This document provides details for a federal solicitation for construction services. The solicitation seeks a contractor to perform facility renovation, improvements, and repairs at the Long Island National Cemetery in Farmingdale, New York. The work includes all labor, materials, equipment, and supervision necessary to complete the project according to the statement of work, specifications, and drawings. The solicitation was issued by the Department of Veterans Affairs National Cemetery Administration. The response due date and award date are not provided in this document.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
815CM3041 Long Island National Cemetery Reno and Improvement Construction Project, responses to PRFI#02 ALL THESE QUESTIONS ARE THE SAME AS WERE ON
RFI #01 PREVIOUSLY ANSWERED WITH SOME MARKED UP DRAWINGS AND
SKETCHES ATTACHED.
1. Refer to drawing M‐113, MH‐115, please confirm if condensate and refrigerant Piping needs insulation?
Provide insulation per table in specification.
2. Specification section 23 07 11 has many type of insulation for mechanical Pipes, please advise on material of insulation of Condensate and Refrigerant Piping? Please advise on the suitable diameter of
Refrigerant Piping as per drawing MH113 and MH115.
See table in specification for insulation type. Piping to be determined by manufacturer's instructions.
Exact length and type of refrigerant used may vary.
3. Refer to drawing AE‐118, restoration of existing historic wrought iron railing of lodge stairs is required.
Please confirm this restoration work can be done both on‐site and off‐site?
This may be done off-site or on-site if approved by NCA.
4. Please confirm if asphalt pavement work shown on drawings CD‐101, CD‐102, CP‐101 thru CP‐201 is to be done in phases? If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation package posted on sam.gov.
5. Please confirm if erosion & sediment control work shown on drawings CE‐101 & CE‐201 is to be done in phases? If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation
6. Please confirm if grading & drainage work shown on drawings CG‐101 thru CG‐104 is to be done in phases? If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation
7. Refer to note 12 on drawing AD‐113 states to replace Bent Return Air Return Diffuser but on drawing
MD‐114 same diffusers are to remain. Please clarify
Replace 1 bent air (return) diffuser in-kind.
8. Refer to specification section 23 31 00, please advise on the material to be used for HVAC Ducts in this project
Specification states material to be used.
9. Refer to drawing MH‐211, please provide the detail and specification for CU‐PIC‐1 CU-PIC-1 corresponds to CU-OB-1. Tag on M100 is incorrect.
10. Refer to drawing MH‐211 and MH‐411 please advise on the material of new Wall Hood Cap?
Follow heater manufacturer's instructions vent piping termination.
11. Refer to drawing EP‐313, please confirm temporary poles need any concrete foundation, please provide the details?
Concrete foundation not required for temporary power poles.
12. Please advise on the size of Wire & Conduit for Communication Devices.
Refer to specification section 27 10 00 Structured Cabling.
13. Refer to drawing E‐005, Luminaire Schedule for FL4 is not given. Please advise on it.
Luminaire type FL4 is the 4' strip light version of type FL2. Provide Cree Lighting
#C-STRIP-A-LIN4-46L-40K-WH or approved equivalent. Refer to attached EB-03.
14. Refer to drawing EP‐313. Please confirm that Sjoow cable (for overhead feed to temporary Restrooms) is temporary?
Yes, the overhead wiring for the temporary restroom is also temporary.
15. Refer to Drawing EP‐711 Please confirm that Underground Raceways from MCC to Water Well Pump &
Pump Control House are furnished & Install by Electrical Contractor.
Yes, underground raceways shall be furnished & installed by Electrical Contractor.
16. Please confirm if planting work shown on drawing LP‐101 is to be done in phases? If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation
17. Please confirm if site demolition work shown on drawings LD‐101 thru LD‐201 is to be done in phases?
If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation
18. Please confirm if site development work shown on drawings LS‐101 thru LS‐415 is to be done in phases? If yes, please confirm number of phases?
This is means and methods, conceptual phasing plans SK 01 thru SK 04 were included in the solicitation
19. Refer to drawing PP‐212 at Basement level, please provide the specifications of new drain pan.
Provide commercially available drain pan to accommodate size of existing water heater.
20. Refer to drawing PP‐311, please provide the manufacturer and model details of Wall Clean Out.
Provide cleanout per specifications.
21. Refer to drawing M‐100 (Mechanical Schedules), Please provide specifications on material of Cover of
Hot Water Radiator.
This should be based on the a basis of design product indicated on schedule.
22. Refer to drawing GI‐104, legend “R” shows (3) three temporary public modular restrooms. Please confirm the model, size & service requirements of temporary public modular restrooms? Also clarify the duration (months) for which temporary public modular restrooms will be required on site?
See plan detail 1 and Legend on Sheet GI-10
23. Refer to drawings AE‐511, keynote 02 states to repoint all existing (interior & exterior) masonry walls, but the extent of repointing is not shown. Please clarify the extent or provide quantity for bidding purpose.
ABOVE GRADE WALLS ONLY: Repoint all 4 exterior brick walls, repoint all 4 interior masonry block walls except where inaccessible behind electrical panels and electrical equipment. NO REPOINTING IN BASEMENT, only repair wall per Keynote 05, sheet AE-511.
24. Refer to drawing GI‐104, legend “R” shows (3) three temporary public modular restrooms. Please confirm the model, size & service requirements of temporary public modular restrooms? Also clarify the duration (months) for which temporary public modular restrooms will be required on site?
See sheet LS-401, detail 5.
25. Refer to drawings AE‐511, keynote 02 states to repoint all existing (interior & exterior) masonry walls, but the extent of repointing is not shown. Please clarify the extent or provide quantity for bidding purpose.
ABOVE GRADE WALLS ONLY: Repoint all 4 exterior brick walls, repoint all 4 interior masonry block walls except where inaccessible behind electrical panels and electrical equipment. NO REPOINTING
IN BASEMENT, only repair wall per Keynote 05, sheet AE-511.
26. Reference Drawing No. EP‐510 as per note 6, does not show any path for New Underground Wire, Conduit & New Concrete Pad size. Please mention the size of new Duct Bank & also identify the specific Path for New underground wire & conduit and New Concrete Pad Size.
Sheet EP-510 is drawn to scale and shows the location of the utilty transformer &
CT/meter, which are right next to each other outside. Contractor shall route underground conduits as direct as possible and avoid conflicts with existing conditions. Verify exact routing in the field. Refer to VA duct bank detail Dwg No.
SD260541-02, attached, for duct bank sizing. Refer to PSEG Long Island handbook and coordinate with power company for concrete pad size.
27. Refer to Drawing No. ET‐112, ET‐113 & ET‐114.Please advise on termination of wire & conduit for
Communication devices (Security Camera, Voice/Data Outlets, TV Jack Etc.)
Electrical contractor shall furnish and install pathways and provisions (raceways, bushings, pull cord, back boxes, blank wall plates, etc.) for telecommunication & security devices. The pathways and provisions shall be for use by the VA's
28. Refer to Drawing No.ET‐311 Note2. Shows OS2 Single Mode Fiber Cabling from media converter to smart LB & as per Note 1. Cat 6 cable from Media converter to Patch Panel in Maintenance Building as per Riser Diagram. Please advise on the locations of Media Converter & Patch Panel in Maintenance
Building.
Inside Data 103A that is adjacent to Mud Room 103. Refer to existing drawings dated 6/8/2020 and field verify.
29. Refer to drawing LS‐415, restoration of existing bronze plaques is required. Please confirm this work falls under historic restoration?
30. Confirmed.
31. Refer to drawing AD‐113, keynote 14 (note 2) states to replace up to 50 damaged snow guards to match existing, but these snow guards are not shown on drawings. Please clarify the length and quantity of snow guards to be replaced.
Replace up to 50 damaged snow guards. Refer to Keynote 14 No. 3 for snowguard manufacturer and product no.