22-Addendum 1 14 7b Revised Required Price Schedule IFB 092 25 RM.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Pump Station 43 Improvements
- Solicitation number
- IFB-092-25-RM
- Issued by
- Leon County, Florida
About this file
This document is a bid form (Addendum 1) for the Pump Station 43 Improvements project for the City of Tallahassee, Florida. The project involves comprehensive infrastructure replacement and renovation, including removal of an out-of-service forcemain, installation of approximately 675 linear feet of 18-inch ductile iron pipe (DIP) force main, placement of an existing forcemain out of service, installation of a surge tank and kingpin manhole, and relocation of a chemical tank. The project also includes surface restoration work such as asphalt patching, milling, resurfacing, and arboricultural mitigation. A mandatory pre-bid meeting is scheduled for July 23, 2025, at 2:00 PM EST via Microsoft Teams, with specific connection details provided.
The bid form includes a detailed schedule of bid items across multiple categories, including general contract items, road surface restoration, miscellaneous surface restoration, sanitary sewer utilities, and surge tank and chemical feed tank installations. The itemized list covers numerous specific tasks with associated quantities, such as mobilization, maintenance of traffic, tree removal, fence installation, sewer main removal and installation, concrete work, and bypass pumping. While the unit price fields are currently blank, the document provides a structured framework for contractors to complete their pricing. The project appears to be funded by local municipal infrastructure funds, with an emphasis on comprehensive utility improvement and replacement.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PS-43-Bid Form
| ADD 1 - REQUIRED REVISED 14-7a. - Schedule of Bid Items | |||||
| Pump Station 43 Improvements | |||||
| 7/30/25 | |||||
| Contractor Name: __________________________________________________ | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| General Contract Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 101-1 | Mobilization | 1 | LS | $ - 0 | $ - 0 |
| 102-1 | Maintenance of Traffic | 1 | LS | $ - 0 | $ - 0 |
| 104-WS | Temporary Erosion, Sedimentation, and Water Pollution Control | 1 | LS | $ - 0 | $ - 0 |
| 104-15 | Soil Tracking Prevention Device | 1 | EA | $ - 0 | $ - 0 |
| 110-1-1 | Clearing & Grubbing | 1 | LS | $ - 0 | $ - 0 |
| 110-4 | Removal of Existing Concrete Pavement | 45 | SY | $ - 0 | $ - 0 |
| 110-4-1 | Removal of Existing Concrete Air Release Vault | 1 | LS | $ - 0 | $ - 0 |
| 110-4-2 | Removal of Existing Concrete Thrust Restraints | 1 | LS | $ - 0 | $ - 0 |
| 110-15 | Tree Protection & Arboricultural Mitigation | 1 | LS | $ - 0 | $ - 0 |
| 110-23 | Tree Removal | 6 | EA | $ - 0 | $ - 0 |
| 110-4-10 | Removal of Existing Concrete | 7 | SY | $ - 0 | $ - 0 |
| 550-10-70 | Fence Gate (3') | 1 | EA | $ - 0 | $ - 0 |
| 550-10-80 | Fence Gate (16' Cantilever) | 1 | EA | $ - 0 | $ - 0 |
| SBP-10 | Sewer Bypass Pumping (Each Day)1 | 1 | EA | $ - 0 | $ - 0 |
| PWS-1 | Relocate/Adjust Existing Water Service | 1 | EA | $ - 0 | $ - 0 |
| 550-10-620 | Perimeter Fence (Vinyl - 5.1'-6.0') | 405 | LF | $ - 0 | $ - 0 |
| Subtotal - General | $ - 0 | ||||
| Road Surface Restoration Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 334-1 | Structural Asphalt (SP 9.5) (1.5") | 72 | SY | $ - 0 | $ - 0 |
| 327-70-4 | Milling (1.5") | 72 | SY | $ - 0 | $ - 0 |
| Subtotal - Roadway | $ - 0 | ||||
| Miscellaneous Surface Restoration Items | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 522-1 | Reinforced Concrete Ditch Pavement2 | 23 | SY | $ - 0 | $ - 0 |
| 570-1 | Solid Sod | 2050 | SY | $ - 0 | $ - 0 |
| Subtotal - Miscellaneous | $ - 0 | ||||
| Sanitary Sewer Utilities | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| MHL-SPEC-0721 | Sanitary Manhole (Sluice Gate Structure) | 1 | EA | $ - 0 | $ - 0 |
| GSM-02-18-20-DIP | Gravity Sewer Main, 18", 18.1-20.0 Ft. Depth, DIP | 16 | LF | $ - 0 | $ - 0 |
| YP-16-SS | 16" Stainless Steel Suction Assembly | 1 | EA | $ - 0 | $ - 0 |
| 522-10 | Concrete Slab (6" - Bypass)3 | 8 | SY | $ - 0 | $ - 0 |
| SFM-01-18-DIP | Sewer Force Main, 18”, DIP (In Pavement/Road) | 47 | LF | $ - 0 | $ - 0 |
| SFM-02-18-DIP | Sewer Force Main, 18”, DIP (Outside Pavement/Road) | 632 | LF | $ - 0 | $ - 0 |
| SPV-18 | Plug Valve w/ Valve Box, 18” | 2 | EA | $ - 0 | $ - 0 |
| YP-18-DIP | Bypass Connection Assembly | 1 | EA | $ - 0 | $ - 0 |
| APS-01 | Place Out of Service Sanitary Sewer Main Grout-Fill | 33 | CY | $ - 0 | $ - 0 |
| APS-05-8 | Remove Sanitary Sewer Main (8") | 11 | LF | $ - 0 | $ - 0 |
| APS-05-16 | Remove Sanitary Sewer Main (16") | 591 | LF | $ - 0 | $ - 0 |
| APS-05-18 | Remove Sanitary Sewer Main (18") | 520 | LF | $ - 0 | $ - 0 |
| Subtotal - Sewer | $ - 0 | ||||
| Surge Tank and Chemical Feed Tank | |||||
| Item No. | Description of Item | QTY | Unit | Unit Prices | Extended Prices |
| 522-11 | Concrete Foundation (Surge Tank and Chem Tank Pads)4 | 42 | SY | $ - 0 | $ - 0 |
| Tank-01 | Surge Tank Installation | 1 | LS | $ - 0 | $ - 0 |
| YP-12-DIP | 12" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| YP-3-DIP | 3" DIP Pipe Connection | 1 | LS | $ - 0 | $ - 0 |
| Subtotal - Tanks | $ - 0 | ||||
| TOTAL | |||||
| TOTAL | $ - 0 | ||||
| Notes | |||||
| 1) | Contractor shall provide anticipated number of days sewer bypass to be required. | ||||
| 2) | Quantity may vary as paved ditch shall be removed and replaced to nearest joint. | ||||
| 3) | Quantity includes concrete slabs around suction line and connection line for sewer bypass system. | ||||
| 4) | Quantity includes concrete slabs surge tank and chemical feed tank per foundation design plans. | ||||
| 5) | Any item not specifically identified on the bid form shall be considered incidental and all costs associated with that item shall be included using the most appropriate bid item listed. This could include, but is not limited to: As‐built preparation, and coordination with City Electric/Gas/Growth Management Departments, etc. |
6) YP-3-DIP is named as such because the connection to the surge tank is a 3" connection. All fittings and valves will be 4" downstream of the transition.