This document consists of an amendment to a solicitation for facility renovation, improvements, and repairs at the Long Island National Cemetery. The amendment extends the hour and date for receipt of offers, provides the government's responses to two request for information questions regarding erosion control methods and signage details, and attaches the full amendment, questions and answers documents. The solicitation seeks a contractor to provide all labor, materials, equipment, and supervision to perform renovations, improvements, and repairs to facilities located at the Long Island National Cemetery in Farmingdale, New York for the Department of Veterans Affairs National Cemetery Administration. The virtual bid opening remains scheduled for February 23, 2024 at 1:00 PM EST.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 6
A0003 31 Jan 2024
815CM3041
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
36C786
Department of Veterans Affairs
National Cemetery Administration
Contracting Services
18434 Joplin Road
Triangle VA 22172
To all Offerors/Bidders
36C78624B0005
02-01-2024
A0003
X
X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
X 1
AMENDMENT (A0003) | Long Island National Cemetery | Facility Renovation, Improvements & Repairs | Project #815CM3041
The Purpose of Amendment (A0003) is to Notify the Public of the Government's Responses to BOTH RFI #02A and RFI #03.
1.) The Virtual Bid Opening Date & Time is still 23 February 2024 @ 1300; (1:00 P.M.) EST.
NOTE: Please See Attachments for Content
**All Factors & Content of This IFB Solicitations remains the Same**
Sheryl Palacio-Davis
Contracting Officer
A.1 IFB A0003 SOLICITATION DESCRIPTION FOR LONG ISLAND
NATIONAL CEMETERY
AMENDMENT (A0003), IS THE GOVERNMENT’S RESPONSES TO BOTH
RFI #02A AND RFI #03.
PROJECT LOCATION: LONG ISLAND NATIONAL CEMETERY
Long Island National Cemetery
2040 Wellwood Avenue
Farmingdale, New York, 11735
PROJECT TITLE: Facility Renovation, Improvements, and Repairs
PROJECT NUMBER: 815CM3041
STATEMENT OF WORK SUMMARY:
▪ Contractor shall furnish all tools, labor, materials, equipment, and professional supervision to perform work described in the Statement of Work (SOW), Specification & Drawings, for the Facility Renovation, Improvements, and Repairs, located at the Long Island National Cemetery, NY.
▪ Suffolk County) in the State of New York.
CONTINUATION PAGE
AMENDMENT A0003: Is the Government’s Responses to Both RFI #02A and RFI #03
LONG ISLAND NATIONAL CEMETERY | IFB Solicitation No. 36C78624B0005 | Project No.
815CM3041 | Facility Renovation, Improvements, and Repairs.
▪ CEMETERY’S ADDRESS:
Long Island National Cemetery 2040 Wellwood Avenue Farmingdale, New York, 11735
AMENDMENT A0003, is the Government’s Responses to Both RFI #02A and RFI #03 as Follows:
RFI #02A
QUESTIONS & ANSWERS
• Can silt fence be used in lieu of sediment logs for erosion control? No
• Can silt sack/dandy bags be used in lieu of sediment logs for inlet protection? No
• The bid sheets appear to be set up to separate the work into spec section per scope. This appears to be counterintuitive and cumbersome especially since it there is no way to know how each bidder separated the scope since they often overlap. Would you consider changing the bid sheets to follow the attached scope that was provided at the bid walk-through? A simple lump sum bid for each scope item and then a total to determine the low bidder. Please advise. Yes
• The sign details show a helical pile drilled under each signpost. Can you please confirm the quantity of total piles required? No, you can use the drawings and schedules to do you own take off.
• Please provide a detail of the existing signs that have to be removed or provide additional information if they have concrete footings or are just directly driven into the earth or if they have piles requiring removal or abandonment.
Assume each of the existing signs have footings that will need to be completely removed and legally disposed of offsite.
• Please confirm that the concrete/brick sign with footing and associated fence work (LS-413) etc is to be included in Scope Item 06. You can make this scope item 6A if you like to track as separate stand alone cost roll up.
• Are observation wells going to be required for the installation of the new well? If so, how many and what are the requirements During our initial Feasibility Evaluation we discussed observation well requirements with DEC staff, and the findings are outlined in Section 7.0 on page 16 of the report. To summarize, DEC did not provide us with a definitive answer on whether an observation well(s) would need to be installed, or whether the existing well could be used as an observation well. I expect that we will not know the answer to this question until DEC finishes reviewing the permit application. My best guess is that they will ask for the existing well to be used as an observation well but will not require the installation of a new well(s), given the irrigation use of the planned well and space constraints onsite.
RFI #003
QUESTIONS & ANSWERS
QUESTION?
We were invited to bid on this project; however, we are unable to find any bird control involved in the plans other than the removal of bird spikes. Please let us know if we missed something and/or if the bird spikes are to be re-installed. Thank you and I look forward to hearing from you!
ANSWER:
Bird spikes are not to be re-installed at the committal shelters; only existing spikes are to be removed. We are closing up the areas where birds can land and/or nest with wood panels and trim, see details of new work. As far as I know there are no areas of the project that require new bird spikes.
NOTE: Please find attached, the Government’s Responses to both RFI #02A and RFI #03
Questions & Answers, for your review and reference.
A.2 OTHER ATTACHMENTS
See attached document: Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.
See attached document: RFI 02A - Long Island Natl Cem - LINC PRFI 02A.
See attached document: RFI 03 - Long Island Nalt Cem - LINC PRFI 03.
END OF DOCUMENT