30-IFB 092-25-RM-Addendum 3.docx
DOCX document 28 KB Posted
- Attached to
- Pump Station 43 Improvements
- Solicitation number
- IFB-092-25-RM
- Issued by
- Leon County, Florida
About this file
This document is Addendum No. 3 for the Pump Station 43 Improvements project issued by the local government (City), specifically addressing an Invitation for Bid (IFB) numbered 092-25-RM. The addendum, dated August 14, 2025, modifies the original bid specifications and requires contractors to provide a detailed bypass pumping plan, with updated notes added to Sheet 4 of the plan set. The bid opening remains unchanged and is scheduled for Thursday, August 21, 2025, at 2:30 P.M., with bidders required to acknowledge the addendum through the Bonfire platform.
The underlying project involves infrastructure improvements for Pump Station 43, which includes removing an out-of-service forcemain, installing approximately 675 linear feet of 18-inch ductile iron pipe force main, placing an existing forcemain out of service, and installing infrastructure components such as a surge tank, kingpin manhole, and relocating a chemical tank. Additional project elements include asphalt patching, milling, resurfacing, surface restoration, traffic maintenance, and arboricultural mitigation. A mandatory pre-bid meeting was previously held on July 23, 2025, via Microsoft Teams, indicating thorough pre-procurement planning and stakeholder engagement for this municipal infrastructure project.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 14, 2025
NOTICE TO BIDDERS ADDENDUM NO. 3
PUMP STATION 43 IMPROVEMENTS
IFB 092-25-RM
Please be advised of Addendum No. 3 to the above referenced Bid Solicitation as follows:
1. This addendum forms a part of the proposal documents and modifies the original specifications and proposal documents, dated DATE as noted below.
2. Respondent must acknowledge this addendum by accepting the addendum in Bonfire.
This addendum consists of one item:
ITEM NO. 1:
The Contractor will be required to provide a detailed by-pass pumping plan. To aid in that effort, notes have been added and/or revised on Sheet 4 of the provided plan set. These notes detail the contractor’s requirements, the City’s requirements, and the flow and pressure data requirements for the bypass pumping operations.
Please replace the existing Sheet 4 in the plan set with the revised Sheet 4 added to Bonfire.
BID OPENING HAS NOT CHANGED AND IS THURSDAY, AUGUST 21, 2025, AT 2:30 P.M.
Veronica McCrackin Veronica McCrackin Purchasing Director image1.png