQUEST FOR PROPOSAL

MISC CONSTRUCTION VIA JOC

Los Angeles World Airports

Date Submitted:

type of Material

Estimated Quantities

Facility to be Used/Location XYZ Disposal Los Angeles type of Material No. of Procedure to be Used (as above) Facility to be Used/Location

Sheet1