About this file

This document provides details for a federal solicitation for construction services. The solicitation seeks a contractor to perform facility renovation, improvements, and repairs at the Long Island National Cemetery in Farmingdale, New York. The work will be performed according to the statement of work, specifications, and drawings provided. The solicitation was issued by the Department of Veterans Affairs National Cemetery Administration. Interested offerors should review solicitation number 36C78624B0005 for pricing, response date, and other requirements to provide the services described at the Long Island National Cemetery facility.

View the file

Other files

File Type Posted
LINC PRFI 03.pdf PDF
LINC PRFI 05.pdf PDF
LINC PRFI 06.pdf PDF
LINC PRFI 02.pdf PDF
A0006 - Long Island Natl Cem - 36C78624B0005.pdf PDF
LINC PRFI 01.pdf PDF
LINC PRFI 04R.pdf PDF
A0005 - Long Island Natl Cem - 36C78624B0005.pdf PDF
A0004 - Long Island Natl Cem - 36C78624B0005.pdf PDF
Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.pdf PDF
RFI 03 - Long Island nalt Cem - LINC PRFI 03.pdf PDF
RFI 02A - Long Island Natl Cem - LINC PRFI 02A.pdf PDF
Virtual Bid Opening - Long Island Natl Cem (1).pdf PDF
A0002 - Long Island Natl Cem 36C78624B0005.pdf PDF
RFI Number 01 - Long Island National Cemetery - LINC PRFI 01 (1).pdf PDF
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem -FY-24.xlsx XLSX spreadsheet
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem.xlsx XLSX spreadsheet
Method of Award - Correction of Pre-Sol Previously Posted for LINC.pdf PDF
SITE VISIT - CONSTRUCTION 52.236-27 - LINC - 11 Jan 2024 .pdf PDF
Virtual Bid Opening - Long Island NC - 09 Feb 2024 .pdf PDF
36C78624B0005 A0001.docx DOCX document
815CM3041 LINC Phasing SK 01-04.pdf PDF
815CM3041 LINC Project Manual Spec Bk-02.pdf PDF
Appendix IV Well depth Eval ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-14.pdf PDF
815CM3041 LINC Bid Set Bk-06.pdf PDF
LINC FacRen 815CM3041 -ASI 02 - Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-07.pdf PDF
815CM3041 LINC Bid Set Bk-16.pdf PDF
815CM3041 LINC Project Manual Spec Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-05.pdf PDF
Wage Determination Suffolk County NY - LINC FY24.pdf PDF
003 GI-103 Gen Notes - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-02.pdf PDF
815CM3041 LINC Bid Set Bk-09.pdf PDF
LINC Spec 33 01 10 81 Water Supply Well Abandonment ASI 01.pdf PDF
LINC Spec 33 1113 Potable Supply Wells ASI 01.pdf PDF
815CM3041 LINC Bid Set Bk-04.pdf PDF
815CM3041 LINC Bid Set Bk-15.pdf PDF
815CM3041 LINC Bid Set Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-10.pdf PDF
815CM3041 LINC Spec ASI 01 Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-03.pdf PDF
815CM3041 LINC Bid Set Bk-13.pdf PDF
815CM3041 LINC Bid Set Bk-08.pdf PDF
089 I-501 IRRIGATION WATER WELL - DETAILS - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-11.pdf PDF
815CM3041 LINC Bid Set Bk-12.pdf PDF
36C78624B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

815CM3041 Long Island National Cemetery Reno and Improvement Construction Project, responses to PRFI#02A

• Can silt fence be used in lieu of sediment logs for erosion control? No

• Can silt sack/dandy bags be used in lieu of sediment logs for inlet protection? No

• The bid sheets appear to be set up to separate the work into spec section per scope. This appears to be counterintuitive and cumbersome especially since it there is no way to know how each bidder separated the scope since they often overlap. Would you consider changing the bid sheets to follow the attached scope that was provided at the bid walk-through? A simple lump sum bid for each scope item and then a total to determine the low bidder.

Please advise. Yes

• The sign details show a helical pile drilled under each sign post. Can you please confirm the quantity of total piles required? No, you can use the drawings and schedules to do you own take off.

• Please provide a detail of the existing signs that have to be removed or provide additional information if they have concrete footings or are just directly driven into the earth or if they have piles requiring removal or abandonement. Assume each of the existing signs have footings that will need to be completely removed and legally disposed of off site.

• Please confirm that the concrete/brick sign with footing and associated fence work (LS-413) etc is to be included in Scope Item 06. You can make this scope item 6A if you like to track as separate stand alone cost roll up.

• Are observation wells going to be required for the installation of the new well? If so how many and what are the requirements During our initial Feasibility Evaluation we discussed observation well requirements with DEC staff, and the findings are outlined in Section 7.0 on page 16 of the report. To summarize, DEC did not provide us with a definitive answer on whether an observation well(s) would need to be installed, or whether the existing well could be used as an observation well. I expect that we will not know the answer to this question until DEC finishes reviewing the permit application. My best guess is that they will ask for the existing well to be used as an observation well but will not require the installation of a new well(s), given the irrigation use of the planned well and space constraints onsite