This document package includes an engineering drawing set and related federal contract opportunity. The engineering drawing set provides design details for a new irrigation water well to be installed at the Long Island National Cemetery. It includes plans for the wellhead, pump system, discharge piping, and controls. The related federal contract opportunity is an Invitation for Bid for a renovation, improvements and repairs construction project at the Long Island National Cemetery. The solicitation seeks bids for all labor, materials, equipment and supervision to complete the scope of work outlined in the drawings and specifications. Key work includes a new irrigation well to a maximum depth of 400 feet, capable of producing 1,500-2,000 gallons per minute. The solicitation number is 36C78624B0005 and was issued by the Department of Veterans Affairs National Cemetery Administration for Project 815CM3041 located at Long Island National Cemetery. The response due date and award date are not provided.

View the file

Other files

File Type Posted
LINC PRFI 03.pdf PDF
LINC PRFI 05.pdf PDF
LINC PRFI 06.pdf PDF
LINC PRFI 02.pdf PDF
A0006 - Long Island Natl Cem - 36C78624B0005.pdf PDF
LINC PRFI 01.pdf PDF
LINC PRFI 02A.pdf PDF
LINC PRFI 04R.pdf PDF
A0005 - Long Island Natl Cem - 36C78624B0005.pdf PDF
A0004 - Long Island Natl Cem - 36C78624B0005.pdf PDF
Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.pdf PDF
RFI 03 - Long Island nalt Cem - LINC PRFI 03.pdf PDF
RFI 02A - Long Island Natl Cem - LINC PRFI 02A.pdf PDF
Virtual Bid Opening - Long Island Natl Cem (1).pdf PDF
A0002 - Long Island Natl Cem 36C78624B0005.pdf PDF
RFI Number 01 - Long Island National Cemetery - LINC PRFI 01 (1).pdf PDF
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem -FY-24.xlsx XLSX spreadsheet
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem.xlsx XLSX spreadsheet
Method of Award - Correction of Pre-Sol Previously Posted for LINC.pdf PDF
SITE VISIT - CONSTRUCTION 52.236-27 - LINC - 11 Jan 2024 .pdf PDF
Virtual Bid Opening - Long Island NC - 09 Feb 2024 .pdf PDF
36C78624B0005 A0001.docx DOCX document
815CM3041 LINC Phasing SK 01-04.pdf PDF
815CM3041 LINC Project Manual Spec Bk-02.pdf PDF
Appendix IV Well depth Eval ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-14.pdf PDF
815CM3041 LINC Bid Set Bk-06.pdf PDF
LINC FacRen 815CM3041 -ASI 02 - Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-07.pdf PDF
815CM3041 LINC Bid Set Bk-16.pdf PDF
815CM3041 LINC Project Manual Spec Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-05.pdf PDF
Wage Determination Suffolk County NY - LINC FY24.pdf PDF
003 GI-103 Gen Notes - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-02.pdf PDF
815CM3041 LINC Bid Set Bk-09.pdf PDF
LINC Spec 33 01 10 81 Water Supply Well Abandonment ASI 01.pdf PDF
LINC Spec 33 1113 Potable Supply Wells ASI 01.pdf PDF
815CM3041 LINC Bid Set Bk-04.pdf PDF
815CM3041 LINC Bid Set Bk-15.pdf PDF
815CM3041 LINC Bid Set Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-10.pdf PDF
815CM3041 LINC Spec ASI 01 Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-03.pdf PDF
815CM3041 LINC Bid Set Bk-13.pdf PDF
815CM3041 LINC Bid Set Bk-08.pdf PDF
815CM3041 LINC Bid Set Bk-11.pdf PDF
815CM3041 LINC Bid Set Bk-12.pdf PDF
36C78624B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15'-6" BASE

18' SLAB

11'

SLAB

8'-2"

BASE

61"

37"

8.4"

36" BURY DEPTH

8'-6"

L

C F

B

84" DOOR

48" DOOR

J

61.25"

NOT VERIFIED

SLAB, THRUST BLOCKS AND

SUB-BASE. SEE S-201.

CONCRETE PAD AND

PEDESTAL. SEE S-201

2" WELL SERVICE

AIR VALVE

COMPLY WITH APPENDIX III OF THE PROJECT

MANUAL, IRRIGATION SUPPLY WELL DESKTOP

EVALUATION, SHEET I-501, AND SPECIFICATION

SECTION 33 11 13 FOR WATER WELL

CONSTRUCTION REQUIREMENTS.

D

2" NPT HALF-COUPLING FOR

IRRIGATION SYSTEM BLOW-DOWN.

H A

A-A I-501

ELEVATION A-A

GROOVED COUPLING (TYPICAL)

PREFABRICATED FLOW CONTROL SPOOL ON STEEL PLATFORM WITH COMPOSITE ENCLOSURE.

250 HP PUMP MOTOR

14" PUMP DISCHARGE BASE

12" STEEL PIPE

GUIDE RAIL AND POSTS.

CUT AWAY FOR CLARITY.

SEE LS-402.

COMPOSITE ENCLOSURE

12" WAFER CHECK VALVE

12" STEEL

DROP PIPE

6" PVC DRAIN PIPE 24" COVER, DISCHARGE

INTO UNDERGROUND INFILTRATION BASIN.

SEE CS-201.

G

VENT

CONCRETE THRUST

BLOCK. SEE S-201.

CONCRETE SLAB. SEE

DETAIL 2 ON S-201

LOWER SECTIONS OF PIPE

ARE SWIVELED. SHOWN

FLAT FOR CLARITY.

56"

18" BURY DEPTH

PUMP COLUMN

FLAG NOTES

MINIMIZE THE HEIGHT OF THE FLOW CONTROL SPOOL WHILE ACCOMMODATING

THE AIR GAP DRAIN UNDER THE BACKFLOW PREVENTER.

WINTERIZATION DRAIN, 24" BELOW GRADE. 1.5" NPT STAINLESS STEEL GATE VALVE

WITH CROSS HANDLE. CONNECT TO 6" PVC DRAIN PIPE WITH 2" SCH 40 PVC PIPE.

PUMP SHAFT PRELUBE SYSTEM: 1" GATE VALVE, 1" REMOTE CONTROL VALVE, 3/4"

SCH 40 PVC PIPE TO PUMP DISCHARGE HEAD. WINTERIZE WITH COMPRESSED AIR

INTRODUCED AT THIS UNION AND VENTED AT THE WELL HEAD.

DEPTH FROM EXISTING GRADE TO CENTER OF EXISTING IRRIGATION MAIN IS

BASED ON THE RELATIVE ELEVATION OF THE EXISTING MAIN WHERE IT ENTERS

THE PUMP BUILDING BASEMENT. CONTRACTOR SHALL VERIFY THE PIPE DEPTH AT

THE LOCATION OF CONNECTION TO THE NEW PIPE FROM THE NEW WELL PRIOR TO

HAVING THE DISCHARGE DROP PIPE FABRICATED.

DIMENSIONS OF FABRICATED DISCHARGE DROP PIPE SHALL BE COORDINATED BY

CONTRACTOR WITH THE MANUFACTURER. CONTRACTOR SHALL VERIFY THE

DISTANCE BETWEEN THE FLOW CONTROL SPOOL SLAB AND THE CENTER OF THE

EXISTING IRRIGATION MAIN.

PUMP PRE-LUBE: 3/4"

SCH 40 PVC PIPE TO

PUMP COLUMN

PUMP SHAFT

PRE-LUBE PIPE

TOP OF EXISTING

PAVEMENT

FULLY RESTRAINED NEW 12" COMPACT

MJ TEE OR FULL CIRCUMFERENTIAL

TAPPING SLEEVE WITH 12" MJ OUTLET

ON EXISTING IRRIGATION MAIN PIPE

78.70"

NOT VERIFIED

RESTRAIN PIPE FROM UPWARD THRUST

TRANSMITTED FROM TOP ELBOW ON

STEEL DROP PIPE (TYPICAL). SEE S-201.

REINFORCED

CONCRETE

THRUST BLOCK

EXISTING

12" AC PIPE

PLAIN END FOR

INSERTION INTO MJ T

OR TAPPING SLEEVE.

E

K

DISCHARGE DRAIN TO

UNDERGROUND INFILTRATION BASIN

K

12" STEEL

DROP PIPE

2" PVC DRAIN PIPE

DEMOLISH PIPES AND FITTINGS WITHIN

THIS BOUNDARY. CAP THE REMAINING TWO

FLANGED OPENINGS (A & B) WITH BLANK

FLANGES AND NEW NUT, BOLT AND

GASKET SETS.

B

A

C

D

E

C, D, E: REPLACE THREE 12" GATE VALVES WITH

12" FXF, NRS, RESILIENT WEDGE, WHEEL

OPERATED, EPOXY COATED DUCTILE IRON

GATE VALVES. 250 LB CWP. AWWA C515

COMPLIANT. CONNECT WITH NEW NUT, BOLT

AND GASKET SETS.

36" BELOW FINISHED

GRADE OR AT THE

SAME DEPTH AS THE

EXISTING IRRIGATION

MAIN. SEE

12"

TRACEABLE WARNING TAPE,

12" BELOW GRADE, DIRECTLY

OVER PIPE

INITIAL BEDDING

3"

FINAL BACKFILL: CLEAN NATIVE SOIL,

PLACED AND COMPACTED TO 90%

DENSITY IN 6" LIFTS.

PIPE TRENCH SECTION

3"

3"

INITIAL FILL

HAUNCHING

USE WELL COMPACTED AASHTO 67 FOR

BEDDING, HAUNCHING AND INITIAL FILL.

NOTES

1. SUBMIT SHOP DRAWINGS PRIOR TO FABRICATION AND

INSTALLATION OF:

1.1. THE FLOW CONTROL SPOOL;

1.2. DROP PIPES;

1.3. THRUST BLOCKS.

COMPONENT KEY

A. PRESSURE GAUGE

B. 10" STRAINER.

C. 10" ASSE 1013 BACKFLOW PREVENTER.

D. AIR GAP DRAIN.

E. 6" PVC SWING CHECK VALVE.

F. 10" ELECTROMAGNETIC FLOW METER.

G. PUMP SHAFT LUBRICATION SOURCE: ISOLATION

VALVE & REMOTE CONTROL VALVE.

H. PRESSURE TRANSDUCER & GAUGE.

I. NOT USED

J. 6" PRESSURE RELIEF VALVE

K. 6" SOLVENT WELD SCH 40 PVC DRAIN PIPE

L. 10" ISOLATION VALVE

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Hydro Designs, Inc.

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

FACILITY RENOVATION

LONG ISLAND NATIONAL CEMETERY

815CM3041

MJK HDI

May 22, 2023

INFO@HYDRODESIGNS.COM WWW.HYDRODESIGNS.COM

nssn

IRRIGATION

ddHyyH roDesiggiseDor

Frederick, MD 21702 PO Box 1862

AUTOMATIC CONTROLS

301/471-7917 301/704-3102

PUMPING SYSTEMS

inc. M

IC

HAEL J . KRONES , Ph . D

C E

R T

I F I E

D IRR

IG

A T

IO

N

DES IGNER

G O

L F

COURSE - COMMERC

IA

L

001626

M

IC

HAEL J . KRONES , Ph . D

C E

R T

I F I E

D IRR

IG

A T

IO

N

DES IGNER

G O

L F

COURSE - COMMERC

IA

L

001626

May 22, 2023 Dwg.

IRRIGATION WATER WELL

DETAILS

I-501

ASI - Issued for Construction 0 1' 2' 4' 8'

3/8" = 1'

IRRIGATION PUMPING DETAILED LAYOUT1

I-501

NO SCALE

WATER WELL DESIGN2

I-501

3/8" = 1'-0"

PUMP BUILDING BASEMENT FLOOR PLAN, 1972 DESIGN DRAWING4

I-501

N.T.S.

PIPE TRENCH SECTION3

I-501

ASI 02 07/06/23

THE DESIGN TEAM PROVIDED AN IRRIGATION SUPPLY WELL DESKTOP EVALUATION

(ECS), DATED JANUARY 21, 2022 (PROJECT MANUAL, APPENDIX III) AND AN

IRRIGATION SUPPLY WELL DEPTH EVALUATION (ECS), DATED MARCH 29, 2023

(PROJECT MANUAL, APPENDIX IV). THE DESIGN TEAM UNDERSTANDS THE

GOVERNMENT WOULD LIKE TO INSTALL A NEW IRRIGATION SUPPLY WELL AT THE

SITE THAT IS CAPABLE OF PRODUCING 1,500-2,000 GALLONS PER MINUTE (GPM) AT A

MAXIMUM DEPTH OF 400 FEET BELOW GROUND SURFACE (BGS). AS SUCH, THE WELL

DESIGN AND SPECIFICATION DOCUMENTS CONTAINED WITHIN THE PREVIOUSLY

SUBMITTED IRRIGATION SUPPLY WELL DESKTOP EVALUATION HAVE BEEN REVISED

(ASI 01) BASED ON FINDINGS FROM THE IRRIGATION SUPPLY WELL DEPTH

EVALUATION. THE IRRIGATION SUPPLY WELL DEPTH EVALUATION INCLUDED A

RECOMMENDATION THAT A STEP-DRAWDOWN PUMPING TEST OF THE SITE'S

EXISTING IRRIGATION SUPPLY WELL BE PERFORMED TO EVALUATE WHETHER THE

UPPER MAGOTHY AQUIFER APPEARS CAPABLE OF MEETING THE GOVERNMENT'S

WATER DEMAND OF 1,500-2,000 GPM. THE DESIGN TEAM HAS SINCE BEEN INFORMED

THAT THE GOVERNMENT WOULD LIKE TO PROCEED WITHOUT PERFORMING THE

RECOMMENDED STEP-DRAWDOWN PUMPING TEST. AS SUCH, IT IS IMPORTANT TO

RECOGNIZE THAT THE SPECIFICATION DOCUMENTS WERE DEVELOPED BASED ON

THE ASSUMPTION THAT THE ESTIMATED MAXIMUM WELL DEPTH OF 400 FEET BGS

WILL BE ADEQUATE TO MEET THE GOVERNMENT'S WATER DEMAND OF 1,500-2,000

GPM. WHILE OUR PRIOR EVALUATIONS DO INDICATE THAT A WELL COMPLETED TO A

DEPTH OF 400 FEET BGS WOULD LIKELY PROVIDE THE DESIRED PRODUCTION OF

1,500-2,000 GPM, IT IS IMPORTANT TO NOTE THAT SOME LEVEL OF UNCERTAINTY

DOES EXIST DUE TO A GENERAL LACK OF INFORMATION REGARDING THE EXISTING

WELL'S PRODUCTIVITY AND A LACK OF AVAILABLE OFFSITE WELL LOGS IN PROXIMITY

TO THE PLANNED WELL LOCATION.

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .