About this file
This is a Price Schedule Bid Form for the Pump Station 43 Improvements project for the City of Tallahassee, Florida. The project involves comprehensive infrastructure upgrades, including removal and installation of approximately 675 linear feet of 18-inch ductile iron pipe (DIP) force main, installation of a surge tank and kingpin manhole, bypass pumping components, and relocation of an existing chemical tank. The bid includes multiple contract items such as mobilization, maintenance of traffic, erosion control, tree removal, fence installation, sewer utilities work, and surface restoration. A mandatory pre-bid meeting is scheduled for July 23, 2025, at 2:00 PM EST via Microsoft Teams, with specific connection details provided.
The bid form is structured with itemized line items across several categories including general contract items, road surface restoration, miscellaneous surface restoration, sanitary sewer utilities, and surge tank and chemical feed tank work. While specific pricing is not filled in on this form, the document provides a comprehensive breakdown of quantities and units for each project component. The bid will be awarded to the contractor with the lowest total bid, with notes indicating that any item not specifically identified shall be considered incidental. The project scope requires the contractor to perform work in a first-class workmanlike manner, including arboricultural mitigation, disposal of removed materials, maintenance of traffic, and restoration of disturbed areas.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PS-43-Bid Form
| 14-7b. - Schedule of Bid Items REVISED 08-21-25 REQUIRED | |||||
| Pump Station 43 Improvements | |||||
| 8/21/25 | |||||
| Contractor Name: __________________________________________________ | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| General Contract Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 101-1 | Mobilization | 1 | LS | $ - 0 | $ - 0 |
| 102-1 | Maintenance of Traffic | 1 | LS | $ - 0 | $ - 0 |
| 104-WS | Temporary Erosion, Sedimentation, and Water Pollution Control | 1 | LS | $ - 0 | $ - 0 |
| 104-15 | Soil Tracking Prevention Device | 1 | EA | $ - 0 | $ - 0 |
| 110-1-1 | Clearing & Grubbing | 1 | LS | $ - 0 | $ - 0 |
| 110-4 | Removal of Existing Concrete Pavement | 45 | SY | $ - 0 | $ - 0 |
| 110-4-1 | Removal of Existing Concrete Air Release Vault | 1 | LS | $ - 0 | $ - 0 |
| 110-4-2 | Removal of Existing Concrete Thrust Restraints | 1 | LS | $ - 0 | $ - 0 |
| 110-15 | Tree Protection & Arboricultural Mitigation | 1 | LS | $ - 0 | $ - 0 |
| 110-23 | Tree Removal | 6 | EA | $ - 0 | $ - 0 |
| 110-4-10 | Removal of Existing Concrete | 7 | SY | $ - 0 | $ - 0 |
| 550-10-70 | Fence Gate (3') | 1 | EA | $ - 0 | $ - 0 |
| 550-10-80 | Fence Gate (16' Cantilever) | 1 | EA | $ - 0 | $ - 0 |
| SBP-10 | Sewer Bypass Pumping (Each Day)1 | 1 | EA | $ - 0 | $ - 0 |
| PWS-1 | Relocate/Adjust Existing Water Service | 1 | EA | $ - 0 | $ - 0 |
| 550-10-620 | Perimeter Fence (Vinyl - 5.1'-6.0') | 405 | LF | $ - 0 | $ - 0 |
| Subtotal - General | $ - 0 | ||||
| Road Surface Restoration Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 334-1 | Structural Asphalt (SP 9.5) (1.5") | 72 | SY | $ - 0 | $ - 0 |
| 327-70-4 | Milling (1.5") | 72 | SY | $ - 0 | $ - 0 |
| Subtotal - Roadway | $ - 0 | ||||
| Miscellaneous Surface Restoration Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 522-1 | Reinforced Concrete Ditch Pavement2 | 23 | SY | $ - 0 | $ - 0 |
| 570-1 | Solid Sod | 2050 | SY | $ - 0 | $ - 0 |
| Subtotal - Miscellaneous | $ - 0 | ||||
| Sanitary Sewer Utilities | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| MHL-SPEC-0721 | Sanitary Manhole (Sluice Gate Structure) | 1 | EA | $ - 0 | $ - 0 |
| GSM-02-18-20-DIP | Gravity Sewer Main, 18", 18.1-20.0 Ft. Depth, DIP | 16 | LF | $ - 0 | $ - 0 |
| YP-16-SS | 16" Stainless Steel Suction Assembly | 1 | EA | $ - 0 | $ - 0 |
| 522-10 | Concrete Slab (6" - Bypass)3 | 8 | SY | $ - 0 | $ - 0 |
| SFM-01-18-DIP | Sewer Force Main, 18”, DIP (In Pavement/Road) | 47 | LF | $ - 0 | $ - 0 |
| SFM-02-18-DIP | Sewer Force Main, 18”, DIP (Outside Pavement/Road) | 632 | LF | $ - 0 | $ - 0 |
| SPV-18 | Plug Valve w/ Valve Box, 18” | 2 | EA | $ - 0 | $ - 0 |
| YP-18-DIP | Bypass Connection Assembly | 1 | EA | $ - 0 | $ - 0 |
| APS-01 | Place Out of Service Sanitary Sewer Main Grout-Fill | 33 | CY | $ - 0 | $ - 0 |
| APS-05-8 | Remove Sanitary Sewer Main (8") | 11 | LF | $ - 0 | $ - 0 |
| APS-05-16 | Remove Sanitary Sewer Main (16") | 591 | LF | $ - 0 | $ - 0 |
| APS-05-18 | Remove Sanitary Sewer Main (18") | 520 | LF | $ - 0 | $ - 0 |
| Subtotal - Sewer | $ - 0 | ||||
| Surge Tank and Chemical Feed Tank | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 522-11 | Concrete Foundation (Surge Tank and Chem Tank Pads)4 | 42 | SY | $ - 0 | $ - 0 |
| Tank-01 | Surge Tank Installation | 1 | LS | $ - 0 | $ - 0 |
| YP-12-DIP | 12" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| YP-3-DIP | 4" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| Subtotal - Tanks | $ - 0 | ||||
| TOTAL | |||||
| TOTAL | $ - 0 | ||||
| Notes | |||||
| 1) | Contractor shall provide anticipated number of days sewer bypass to be required. | ||||
| 2) | Quantity may vary as paved ditch shall be removed and replaced to nearest joint. | ||||
| 3) | Quantity includes concrete slabs around suction line and connection line for sewer bypass system. | ||||
| 4) | Quantity includes concrete slabs surge tank and chemical feed tank per foundation design plans. | ||||
| 5) | Any item not specifically identified on the bid form shall be considered incidental and all costs associated with that item shall be included using the most appropriate bid item listed. This could include, but is not limited to: As‐built preparation, and coordination with City Electric/Gas/Growth Management Departments, etc. |
Bid will be awarded to contractor with the lowest total bid for both projects.