Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.pdf

PDF 272 KB Posted

Attached to
Y1AZ--NEW IFB (FY-24) | LONG ISLAND NATL CEM | RENOVATION, IMPROVEMENTS & REPAIRS CONSTRUCTION PROJECT | PROJECT NO. 815CM3041
Solicitation number
36C78624B0005
Issued by

About this file

This document consists of an amendment to a solicitation for facility renovation, improvements, and repairs at the Long Island National Cemetery. The amendment extends the hour and date for receipt of offers, provides the government's responses to two request for information questions regarding erosion control methods and signage details, and attaches the full amendment, questions and answers documents. The solicitation seeks a contractor to provide all labor, materials, equipment, and supervision to perform renovations, improvements, and repairs to facilities located at the Long Island National Cemetery in Farmingdale, New York for the Department of Veterans Affairs National Cemetery Administration. The virtual bid opening remains scheduled for February 23, 2024 at 1:00 PM EST.

View the file

Other files

File Type Posted
LINC PRFI 03.pdf PDF
LINC PRFI 05.pdf PDF
LINC PRFI 06.pdf PDF
LINC PRFI 02.pdf PDF
A0006 - Long Island Natl Cem - 36C78624B0005.pdf PDF
LINC PRFI 01.pdf PDF
LINC PRFI 02A.pdf PDF
LINC PRFI 04R.pdf PDF
A0005 - Long Island Natl Cem - 36C78624B0005.pdf PDF
A0004 - Long Island Natl Cem - 36C78624B0005.pdf PDF
RFI 03 - Long Island nalt Cem - LINC PRFI 03.pdf PDF
RFI 02A - Long Island Natl Cem - LINC PRFI 02A.pdf PDF
Virtual Bid Opening - Long Island Natl Cem (1).pdf PDF
A0002 - Long Island Natl Cem 36C78624B0005.pdf PDF
RFI Number 01 - Long Island National Cemetery - LINC PRFI 01 (1).pdf PDF
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem -FY-24.xlsx XLSX spreadsheet
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem.xlsx XLSX spreadsheet
Method of Award - Correction of Pre-Sol Previously Posted for LINC.pdf PDF
SITE VISIT - CONSTRUCTION 52.236-27 - LINC - 11 Jan 2024 .pdf PDF
Virtual Bid Opening - Long Island NC - 09 Feb 2024 .pdf PDF
36C78624B0005 A0001.docx DOCX document
815CM3041 LINC Phasing SK 01-04.pdf PDF
815CM3041 LINC Project Manual Spec Bk-02.pdf PDF
Appendix IV Well depth Eval ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-14.pdf PDF
815CM3041 LINC Bid Set Bk-06.pdf PDF
LINC FacRen 815CM3041 -ASI 02 - Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-07.pdf PDF
815CM3041 LINC Bid Set Bk-16.pdf PDF
815CM3041 LINC Project Manual Spec Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-05.pdf PDF
Wage Determination Suffolk County NY - LINC FY24.pdf PDF
003 GI-103 Gen Notes - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-02.pdf PDF
815CM3041 LINC Bid Set Bk-09.pdf PDF
LINC Spec 33 01 10 81 Water Supply Well Abandonment ASI 01.pdf PDF
LINC Spec 33 1113 Potable Supply Wells ASI 01.pdf PDF
815CM3041 LINC Bid Set Bk-04.pdf PDF
815CM3041 LINC Bid Set Bk-15.pdf PDF
815CM3041 LINC Bid Set Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-10.pdf PDF
815CM3041 LINC Spec ASI 01 Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-03.pdf PDF
815CM3041 LINC Bid Set Bk-13.pdf PDF
815CM3041 LINC Bid Set Bk-08.pdf PDF
089 I-501 IRRIGATION WATER WELL - DETAILS - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-11.pdf PDF
815CM3041 LINC Bid Set Bk-12.pdf PDF
36C78624B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

A0003 31 Jan 2024

815CM3041

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78624B0005

02-01-2024

A0003

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to:

X 1

AMENDMENT (A0003) | Long Island National Cemetery | Facility Renovation, Improvements & Repairs | Project #815CM3041

The Purpose of Amendment (A0003) is to Notify the Public of the Government's Responses to BOTH RFI #02A and RFI #03.

1.) The Virtual Bid Opening Date & Time is still 23 February 2024 @ 1300; (1:00 P.M.) EST.

NOTE: Please See Attachments for Content

**All Factors & Content of This IFB Solicitations remains the Same**

Sheryl Palacio-Davis

Contracting Officer

A.1 IFB A0003 SOLICITATION DESCRIPTION FOR LONG ISLAND

NATIONAL CEMETERY

AMENDMENT (A0003), IS THE GOVERNMENT’S RESPONSES TO BOTH

RFI #02A AND RFI #03.

PROJECT LOCATION: LONG ISLAND NATIONAL CEMETERY

Long Island National Cemetery

2040 Wellwood Avenue

Farmingdale, New York, 11735

PROJECT TITLE: Facility Renovation, Improvements, and Repairs

PROJECT NUMBER: 815CM3041

STATEMENT OF WORK SUMMARY:

▪ Contractor shall furnish all tools, labor, materials, equipment, and professional supervision to perform work described in the Statement of Work (SOW), Specification & Drawings, for the Facility Renovation, Improvements, and Repairs, located at the Long Island National Cemetery, NY.

▪ Suffolk County) in the State of New York.

CONTINUATION PAGE

AMENDMENT A0003: Is the Government’s Responses to Both RFI #02A and RFI #03

LONG ISLAND NATIONAL CEMETERY | IFB Solicitation No. 36C78624B0005 | Project No.

815CM3041 | Facility Renovation, Improvements, and Repairs.

▪ CEMETERY’S ADDRESS:

Long Island National Cemetery 2040 Wellwood Avenue Farmingdale, New York, 11735

AMENDMENT A0003, is the Government’s Responses to Both RFI #02A and RFI #03 as Follows:

RFI #02A

QUESTIONS & ANSWERS

• Can silt fence be used in lieu of sediment logs for erosion control? No

• Can silt sack/dandy bags be used in lieu of sediment logs for inlet protection? No

• The bid sheets appear to be set up to separate the work into spec section per scope. This appears to be counterintuitive and cumbersome especially since it there is no way to know how each bidder separated the scope since they often overlap. Would you consider changing the bid sheets to follow the attached scope that was provided at the bid walk-through? A simple lump sum bid for each scope item and then a total to determine the low bidder. Please advise. Yes

• The sign details show a helical pile drilled under each signpost. Can you please confirm the quantity of total piles required? No, you can use the drawings and schedules to do you own take off.

• Please provide a detail of the existing signs that have to be removed or provide additional information if they have concrete footings or are just directly driven into the earth or if they have piles requiring removal or abandonment.

Assume each of the existing signs have footings that will need to be completely removed and legally disposed of offsite.

• Please confirm that the concrete/brick sign with footing and associated fence work (LS-413) etc is to be included in Scope Item 06. You can make this scope item 6A if you like to track as separate stand alone cost roll up.

• Are observation wells going to be required for the installation of the new well? If so, how many and what are the requirements During our initial Feasibility Evaluation we discussed observation well requirements with DEC staff, and the findings are outlined in Section 7.0 on page 16 of the report. To summarize, DEC did not provide us with a definitive answer on whether an observation well(s) would need to be installed, or whether the existing well could be used as an observation well. I expect that we will not know the answer to this question until DEC finishes reviewing the permit application. My best guess is that they will ask for the existing well to be used as an observation well but will not require the installation of a new well(s), given the irrigation use of the planned well and space constraints onsite.

RFI #003

QUESTIONS & ANSWERS

QUESTION?

We were invited to bid on this project; however, we are unable to find any bird control involved in the plans other than the removal of bird spikes. Please let us know if we missed something and/or if the bird spikes are to be re-installed. Thank you and I look forward to hearing from you!

ANSWER:

Bird spikes are not to be re-installed at the committal shelters; only existing spikes are to be removed. We are closing up the areas where birds can land and/or nest with wood panels and trim, see details of new work. As far as I know there are no areas of the project that require new bird spikes.

NOTE: Please find attached, the Government’s Responses to both RFI #02A and RFI #03

Questions & Answers, for your review and reference.

A.2 OTHER ATTACHMENTS

See attached document: Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.

See attached document: RFI 02A - Long Island Natl Cem - LINC PRFI 02A.

See attached document: RFI 03 - Long Island Nalt Cem - LINC PRFI 03.

END OF DOCUMENT

File details come from the government source that posted it. Updated .