39-IFB 092-25-RM-ADDENDUM 5.docx
DOCX document 28 KB Posted
- Attached to
- Pump Station 43 Improvements
- Solicitation number
- IFB-092-25-RM
- Issued by
- Leon County, Florida
About this file
This document is Addendum No. 5 for the Pump Station 43 Improvements Invitation for Bid (IFB 092-25-RM) issued by the local government of Tallahassee, Florida. The addendum, released on August 22, 2025, modifies the original bid solicitation by providing a revised Schedule of Bid Items with corrected cell formatting in the Bonfire spreadsheet. The bid opening remains scheduled for Tuesday, August 26, 2025, at 2:30 P.M. The associated contract opportunity involves infrastructure improvements including removal of an out-of-service forcemain, installation of approximately 675 linear feet of 18-inch ductile iron pipe force main, placement of a surge tank, installation of a kingpin manhole, bypass pumping components, and relocation of an existing chemical tank.
The project includes additional scope elements such as asphalt patching, milling, resurfacing, surface restoration, material disposal, traffic maintenance, and area restoration. Contractors are required to provide arboricultural mitigation for impacted trees and secure road closure requests after submitting acceptable Temporary Traffic Control plans. A mandatory pre-bid meeting was conducted on July 23, 2025, via Microsoft Teams, indicating the project's complexity and need for detailed contractor understanding. The solicitation emphasizes that the selected contractor must demonstrate capability to perform services in a timely, professional manner and complete all work in accordance with the provided contract documents.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 22, 2025
NOTICE TO BIDDERS ADDENDUM NO. 5
PUMP STATION 43 IMPROVEMENTS
IFB 092-25-RM
Please be advised of Addendum No. 5 to the above referenced Bid Solicitation as follows:
1. This addendum forms a part of the proposal documents and modifies the original specifications and proposal documents, dated DATE as noted below.
2. Respondent must acknowledge this addendum by accepting the addendum in Bonfire.
This addendum consists of one item:
ITEM NO. 1:
A revised Schedule of Bid Items has been added to Bonfire. In the spreadsheet, cells F27-28 and F32-33 were not properly formatted, so the Extended Prices would not be calculated correctly.
Please utilize this updated spreadsheet when filling out your bid pricing.
BID OPENING HAS NOT CHANGED AND IS TUESDAY, AUGUST 26, 2025, AT 2:30 P.M.
Veronica McCrackin Veronica McCrackin Purchasing Director image1.png