815CM3041 LINC Bid Set Bk-01.pdf
PDF 19 MB Posted
- Solicitation number
- 36C78624B0005
About this file
This federal contract opportunity solicitation is for facility renovation, improvements, and repairs at the Long Island National Cemetery in Farmingdale, New York. The solicitation number is 36C78624B0005 and is issued by the Department of Veterans Affairs National Cemetery Administration. Under the terms of the solicitation, the contractor will be required to provide all labor, materials, equipment, and supervision necessary to complete the renovation, improvement, and repair work described in the Statement of Work, Specifications and Drawings. The work will involve facility upgrades located at the Long Island National Cemetery. The solicitation does not provide pricing terms or response dates.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long Island National Cemetery Farmingdale, New York
Facility Renovation, Improvements, and Repairs Project Number: 815CM3041
VICINITY MAP CONSULTANTS
PRIME CONSULTANT, ARCHITECT, LANDSCAPE
ARCHITECT:
WALKER FEDERAL SERVICES
7820B-162 WORMANS MILL ROAD
FREDERICK, MARYLAND 21701
MEP ENGINEER
CHARLOTTE ENGINEERS
5838 MONROE ROAD
CHARLOTTE, NORTH CAROLINA 28212
CIVIL, STRUCTURAL ENGINEER
PRINCIPAL ENGINEERING, INC.
1011 N. CAUSEWAY BOULEVARD, SUITE 19
MANDEVILLE, LOUISIANA 70471
IRRIGATION DESIGN CONSULTANT
HYDRO DESIGNS, INC.
3 COLLEGE AVENUE, SUITE 8
FREDERICK, MARYLAND 21701
GEOTECHNICAL ENGINEER, HYDROGEOLOGICAL
ENGINEER, HAZMAT CONSULTANT
ECS MID-ATLANTIC, LLC
2 EXECUTIVE DRIVE
SUITE 11
MOORESTOWN, NEW JERSEY 08057
CONSTRUCTABILITY REVIEW, COST ESTIMATOR
R&R CONSTRUCTION SERVICES, INC.
2403 HELEN STREET
MCKEES ROCKS, PENNSYLVANIA 15136
SURVEYOR
CONTROL POINT ASSOCIATES, INC.
2929 EXPRESSWAY DRIVE NORTH, SUITE 125
HAUPPAUGE, NEW YORK 11749
COVER SHEET
GI-101
PROJECT
SITE
W
ELLW
O O
D AVE
NATIONAL
CEMETERY
ADMINISTRATION
Revisions Date
Drawing Title
Approved:
Checked
Location
DRAWING NO.
Dwg.
Of
4 5 8
1 2 3 4 7 9
D E
F
C D
E
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Approved:
Project Title
Building Number
Drawn
Date
Project No.
1 2 6 7 9
5 6 8
A B
C
A B
F
© COPYRIGHT 2023, Walker Federal Services, LLC
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
BJ JC, EM
May 22, 2023
Final Construction Documents - Issued for Construction
G
L I N C
F a c R e n C M C a d d o c s
G I
C o v e r d w g
P M
T D
S t d D W G
T o
P D F p c
AutoCAD SHX Text
AutoCAD SHX Text
0.5 MI.
AutoCAD SHX Text
1 MI.
AutoCAD SHX Text
1.5MI.
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
m.melendez Andre NY
INDEX OF SHEETS
GI-102
NATIONAL
CEMETERY
ADMINISTRATION
Revisions Date
Drawing Title
Approved:
Checked
Location
DRAWING NO.
Dwg.
Of
4 5 8
1 2 3 4 7 9
D E
F
C D
E
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Approved:
Project Title
Building Number
Drawn
Date
Project No.
1 2 6 7 9
5 6 8
A B
C
A B
F
© COPYRIGHT 2023, Walker Federal Services, LLC
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
BJ JC, EM
May 22, 2023
Final Construction Documents - Issued for Construction
GENERAL
1 GI-101 COVER SHEET
2 GI-102 INDEX OF SHEETS
3 GI-103 GENERAL NOTES
4 GI-104 OVERALL SITE PLAN
5 GI-105 OVERALL SITE PLAN
SITE
SURVEY
6 VF-101 EXISTING CONDITIONS SURVEY
7 VF-102 EXISTING CONDITIONS SURVEY
8 VF-103 EXISTING CONDITIONS SURVEY
9 VF-104 EXISTING CONDITIONS SURVEY
10 VF-105 EXISTING CONDITIONS SURVEY
11 VF-201 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
12 VF-202 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
13 VF-203 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
14 VF-204 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
15 VF-205 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
16 VF-206 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
17 VF-207 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
18 VF-208 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
19 VF-209 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
20 VF-210 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
21 VF-211 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
22 VF-212 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
23 VF-213 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
24 VF-214 EXISTING CONDITIONS SURVEY - ENLARGEMENTS
EROSION AND SEDIMENT CONTROL
25 CE-101 EROSION AND SEDIMENT CONTROL PLAN - CORTEGE LANE
26 CE-201 EROSION AND SEDIMENT CONTROL DETAILS
DEMOLITION
27 CD-101 DEMOLITION PLAN - CORTEGE LANE
28 CD-102 DEMOLITION PLAN
PAVEMENT
29 CP-101 PAVEMENT REPAIR PLAN - NORTH
30 CP-102 PAVEMENT REPAIR PLAN - WEST
31 CP-103 PAVEMENT REPAIR PLAN - EAST
32 CP-104 PAVEMENT REPAIR PLAN - SOUTH WEST
33 CP-105 PAVEMENT REPAIR PLAN - SOUTH EAST
34 CP-201 PAVING PLAN AND PROFILE - CORTEGE LANE
35 CP-202 PAVING PLAN AND SECTION - GATE 5 DRIVE APRON
36 CP-301 PAVING DETAILS
37 CP-302 PAVING DETAILS
GRADING AND DRAINAGE
38 CG-101 GRADING AND DRAINAGE PLAN - CORTEGE LANE
39 CG-102 GRADING PLAN - LODGE
40 CG-103 GRADING PLAN - RESTROOM BUILDING
41 CG-104 GRADING PLAN - WATER WELL
STORMWATER MANAGEMENT
42 CS-101 STORMWATER MANAGEMENT PLAN
43 CS-201 STORMWATER MANAGEMENT DETAILS
SITE DEMOLITION
44 LD-101 SITE DEMOLITION PLAN
45 LD-102 SITE DEMOLITION PLAN
46 LD-103 SITE DEMOLITION PLAN
47 LD-104 SITE DEMOLITION PLAN
48 LD-105 SITE DEMOLITION PLAN
49 LD-201 SITE DEMOLITION PHOTOGRAPHS
SITE DEVELOPMENT
50 LS-101 SITE DEVELOPMENT PLAN
51 LS-102 SITE DEVELOPMENT PLAN
52 LS-103 SITE DEVELOPMENT PLAN
53 LS-104 SITE DEVELOPMENT PLAN
54 LS-105 SITE DEVELOPMENT PLAN
55 LS-201 SITE DEVELOPMENT PLAN - SITE SIGNAGE
56 LS-202 SITE DEVELOPMENT PLAN - SITE SIGNAGE
57 LS-203 SITE DEVELOPMENT PLAN - SITE SIGNAGE
58 LS-204 SITE DEVELOPMENT PLAN - SITE SIGNAGE
59 LS-205 SITE DEVELOPMENT PLAN - SITE SIGNAGE
60 LS-301 SITE DEVELOPMENT PLAN - ENLARGEMENTS
61 LS-302 SITE DEVELOPMENT PLAN - ENLARGEMENTS
62 LS-303 SITE DEVELOPMENT PLAN - ENLARGEMENTS
63 LS-304 SITE DEVELOPMENT PLAN - ENLARGEMENTS
64 LS-305 SITE DEVELOPMENT PLAN - ENLARGEMENTS
65 LS-306 SITE DEVELOPMENT PLAN - ENLARGEMENTS
66 LS-307 SITE DEVELOPMENT PLAN - ENLARGEMENTS
67 LS-308 SITE DEVELOPMENT PLAN - ENLARGEMENTS
68 LS-309 SITE DEVELOPMENT PLAN - ENLARGEMENTS
69 LS-310 SITE DEVELOPMENT PLAN - ENLARGEMENTS
70 LS-401 SITE DEVELOPMENT PLAN - DETAILS
76 LS-407 SITE DEVELOPMENT PLAN - DETAILS
77 LS-408 SITE DEVELOPMENT PLAN - DETAILS
78 LS-409 SITE DEVELOPMENT PLAN - DETAILS
79 LS-410 SITE DEVELOPMENT PLAN - DETAILS
80 LS-411 SITE DEVELOPMENT PLAN - DETAILS
81 LS-412 SITE DEVELOPMENT PLAN - DETAILS
82 LS-413 SITE DEVELOPMENT PLAN - DETAILS
83 LS-414 SITE DEVELOPMENT PLAN - DETAILS
84 LS-415 SITE DEVELOPMENT PLAN - DETAILS
PLANTING
85 LP-101 PLANTING PLAN
86 LP-201 PLANT DETAILS & PLANT SCHEDULE
IRRIGATION WATER WELL
87 I-101 IRRIGATION WATER WELL - SITE PLAN
88 I-401 IRRIGATION PUMP HOUSE - 1972 MECHANICAL
89 I-501 IRRIGATION WATER WELL - DETAILS
ARCHITECTURAL
GENERAL
90 A-001 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS
91 A-101 BUILDING CODE ANALYSIS AND LIFE SAFETY PLAN: DIRECTOR'S LODGE
92 A-102 BUILDING CODE ANALYSIS AND LIFE SAFETY PLAN: RESTROOM BUILDING
93 A-103 BUILDING CODE ANALYSIS AND LIFE SAFETY PLAN: MAINTENANCE BUILDING
94 A-104 BUILDING CODE ANALYSIS AND LIFE SAFETY PLAN: PUMP HOUSE
95 A-105 BUILDING CODE ANALYSIS AND LIFE SAFETY PLAN: PUBLIC INFORMATION CENTER
DEMOLITION
96 AD-111 DIRECTOR'S LODGE: BASEMENT FLOOR AND CEILING DEMOLITION PLANS
97 AD-112 DIRECTOR'S LODGE: GROUND LEVEL FLOOR AND CEILING DEMOLITION PLANS
98 AD-113 DIRECTOR'S LODGE: SECOND, ATTIC AND ROOF LEVELS DEMOLITION PLANS
99 AD-131 DIRECTOR’S LODGE: SOUTH, EAST, WEST EXTERIOR ELEVATIONS DEMOLITION
100 AD-132 DIRECTOR’S LODGE: NORTH ELEVATION DEMOLITION
101 AD-211 PUBLIC INFORMATION CENTER: FLOOR AND CEILING DEMOLITION PLANS
102 AD-231 PUBLIC INFORMATION CENTER: EXTERIOR ELEVATIONS DEMOLITION
103 AD-311 PUBLIC RESTROOMS: DEMOLITION FLOOR, CEILING & ROOF PLANS
104 AD-331 PUBLIC RESTROOMS: DEMOLITION ELEVATIONS
105 AD-411 MAINTENANCE BUILDING: DEMOLITION FLOOR PLAN
106 AD-412 MAINTENANCE BUILDING: DEMOLITION CEILING PLAN
107 AD-413 MAINTENANCE BUILDING: DEMOLITION ROOF PLAN
108 AD-431 MAINTENANCE BUILDING: DEMOLITION ELEVATIONS
109 AD-511 PUMP HOUSE: DEMOLITION FLOOR AND ROOF PLANS
110 AD-522 PUMP HOUSE: DEMOLITION ELEVATIONS
111 AD-611 COMMITTAL SHELTER A: FLOOR, CEILING AND ROOF DEMOLITION PLANS
112 AD-612 COMMITTAL SHELTER B: FLOOR, CEILING AND ROOF DEMOLITION PLANS
113 AD-631 COMMITTAL SHELTER A: EXTERIOR ELEVATIONS DEMOLITION
114 AD-632 COMMITTAL SHELTER B: EXTERIOR ELEVATIONS DEMOLITION
115 AD-701 COLUMBARIUM PLAZA A: DEMOLITION ELEVATIONS
116 AD-702 COLUMBARIUM PLAZA A: DEMOLITION DETAILS
DIRECTOR'S LODGE
117 AE-111 DIRECTOR'S LODGE: BASEMENT LEVEL FLOOR AND CEILING PLANS
118 AE-112 DIRECTOR'S LODGE: GROUND FLOOR PLAN
119 AE-113 DIRECTOR'S LODGE: GROUND LEVEL CEILING PLAN
120 AE-114 DIRECTOR'S LODGE: SECOND & ATTIC LEVEL FLOOR & CEILING PLANS
121 AE-115 DIRECTOR'S LODGE: ENLARGED INTERIOR PLANS AND ELEVATIONS
122 AE-116 DIRECTOR'S LODGE: ENLARGED RAMP DECK PLAN AND ELEVATIONS
123 AE-117 DIRECTOR'S LODGE: DECK AND RAMP DETAILS
124 AE-118 DIRECTOR'S LODGE: STAIR DETAILS
PUBLIC INFORMATION CENTER
125 AE-211 PUBLIC INFORMATION CENTER: BASEMENT AND ROOF PLANS
126 AE-212 PUBLIC INFORMATION CENTER: GROUND LEVEL FLOOR AND CEILING PLANS
127 AE-213 PUBLIC INFORMATION CENTER: FURNITURE AND FINISH PLANS
128 AE-221 PUBLIC INFORMATION CENTER: ENLARGED INTERIOR PLANS AND ELEVATIONS
129 AE-231 PUBLIC INFORMATION CENTER: EXTERIOR ELEVATIONS
130 AE-232 PUBLIC INFORMATION CENTER: EXTERIOR RAMP AND CANOPY ENLARGED PLANS
131 AE-233 PUBLIC INFORMATION CENTER: EXTERIOR RAMP AND CANOPY ENLARGED DETAILS
PUBLIC RESTROOMS
132 AE-311 PUBLIC RESTROOMS: FLOOR PLAN
133 AE-312 PUBLIC RESTROOMS: CEILING, ROOF & FINISH PLANS
134 AE-321 PUBLIC RESTROOMS: INTERIOR ELEVATIONS
135 AE-331 PUBLIC RESTROOMS: EXTERIOR ELEVATIONS
MAINTENANCE BUILDING
136 AE-411 MAINTENANCE BUILDING: FLOOR PLAN
137 AE-421 MAINTENANCE BUILDING: REFLECTED CEILING PLAN
DETAILS
151 AE-800 DETAILS: GENERAL
152 AE-801 DETAILS: GENERAL
153 AE-802 SCHEDULES: DOORS
154 AE-803 SCHEDULES: DOOR & WINDOW DETAILS
155 AE-804 SCHEDULES: PARTITION TYPES AND WINDOW
156 AE-805 SCHEDULES: FINISHES, RESTROOM ACCESSORIES AND EQUIPMENT
FINISH BOARDS
157 AE-901 DIRECTOR'S LODGE: BASEMENT FINISHES
158 AE-902 DIRECTOR'S LODGE: GROUND LEVEL FINISHES
159 AE-903 DIRECTOR'S LODGE: BATHROOMS FINISHES
160 AE-904 DIRECTOR'S LODGE: RAMP AND DECK FINISHES
161 AE-905 PUBLIC INFORMATION CENTER: FINISHES
162 AE-906 RESTROOM BUILDING: FINISHES
MECHANICAL
GENERAL
163 M-001 ABBREVIATIONS AND SYMBOLS
164 M-002 MECHANICAL - DETAILS
165 M-100 MECHANICAL SCHEDULES - DIRECTOR'S LODGE
DEMOLITION
166 MD-110 DIRECTOR'S LODGE - BASEMENT LEVEL - EAST - FLOOR PLAN - DEMOLITION
167 MD-111 DIRECTORS LODGE - BASEMENT LEVEL - WEST - FLOOR PLAN - DEMOLITION
168 MD-112 DIRECTORS LODGE - GROUND LEVEL - EAST - FLOOR PLAN - DEMOLITION
169 MD-113 DIRECTORS LODGE - GROUND LEVEL - WEST - FLOOR PLAN - DEMOLITION
170 MD-114 DIRECTORS LODGE - SECOND LEVEL - FLOOR PLAN - DEMOLITION
171 MD-115 DIRECTORS LODGE - ATTIC - FLOOR PLAN - DEMOLITION
172 MD-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - FLOOR PLAN - DEMOLITION
173 MD-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - FLOOR PLAN
174 MD-311 PUBLIC RESTROOMS - FLOOR PLAN - DEMOLITION
175 MD-312 PUBLIC RESTROOMS - ROOF PLAN - MECHANICAL DEMOLITION
176 MD-411 MAINTENANCE BUILDING - FLOOR PLAN - DEMOLITION
177 MD-412 MAINTENANCE BUILDING - ROOF PLAN - DEMOLITION
178 MD-511 PUMP HOUSE - BASEMENT & GROUND LEVEL - FLOOR PLAN - DEMOLITION
HVAC
179 MH-111 DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN - WEST - HVAC
180 MH-112 DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN - EAST - HVAC
181 MH-113 DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN - WEST - HVAC
182 MH-114 DIRECTORS LODGE - SECOND LEVEL - FLOOR PLAN - HVAC
183 MH-115 DIRECTORS LODGE - ATTIC LEVEL - FLOOR PLAN - HVAC
184 MH-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - MECHANICAL - HVAC
185 MH-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - FLOOR PLAN - HVAC
186 MH-212 PUBLIC INFORMATION CENTER - ROOF PLAN - HVAC
187 MH-311 PUBLIC RESTROOMS - GROUND LEVEL - FLOOR PLAN - HVAC
188 MH-312 PUBLIC RESTROOMS - ROOF PLAN - HHVAC
189 MH-411 MAINTENANCE BUILDING - GROUND FLOOR - FLOOR PLAN - HVAC
190 MH-412 MAINTENANCE BUILDING - ROOF PLAN - HVAC
191 MH-511 PUMP HOUSE - BASEMENT, GROUND AND ROOF - FLOOR PLAN - HVAC
MECHANICAL PIPING
192 MP-110 DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN - EAST - PIPING
193 MP-111 DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN - WEST - PIPING
194 MP-112 DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN - EAST - PIPING
195 MP-113 DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN - WEST - PIPING
196 MP-114 DIRECTORS LODGE - SECOND LEVEL- FLOOR PLAN - PIPING
197 MP-311 PUBLIC RESTROOMS - GROUND LEVEL - FLOOR PLAN - PIPING
198 MP-411 MAINTENANCE BUILDING - GROUND LEVEL - FLOOR PLAN - PIPING
ELECTRICAL
GENERAL
199 E-001 SYMBOLS, LEGENDS, NOTES, AND DRAWING INDEX
200 E-002 DETAILS
201 E-003 LIGHTNING DETAILS
202 E-004 LUMINAIRE SCHEDULE AND RISER DIAGRAM - DIRECTOR'S LODGE
203 E-005 LUMINAIRE SCHEDULE AND RISER DIAGRAM - PUBLIC INFORMATION CENTER
204 E-006 LUMINAIRE SCHEDULE AND RISER DIAGRAM - PUBLIC RESTROOMS
205 E-007 LUMINAIRE SCHEDULE AND RISER DIAGRAM - MAINTENANCE BUILDING
206 E-008 LUMINAIRE SCHEDULE AND RISER DIAGRAM - PUMP HOUSE
207 E-009 LUMINAIRE SCHEDULE AND RISER DIAGRAM - COMMITTAL SHELTERS
208 E-010 OVERALL SITE PLAN
138 AE-422 MAINTENANCE BUILDING: ROOF PLAN
139 AE-423 MAINTENANCE BUILDING: EXTERIOR ELEVATIONS
140 AE-431 MAINTENANCE BUILDING: INTERIOR ELEVATIONS
LIGHTING
227 EL-110 DIRECTORS LODGE - BASEMENT LEVEL - EAST - LIGHTING
228 EL-111 DIRECTORS LODGE - BASEMENT LEVEL - WEST - LIGHTING
229 EL-112 DIRECTORS LODGE - GROUND LEVEL - EAST - LIGHTING
230 EL-113 DIRECTORS LODGE - GROUND LEVEL - WEST - LIGHTING
231 EL-114 DIRECTORS LODGE - SECOND LEVEL - LIGHTING
232 EL-115 DIRECTORS LODGE - ATTIC LEVEL - LIGHTING
233 EL-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - LIGHTING
234 EL-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - LIGHTING
235 EL-311 PUBLIC RESTROOMS - GROUND LEVEL - LIGHTING
236 EL-411 MAINTENANCE BUILDING - GROUND LEVEL - LIGHTING
237 EL-510 PUMP HOUSE - BASEMENT & GROUND LEVEL - LIGHTING
238 EL-611 COMMITTAL SHELTER A - LIGHTING
239 EL-612 COMMITTAL SHELTER B - LIGHTING
POWER
240 EP-110 DIRECTORS LODGE - BASEMENT LEVEL - EAST - POWER
241 EP-111 DIRECTORS LODGE - BASEMENT LEVEL - WEST - POWER
242 EP-112 DIRECTORS LODGE - GROUND LEVEL - EAST - POWER
243 EP-113 DIRECTORS LODGE - GROUND LEVEL - WEST - POWER
244 EP-114 DIRECTORS LODGE - SECOND LEVEL - POWER
245 EP-115 DIRECTORS LODGE - ATTIC LEVEL - POWER
246 EP-116 DIRECTORS LODGE - ROOF PLAN-EAST - POWER
247 EP-117 DIRECTORS LODGE - ROOF PLAN-WEST - POWER
248 EP-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - POWER
249 EP-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - POWER
250 EP-212 PUBLIC INFORMATION CENTER - ROOF PLAN - POWER
251 EP-311 PUBLIC RESTROOMS - GROUND LEVEL - POWER
252 EP-312 PUBLIC RESTROOMS - ROOF PLAN - POWER
253 EP-313 PUBLIC RESTROOMS - TEMPORARY POWER
254 EP-411 MAINTENANCE BUILDING - GROUND LEVEL - NORTH - POWER
255 EP-412 MAINTENANCE BUILDING - GROUND LEVEL - EAST - POWER
256 EP-413 MAINTENANCE BUILDING - GROUND LEVEL - WEST - POWER
257 EP-414 MAINTENANCE BUILDING - ROOF PLAN - POWER
258 EP-510 PUMP HOUSE - BASEMENT LEVEL & GROUND LEVEL & ROOF - POWER
259 EP-611 COMMITTAL SHELTER A - GROUND LEVEL - POWER
260 EP-612 COMMITTAL SHELTER B - GROUND LEVEL - POWER
261 EP-711 IRRIGATION WELL - POWER
TELECOMMUNICATIONS
262 ET-110 DIRECTOR'S LODGE - BASEMENT LEVEL - EAST - TELECOMMUNICATIONS
263 ET-111 DIRECTOR'S LODGE - BASEMENT LEVEL - WEST - TELECOMMUNICATIONS
264 ET-112 DIRECTOR'S LODGE - GROUND LEVEL - EAST - TELECOMMUNICATIONS
265 ET-113 DIRECTOR'S LODGE - GROUND LEVEL - WEST - TELECOMMUNICATIONS
266 ET-114 DIRECTOR'S LODGE - SECOND LEVEL - TELECOMMUNICATIONS
267 ET-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - TELECOMMUNICATIONS
268 ET-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - TELECOMMUNICATIONS
269 ET-311 PUBLIC RESTROOMS - GROUND LEVEL - TELECOMMUNICATIONS
PLUMBING
GENERAL
270 P-001 PLUMBING - ABBREVIATIONS, SCHEDULES AND SYMBOLS
271 P-002 PLUMBING - DETAILS
DEMOLITION
272 PD-110 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN EAST - DEMOLITION 273 PD-111 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN WEST - DEMOLITION 274 PD-112 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN EAST - DEMOLITION 275 PD-113 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN WEST - DEMOLITION
276 PD-114 DIRECTORS LODGE - PLUMBING - SECOND LEVEL - FLOOR PLAN - DEMOLITION
277 PD-211
PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN -
DEMOLITION
278 PD-311 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - FLOOR PLAN - DEMOLITION
NEW WORK
279 PP-110 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN EAST
280 PP-111 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN WEST
281 PP-112 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN EAST
282 PP-113 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN WEST
283 PP-114 DIRECTORS LODGE - PLUMBING - SECOND LEVEL - FLOOR PLAN
284 PP-211 PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN - GRAVITY 285 PP-212 PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN - PRESSURE
286 PP-311 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - FLOOR PLAN - GRAVITY
287 PP-312 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - FLOOR PLAN - PRESSURE
288 PP-313 PUBLIC RESTROOMS - TEMPORARY PLUMBING
FIRE ALARM
289 FA-001 SYMBOLS, NOTES, ABBREVIATIONS, AND DRAWING INDEX
290 FA-002 DETAILS AND MATRIX
291 FA-110 DIRECTORS LODGE - BASEMENT & GROUND LEVEL - FIRE ALARM
292 FA-111 DIRECTORS LODGE - SECOND & ATTIC LEVEL - FIRE ALARM
STRUCTURAL
293 S-101 STRUCTURAL NOTES
294 S-201 STRUCTURAL DETAILS
295 S-202 STRUCTURAL DETAILS
296 S-203 STRUCTURAL DETAILS
71 LS-402 SITE DEVELOPMENT PLAN - DETAILS
72 LS-403 SITE DEVELOPMENT PLAN - DETAILS
73 LS-404 SITE DEVELOPMENT PLAN - DETAILS
74 LS-405 SITE DEVELOPMENT PLAN - DETAILS
75 LS-406 SITE DEVELOPMENT PLAN - DETAILS
PUMP HOUSE
141 AE-511 PUMP HOUSE: BASEMENT & GROUND LEVELS FLOOR PLANS
142 AE-512 PUMP HOUSE: ROOF - PLAN, ELEVATIONS & ROOF REPAIR DETAIL
143 AE-521 PUMP HOUSE: BASEMENT & GROUND LEVELS REFLECTED CEILING PLANS
144 AE-531 PUMP HOUSE: EXTERIOR ELEVATIONS
COMMITTAL SERVICE SHELTERS A & B
145 AE-611 COMMITTAL SHELTER A: FLOOR, CEILING AND ROOF PLANS
146 AE-612 COMMITTAL SHELTER B: FLOOR, CEILING AND ROOF PLANS
147 AE-621 COMMITTAL SHELTER A & B: INTERIOR ELEVATIONS
148 AE-622 COMMITTAL SHELTER DETAILS
149 AE-631 COMMITTAL SHELTER A: EXTERIOR ELEVATIONS
150 AE-632 COMMITTAL SHELTER B: EXTERIOR ELEVATIONS
DEMOLITION
209 ED-110 DIRECTOR'S LODGE - BASEMENT LEVEL - EAST - DEMOLITION
210 ED-111 DIRECTORS LODGE - BASEMENT LEVEL - -WEST - DEMOLITION
211 ED-112 DIRECTORS LODGE - GROUND LEVEL - EAST - DEMOLITION
212 ED-113 DIRECTORS LODGE - GROUND LEVEL - WEST - DEMOLITION
213 ED-114 DIRECTORS LODGE - SECOND LEVEL - DEMOLITION
214 ED-115 DIRECTORS LODGE - ATTIC LEVEL - DEMOLITION
215 ED-116 DIRECTORS LODGE - ROOF PLAN-EAST - DEMOLITION
216 ED-117 DIRECTORS LODGE - ROOF PLAN-WEST - DEMOLITION
217 ED-210 PUBLIC INFORMATION CENTER - BASEMENT LEVEL - DEMOLITION
218 ED-211 PUBLIC INFORMATION CENTER - GROUND LEVEL - DEMOLITION
219 ED-212 PUBLIC INFORMATION CENTER - ROOF PLAN - DEMOLITION
220 ED-311 PUBLIC RESTROOMS - GROUND LEVEL - DEMOLITION
221 ED-312 PUBLIC RESTROOMS - ROOF PLAN - DEMOLITION
222 ED-411 MAINTENANCE BUILDING - GROUND LEVEL - DEMOLITION
223 ED-412 MAINTENANCE BUILDING - ROOF PLAN - DEMOLITION
224 ED-510 PUMP HOUSE - BASEMENT & GROUND LEVEL - DEMOLITION
225 ED-611 COMMITTAL SHELTER A - DEMOLITION
226 ED-612 COMMITTAL SHELTER B - DEMOLITION
G
L I N C
F a c R e n C M C a d d o c s
G I
I n d e x d w g
P M
T D
S t d D W G
T o
P D F p c
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
CONSTRUCTION SEQUENCE &
PHASING PLAN
GI-103
NATIONAL
CEMETERY
ADMINISTRATION
Revisions Date
Drawing Title
Approved:
Checked
Location
DRAWING NO.
Dwg.
Of
4 5 8
1 2 3 4 7 9
D E
F
C D
E
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Approved:
Project Title
Building Number
Drawn
Date
Project No.
1 2 6 7 9
5 6 8
A B
C
A B
F
© COPYRIGHT 2023, Walker Federal Services, LLC
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
BJ JC, EM
May 22, 2023
Final Construction Documents - Issued for Construction
1. ALL STORM SEWER STRUCTURES AND PIPES SHALL CONFORM TO NEW YORK STATE
DEPARTMENT OF TRANSPORTATION STANDARDS.
2. COORDINATE CONSTRUCTION OF STORM SEWER LINES WITH OTHER CONSTRUCTION
ACTIVITIES ON SITE.
3. VERIFY LOCATIONS AND INVERTS OF EXISTING STORM WATER STRUCTURES PRIOR TO THE
START OF CONSTRUCTION.
4. ENSURE THAT ALL TRENCHES AND EXCAVATIONS MADE IN THE SUBGRADE ARE BACKFILLED
ACCORDING TO 31 20 00 EARTH MOVING, ADJUSTED TO THE REQUIRED UNIFORM
MOISTURE CONTENT, AND COMPACTED TO THE SPECIFIED DENSITY.
1. STRIP A MINIMUM 6-INCH LAYER OF TOPSOIL IN ALL AREAS OF CUT AND FILL. STOCKPILE AT
LOCATION(S) AND BY MEANS APPROVED BY COR AND RE-SPREAD SUFFICIENT TOPSOIL TO A
MINIMUM DEPTH OF 6 INCHES IN ALL DISTURBED AREAS TO RECEIVE TURF OR OTHER
PLANTINGS.
2. FINISHED GRADES INDICATES THE SURFACE ELEVATION AFTER THE LAYER OF TOPSOIL AND
PAVING HAVE BEEN PLACED.
3. THIS IS DESIGN GRADING. CONTOUR ALL GRADES SMOOTHLY WITH GENTLE
ROUNDING/SHAPING OF ALL AFFECTED LAND SURFACES. ABRUPT TRANSITIONS AT THE TOP
OF SLOPES WHERE PROPOSED GRADES MEET EXISTING ARE NOT ACCEPTABLE. SURVEY STAKES
ARE FOR GENERAL GRADING PURPOSES ONLY. NOT ALL SLOPES ARE CONSTANT. REFER TO
THE GRADING PLANS FOR FINAL GRADE SHAPING. ENSURE POSITIVE DRAINAGE IN ALL AREAS.
THE GRADING SHALL BE APPROVED BY THE COR PRIOR TO THE ADDITION OF THE TOPSOIL
LAYER.
4. SCARIFYING OVER UTILITY LINES MAY BE ELIMINATED, IF IN THE OPINION OF THE COR, A HAZARDOUS SITUATION EXISTS.
5. PROVIDE AN INDEPENDENT TESTING AND INSPECTION LABORATORY TO PERFORM ALL
COMPACTION TESTS. REFER TO GEOTECHNICAL REPORT, PROJECT MANUAL,
APPENDIX I, FOR REQUIRED FREQUENCY OF TESTING. PERFORM A SUFFICIENT
NUMBER OF TESTS TO ENSURE THAT BACKFILLED AREAS MEET ESTABLISHED
REQUIREMENTS. IF THE TEST RESULTS DO NOT MEET SUCH REQUIREMENTS, REWORK
THE AREAS IN QUESTION AND RETEST. ANY REQUIRED REWORKING AND RETESTING
SHALL BE AT THE CONTRACTOR'S EXPENSE. THE INDEPENDENT TESTING AND
INSPECTION LABORATORY SHALL SUBMIT THE TEST RESULTS IN WRITING TO THE COR
AS SOON AS PRACTICAL.
6. DO NOT USE FROZEN MATERIAL FOR FILL MATERIAL. SUSPEND GRADING OPERATIONS
IF FROZEN EXCAVATION OR A BLANKET OF FROST IS ENCOUNTERED.
1. PROVIDE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH USE OF ROADWAYS, 01 00 02 FOR COR'S REVIEW NOT LESS THAN SEVEN DAYS PRIOR TO WORK. COR'S APPROVAL IS REQUIRED
PRIOR TO COMMENCING AFFECTED WORK.
2. PROVIDE FLAGGERS WHEN CROSSING, ENTERING, AND WORKING IN AND ADJACENT TO CEMETERY ROADS. MAINTAIN AT LEAST ONE OPEN LANE AT ALL TIMES, UNLESS SPECIFICALLY APPROVED IN WRITING BY COR. PROVIDE ADEQUATE TRAFFIC CONTROL MEASURES TO SAFELY WARN AND ROUTE VEHICULAR AND PEDESTRIAN TRAFFIC, AND AS DIRECTED BY COR. THIS MAY INCLUDE BARRICADES, SIGNAGE, ETC., AS WELL AS LIGHTS, REFLECTORS, AND FLAGGERS DURING CEMETERY HOURS OF
OPERATION.
3. COORDINATE ANY CLOSURE OF AND WORK ON AND ADJACENT WELLWOOD AVENUE SIDEWALKS WITH LOCAL JURISDICTIONS HAVING AUTHORITY. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL RELEVANT PERMITS/APPROVALS AND PAYING ALL ASSOCIATED FEES WITHOUT ADDITIONAL COST TO
THE GOVERNMENT.
4. MAINTAIN VEHICULAR ACCESS TO THE ADMINISTRATION BUILDING AND MAINTENANCE YARD AT ALL TIMES AND TO THE COMFORT STATION WHEN IT IS NOT CLOSED FOR CONSTRUCTION, INCLUDING DURING PAVING OPERATIONS. SINGLE LANE CLOSURES AND USE OF FLAGGERS IS POTENTIALLY
ACCEPTABLE, PENDING COR'S APPROVAL OF CONSTRUCTION TRAFFIC CONTROL PLAN.
5. ALL TRAFFIC AND PEDESTRIAN CONTROL DEVICES AND MARKINGS, INCLUDING CONSTRUCTION SIGNAGE, SHALL CONFORM TO THE LATEST EDITIONS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES & THOSE OF NEW YORK SUPPLEMENT 17 NYCRR CHAPTER V, MINIMUM.
6. BURIAL ACTIVITIES TAKE PRECEDENCE OVER CONSTRUCTION ACTIVITIES. COOPERATE & COORDINATE WITH CEMETERY DIRECTOR & COR TO ARRANGE CONSTRUCTION SCHEDULE TO CAUSE LEAST POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES IN AND ADJACENT TO BURIAL AREAS & PROCESSIONS.
CONSTRUCTION NOISE SHALL NOT DISTURB COMMITTAL SERVICES & ACTIVITIES. TRUCKS, EQUIPMENT, AND WORKERS SHALL NOT PASS THROUGH OR NEAR SERVICE AREAS DURING SERVICES.
1. THE FOLLOWING SHALL BE SUBMITTED TO AND APPROVED BY COR PRIOR TO COMMENCEMENT OF
WORK:
a. CONSTRUCTION SEQUENCING PLAN & PROJECT SCHEDULE PER 01 32 16.13. INCLUDE PLANS INDICATING PROPOSED SHORT-TERM STORAGE AT AND CONSTRUCTION ACCESS TO EACH DISCRETE
AREA OF WORK.
b. DETAILED PHASING PLAN & SCHEDULE FOR COLUMBARIUM "A." SUBDIVIDE BY EXISTING WALL DESIGNATIONS, A1-A6, INCLUDING ADJACENT SITEWORK. WORK MAY OCCUR CONCURRENTLY AT UP
TO 2 NON-CONTIGUOUS WALLS. COMPLETE WORK ON ANY WALL AND TURN OVER TO CEMETERY
PRIOR TO BEGINNING WORK ON ANY SUBSEQUENT WALL. WORK DURATION FOR 1 WALL & ADJACENT SITEWORK, INCLUDING INSPECTION AND PUNCHLIST FULFILLMENT, SHALL NOT EXCEED 15 CALENDAR DAYS. ENSURE OPERATIONS AT ADJACENT COMMITTAL SERVICE SHELTERS "NORTH" AND "SOUTH" ARE
UNAFFECTED.
c. DETAILED SCHEDULE FOR COMMITTAL SERVICE SHELTERS "A" & "B." COMPLETE WORK ON THE FIRST SHELTER, INCLUDING INSPECTION AND PUNCHLIST FULFILLMENT, AND TURN OVER TO CEMETERY
PRIOR TO BEGINNING WORK ON THE SECOND. WORK DURATION FOR EACH SHELTER SHALL NOT
EXCEED 45 CALENDAR DAYS.
2. COORDINATE ALL ACTIVITIES WITH APPROPRIATE AGENCIES HAVING JURISDICTION. APPLY FOR AND
OBTAIN ALL NECESSARY PERMITS & LICENSES PRIOR TO SCHEDULED COMMENCEMENT OF WORK.
COMPLY WITH ALL FEDERAL, STATE, AND LOCAL ORDINANCES, LAWS, AND REGULATIONS APPLICABLE
TO PERFORM THE WORK.
3. LOCATE & PROTECT ALL UTILITIES FROM DAMAGE, INCLUDING UNDERGROUND UTILITIES, WHETHER INDICATED OR NOT. DO NOT BEGIN EXCAVATION IN AREA OF UTILITIES UNTIL ALL SUCH UTILITIES HAVE BEEN LOCATED AND IDENTIFIED. PROCEED WITH EXTREME CARE TO AVOID ANY POSSIBILITY OF
DAMAGE.
4. RETAIN A PRIVATE UNDERGROUND LOCATOR TO IDENTIFY & MARK UTILITIES NOT MARKED ABOVE & ALL EXISTING IMPROVEMENTS BELOW GRADE WITHIN & ADJOINING WORK AREAS. WALK EACH WORK AREA WITH COR AND ADJUST NEW WORK TO AVOID CONFLICTS, DAMAGE, OR INTERRUPTIONS OF
UTILITIES & CEMETERY OPERATIONS, AS DIRECTED BY COR.
5. REMOVE ALL MARKINGS UPON COMPLETION OF WORK OR AS DIRECTED BY COR.
6. INSTALL TEMPORARY CONSTRUCTION FENCING, TREE PROTECTION MEASURES, AND EROSION &
SEDIMENT CONTROLS WHERE WORK WILL BE PERFORMED PRIOR TO START OF WORK IN EACH
RESPECTIVE AREA. INSPECT & MAINTAIN DAILY THROUGHOUT CONSTRUCTION UNTIL PROJECT IS
ACCEPTED.
7. COMPLETE DEMOLITION FOR AREAS WHERE WORK WILL BE PERFORMED IMMEDIATELY PRIOR TO
RESPECTIVE WORK.
8. COMPLETE WORK IN EACH OF THE FOLLOWING AREAS PRIOR TO COMMENCING WITH SUBSEQUENT AREAS. LIST IS NOT INTENDED TO BE ALL-INCLUSIVE AND ORDER OF a-d MAY CHANGE, AS APPROVED BY COR. COR WILL CONSIDER REQUESTS TO ALTER LIST NOT LESS THAN 30 DAYS IN ADVANCE OF AFFECTED
ITEMS:
a. CONTRACTOR'S YARD & UTILITIES, CONSTRUCTION FENCING & GATES, CONSTRUCTION SIGNAGE.
b. DIRECTOR'S LODGE, OFFICE BUILDING, AND ASSOCIATED SITE WORK.
c. MAINTENANCE BUILDING, PUMP HOUSE, TEMPORARY PUBLIC RESTROOMS, COMFORT
STATION/RESTROOM BUILDING, WELL & CONNECTION TO WATER DISTRIBUTION SYSTEM, AND
ASSOCIATED SITEWORK.
c.a. COMPLETE PUMP HOUSE ELECTRICAL WORK PRIOR TO SCHEDULED ENERGIZING OF
TEMPORARY PUBLIC RESTROOMS.
c.b. COMPLETE INSTALLATION OF TEMPORARY PUBLIC RESTROOMS PRIOR TO ANY WORK ON
COMFORT STATION/RESTROOM BUILDING.
c.c. COMPLETE PAVEMENT WORK AT COMFORT STATION/RESTROOM BUILDING PARKING LOT
FOLLOWING REMOVAL OF TEMPORARY PUBLIC RESTROOMS.
d. COLUMBARIUM A, COMMITTAL SERVICE SHELTER (CSS) A & B, AND ASSOCIATED SITEWORK.
9. THE FOLLOWING MAY BE SCHEDULED INDEPENDENTLY FROM OR CONCURRENT WITH ANY OF THE
ABOVE, AS APPROVED BY COR.
a. CORTEGE LANES & ASSOCIATED DIRECTIONAL SIGNAGE, SITE DRAINAGE, CURB & GUTTER
REPAIRS, SITE PAVING.
a.a. PRIOR TO CONSTRUCTION, EMPLOY THE SERVICES OF NY-LICENSED GEOTECHNICAL
ENGINEER TO EVALUATE AND CONFIRM THE SUITABILITY OF SOILS BELOW NEW PAVING IN
THE AREA NORTH OF THE ADMINISTRATION BUILDING, FORMERLY A RESERVOIR. PROVIDE
ENGINEER'S SEALED REPORT FOR COR'S REVIEW PRIOR TO CONSTRUCTION. SEE
APPROXIMATE HISTORIC BOUNDARY LINE OF RESERVOIR ON SITE DRAWING IN THAT AREA.
b. SITE SIGNAGE.
c. PLAQUE RESTORATION.
d. SECTION MONUMENTS.
e. FLOWER WATERING STATIONS.
10. DO NOT REMOVE EXISTING SITE SIGNS, SECTION MARKERS, AND YARD HYDRANTS UNTIL
CORRESPONDING NEW UNITS ARE APPROVED AND READY FOR IMMEDIATE INSTALLATION. REMOVE ONLY THOSE UNITS THAT WILL BE REPLACED BY THE END OF EACH DAY, UNLESS OTHERWISE DIRECTED
BY COR.
1. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN OR INFERRED
BY THESE DOCUMENTS.
2. ALL DIMENSIONS SHOWN PARALLEL AND PERPENDICULAR UNLESS OTHERWISE NOTED. DO NOT SCALE
DIMENSIONS OFF THE DRAWINGS.
3. QUANTITIES SHOWN ARE ESTIMATED. DETERMINE ACTUAL QUANTITIES REQUIRED. THERE SHALL BE NO ADDITIONAL COMPENSATION FOR QUANTITIES BEYOND THOSE INDICATED UNLESS REQUIRED BY CHANGES
APPROVED BY COR.
4. FIELD STAKEOUT SURVEYOR IS RESPONSIBLE FOR VERIFYING EXISTING SITE CONDITIONS AND NOTING ANY DISCREPANCIES BETWEEN THOSE AND STAKING PLAN PRIOR TO CONSTRUCTION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR IS RESPONSIBLE FOR WORK PERFORMED PRIOR TO VERIFICATION OF STAKING PLAN AND SHALL BEAR THE COSTS ASSOCIATED WITH REMEDIAL ACTION.
5. CONTRACTING OFFICER'S REPRESENTATIVE (COR) SHALL APPROVE STAKING IN FIELD OF ALL WORK PRIOR TO
CONSTRUCTION. NOTIFY COR 72 HOURS IN ADVANCE OF STAKEOUT.
6. COMPLY WITH REQUIREMENTS OF DIG SAFELY NEW YORK TO LOCATE AND MARK UTILITIES IN ADVANCE
OF EXCAVATION. DIG SAFELY NEW YORK: 1-800-962-7962 OR 811
7. PRIOR TO CONSTRUCTION OF WALLS, CURBS, AND PAVEMENTS, VERIFY ACTUAL FINISH GRADE ELEVATIONS IN
THE FIELD AND ADJUST ELEVATIONS, AS APPROVED BY COR, TO MEET THE DESIGN INTENT.
8. DO NOT PROCEED WHEN OBSTRUCTIONS, CONFLICTS, OR DISCREPANCIES EXIST. IMMEDIATELY NOTIFY COR.
CONTRACTOR BEARS RESPONSIBILITY FOR ALL DAMAGES, REVISIONS, AND REMEDIAL WORK DUE TO FAILURE TO
GIVE SUCH NOTIFICATION.
9. A GEOTECHNICAL REPORT IS INCLUDED IN THE PROJECT MANUAL'S APPENDICES. REFER TO REPORT FOR RECOMMENDED PAVEMENT THICKNESS, SUBGRADE PREPARATION, BACKFILLING, ETC. FOLLOW REQUIREMENTS FOR SITE PREPARATION, PROOF-ROLLING, LIFT THICKNESS, STRUCTURAL FILL, OTHER ITEMS. IF DISCREPANCIES ARISE BETWEEN PLANS, SPECIFICATIONS, AND REPORT, THE MORE CONSERVATIVE AND STRINGENT
REQUIREMENTS SHALL GOVERN.
10. LOCATE CONTRACTOR'S TEMPORARY OFFICE(S), FACILITIES, PARKING, STORAGE, ETC. AT CONTRACTOR'S YARD.
ALL GENERAL CONSTRUCTION & DELIVERY TRAFFIC SHALL ACCESS THE CONTRACTOR'S YARD DIRECTLY AND SOLELY BY MEANS OF GATE 3. LIMITED TRANSIT ON CEMETERY ROADS TO DISCRETE WORK AREAS WHEN SCHEDULED WORK IS OCCURRING, AS WELL AS SHORT-TERM STORAGE OF UP TO 15 CALENDAR DAYS, MAY OCCUR AT DISCRETE WORK AREAS, SUBJECT TO APPROVAL OF CONTRACTOR'S PROPOSED CONSTRUCTION SEQUENCING PLAN. CONTRACTOR MAY REQUEST LIMITED USE OF OTHER BACK-OF-HOUSE AREAS FOR SECONDARY STORAGE, PENDING WRITTEN APPROVAL BY COR NOT LESS THAN 7 DAYS IN ADVANCE. ALL OTHER USE OF CEMETERY PROPERTY IS PROHIBITED, UNLESS SPECIFICALLY APPROVED IN WRITING BY THE COR NOT LESS
THAN 7 DAYS IN ADVANCE.
11. PRESERVE ALL PROPERTY IRONS/SURVEY CONTROL MONUMENTS. RE-ESTABLISH ANY AFFECTED BY CONTRACTOR'S FORCES. SUCH IRONS SHALL BE REESTABLISHED BY A NEW YORK STATE LICENSED LAND
SURVEYOR IN ACCORDANCE WITH STATE LAWS AT CONTRACTOR'S EXPENSE.
12. PROTECT ALL TREES & SHRUBS NOT SPECIFICALLY IDENTIFIED FOR REMOVAL PER 4/LS-401 & 01 56 39, WHETHER TREE PROTECTION FENCING AND OTHER MEASURES ARE SPECIFICALLY IDENTIFIED ON THE PLANS.
13. LIMITS OF WORK FOR INDIVIDUAL SIGNS AND OTHER SMALL DISCRETE OPERATIONS ARE NOT SHOWN ON PLANS.
PROVIDE CONSTRUCTION FENCING AT EACH AREA OF WORK PER 3/LS-401 & 01 00 02. MAINTAIN UNTIL WORK IS COMPLETE, AS APPROVED BY COR. FLAG FENCE LOCATIONS IN FIELD FOR COR'S APPROVAL & ADJUSTMENT PRIOR TO ERECTING. DO NOT BLOCK ROADS OR SIDEWALKS UNLESS APPROVED BY COR IN WRITING.
14. WORK INVOLVES CONSTRUCTION ACTIVITY IN CLOSE PROXIMITY TO GRAVES. WORKING, OPERATING EQUIPMENT, OR STORING MATERIALS ON OCCUPIED GRAVES IS PROHIBITED AT ALL TIMES. PROTECT ALL EXISTING GRAVES, HEADSTONES, TEMPORARY GRAVE MARKERS, AND MEMORIALS AT ALL TIMES FROM DAMAGE DUE TO CONTRACTOR'S FORCES. INSTALL RIGID PROTECTIVE COVERS ON ALL ADJACENT HEADSTONES AND MEMORIALS WITHIN 10 FEET OF DEMOLITION OR CONSTRUCTION ACTIVITIES AND AS DIRECTED BY COR OR CEMETERY DIRECTOR. REMOVE AFTER ADJACENT WORK IS COMPLETE, OR AS DIRECTED BY COR OR CEMETERY
DIRECTOR.
15. INSTALL EROSION CONTROL DEVICES AS INDICATED AND ACCORDING TO 01 57 19. REPAIR AT NO ADDITIONAL
COST AND SUPPLEMENT AT NO ADDITIONAL COST IF REQUIRED BY PERMITTING AUTHORITY.
16. TRACKING SEDIMENTS AND OTHER SUBSTANCES OFF-SITE OR ON CEMETERY ROADS IS PROHIBITED. CLEAN ROADS USED BY CONTRACTOR'S FORCES DAILY AND AS DIRECTED BY COR. CONTROL GENERATION OF FUGITIVE DUST. EMPLOY STREET SWEEPING, WASH RACKS, AND OTHER MEASURES AS NECESSARY. REMOVE DEBRIS AS IT
OCCURS.
17. MAINTAIN ADEQUATE DRAINAGE AT ALL TIMES. RESTORE ANY ADJACENT PRE-CONSTRUCTION DRAINAGE
CONDITIONS AND IMPROVEMENTS DISTURBED DURING CONSTRUCTION TO COR'S SATISFACTION.
18. PROPOSED SIDEWALKS SHALL NOT EXCEED 1.75% CROSS-SLOPE OR 4.75% LONGITUDINAL SLOPE.
19. ALL WORK SHALL CONFORM TO THE PROVISIONS OF ALL APPLICABLE ORDINANCES, REGULATIONS, AND ADOPTED STANDARDS OF THE NATIONAL CEMETERY ADMINISTRATION AND STATE OF NEW YORK, UNLESS
WAIVED AND/OR MODIFIED UNDER SEPARATE APPLICATION.
20. PROVIDE TEMPORARY MODULAR PUBLIC RESTROOM BUILDING(S), UTILITIES, AND SIGNAGE WHEN WORK IS UNDERWAY AT COMFORT STATION PER GI-104. NOT FOR USE BY CONTRACTOR AT ANY TIME. COR'S APPROVAL IS REQUIRED PRIOR TO CLOSING RESTROOM BUILDING. MAINTAIN UNTIL RESTROOM BUILDING WORK IS
COMPLETE AND ACCEPTED BY COR.
21. PROVIDE TEMPORARY SHORING, BRACING AND/OR FALSEWORK TO SUPPORT & PROTECT ALL ITEMS AFFECTED BY WORK. OBTAIN DETAILS, DESIGN, AND PROCEDURE SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NEW YORK FOR ALL TEMPORARY SHORING, BRACING, AND/OR FALSEWORK, AS APPROVED BY THE COR AND/OR PROJECT ENGINEER. PROVIDE SAFETY RAILING AT TOP OF TEMPORARY SHORING AS REQUIRED BY
OSHA. BARRICADE EXCAVATED AREAS WHEN WORK IS NOT OCCURRING.
22. EXISTING UTILITY SERVICE LINES & APPURTENANCES ARE TO REMAIN IN PLACE & IN OPERATION UNLESS PLANS SPECIFICALLY CALL FOR THEIR ADJUSTMENT. IF UTILITY INTERRUPTIONS ARE REQUIRED FOR EXECUTION OF
WORK, MINIMIZE INTERRUPTION AND NOTIFY COR PER REQUIREMENTS OF 01 00 02.
23. EXISTING UTILITIES SHOWN REPRESENT THE BEST INFORMATION OBTAINABLE FOR DESIGN. LOCATIONS ARE NOT GUARANTEED & SOME ITEMS MAY NOT BE INDICATED. WORK INCLUDES SUBSURFACE UTILITY SCANNING, TEST PITS, AND OTHER INVESTIGATIVE MEANS AS NECESSARY TO ENSURE COMPLETE & ACCURATE INFORMATION PRIOR TO WORK. ADJUST WORK, AS APPROVED BY COR, AT NO ADDITIONAL COST TO AVOID CONFLICTS.
CONTRACTOR SHALL BEAR EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES DAMAGED DURING WORK.
COORDINATE WORK WITH ALL UTILITY COMPANIES/AUTHORITIES PERTINENT TO PROSECUTION OF WORK.
24. COORDINATE WORK ADJACENT TO EXISTING COMMITTAL SERVICE SHELTERS, CORTEGE PARKING, COLUMBARIA, AND INTERMENT SECTIONS W/ COR AND CEMETERY DIRECTOR NOT LESS THAN 10 DAYS PRIOR TO PROPOSED WORK TO LIMIT IMPACT ON CEMETERY SERVICES AND VISITORS. CONTROL TRUCK AND EQUIPMENT OPERATION & TRANSIT TO PREVENT DISTURBANCE TO FUNERAL SERVICES, CORTEGE PARKING, PROCESSIONS, AND OTHER
FUNERAL ACTIVITY AS DIRECTED BY COR.
25. REPLACE ALL EXISTING FACILITIES AND IMPROVEMENTS DAMAGED BY CONTRACTOR'S FORCES IN ACCORDANCE WITH APPLICABLE AGENCY STANDARDS. REPLACEMENT WORK SHALL MEET PRE-CONSTRUCTION CONDITION, AT
A MINIMUM, AS APPROVED BY COR.
26. FINISH GRADE DISTURBED AREAS NOT OTHERWISE PLANTED OR PAVED W/ TOPSOIL FILL & TURF SOD PER 32 90
00 AND LP-201. FEATHER ADJACENT GRADES & PROVIDE POSITIVE DRAINAGE.
27. ALL MATERIAL NOT INDICATED FOR SALVAGE AND REUSE ON PROJECT, INCLUDING EXCESS EXCAVATED MATERIAL, OVERBURDEN, DEBRIS, RUBBLE, WASTE, AND SURPLUS MATERIALS, SHALL BECOME PROPERTY OF CONTRACTOR. REMOVE FROM THE SITE AND DISPOSE OF LEGALLY OFF GOVERNMENT'S PROPERTY PER 01 00 02
28. REMOVE TEMPORARY FACILITIES, UNLESS OTHERWISE INDICATED, & RESTORE ALL AREAS & ELEMENTS DISTURBED BY CONTRACTOR'S FORCES TO A CONDITION EQUAL TO OR BETTER THAN EXISTING, AS APPROVED BY COR. REFER TO 01 00 02 FOR PHOTOGRAPHIC DOCUMENTATION OF PRE-CONSTRUCTION CONDITIONS.
29. PERFORM EQUIPMENT REPAIR AND MAINTENANCE SOLELY OFFSITE OR WITHIN THE FENCED CONTRACTOR'S LAYDOWN YARD AND CONCEALED FROM PUBLIC VIEW, UNLESS OTHERWISE DIRECTED BY COR. COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS. ACTIVITIES THAT CREATE EXCESSIVE NOISE OR OFFENSIVE OR
PERVASIVE ODORS, AS DETERMINED BY THE COR, ARE PROHIBITED.
GENERAL NOTES CONSTRUCTION SEQUENCE SITE GRADING
MAINTENANCE OF TRAFFIC
STORM SEWER
1. PROJECT INCLUDES HAZARDOUS MATERIALS. REFER TO ARCHITECTURAL AND ENGINEERING
DEMOLITION DRAWINGS AND 02 82 11 TRADITIONAL ASBESTOS ABATEMENT, 02 82 13.31
ASBESTOS TRANSITE-TYPE ABATEMENT, 02 83 33.13 LEAD-BASED PAINT REMOVAL, AND
HAZARDOUS MATERIALS SURVEY, 7/28/21, PROJECT MANUAL APPENDIX II FOR SPECIFIC
INFORMATION. COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS.
2. NOT LESS THAN 30 DAYS PRIOR TO MOBILIZATION, PROVIDE CONTRACTOR'S AND
SUBCONTRACTORS' PROOF OF INSURANCE DEMONSTRATING ASBESTOS AND LEAD-BASED
PAINT ABATEMENT LIABILITY INSURANCE AND LIMITS, INCLUDING PROTECTION AGAINST
THIRD-PARTY CLAIMS OF BODILY INJURY AND PROPERTY DAMAGE FROM ABATEMENT
RELATED TO BOTH WORK IN PROGRESS AND COMPLETED PROJECTS. OBTAIN COR'S
APPROVAL PRIOR TO COMMENCEMENT OF WORK.
3. PROVIDE A LIST OF PROPOSED CONTRACTOR AND SUBCONTRACTOR PERSONNEL WHO WILL BE
INVOLVED WITH AND PERFORM THE WORK. INCLUDE COMPLETE HAZARDOUS MATERIALS
QUALIFICATIONS AND CREDENTIALS. OBTAIN COR'S APPROVAL PRIOR TO COMMENCEMENT
OF WORK.
4. ANY PROPOSED CHANGES TO THE APPROVED SUBCONTRACTORS AND ASSIGNED PERSONNEL
SHALL REQUIRE RESUBMISSION OF THE ABOVE NOT LESS THAN 15 DAYS PRIOR TO EACH SUCH
PROPOSED CHANGE. ACCEPTANCE OF ANY SUCH PROPOSED CHANGE SHALL BE SUBJECT TO
COR'S APPROVAL.
5. PROVIDE THE FOLLOWING WITH BID SUBMISSION:
a. NARRATIVE PLAN OF HAZARDOUS MATERIALS WORK AND DRAFT PROJECT-SPECIFIC
HEALTH AND SAFETY PLAN, PER 01 00 02
HAZARDOUS MATERIALS
1. NEW WELL INCLUDES DECOMMISSIONING OF EXISTING WELL AND DESIGN AND TEST WELL.
REFER TO PROJECT MANUAL, APPENDIX III, IRRIGATION SUPPLY WELL DESKTOP EVALUATION
FOR SPECIFIC REQUIREMENTS AND SEQUENCE OF WORK. REFER ALSO TO DIVISION 33
SPECIFICATIONS.
2. EXISTING IRRIGATION WELL IS CURRENTLY IN USE. SUBMIT PROPOSED DECOMMISSIONING
SCHEDULE WITH COR NOT MORE THAN 30 DAYS FOLLOWING NOTICE TO PROCEED TO LIMIT
IMPACTS TO CEMETERY OPERATIONS AND SERVICES.
IRRIGATION WELL
G
L I N C
F a c R e n C M C a d d o c s
G I
G e n n o t e s d w g
P M
T D
S t d D W G
T o
P D F p c
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
TBM-A
ELEV=99.71
B-09
B-11
B-08
ISO
C-08
C-09
C-10
C-11
C-12
C-13
C-14
C-15
C-16 C-17
C-18
C-19
C-20
C-21
C-22
C-23
C-24
C-25 C-26
C-27
C-36
C-37
C-38
C-39
C-40
C-41 C-42
ISO
ISO
3B
2X
2Z
2Y
2W 3D
2S
2R
2Q
3F
3C
2U
2T
2M
2P2N
3A
M al l Dr
. W
Cross Dr.
Ce nt ra l D r.
Mall Dr.
West Third Dr.
West Fourth Dr.
West Fifth Dr.
West Sixth Dr.
East Third Dr.
East Fourth Dr.
East Fifth Dr.
East Sixth Dr.
Eastern Dr.
W es te rn D r.
Northern Dr.
C o l o n i a l
S p r i n g s
R o a d
P i n e l a w n a d
Rostrum Dr. W
M al l Dr
. E
Ro st ru m
D r.
E.
Outer Mall Dr.
2U
2P2N
2S 3F
OC
Y
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
R
GI-104
ENLARGEMENT
O
C
R.1 (TYP.)
R ACCESSIBLE
R (TYP.)
3'-6"
3'-6"
3' -6
(T
YP
5' -0
3'-6"(TYP.)
34'-0"
# GATE
14 PROPOSED CORTEGE
12 ADMINISTRATION BUILDING
13 PUBLIC INFORMATION CENTER
10 PLAQUE, MEMORIAL DAY ORDER
11 DIRECTOR'S LODGE
9 PLAQUE, GETTYSBURG ADDRESS
8 PLAQUE, 1867 SECTION 3
7 PLAQUE, GENERAL ORDER 80
16 COMMITTAL SERVICE SHELTER B
4 MAINTENANCE BUILDING
1 PROPOSED WELL & CONTROL SPOOL ENCLOSURE
2 EXISTING PUMP HOUSE
Y CONTRACTOR'S YARD, STAGING, TEMP. FACILITIES
3 COMFORT STATION/PUBLIC RESTROOM BUILDING
B-## BORING; PROJECT MANUAL,
APPENDIX I, GEOTECHNICAL REPORT
SURVEY CONTROL POINT
PAVEMENT CORE; PROJECT MANUAL,
APPENDIX I, GEOTECHNICAL REPORT
15 COMMITTAL SERVICE SHELTER A
C-##
R
R.1 BARRICADE, PER 1/LS-401
LS-401
TEMPORARY PUBLIC
MODULAR RESTROOMS
CONSTRUCTION ACCESS ROUTE
LS-401
SA.2 SAFETY SIGN
SA.1 1
LS-401
SA.1 CONSTRUCTION SIGN
SA.2
17 FORMER RESERVOIR, APPROX. HISTORIC BOUNDARY LINE
OVERALL SITE PLAN
PHASING PLAN
GI-104
0 100 200 400 600
LEGEND
NATIONAL
CEMETERY
ADMINISTRATION
Revisions Date
Drawing Title
Approved:
Checked
Location
DRAWING NO.
Dwg.
Of
4 5 8
1 2 3 4 7 9
D E
F
C D
E
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Approved:
Project Title
Building Number
Drawn
Date
Project No.
1 2 6 7 9
5 6 8
A B
C
A B
F
© COPYRIGHT 2023, Walker Federal Services, LLC
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
BJ JC, EM
May 22, 2023
Final Construction Documents - Issued for Construction
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
KEYKEYKEYKEYKEYKEY
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
ENLARGEMENT
1"=10' 0 10 20 40 60
NOTES:
1. REFER TO ELECTRICAL PLANS FOR SERVICE TO TEMPORARY RESTROOM TRAILERS.
G
L I N C
F a c R e n C M C a d d o c s
G I
S i t e p l a n d w g
P M
T D
S t d D W G
T o
P D F p c
AutoCAD SHX Text
AC
AutoCAD SHX Text
GM
AutoCAD SHX Text
GM
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text
EM
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
HB
AutoCAD SHX Text
GM
AutoCAD SHX Text V
AutoCAD SHX Text
EM
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
MH
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
# GATE
14 PROPOSED CORTEGE
12 ADMINISTRATION BUILDING
13 PUBLIC INFORMATION CENTER
10 PLAQUE, MEMORIAL DAY ORDER
11 DIRECTOR'S LODGE
9 PLAQUE, GETTYSBURG ADDRESS
8 PLAQUE, 1867 SECTION 3
7 PLAQUE, GENERAL ORDER 80
16 COMMITTAL SERVICE SHELTER B
4 MAINTENANCE BUILDING
1 PROPOSED WELL & CONTROL SPOOL ENCLOSURE
2 EXISTING PUMP HOUSE
Y CONTRACTOR'S YARD, STAGING, TEMP. FACILITIES
3 COMFORT STATION/PUBLIC RESTROOM BUILDING
B-## BORING; PROJECT MANUAL,
APPENDIX I, GEOTECHNICAL REPORT
SURVEY CONTROL POINT
PAVEMENT CORE; PROJECT MANUAL,
APPENDIX I, GEOTECHNICAL REPORT
15 COMMITTAL SERVICE SHELTER A
C-##
R
R.1 BARRICADE, PER 1/LS-401
LS-401
TEMPORARY PUBLIC
MODULAR RESTROOMS
CONSTRUCTION ACCESS ROUTE
LS-401
SA.2 SAFETY SIGN
SA.1 1
LS-401
SA.1 CONSTRUCTION SIGN
SA.2
17 FORMER RESERVOIR, APPROX. HISTORIC BOUNDARY LINE
B-06 B-07
B-01
B-02B-03
B-10
B-04
B-05
TBM-B
ELEV=92.76
TBM-C
ELEV=90.84
C-01
C-02
C-03
C-04
C-05
C-06 C-07
C-08
C-28
C-29
C-30
C-31
C-32
C-33
C-34
C-35
2D2K
H
J
D
N
O
M
L
K
I
A
B
G
F
2L 2H2J
2E2G
R
Q
P
Y Z
2A
X
V
T
U S
2C
2B
2V
West First Dr.
Southern Dr.
Memorial Dr. South
East First Dr.
West Second Dr. East Second Dr.
W e l l w o d
A v e n u e
L i t t l e
E a s t
N e c k a d
Eastern Dr.
W es te rn
D r.
Lin k
Dr
Fl ag st af f D r.
Main Portal Dr.
W Memorial Dr. S.
Memorial Dr. N.
C
MB3EDSS
2E2G
E
Southern Dr.
Center Portal Dr.
Main Portal Dr.
Main Portal Dr.
Center Portal Dr.
Eastern Dr.
2C
H T
COLMB
B
CO
LM
BA
RI
U M
A
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
GI-105
ENLARGEMENT
SA.2
SA.1
17 COLMB
SA.2
SA.1
OVERALL SITE PLAN
PHASING PLAN
GI-105
0 100 200 400 600
LEGEND
NATIONAL
CEMETERY
ADMINISTRATION
Revisions Date
Drawing Title
Approved:
Checked
Location
DRAWING NO.
Dwg.
Of
4 5 8
1 2 3 4 7 9
D E
F
C D
E
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Approved:
Project Title
Building Number
Drawn
Date
Project No.
1 2 6 7 9
5 6 8
A B
C
A B
F
© COPYRIGHT 2023, Walker Federal Services, LLC
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
BJ JC, EM
May 22, 2023
Final Construction Documents - Issued for Construction
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
KEYKEYKEYKEYKEYKEY
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
NOT TO SCALE
KEY
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2H2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
I
A
B
G
F
2L
2P2N
2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
DSSE 3E
ENLARGEMENT
1"=10' 0 10 20 40 60
G
L I N C
F a c R e n C M C a d d o c s
G I
S i t e p l a n d w g
P M
T D
S t d D W G
T o
P D F p c
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text C/O
AutoCAD SHX Text C/O
AutoCAD SHX Text
EB
AutoCAD SHX Text
EM
AutoCAD SHX Text
GM
AutoCAD SHX Text
GM
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text V
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
AC
AutoCAD SHX Text
MH
AutoCAD SHX Text
TIE WALL
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
HB
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
MH
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .