17-18-APPENDIX D - IFB 092-25-RM PS-43 Meginnis Arm WGI (4-9-2024) Utility Report.pdf

PDF 5 MB Posted

Attached to
Pump Station 43 Improvements
Solicitation number
IFB-092-25-RM
Issued by
Leon County, Florida

About this file

The document is a Surveyor's Report of Subsurface Utility Investigation prepared by WGI, Inc. for the City of Tallahassee's Water Resources Engineering department, focusing on the Pump Station 43 Force Main project located on Meginnis Arm Road in Leon County, Florida. The investigation was conducted between March 8 and April 4, 2024, with the primary purpose of detecting, designating, exposing, and surveying wastewater pipelines within specified project limits. The study followed the ASCE 38-22 Standard Guideline for Investigating and Documenting Existing Utilities, specifically targeting Quality Level B and Quality Level A investigations to identify material type transitions and depths of the Meginnis Arm Force Main.

The investigation involved eight Quality Level A test holes along the force main, using methods such as One Call utility identification, geophysical searching, and physical excavation to precisely locate underground utilities. The project utilized ground penetrating radar, utility line locators, and a vacuum excavation truck to expose and measure utility features. The report includes detailed site photos, elevation data, and utility mapping, with depths ranging from 5.2' to 6.7' and surface elevations between 121.6' and 130.8'. WGI emphasizes that while comprehensive, the investigation does not guarantee complete utility detection due to potential interference from soil conditions, utility materials, and other environmental factors. The report is certified by a Professional Surveyor and Mapper with Florida License No. LS 6387, providing a professional assessment of the subsurface utility infrastructure.

View the file

Other files

File Type Posted
6-6-13. REQUIRED IFB 092-25-RM Representations Certifications.docx DOCX document
5-5-12. REQUIRED IFB 092-25-RM Non Collusion Affidavit of Respondent.docx DOCX document
18-19-APPENDIX E - IFB 092-25-RM PS-43 Meginnis Arm Survey SIGNED.pdf PDF
38-14-7. REQUIRED REVISED 08-21-25 PRICE SCHEDULE IFB 092-25-RM-ADDENDUM 5.xlsx XLSX spreadsheet
35-IFB 092-25-RM-Addendum 4.docx DOCX document
7-7-14. REQUIRED IFB 092-25-RM Local Vendor Affidavit.docx DOCX document
36-IFB 092-25-RM-ADDENDUM 5.docx DOCX document
37-14-7. REQUIRED REVISED 08-21-25 PRICE SCHEDULE IFB 092-25-RM-ADDENDUM 5.xlsx XLSX spreadsheet
13-13-6. IFB 092-25-RM Final Plans.pdf PDF
3-3-16. REQUIRED IFB 092-25-RM OEV FORMS ITB MWBE Forms Updated 10.06.22.docx DOCX document
21-MANDATORY PRE-BID SIGN IN SHEET A.doc DOC document
1-1-1. REQUIRED IFB 092-25-RM IFB SECTIONS 123.docx DOCX document
12-12-5. IFB 092-25-RM SUPPLEMENTAL INFORMATION.docx DOCX document
8-8-15. REQUIRED IFB 092-25-RM Responsible Vendor Review Form.docx DOCX document
30-IFB 092-25-RM-Addendum 3.docx DOCX document
15-16-APPENDIX B - IFB 092-25-RM Leon County EMP Permit (LEM24062).pdf PDF
2-2-8. REQUIRED IFB 092-25-RM Performance and Bid Bond Trench Safety Act Form.docx DOCX document
32-IFB 092-25-RM-Addendum 3.docx DOCX document
33-IFB 092-25-RM ADDENDUM 3 REMOVE AND REPLACE Plan Sheet 4-Addendum 3.pdf PDF
26-9. REQUIRED Certification of a Drug Free Workplace (1).pdf PDF
28-IFB 092-25-RM-Addendum 2.docx DOCX document
25-IFB 092-25-RM-Addendum 1.docx DOCX document
24-ADDENDUM 1 13-6a. Revised Plan Sheets 4,16,17,18-Addendum 1.pdf PDF
11-11-4. IFB 092-25-RM SPECIAL PROVISIONS.docx DOCX document
31-IFB 092-25-RM ADDENDUM 3 REMOVE AND REPLACE Plan Sheet 4-Addendum 3.pdf PDF
27-PS-43-Mandatory Pre-Bid Meeting Agenda.docx DOCX document
14-15-APPENDIX A - IFB 092-25-RM City of Tallahassee General Utility Permit (TEM220057).pdf PDF
20-21. HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
19-20-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
22-Addendum 1 14 7b Revised Required Price Schedule IFB 092 25 RM.xlsx XLSX spreadsheet
34-IFB 092-25-RM-Addendum 4.docx DOCX document
4-4-11. REQUIRED IFB 092-25-RM Vendor Conflict of Interest.docx DOCX document
10-10-3. IFB 092-25-RM SUPPLEMENTAL SPECIFICATIONS.pdf PDF
39-IFB 092-25-RM-ADDENDUM 5.docx DOCX document
16-17-APPENDIX C - IFB 092-25-RM PS-43 Leon County R-W Permit (LRW24208).pdf PDF
23-IFB 092-25-RM-Addendum 1.docx DOCX document
9-9-2. IFB 092-25-RM GENERAL PROVISIONS.pdf PDF
29-IFB 092-25-RM-Addendum 2.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page

Surveyor’s Report of Subsurface Utility Investigation

WGI Inc. Project Number: 6462.12

Pump Station 43 (Meginnis Arm) Force Main

Meginnis Arm Road Leon County, Florida

Report Date: April 9, 2024

Submitted to:

City of Tallahassee

Water Resources Engineering Underground Utilities & Public Infrastructure

408 N. Adams Street Tallahassee, Florida 32301

Submitted by:

WGI, Inc.

Licensed Business Number 7055

2316 Killearn Center Boulevard, Building C, Suite 100 Tallahassee, Florida 32309

Phone: (850) 210-0101 Fax: (855) 856-3577

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 2

CONTENTS

1. PROJECT INFORMATION

2. PROJECT LOCATION

3. TYPE OF SURVEY

4. METHODS USED TO COLLECT AND DEPICT UTILITY INFORMATION

One Call

Geophysical Search

Quality Level B Designating

Quality Level A Locating

5. METADATA FROM CLIENT

6. UTILITY DRAWING FILES THAT ACCOMPANY THIS REPORT

7. PROJECT CONTROLS AND DATUMS

8. UTILITY LOCATION TEST HOLE DATA

9. UTILITY MAP

10. DATA LIMITATIONS

11. CERTIFICATION

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 3

1. PROJECT INFORMATION

• Client: City of Tallahassee

• WGI Project Number: 6462.12

• Project Location: Meginnis Arm Road (see Figure 1.)

• Project Limits: Along Meginnis Arm Road between Meginnis Lane and Lakeshore Drive near the Right of Way of SR 8 (I-10)

• Survey Date: Begin Date: 03/08/2024; End Date: 04/04/2024.

• Field Personnel: John Alford, Matt Logue, and Aaron Taylor

• Field Book Number: N117

2. PROJECT LOCATION

Figure 1.

3. TYPE OF SURVEY

The purpose of this investigation was to detect, designate, expose, interpret, and survey the locations of wastewater pipelines within specified project limits identified by the Client.

This report depicted the results of the subsurface utility investigation in general conformity with the Quality Level B and Quality Level A definitions of ASCE1 38-22 Standard Guideline for Investigating and Documenting Existing Utilities.

The subsurface utility investigation focused on identifying the points of material type transition and corresponding depths of the Meginnis Arm Force Main at locations specified by the Client.

1 ASCE. Standard guideline for investigating and documenting existing utilities. American Society of Civil Engineers.

ASCE/UESI/CI 38-22. Reston, VA. 2022

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 4

4. METHODS USED TO COLLECT AND DEPICT UTILITY INFORMATION

One Call

WGI contacted Sunshine 811 One Call of Florida (SSOCOF). Design Ticket Nos.

067402995 was issued to WGI. Using the design ticket record of Utility Agency Owners (UAO), WGI contacted each UAOs (see Table 1.) to request utility records for the project site. However, no records, oral nor written, were provided to WGI other than responses included in the design tickets (See Table 1.). WGI did not perform any utility record records research on this project.

Geophysical Search

WGI used a Mala Locator System ground penetrating radar (GPR) device and Vivax Metrotech Utility Line Locator, Model 9860XT to sweep for known, suspected, and unknown utilities within the specified project limits.

Quality Level B Designating

WGI performed ASCE 38-22 Quality Level B subsurface utility designation of the Meginnis Arm force main using geophysical prospecting equipment: Mala Locator System ground penetrating radar (GPR), Vivax Metrotech Utility Line Locator, and Rigid SR-60 Seek-Tech Utility Line Locator.

WGI and affected utility agency owners marked existing underground utilities at the ground surface in accordance with the American Public Works Association Uniform Color Code. Paint marks were sprayed on the ground representing the approximate centerline of a utility feature. WGI also photographed the immediate position of each test hole that included paint marks, where designation was performed.

Quality Level A Locating

Test hole locations were selected by the Client in consultation with WGI. After utilities were designated and marked on the ground surface, subsurface utility investigation personnel performed soil extraction at individual test holes to determine type, depth, configuration, and size of utility feature using a Vacuum Master 4000 truck. After backfilling test holes, a geospatial survey crew performed a horizontal and vertical survey to accurately determine three-dimensional coordinates of each exposed utility.

This is the process known as Quality Level A utility locating, as defined by ASCE 38-22.

A total of eight (8) Quality Level A test holes were performed for this task order.

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 5

Table 1. Utility Agency Owners

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 6

5. METADATA FROM CLIENT

Client furnished the following digital data files for use by WGI:

• DEV_F060 PS 43 FM 1992.pdf

6. UTILITY DRAWING FILES THAT ACCOMPANY THIS REPORT

• V-646212-SV0001.dwg

7. PROJECT CONTROLS AND DATUMS

• Horizontal and vertical control was utilized from a previous survey, by this firm, job number, 5987.00, dated 07/28/2020.

• The coordinate system utilized herein is relative to the Florida State Plane Coordinate

System, North Zone, Lambert Projection, North American Datum of 1983 (National Spatial

Reference System of 2011 Adjustment) (NAD83/NSRS2011).

• Units of measurements used are U.S. Survey Feet.

• Elevations are based on the North American Vertical Datum of 1988 (NAVD 88).

8. UTILITY LOCATION TEST HOLE DATA

ABBREVIATIONS

ASCE = American Society of Civil Engineers AT = Aaron Taylor

(B) = Level B BE = Buried Electric BGV = Below Grade Vault BPWR = Buried Power BT = Buried Telephone CL = Centerline CMON = Concrete Monument CONC. = Concrete DIP = Ductile Iron Pipe DB = Duct Bank DBC = Direct Buried Cable FB = Field Book FM = Force Main FOCU = Buried Fiber Optic Cable GM = Gas Line GPR = Ground Penetrating Radar HDPE = High Density Polyethylene HL = Hub & Lathe INC. = Incorporated I.R.C. = Iron Rod & Cap JA = John Alford JH = Jarvaro Hampton ML = Matt Logue N/A = Not applicable

N = Nail No. = Number PG = Page Number PVC = Polyvinyl Chloride QLA = Quality Level A QLB = Quality Level B RT = Right R.O.W. = Right-of-Way RCP = Reinforced Concrete Pipe S/N = South to North SLC = Street Light ST. = Street STA = Station STL = Steel STS = Storm Sewer SS = Sanitary Sewer TC = Traffic Control THA = Test Hole Quality Level A UNK = Unknown, Unable to Identify Utility VCP = Vitrified Clay Pipe W/E = West to East WGI = WGI, Inc.

WM = Water Line WPB = Wiring Pull Box X = Chiseled X Cut

7 WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 8

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 9

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 10

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 11

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 12

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 13

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 14

PREPARED BY: V-646212-SV001.DWG

CHECKED/QC

DRAWN BY

CAD

DATE

JOB NO.

JH

AV

6462.12

4/9/2024

PROJECT: TASK:

PUMP STATION 43 FORCE MAIN UTILITY MAP (1)

0 50 100 200

SCALE: 1" = 100'

Phone No. 866.909.2220 www.wginc.com LB No. 7055

2316 Killearn Center Blvd, Bldg C, Suite 100, Tallahassee, FL 32309

AutoCAD SHX Text

MEGINNIS ARM ROAD

AutoCAD SHX Text

SR 8 (I-10)

AutoCAD SHX Text

PUMP STATION 43

AutoCAD SHX Text TEST HOLE #JA01 FM 30" STEEL CASING GROUND ELEVATION: 121.6' DEPTH TO COVER: 6.20' TOP ELEVATION: 115.4' TEST HOLE #JA02 FM 18" DIP GROUND ELEVATION: 121.6' DEPTH TO COVER: 6.6' TOP ELEVATION: 115.0'

AutoCAD SHX Text TEST HOLE #JA03 FM CONC. THRUST BLOCK GROUND ELEVATION: 122.2' DEPTH TO COVER: 6.6' TOP ELEVATION: 115.6'

AutoCAD SHX Text TEST HOLE #JA04 FM 18" PVC GROUND ELEVATION: 121.9' DEPTH TO COVER: 6.7' TOP ELEVATION: 115.2'

AutoCAD SHX Text TEST HOLE #JA08 FM 30" STEEL CASING GROUND ELEVATION: 130.3' DEPTH TO COVER: 4.8' TOP ELEVATION: 125.5' TEST HOLE #JA07 FM 18" DIP GROUND ELEVATION: 130.3' DEPTH TO COVER: 5.2' TOP ELEVATION: 125.5'

AutoCAD SHX Text Jarvaro Hampton P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg

AutoCAD SHX Text

TM

AutoCAD SHX Text

TP

AutoCAD SHX Text

= TEST HOLE

AutoCAD SHX Text

LINE LEGEND:

AutoCAD SHX Text

= BURIED SANITARY FORCE MAIN(ASCE 38-22 QUALITY LEVEL)

PREPARED BY: V-646212-SV001.DWG

CHECKED/QC

DRAWN BY

CAD

DATE

JOB NO.

JH

AV

6462.12

4/9/2024

PROJECT: TASK:

PUMP STATION 43 FORCE MAIN UTILITY MAP (2)

0 50 100 200

SCALE: 1" = 100'

Phone No. 866.909.2220 www.wginc.com LB No. 7055

2316 Killearn Center Blvd, Bldg C, Suite 100, Tallahassee, FL 32309

AutoCAD SHX Text TEST HOLE #JA08 FM 30" STEEL CASING GROUND ELEVATION: 130.3' DEPTH TO COVER: 4.8' TOP ELEVATION: 125.5' TEST HOLE #JA07 FM 18" DIP GROUND ELEVATION: 130.3' DEPTH TO COVER: 5.2' TOP ELEVATION: 125.5'

AutoCAD SHX Text TEST HOLE #JA05 FM 18" DIP GROUND ELEVATION: 130.6' DEPTH TO COVER: 5.5' TOP ELEVATION: 125.1'

AutoCAD SHX Text TEST HOLE #JA06 FM 18" PVC GROUND ELEVATION: 130.8' DEPTH TO COVER: 6.0' TOP ELEVATION: 124.8'

AutoCAD SHX Text

SR 8 (I-10)

AutoCAD SHX Text

MEGINNIS ARM ROAD

AutoCAD SHX Text Jarvaro Hampton P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg P:\6400\6462.12 Pump Station 43 Force Main SUE\SURVEY\Drawings\Survey\V-646212-SV001.dwg

AutoCAD SHX Text

TM

AutoCAD SHX Text

TP

AutoCAD SHX Text

= TEST HOLE

AutoCAD SHX Text

LINE LEGEND:

AutoCAD SHX Text

= BURIED SANITARY FORCE MAIN(ASCE 38-22 QUALITY LEVEL)

WGI, Inc. 2316 Killearn Center Blvd., Building C, Suite 100, Tallahassee, FL 32309 850.210.0101 Page 17

10. DATA LIMITATIONS

This report presents spatial data of existing utilities to allow new infrastructure to be designed above, below, or around the existing utility features. The utility data is not intended for the design of a new utility joining an existing utility. Quality Level A or B data presented in this report may not be accurate or precise enough to be relied upon for the design of utility connections or taps to existing or proposed pipelines and conduits.

Quality Level B data should not be used where exact horizontal and vertical measurements are necessary.

Quality Level A utility data is the horizontal and vertical location of a utility feature obtained by exposure and measurement of the utility feature at a specific point of reference.

The absence of utilities does not guarantee there is a finding of “no utility conflict.”

Utilizing WGI’s subsurface utility investigation services does not relieve any party from its obligation to contact the utility damage prevention system before construction excavation begins. Utility marks placed on the ground by WGI are not to be used for construction purposes.

Geophysical prospecting techniques are subject to outside interference which are beyond the control of WGI and may impede the effectiveness of utility detection. Soil conditions, utility material, size, depth, groundwater salinity, and soil conductivity may prevent detection of some underground utilities. Therefore, there is no guarantee that all utilities have been detected and located.

Certain surface obstructions may have restricted access to some utility features. In such cases, subsurface investigation was concluded at the sole discretion of WGI after determining that all reasonable resources, means, and methods have been exhausted.

Such occurrences, if any, are specifically noted in this report.

11. CERTIFICATION

I hereby certify that this subsurface utility investigation report and all files herein are a true and accurate representation of a field investigation made under my responsible charge, and that to the best of my knowledge meets the Standards of Practice as set forth by the Florida Boards of Professional Surveyors and Mappers in Rule Chapter 5J-17, Florida Administrative Code.

Signed:

Jeremiah Slaymaker, Professional Surveyor and Mapper Florida License No. LS 6387

The official records of this surveyor’s report is the electronic files digitally signed and sealed under rule 5J-17.062, F.A.C.

V-646212-SV001-8.5X11 - 2.pdf
Sheets and Views
8.5X11 - 2
V-646212-SV001-8.5X11 - 1.pdf
Sheets and Views
8.5X11 - 1
2024-04-09T21:11:59-0400
Jeremiah Slaymaker

File details come from the government source that posted it. Updated .