30-10 Exhibit 10 Technical Specifications.pdf
PDF 7 MB Posted
- Attached to
- Miscellaneous Construction Via Job Order Contracting for Los Angeles World Airports (Personal Services)
- Solicitation number
- 0051-2024-07-RFP-228194
- Issued by
- Los Angeles County, California
About this file
This is a Technical Specifications document for Los Angeles World Airports' (LAWA) Request for Proposals for Miscellaneous Construction via Job Order Contracting (JOC). The specifications detail comprehensive technical requirements across multiple construction disciplines including concrete facilities maintenance, concrete pressure grouting, asphalt surface treatment, asbestos remediation, lead remediation, and mold remediation, along with sections addressing parking control equipment, loading dock equipment, vehicle service equipment, elevators and escalators, facility maintenance, telecommunications, access control, site preparation, roadways, utilities, and traffic control systems. The contract is anticipated to have a combined value of up to $6,000,000 with a three-year term, though contract award does not guarantee work and services will only be performed upon issuance of Task Orders by LAWA. The specifications require bidders proposing alternative products equal to those specified by name to submit product data sheets no later than 15 business days before the proposal submission deadline. The specifications mandate compliance with LAWA's JOC System utilizing Facility Optimization Solutions (FOS) by CannonDesign or equivalent software such as Simplebid, along with adherence to the FOS Simplebid Construction Procurement Catalog or equivalent cost data.
The specifications establish detailed technical and quality assurance requirements for all work categories, including contractor qualifications, equipment specifications, material standards, installation procedures, and safety protocols. For specialized remediation work such as asbestos and lead abatement, the specifications require contractors to possess established experience, appropriate state licensing, qualified supervisors, and compliance with EPA, OSHA, and California Department of Industrial Relations standards. Environmental and air quality monitoring by independent consultants is mandated for hazardous material removal projects, with clearance criteria requiring airborne fiber concentrations not to exceed specified limits. All contractors must maintain comprehensive records, obtain necessary permits and approvals, and comply with applicable federal, state, and local regulations. Bidders must register in the Bonfire portal to access relevant documents and submit proposals, with vendor support available through Bonfire's customer service channels.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Misc. Construction via
Job Order Contracting (JOC)
Technical Specifications
Technical Specifications - Index
010000-1 JOC System 022510 Concrete Pressure Grouting 027860 Asphalt Surface Treatment 028200 Asbestos Remediation 028300 Lead Remediation 028500 Mold Remediation 033000 to 035416 Concrete 040120 to 047000 Masonry 111200 Parking Control Equipment 111300 Loading Dock Equipment 111400 Vehicle Service Equipment 111430 Spray Paint Booth 111455 Turnstiles 118226 Facility Waste Compactors 111920 to 111930 Detention Enclosure and Furniture 133419 to 133423 Metal Building and Fabrication Structures 141000 to 149100******* Elevator, Escalator and Lifts
19313.10 to 19313.90 Facilities Maintenance 270500 to 275313******* Telecommunication Requirements 281300 to 284619******** Access Control and Monitoring 31100 to 316400 Site Preparation
320113.68 to 329600 Roadways and Landscaping 330111 to 337119 Utilities 344113 to 347119 Traffic Signals, Barriers and Guard Rails
REQUEST FOR PROPOSALS
MISC CONSTRUCTION VIA JOC
Los Angeles World Airports
If bidder wishes to propose an alternative "equal" product to any product specified by name in these "Technical Specifications," it must submit a product data sheet or, in the case of Section 010000, "the JOC System," an electronic copy of the proposed alternative product, no later than 15 business days before the required date for submission of proposals.
SECTION 010000 – JOC SYSTEMS
PART 1 – GENERAL
LAWA, contractor and subcontractor will utilize the same comprehensive unit price management information and support system.
PART 2 – PRODUCTS
2.1 MANUFACTURER
A. Facility Optimization Solutions (FOS) by CannonDesign or Equivalent
2.2 SOFTWARE
A. Simplebid® or Equivalent
2.3 COST DATA
A. FOS Simplebid® Construction Procurement Catalog or Equivalent
JOC SYSTEM 010000‐1
TECHNICAL SPECIFICATIONS
JOB ORDER CONTRACTING AT LAX
CONCRETE FACILITIES MAINTENANCE 019313.10 - 1
SECTION 019313.10 - CONCRETE FACILITIES MAINTENANCE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2
SUMMARY
A. Section Includes the following maintenance tasks:
1. Epoxy floor resurfacing
2. Concrete patching
3. Concrete sealing.
1.3
ACTION SUBMITTALS
A. Product Data: For each type of maintenance required.
1.4
QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs workers for this project who are competent in techniques required.
PART 2 - PRODUCTS
2.1 MANUFACTURER
A. Manufacturer must comply with project requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine concrete surfaces with Installer present, for compliance with conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
CONCRETE FACILITIES MAINTENANCE 019313.10 - 2
3.2
A.
PREPARATION
Prepare substrates according to manufacturer’s written instructions.
3.3
A.
CLEANING AND PROTECTION
Clean work area of all waste material and sweep area.
END OF SECTION 019313.10
CONCRETE PRESSURE GROUTING 022510- 1
SECTION 022510 – CONCRETE PRESSURE GROUTING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
1.2 GENERAL
A. The work consists of drilling grout holes, exploratory holes and check holes, pressure testing, pressure washing, and injecting suspension grout under pressure, and shall include furnishing of all materials, labor, and equipment as described and specified.
2.1 PORTLAND CEMENT
A. Portland Cement shall conform to ASTM C150.
2.2
WATER
A. Water used shall be clean and free from injurious amounts of oil, acid, organic matter, or other deleterious substances.
2.3
SAND
A. Sand for grout shall conform to ASTM C 33 and unless otherwise specified, the gradation shall be within the numerical limits in the following table:
Sieve Designation (U.S. Std. Square Mesh) Percent Passing by Weight
16 100 50 20-50 100 10-30 200 0-5
CONCRETE PRESSURE GROUTING 022510- 2
2.4 ADMIXTURES
A. Admixtures shall be the type and quality specified on the plans.
3.1 DELIVERY, STORAGE AND HANDLING
A. The Contractor is responsible for handling and protection of all materials after arrival at destination.
B. Any damage must be reported immediately to the Engineer.
C. A sufficient quantity of all materials shall be on hand to insure that grouting operations will not be interrupted or delayed.
3.2 INSTALLATION
A. Equipment:
1. All drilling and grouting equipment shall be of a type and capacity, and in condition, to perform the work described.
2. Drilling Equipment: Drilling equipment shall be capable of drilling angle holes up to 45 degrees from vertical, unless otherwise specified.
3. Grouting Equipment: The equipment shall be capable of mixing and pumping grout having a mix ratio, by volume, of one (1) part water, one (1) part cement, and two (2) parts bulk filler, such as sand or fly ash.
4. Mixers: Unless otherwise specified, mixers shall be of the high speed colloidal type and capable of thoroughly mixing water, cement, and bulk fillers to produce a grout of uniform texture and consistency. Mixers shall match the capacity of the pumping plant.
5. Holdover Tank: A holdover tank shall be furnished if a single compartment mixer is used.
It shall be equipped with mechanical agitators to prevent segregation of the grout, and shall have sufficient capacity to temporarily store the grout and thus provide a continuous supply.
6. Pumps: Grout pumps shall be of the long stroke, multiple piston or the helical screw type.
7. Air Supply: The air supply shall meet the requirement of the pumps.
8. Water Meter: One water meter, of the reset type shall be used with each mixer.
9. Pressure Gauges: One pressure gauge shall be installed at the pump and one at the collar of the hole.
10. Hoses, Valves, and Fittings: Hoses, valves, and fittings shall be compatible with the maximum pressures specified. Double or single packers may be required for grouting and pressure testing. Packers shall fit tightly in the holes at all testing and grouting pressures.
11. Each hole shall be equipped with a shutoff valve below the hand coupling union, permitting shutoff at refusal pressure and removal of the header to another hole while still maintaining pressure in the completed hole.
CONCRETE PRESSURE GROUTING 022510- 3
B. Drilling Overburden:
1. Unless otherwise specified, holes drilled through overburden shall be cased with steel.
Casings shall be removed after completion of the grouting operations unless otherwise approved by the Engineer. Holes in overburden shall be backfilled with grout or a sand-cement mixture or by tamping soil into the holes to approximately the bulk density of the surrounding overburden.
C. Drilling Rock:
1. The location, inclination, and depth of holes shall be as shown on the drawings or as directed by the Engineer.
2. The Contractor shall perform such exploratory drilling as may be required to determine the condition of the rock prior to grouting
D. Washing Grout Holes:
1. When authorized by the Engineer and prior to grout injection, grout holes shall be washed with water and air to remove mud, drill cuttings, and other materials which will interfere with the grout take of the hole.
E. Packer and Stage Grouting:
1. For packer grouting, the holes shall be drilled to the total depths and shall be grouted in lifts starting at the bottom.
2. If stage grouting becomes necessary, it shall be performed in successive depth intervals (stages) in each hole beginning at the rock surface and progressing to the deeper stages.
The stages and the grouting pressures for each stage shall be as specified unless otherwise directed by the Engineer.
3. Each stage of a hole shall be washed with water and air simultaneously and immediately before grouting.
F. Grout Injection
1. The Contractor shall caulk surface cracks which allow excessive loss of grout. Cracks may be caulked by mechanical means or with fast-setting mortar.
2. If grout injected into one hole appears in adjacent holes, the interconnected holes shall be plugged temporarily with packers set just above the level at which the grout is entering.
Holes grouted by interconnection shall be split spaced.
3. Grout, which has remained in the mixer or holdover tank with or without agitation for greater than one (1) hour, shall be discarded.
4. Grout temperatures shall be not lower than 50 F. The grouted soil, rock, or concrete shall be not colder than 40 F when grout is injected and for at least 48 hours thereafter.
5. When the hole shows signs of refusal, a thinner mix shall be used to prevent or remove clogging.
CONCRETE PRESSURE GROUTING 022510- 4
G. Grouting Procedures
1. The procedures and grout mixes described below are general guidelines and may be altered in the field by the Engineer to suit the conditions encountered and to meet the design objectives.
2. Unless on-the-site experience indicates otherwise and in lieu of pressure testing, each stage or lift of a hole to be grouted shall be started with a water:cement mix to be no thinner than 5:1 (w:c) by volume.
3. If the hole continues to take grout at a pumping rate not exceeding the specified flow and pressure the mix ratio shall be changed to 3:1 (w:c). If the majority of the holes accept the 3:1 without signs of slowdown in the rate of take, holes in that stage or location may be started with a 3:1 instead of the 5:1 mix. A change to a different location or stage may require a return to the 5:1 starter mix.
4. Grout mixes shall be thickened from 5:1 to 3:1 to 2:1 to 1:1 after which sand and/or fly ash shall be added to the mix in a graduated manner (5:5:1S, 5:5:2S, etc.). The water- cement ratio shall not be less than one.
H. Records
1. Unless otherwise specified, the Contractor shall keep drilling logs and complete records of all grouting operations. These records include time logs of grout mixes and admixtures used in each stage or lift for each hole, related pressures and pumping rates, backpressures, and observations on excessive leakage and other non-routine conditions. The drilling log shall include date, hole location, depth of rock, and depths to various rock features. Rock features shall be described as hard, soft, weathered, cracks, cavities, etc.
2. Unless otherwise specified, one copy of the records shall be provided the Engineer at the completion of each shift.
I. CLEANUP
1. After grouting is completed, the Contractor shall remove the grouting plant and all related parts, equipment, and supplies from the site, including unused materials and waste.
END OF SECTION 022510
ASPHALT SURFACE TREATMENT 027860 - 1
SECTION 027860 – ASPHALT SURFACE TREATMENT
1.1 RELATED DOCUMENTS
1.2 MEASUREMENT PROCEDURES
A. The bituminous material and aggregate to be paid for will be the measured quantities used in the accepted work.
1. Bituminous Material: The amount of bituminous material to be paid for will be measured in tons or the number of gallons of material used in the accepted work, corrected to gallons at 60 degrees F in accordance with ASTM D 633 or ASTM D1250, using a coefficient of expansion of 0.0025 per degree F for asphalt emulsion.
2. Aggregate: The amount of aggregate paid for will be the number of metric 2,000 pounds tons or cubic meter yards of aggregate placed and accepted in the completed work or placed in authorized stockpiles.
3. Quantity Limits: The bituminous material and aggregate shall be spread within the quantity limits shown in PART 2; bids shall be based on the mean of the values in the tables. The individual quantities of bituminous material and aggregate may be varied to meet specific field conditions at all times during the progress of the work, as directed, without adjustments to contract unit prices.
1.3 PAYMENT PROCEDURES
A. The quantities of aggregates and bituminous material, determined as specified in paragraph MEASURENT AND PAYMENT, will be paid for at the respective contract unit prices, which payment shall constitute full compensation for all operations necessary to complete the work as specified herein.
1.4 WAYBILLS AND DELIVERY TICKETS
A. Before the final statement is allowed, file with the Contracting Officer certified waybills and delivery tickets for aggregate and bituminous material used in the bituminous surface treatment.
Do not remove bituminous material from the tank car or storage tank until initial outage and temperature measurements have been taken; nor shall the car or tank be released until final outage has been taken.
ASPHALT SURFACE TREATMENT 027860 - 2
1.5 SYSTEM DESCRIPTION
A. Provide equipment dependable and adequate for the purpose intended and properly maintained in satisfactory and safe operating condition at all times. Discontinue the use of equipment which fails to produce satisfactory work and replace with satisfactory equipment. Calibrated equipment such as asphalt distributors, scales, batching equipment, spreaders and similar equipment, shall have been recalibrated by an approved calibration laboratory within 12 months prior to commencing work and every 6 months thereafter, by such laboratory from the date of recalibration, during the term of the contract.
1. Bituminous Distributors: The distributors shall have pneumatic tires of such width and number that the load produced on the base surface does not exceed 650 pounds per inch of tire width. Distributors shall be designed and equipped to distribute bituminous material uniformly at even heat on various widths of surface at readily determined and controlled rates ranging from 0.20 to 0.05 to 2.00 gallons/S.Y., with a pressure range of 25 to 75 psi.
The allowable variation from any specified rate shall not exceed 5 percent. Distributor equipment shall include a separate power unit for the bitumen pump, full- circulation spray bars, tachometer, pressure gauges, volume-measuring devices, a thermometer for reading the temperature of tank contents, and a hose attachment suitable for applying bituminous material to areas not accessible with distributor spray bar. The distributor shall be equipped for circulation and agitation of bituminous material during the heating process.
2. Single-Pass, Surface Treatment Machines: The machines shall be capable of spraying bituminous material and spreading aggregate in one pass. Bituminous spraying equipment shall conform to the requirements given above for a bituminous distributor. The machine shall be capable of spreading aggregates at controlled amounts per square yard as specified.
In addition, the single-pass, surface treatment machine shall be capable of placing a surface treatment adjacent to an existing surface treatment, forming a joint of the same thickness and uniformity as other portions of the surface treatment. Ridges or blank spaces will not be permitted. Joints in the second application shall be formed at least 1 foot from those formed in the first application.
3. Heating Equipment for Storage Tanks: The equipment shall consist of coils and equipment for producing steam or hot oil and be designed to prevent the introduction of steam or hot oil into the material. An armored thermometer with a range of 100 to 400 degrees F shall be affixed to the tank so the temperature of the bituminous material may be determined at all times.
4. Power Rollers: Power rollers shall be steel-wheeled or pneumatic-tired type, conforming to the following requirements:
a. Steel-wheeled roller shall have at least one steel drum and weigh a minimum of 5 tons. Steel wheels of the rollers shall be equipped with adjustable scrapers.
b. Pneumatic-tired rollers shall be self-propelled and have wheels mounted on two axles in such a manner that the rear tires will not follow the tracks of the forward group. Tires shall be uniformly inflated to not less than 60 psi nor more than 552 kPa 80 psi pressure. The pneumatic-tired rollers shall be equipped with boxes or platforms for ballast loading and shall be loaded so that the tire print width of each wheel is not less than the clear distance between tire prints.
ASPHALT SURFACE TREATMENT 027860 - 3
5. Mechanical Spreaders: The spreaders shall be adjustable and capable of spreading aggregate at controlled amounts per S.Y. as specified.
6. Brooms and Blowers: The machines shall be of the power type, capable of cleaning surfaces to be treated.
7. Scales: The scales shall be standard truck scales of the beam type equipped with a weight-recording device. The scales shall be sufficient in size and capacity to accommodate the trucks used in the hauling aggregates. The scales shall be tested and approved by an inspector of the State Inspection Bureau charged with scale inspection within the state in which the project is located. If an official of the inspection bureau is not available, the scales shall be tested in accordance with state specifications in the presence of the Contracting Officer. Keep the necessary number of standard weights on hand, at all times, for testing the scales.
1.6 SUBMITTALS
A. Submit the following in accordance with specified SUBMITTAL PROCEDURES:
1. Product Data
Waybills and Delivery Tickets Copies of waybills and delivery tickets during progress of the work.
Cutback Asphalt Asphalt Cement Temperature-viscosity relationship of cutback asphalt and asphalt cement.
2. Test Reports
Copies of test results, within 24 hours after completion of each test.
1.7 QUALITY ASSURANCE
A. Safety Precautions
1. No smoking, or open flames shall be permitted within 25 feet of heating, distributing, or transferring operations of bituminous materials other than bituminous emulsions. When tar is used, a full face, organic, vapor-type respirator and protective creams shall be used by personnel exposed to fumes. Protective creams shall not substitute for cover clothing.
B. Sampling and Testing
1. Sampling and testing is the responsibility of the Contractor. Sampling and testing shall be performed by an approved commercial testing laboratory, or by the Contractor, subject to approval. Sampling shall be in accordance with ASTM D75/D75M for aggregates and ASTM D140/D 140M for bituminous material, unless otherwise directed. Perform aggregate gradation tests on each sample in accordance with ASTM C136. Perform all other aggregate tests on the initial source samples and repeat tests when there is a change of source. Perform sieve analyses daily from material samples. The tests shall include an
ASPHALT SURFACE TREATMENT 027860 - 4
analysis of each gradation of material. Perform tests in sufficient number to ensure that material meet specified requirements.
C. Wear Test
1. Perform the wear test in accordance with ASTM C131 to ensure that aggregates have a percentage of wear not exceeding 40 percent after 500 revolutions. Test shall be performed as specified.
D. Soundness Test
1. Perform the soundness test as specified by ASTM C88 to ensure that aggregates have a weight loss not greater than 12 percent when subject to five cycles of the magnesium sulfate test. Tests shall be performed as specified for aggregates in stockpiles or at the source.
E. Stripping Test
1. Perform stripping tests meeting the requirements of ASTM D 3625. Deleterious substances shall not exceed the requirements of ASTM D1139/D1139M.
1.8 DELIVERY, STORAGE AND HANDLING
A. Inspect the materials delivered to the site for contamination and damage. Unload and store the materials with a minimum of handling. Store aggregates preventing segregation and contamination.
1.9 ENVIRONMENTAL REQUIREMENTS
A. Apply bituminous surface treatment only when the existing surface or base course is dry or contains moisture not in excess of the amount that will permit uniform distribution and the desired adhesion. Bituminous surface treatment shall not be applied when either the atmospheric temperature, in the shade, is below 60 degrees F or the pavement surface to be treated is below 70 degrees F unless otherwise directed.
2.1 MATERIALS
A. Use mineral aggregate and bituminous material of the following types, gradations, grades, and consistencies that meet the requirements of stripping, wear, and soundness tests as specified in paragraph SAMPLING AND TESTING.
1. Mineral Aggregate: provide aggregate consisting of crushed stone, crushed gravel, or crushed slag of such nature that thorough coating of bituminous materials, used in the work, will not strip off upon contact with water. Moisture content of the aggregate shall
ASPHALT SURFACE TREATMENT 027860 - 5
be such that the aggregate will be readily coated with the bituminous material. Drying may be required, as directed. Aggregate shall conform to the gradation shown in the following Tables. Determine gradation of the aggregates by ASTM C136.
AGGREGATE GRADATION
SINGLE BITUMINOUS SURFACE TREATMENT
(PERCENT BY WEIGHT PASSING)
Sieve Designation No. 1 No. 2 No. 3
1 inch 100 -- -- 3/4 inch 90-100 100 -- 1/2 inch 20-55 90-100 100 3/8 inch 0-15 40-70 85-100 No. 4 0-5 0-15 10-30 No. 8 -- -- 0.10 No. 16 -- -- 0.5
AGGREGATE GRADATION
DOUBLE BITUMINOUS SURFACE TREATMENT
(PERCENT BY WEIGHT PASSING)
Sieve Designation No. 1 No. 2 No. 3 No. 4
1 inch 100 -- -- -- 3/4 inch 90-100 100 -- -- 1/2 inch 20-55 100 90-100 -- 3/8 inch 0-15 85-100 40-70 100 No. 4 0-5 10-30 0-15 85-100 No. 8 -- 0-10 0.5 10-40 No. 16 -- -- -- 0-10 No. 50 -- -- -- 0.5
2. Crushed Stone: Provide crushed stone consisting of clean, sound, durable particles, free of soft or disintegrated pieces or foreign matter. At least 90 percent by weight of the particles shall have at least two fractured faces.
3. Crushed Slag: Provide crushed slag which is an air-cooled blast-furnace product having a dry weight of not less than 70 pcf, and consists of angular particles uniform in density and quality and free of dust and foreign matter. Determine the weight of a cubic meter foot of slag aggregate by ASTM C29/C29M.
4. Aggregate Quantities: the bituminous material and aggregate shall be spread within the quantity limits shown below. The individual quantities of bituminous material and aggregate may be varied to meet specific field conditions at all times during the progress of the work, as directed, without adjustments to contract unit prices. Aggregate weights shown are for aggregates having a specific gravity of 2.65. If the specific gravity of the aggregate used is other than 2.65, appropriate adjustments shall be made in number of pounds required to ensure a constant volume of aggregate per S.Y. of treatment.
ASPHALT SURFACE TREATMENT 027860 - 6
QUANTITIES (PER S.Y. FOR SINGLE SURFACE TREATMENT)
Gradation No.
Bituminous Material (Gallons)
Aggregate (Pounds)
0.30 – 0.45
35-50
2 0.15 – 0.30 20-25
3. 0.10 – 0.20 15-25
QUANTITIES (PER S.Y FOR DOUBLE SURFACE TREATMENT)
Bituminous Bituminous Material Aggregate Material Aggregate (Gallons) (Pounds) (Gallons) (Pounds)
Gradation First First Second Second No. Application Spreading Application Application
1 0.20 – 0.30 28-34 -- -- 2 -- -- 0.20 – 0.30 20-25 3 0.15 – 0.20 20-25 -- -- 4 -- -- 0.15 – 0.20 10-15
B. Bituminous Materials
1. Cutback Asphalt: Rapid curing cutback asphalt shall conform to ASTM D2082, Designation RC-250, RC-800 or RC-3000.
2. Emulsified Asphalt: Rapid setting emulsified asphalt shall conform to ASTM D 977, Grade RS-1 or RS-2 or ASTM D2987, Grade CRS-1 or CRS-2.
3. Asphalt Cement: Asphalt cement shall conform to ASTM D946/D946M, Penetration
Grade 120-150, Grade 200-300 or ASTM D3381/D3381M, Viscosity Grade AC-2.5, AC-5, AC-10, AC-20 or AR 2000 as specified.
3.1 SURFACE PREPARATION
A. Immediately before applying the first course of bituminous material, clean the surface of loose material with power brooms or power blowers. Take care to remove all dirt, clay and other loose or foreign matter. Flush the surface with water, when necessary to achieve a clean surface, only when directed by the Contracting Officer; allow the surface to dry after flushing
ASPHALT SURFACE TREATMENT 027860 - 7
3.2 APPLICATION OF FIRST COURSE
A. Bituminous Material
1. Apply bituminous material by means of a bituminous distributor at the temperature specified in paragraph APPLICATION TEMPERATURE OF MATERIALS below or as directed; and within the limits specified in paragraph QUANTITY LIMITS in PART 1.
Apply bituminous material in such a manner that uniform distribution is obtained over all surfaces treated. Unless the distributor is equipped to obtain a satisfactory result at the junction of previous and subsequent applications, building paper shall be spread on the surface for a sufficient distance back from the ends of each application so that flow through the sprays may be started and stopped on the paper in order that allow sprays will operate at full force on the surface treated. Immediately after application, remove and destroy the building paper. Areas inaccessible to the distributor shall be properly treated with bituminous material using the hose attachment. Protect adjacent buildings, structured, and trees to prevent their being spattered or marred.
B. Spreading of Aggregate
1. Immediately following application of bituminous material, spread aggregate uniformly over the surface within the limits of the quantities specified in paragraph QUANITY LIMITS in PART 1. Spreading shall be done with mechanical spreaders. Spread aggregate evenly by hand on all areas missed by the mechanical spreader. Equipment spreading aggregate shall be operated backwards, so that the bituminous material will be covered ahead of the truck wheels. When hand spreading is employed on inaccessible areas, spread aggregate directly from the trucks. Additional aggregate shall be spread by hand over the areas having insufficient cover, and spreading will continue during these operations when necessary.
C. Brooming and Rolling
1. Roll the surface with a pneumatic-tired and a steel-wheeled roller after sufficient aggregate is spread. Continue rolling until no more aggregate can be worked into the treated surface.
The use of the steel-wheeled roller will be discontinued, or a lighter weight steel wheel roller substituted, as directed, if the roller being used causes excessive crushing and shattering of the aggregate. If the aggregate is not distributed properly, broom the surface as soon as possible after the first coverage by the roller, but not until the surface has set sufficiently to prevent excessive marking. Brooming, rolling and supplemental spreading of aggregate shall continue until the surface is cured and rolled sufficiently to key and set the aggregate. In places not accessible to rollers, compact the aggregate with pneumatic tampers. Aggregate that becomes contaminated with foreign matter shall be removed, replaced with clean aggregate, and rerolled, as directed. Maintain and protect the treated areas by use of barricades for a period not to exceed 30 days.
ASPHALT SURFACE TREATMENT 027860 - 8
3.3 APPLICATION OF SECOND COURSE
A. Bituminous Treatment
1. Apply the bituminous material for the second course within 48 hours after construction of the first course, weather permitting. Remove excess aggregate prior to the second application of bituminous material. If the treated surface is excessively moistened by rain, allow the surface to dry for such time as deemed necessary. Perform the second application of bituminous material in the manner specified in paragraph APPLICATION OF FIRST COURSE, including temperature and QUANTITY LIMITS.
B. Aggregate:
1. Immediately following the second application of bitumen, aggregate conforming to the gradation and limits specified in paragraph QUANITTY LIMITS shall be spread uniformly over the bituminous material and processed in the manner specified for the first course.
C. Brooming and Rolling Second Course
1. The surface shall be rolled and broomed in the manner specified for the first course until a thoroughly bonded, smooth, even-textured surface is produced. Sweep off the surface surplus aggregate and remove it prior to final acceptance.
3.4
APPLICATION TEMPERATURE OF MATERIALS
A. Cutback Asphalt
1. Use Saybolt Furol as necessary to provide an application viscosity between 0.00004 and
0.00012 square meters per second 40 and 120 centistokes, kinematic or 20 and 60 seconds.
B. Emulsified Asphalt
Within the following ranges:
RS-1: 21.1-60 degrees C70-140 degrees F
RS-2: CRS-1 and CSR 2: 51.7-85 degrees C125-185 degrees F.
C. Asphalt Cement
1. Use Saybolt Furol as necessary to provide an application viscosity between 0.00004 and
0.00012 square meters per second 40 and 120 centistokes, kinematic or 20 and 60 seconds.
ASPHALT SURFACE TREATMENT 027860 - 9
3.5 TRAVEL APPLICATION
A. Preliminary to providing a complete surface treatment, treat three lengths of at least 100 feet each for the full width of the distributor bar. Use the appropriate typical application rates specified herein for one surface treatment trial. Make other surface treatment trials using various amounts of materials as may be deemed necessary.
3.6 PROTECTION
A. Keep all traffic off surfaces freshly treated with bituminous material. Provide sufficient warning signs and barricades so that traffic will not travel over freshly treated surfaces. Protect the treated areas from traffic for at least 24 hours after final application of bituminous material and aggregate, or for such time as necessary to prevent picking up. Immediately prior to opening to traffic, roll the entire treated area with a self-propelled pneumatic-tired roller.
END OF SECTION 027860
ASBESTOS REMEDIATION 028200 - 1
SECTION 028200 – ASBESTOS REMEDIATION
1.1 RELATED DOCUMENTS
1.2 SUMMARY
A. Section includes all work necessary to reduce airborne fiber concentrations of asbestos to the specified level and maintain the specified asbestos control limits during the life of the contract. It also includes removal, containment and disposal of asbestos-containing materials.
1. Work Area: The work area includes the following:
a. As shown in the drawings and documented in the report.
B. Contractor shall collect and package removed material in the method required by OSHA, EPA and specified herein. Contractor shall be responsible for obtaining approval for a waste disposal site in compliance with EPA Regulation 40 CFR Part 61, Subpart M and applicable State and local regulations.
C. Contractor shall post EPA and OSHA regulations at the job site.
D. Contractor shall comply with the requirements of EPA, OSHA and State and local regulations incorporated by reference.
1.3 QUALITY ASSURANCE
A. Contractor Qualifications: The contractor shall be a firm of established reputation (or if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which maintains a regular force of workmen skilled in asbestos abatement, and shall have performed this work on previous projects.
1.4 REFERENCES
A. American National Standards Institute (ANSI) Publication.
1. Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems.
2. E 849-86 Safety and Health Requirements relating to Occupational Exposure to Asbestos.
ASBESTOS REMEDIATION 028200 - 2
B. Code of Federal Regulations (CFR):
1. 29 CFR 1910.1001 and 1926.1101, Occupational Safety and Health Administration
(OSHA).
2. 29 CFR 1910.20, Subpart C, General Safety and Health Provisions.
3. 40 CFR 61, Subpart M: US Environmental Protection Agency ASHARA Regulations for
Asbestos.
4. 40 CFR 763: US Environmental Protection Agency ASHARA Regulations for Asbestos.
5. 29 CFR 1910 134: OSHA Respirator Requirements.
1.5 SUBMITTALS
A. Submit when requested by the Contracting Officer, prior to award of the contract.
1. Contractor Qualification Information. Approval by the Contracting Officer is required of the following submittals.
a. Name and address of all asbestos abatement projects performed by the contractor over the last two years.
b. Daily logs and all air monitoring reports including final decontamination levels for the last five comparable asbestos abatement projects.
c. Name, experience and applicable current asbestos certification for all supervisors and workers proposed for this project. Include documentation of: current state certificates, respiratory protection training, medical clearance and current respirator fit-testing.
d. A copy of current license certificate for the State in which work is to be performed.
B. Submit prior to beginning work. Do not commence work until the following has been approved.
1. Plan of Action: Submit a detailed plan of the procedures proposed for use in complying with the regulations included in this specification. The plan shall include the proposed work-site setup with emphasis on number and locations of air exhaust equipment, decontamination and load-out points. The plan shall also include sequencing of asbestos work, the interface of trades involved in performance of work, removal methods to be used, and emergency response plan.
2. Copy of written notification of asbestos abatement submitted to local, state or federal regulatory authority with jurisdiction over this location.
3. Identify asbestos waste transport and disposal entities proposed for this project, including documentation of the landfill's allowance to accept asbestos waste.
4. Copy of any building permits required by the local authority for related demolition activities.
5. Certificates of Compliance: Submit certification that vacuums, ventilation equipment, and other equipment required to contain airborne asbestos fibers conform to ANSI Z9.2
6. Material Safety Data Sheets: Submit copies of all material safety data sheets for any surfactants, encapsulants, solvents, cleaners, paints or other similar materials which will be used on this project.
ASBESTOS REMEDIATION 028200 - 3
1.6 CONTRACTOR RESPONSIBILITY
A. The contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site. The contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and local regulations, and shall hold the government harmless for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.
1.7 PROJECT/SITE CONDITIONS
A. Means of Egress: Establish and maintain emergency and fire exits from the work area.
B. Use of Existing Facilities: Building must be able to function as usual during normal working hours.
C. Access to Work Area: Access to work areas shall be through decontamination areas. Contractor's workforce, Government representatives, inspectors and maintenance personnel shall have access to the work area.
D. Visitors: A log of all visitors to the work area shall be kept. This log shall be given to the Contracting Officer's Representative (COR) at the close of the project.
E. Worksite Postings: A copy of the current training certificate for the NESHAP-trained responsible person and a copy of the current OSHA asbestos construction standard (29CFR1926.1101) shall be posted at the work site, throughout the project. Also current OSHA WARNING signs shall be posted on-site, in inconspicuous locations, sufficient to prevent accidental unauthorized entry into the immediate work area.
1.8 SEQUENCING/SCHEDULING
A. Unless otherwise directed by the CO or COR, all asbestos-related work shall be performed after normal working hours. Unless otherwise indicated, "After normal working hours" is defined as weekends or holidays and any time between the hours of 6:00 PM and 6:00 AM, weekdays.
2.1 EQUIPMENT
A. Equipment, including protective clothing and respirators, used in the execution of this contract and provided to visitors to the site, shall comply with ASTM E 849 and with the applicable Federal, State and local regulations. Respirators and the contractors employee Respirator Program shall conform to OSHA requirements in 29 CFR 1910.134.
ASBESTOS REMEDIATION 028200 - 4
2.2 ENCAPSULANTS
A. A sealant shall penetrate the asbestos containing material (ACM), withstand moderate impact, be flexible and flame-retardant, resist deterioration over time, have a pigmentation and be non- toxic.
Apply sealants with airless spray equipment.
2.3 AMENDED WATER
A. A wetting agent shall consist of a minimum of 50% polyoxyethylene ester and 50% polyoxyethylene ether. There shall be one ounce of wetting agent per five gallons of water.
3.1 GENERAL
A. Personal Protective Equipment (PPE): If background airborne levels indicate fiber concentration exceeding 0.01 f/cc and visible asbestos debris is present, all preparation work shall be performed while wearing PPE. As a minimum, this shall include disposable coveralls, hood, boots and negative pressure, air purifying half-mask respirators with HEPA disposable cartridges. Prior to entering the contaminated work area, all individuals shall shed street clothing and don the minimum personal protective equipment. Respirator protection shall be upgraded whenever airborne fiber levels within the work area exceed the maximum levels indicated in the table below.
RESPIRATOR TYPE MAXIMUM FIBER LEVEL
1) 1/2 Mask Negative Pressure Air Purifying 0.10 f/cc
2) Full Face Piece Negative Pressure Air Purifying 0.50 f/cc
3) Powered Air Purifying 1.00 f/cc
4) Supplied Air (Type C) >1.00 f/cc
B. The contractor shall clean up any visible debris using wet methods prior to commencing work site preparation and likewise decontaminate or dispose of, as asbestos, any equipment that is visibly contaminated in the work area. Personal protective equipment shall be worn at all times while inside the work areas. Prior to departure, each individual shall dispose of the coveralls, hood and boots and proceed through the decontamination unit or if none is required, proceed to the nearest bathroom or utility closet to wash face and hands.
C. Final Cleanup, Inspection and Encapsulation: Following removal of all asbestos, the contractor shall clean all visible asbestos debris from the interior surfaces of the work area using wet methods. Independent Consultant shall then perform a final visual inspection of the work area.
The contractor shall immediately clean up any additional suspect debris identified by the Independent Consultant. Once the area has passed visual inspection, the contractor shall encapsulate the area cleaned of asbestos and the nearby surrounding material with an asbestos encapsulant.
D. Packaging and Disposal: Contractor shall enclose all asbestos waste double-bagged in a minimum of two layers of 6 mil. Plastic labeled with EPA-approved warnings, DOT designation, the generator name (GSA) and protect location, ensure that EPA-approved Waste
ASBESTOS REMEDIATION 028200 - 5
Shipment Records (WSR) are completed for all asbestos waste disposed and that a copy of each WSR is forwarded to the COR no later than 35 days from the date the waste was accepted by the initial transporter. All asbestos waste shall be transported to the landfill in a plastic-lined, enclosed vehicle. The Government's Independent Consultant shall ensure that the asbestos waste is delivered to the landfill by following the transport vehicle on a random basis.
E. All construction-related activities associated with the contractor's work shall fully comply with current the OSHA construction standard (29 CFR 1926.1101).
3.2 GROSS ASBESTOS REMOVAL
A. All furniture, furnishings, equipment and other removable items shall be removed from the work area. Items that are visibly contaminated with asbestos debris shall be wet cleaned and HEPA vacuumed by the contractor if possible or disposed of as contaminated waste. Items cleaned to the satisfaction of the Government's Independent Consultant, shall be removed or covered with plastic. If visibly contaminated, the floor shall also be wet cleaned and HEPA vacuumed by the contractor prior to covering.
B. Contractor shall set up a decontamination facility at an entrance to the work area, made of 6-mil plastic, duct tape, staples and wooden studs, consisting of a change room, shower room and equipment room separated by overlapping, three-flap plastic airlocks, as a minimum. Shower water shall be filtered prior to disposal with a minimum 5 micron filter. A load-out chamber shall be set up at a separate doorway to the work area made of 6-mil plastic, wooden studs, duct tape and staples, consisting of two rooms joined by an overlapping, 3-flap airlock with an airlock at each end of the chamber, as a minimum.
C. Contractor shall physically isolate the work area.
1. All openings to the work area including but not limited to, doors and window, ventilation diffusers, floor and ceiling penetrations shall be sealed with a minimum of 4 mil thick plastic and duct tape.
2. Walls adjacent to occupied, common areas, such as hallways and corridors shall be additionally isolated with one sheet of 1/2 inch plywood covered with 6 mil polyethylene on both sides.
3. Plenums above lay-in ceilings, connecting other spaces to the removal area, shall be separated with two layers of 6 mil polyethylene, taped in place.
D. Contractor shall line the removal area with plastic.
1. Cover the walls of the removal area with a minimum of two layers of 4 mil plastic, duct taped in place.
2. Cover the floor with a minimum of 2 layers of 6 mil plastic.
3. Attach the wall and floor plastic to overlap the successive wall and floor plastic layers and extend the floor plastic 12 inches up the wall, as a minimum.
E. Contractor shall maintain barriers by visually inspecting and repairing any defects at the beginning of each work period. Any damages to barriers throughout the work period shall be immediately repaired before asbestos removal proceeds in that area.
ASBESTOS REMEDIATION 028200 - 6
F. All ventilation (HVAC) to and from the removal area shall be shut off throughout removal, until clearance criteria is achieved. Following HVAC shutdown, the contractor shall remove, package and dispose of as asbestos, all heating, ventilation, and air-conditioning.
G. Contractor shall cut off and lock out all electrical power in the removal area, and shall protect all electrical outlets and connections with plastic and duct tape. Power for exhaust units, lights, etc., shall be brought in with grounded extension cords. All temporary power systems used in removal areas shall be protected with Ground Fault Circuit interrupters. No internal combustion generators shall be brought in to the area.
H. Following work area preparation, removal procedures shall not commence until the preparation has been inspected and approved by the Independent Consultant.
I. Contractor shall provide High Efficiency Particulate Absolute (HEPA) filtered exhaust units to maintain a net vacuum in the work area with respect to other parts of the building. A minimum of four air charges per hour is required with the air drawn across the entire work area. The work area shall be under a net vacuum during preparation where asbestos could be disturbed, through removal and cleanup and until final inspection and air sampling has been completed.
1. Make-up air shall be provided through the decontamination chamber and loading areas, maintaining air-flow inward through these areas at all time.
2. Exhaust units shall be equipped with audible shut-off alarms and status lights shall be visible to workers. A unit that shuts off shall be reset before work proceeds in that area.
3. Pre-filters and HEPA filter shall be changed whenever the airflow is reduced below the minimum required to maintain 4 air changes per hour, or as required by the manufacturer.
4. Independent Consultant shall provide calculations and/or other test data to the COR to demonstrate achievement of the required air changes.
J. All asbestos shall be removed and maintained in a thoroughly wet state, using amended water.
K. Materials being demolished (such as light fixtures, diffusers and ductwork) must be disposed of as asbestos waste, unless they can be cleaned to the satisfaction of LA County.
3.3 ASBESTOS REMOVAL: MINI-ENCLOSURE
A. The contractor shall isolate the work area and regulate access for the duration of the removal by sealing off all ventilation to and from the immediate work area with a minimum of 4 mil plastic.
Barrier tape may be substituted for danger sign or prevent accidental unauthorized work site entry.
B. The mini-enclosure shall be erected using one layer of 4 mil polyethylene plastic sheeting for the walls and two layers of 6 mil plastic sheeting for the floor. A "roof" to the mini-enclosure may be constructed of 4 mil plastic and duct tape. The wall plastic shall be overlapped and sealed to the floor and "roof" plastic (if used) with adhesive and duct tape. All penetrations into the enclosure, including any wall-ceiling connections or pipe penetrations shall be sealed with plastic and duct tape.
ASBESTOS REMEDIATION 028200 - 7
1. The wall plastic shall be overlapped between the two layers of floor plastic.
2. A change room shall be constructed contiguous to the enclosure, consisting of 6 mil polyethylene plastic, wooden studs, staples and duct tape, as a minimum. If there is sufficient space surrounding the enclosure area, a second room shall be constructed, identical to the change room, for waste load-out. This room shall not be contiguous to the change room.
3. Each change and load-out room shall have two (2) overlapping, three-flap plastic airlocks.
One airlock shall connect each room to the enclosure and one shall connect each room to the outside.
4. The mini-enclosure shall be considered acceptable, once it passes an initial inspection by the Government's Independent Consultant.
C. A net vacuum shall be achieved within the enclosure by utilizing a vacuum cleaner equipped with HEPA filter, or HEPA filtered exhaust unit of sufficient size and quality to achieve a minimum of 4 air changes per hour.
D. All asbestos shall be removed and maintained in a thoroughly wet state, using amended water.
E. All personnel and materials entering and exiting the work area shall pass through the change room. Upon exiting the work area all PPE shall be removed in the change room and bagged waste shall pass through the load-out room.
3.4 GLOVEBAG ASBESTOS REMOVAL
A. The contractor shall isolate the work area and regulate access for the duration of the removal by sealing off all ventilation to and from the immediate work area with a minimum of 4 mil plastic.
Asbestos barrier tape may be substituted for WARNING signs to prevent accidental unauthorized work site entry.
B. The immediate work area shall be under a net vacuum throughout asbestos removal and final cleanup, until clearance criteria is met. Air exhaust units, equipped with HEPA filters or negative-pressure glovebags fitted with HEPA vacuum shall be used to maintain this reduced pressure.
The pre and/or HEPA filters shall be changed whenever the airflow is reduced below the minimum required to maintain 4 air changes per hour.
C. Contractor shall perform the following procedure:
1. Spread one layer of 6 mil plastic on the floor immediately beneath the area to be glovebagged. Floor plastic shall extend a minimum of 4 feet in all directions around the glovebag area.
2. Place all tools necessary to complete insulation removal and pipe cleaning into the glovebag.
3. Don minimum PPE and install glovebag by cutting both top ends and attaching the bag to the pipe in an airtight manner sufficient to prevent detachment during removal.
4. Insert spray wand and vacuum hose into small holes cut in side of bag.
5. Turn on vacuum cleaner or exhaust unit (if used) and commence removal while thoroughly saturating the asbestos with amended water.
ASBESTOS REMEDIATION 028200 - 8
6. Remove asbestos in small sections and lower the insulation material carefully to the bottom of the glovebag.
7. Following removal, pipe and tool cleaning, place tools in inverted glovebag glove.
8. Seal bag between insulation and pipe, with vacuum running, cut bag off pipe at top and carefully lower the bag into a doubled 6 mil labeled disposable bag.
3.5 FLOOR TILE REMOVAL
sealing off all air movement into and out of the immediate work area with a minimum of 4 mil plastic. Asbestos barrier tape may be substituted for WARNING signs to prevent accidental unauthorized work site entry. As a minimum, a change room of plastic, fitted with 2, overlapping, three-flap airlocks, shall be installed at one entrance to the work area; one airlock connecting the work area to the room and one connecting the room to the outside. A second identical load-out room shall be constructed at an available second entrance to the area.
B. Upon exiting the work area, individuals shall dispose of PPE within the change room and then proceed to a janitors closet or bathroom to wash hands and face.
C. Removal of the tiles by heating with a "pan-style" heater is acceptable. If this method is chosen, adequate precautions shall be taken by the contractor to prevent burns or electrical shock. Once the tile has been heated sufficiently to remove it, care shall be taken to prevent breaking tile.
D. Removal of the tiles by physically chipping them, is acceptable. If this method is chosen, all electrical power to the area shall be shut off and locked out, to prevent electrical shock. The tiles and chipping tools shall be thoroughly wetted with amended water before and during the chipping process.
E. Removal of the tiles by "shot-blasting" is acceptable, only if the shot-blasting equipment has been fitted with an effective HEPA filter and the resulting dust is maintained thoroughly wet with amended water.
3.6 FLOOR TILE MASTIC REMOVAL
either shutting off or sealing off all ventilation into and out of the work area with a minimum of 4 mil plastic tape. OSHA WARNING signs shall be posted just outside the work area in inconspicuously in locations sufficient to prevent accidental unauthorized entry into the work area.
B. Removal of the mastic by physically scraping is acceptable. If this method is chosen, amended water shall be used to keep all asbestos-containing material saturated during the removal.
C. Removal of the mastic through…
This is the start of the file's text. The full file is on GovTribe.