This federal contract opportunity is a solicitation for renovation, improvements, and repairs at the Long Island National Cemetery in Farmingdale, New York. The solicitation seeks a contractor to furnish all tools, labor, materials, equipment, and supervision to perform work described in the Statement of Work, Specifications and Drawings. The work includes facility renovation, improvements and repairs located at the Long Island National Cemetery for Project Number 815CM3041. The soliciting agency is the Department of Veterans Affairs National Cemetery Administration. The contractor shall renovate, improve and repair the facilities specified according to the requirements laid out in the solicitation documentation.

View the file

Other files

File Type Posted
LINC PRFI 03.pdf PDF
LINC PRFI 05.pdf PDF
LINC PRFI 06.pdf PDF
LINC PRFI 02.pdf PDF
LINC PRFI 01.pdf PDF
LINC PRFI 02A.pdf PDF
LINC PRFI 04R.pdf PDF
A0005 - Long Island Natl Cem - 36C78624B0005.pdf PDF
A0004 - Long Island Natl Cem - 36C78624B0005.pdf PDF
Amendment - A0003 - Long Island Natl Cem - 36C78624B0005.pdf PDF
RFI 03 - Long Island nalt Cem - LINC PRFI 03.pdf PDF
RFI 02A - Long Island Natl Cem - LINC PRFI 02A.pdf PDF
Virtual Bid Opening - Long Island Natl Cem (1).pdf PDF
A0002 - Long Island Natl Cem 36C78624B0005.pdf PDF
RFI Number 01 - Long Island National Cemetery - LINC PRFI 01 (1).pdf PDF
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem -FY-24.xlsx XLSX spreadsheet
IFB-Contractor Cost Estimate Worksheet - Long Island Nalt Cem.xlsx XLSX spreadsheet
Method of Award - Correction of Pre-Sol Previously Posted for LINC.pdf PDF
SITE VISIT - CONSTRUCTION 52.236-27 - LINC - 11 Jan 2024 .pdf PDF
Virtual Bid Opening - Long Island NC - 09 Feb 2024 .pdf PDF
36C78624B0005 A0001.docx DOCX document
815CM3041 LINC Phasing SK 01-04.pdf PDF
815CM3041 LINC Project Manual Spec Bk-02.pdf PDF
Appendix IV Well depth Eval ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-14.pdf PDF
815CM3041 LINC Bid Set Bk-06.pdf PDF
LINC FacRen 815CM3041 -ASI 02 - Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-07.pdf PDF
815CM3041 LINC Bid Set Bk-16.pdf PDF
815CM3041 LINC Project Manual Spec Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-05.pdf PDF
Wage Determination Suffolk County NY - LINC FY24.pdf PDF
003 GI-103 Gen Notes - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-02.pdf PDF
815CM3041 LINC Bid Set Bk-09.pdf PDF
LINC Spec 33 01 10 81 Water Supply Well Abandonment ASI 01.pdf PDF
LINC Spec 33 1113 Potable Supply Wells ASI 01.pdf PDF
815CM3041 LINC Bid Set Bk-04.pdf PDF
815CM3041 LINC Bid Set Bk-15.pdf PDF
815CM3041 LINC Bid Set Bk-01.pdf PDF
815CM3041 LINC Bid Set Bk-10.pdf PDF
815CM3041 LINC Spec ASI 01 Narrative.pdf PDF
815CM3041 LINC Bid Set Bk-03.pdf PDF
815CM3041 LINC Bid Set Bk-13.pdf PDF
815CM3041 LINC Bid Set Bk-08.pdf PDF
089 I-501 IRRIGATION WATER WELL - DETAILS - ASI 02.pdf PDF
815CM3041 LINC Bid Set Bk-11.pdf PDF
815CM3041 LINC Bid Set Bk-12.pdf PDF
36C78624B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 10

A0006 27 Feb 2024

815CM3041

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78624B0005

02-27-2024

A0006

X

X

X 1

AMENDMENT (A0006) | Long Island National Cemetery | Facility Renovation, Improvements & Repairs | Project #815CM3041

The Purpose of Amendment (A0006) is to Notify the Public of the Government's Responses to RFI #05 .

1.) All Request For Information (RFI) is NOW Closed and the NCA will NOT be accepting anymore RFIs' Effective, Tuesday, 27 Feb 2024.

2.) The Virtual Bid Opening Date & Time Remains the Same, 12 March2024 @ 1300; (1:00 P.M.) EST

NOTE: Please See Attachments for Content

**All Factors & Content of This IFB Solicitations remains the Same**

Sheryl Palacio-Davis

Contracting Officer

A.1 IFB SOLICITATION DESCRIPTION FOR LONG ISLAND NATIONAL

CEMETERY

AMENDMENT (A0006), IS THE GOVERNMENT’S RESPONSES TO

RFI #05

PROJECT LOCATION: LONG ISLAND NATIONAL CEMETERY

Long Island National Cemetery

2040 Wellwood Avenue

Farmingdale, New York, 11735

PROJECT TITLE: Facility Renovation, Improvements, and Repairs

PROJECT NUMBER: 815CM3041

STATEMENT OF WORK SUMMARY:

▪ Contractor shall furnish all tools, labor, materials, equipment, and professional supervision to perform work described in the Statement of Work (SOW), Specification & Drawings, for the Facility Renovation, Improvements, and Repairs, located at the Long Island National

Cemetery, NY.

▪ Suffolk County) in the State of New York.

CONTINUATION PAGE

AMENDMENT A0006: IS THE GOVERNMENT’S RESPONSES TO RFI #05

LONG ISLAND NATIONAL CEMETERY | IFB Solicitation No. 36C78624B0005 | Project No.

815CM3041 | Facility Renovation, Improvements, and Repairs.

▪ CEMETERY’S ADDRESS:

Long Island National Cemetery

2040 Wellwood Avenue

Farmingdale, New York, 11735

1.) All Request For Information (RFI) is NOW Closed and the NCA will NOT be accepting anymore RFIs' Effective, Tuesday, 27 Feb 2024.

2.) The Virtual Bid Opening Date & Time Is Still be held on 12 March2024 @ 1300; (1:00

P.M.) EST.

3.) Please NOTE, AMENDMENT (A0003), IS THE GOVERNMENT’S RESPONSES to BOTH RFI #02A & RFI #03, therefore this will be only one Acknowledgment date for Amendment (A0003).

4.) Additionally, I have also Re-Posted ALL the Amendments (Within this Amendment) for Acknowledgment of Amendments on Section 18 of the SF-1442, located in the IFB Solicitation. There are a total of six (6) Amendments for your Acknowledgment.

NOTE: Please see Questions & Answers below.

Please see attachments with this A0006.

1. Please share information regarding well pump supply intake set depth. We had received inquiries from multiple specified manufacturers on well pump set depth. Contractor has reviewed the bid documents and has not been able to locate any information on the well pump set depth. This information is needed as the intake of the water needs to be set below the

“driest” level of the water table. Referencing the various boring hole reports (Reference:

“APPENDIX I ‐ Geotechnical Report”) show boring depth of 10’‐0”. It does not call out current water table. The previous nearby well locations (ref: “APPENDIX I ‐ Geotechnical Report”) were dated from 1985, which is close to over (40) ago. These reference offers very outdated information. The set depth also impacts cost of the actual well pump equipment.

The pump should be placed 20 feet above the cased section of the well. The base of the casing has been estimated to be 350 feet below ground surface, although it is important to note that this is an estimate and the actual depth will be dictated by site-specific conditions. The water level within the existing well is unknown to ECS but is estimated to be 30-50 feet below ground surface.

2. Refer to detail 9/LS‐402, the detail of guide rail is given but it is not shown on the drawings.

Please clarify the extent of guide rail or provide quantity for bidding purpose.

Guide Rail is located at the new well head/control spool enclosure. Refer to LS-310.

3. Please confirm the below mentioned queries regarding water well pump shown on drawing I‐101:

a‐ Will water well pump be an oil lube pump? If yes, then what will be shaft size, tube size, right or left handed thread?

Not oil lubricated. Water lubricated, as specified and drawn.

b‐ Please confirm threaded column?

Contractor’s discretion.

c‐ Does the bowl assembly and discharge head need to be coated? If so what coating, will it need to be NSF certified?

no coating required d‐ What will be the column setting or total pump length?

The pump will likely be placed approximately 20 feet above the base of the casing. The actual depth to the base of the casing will be dependent on site-specific conditions, as determined through the collection of cuttings samples and borehole geophysical logging. The casing is presently estimated to be 350’.

4. Refer to drawing AE‐621, keynote 01 says to provide new ship lap siding on new framing above interior walls, beams, and columns to underside of existing ceiling. Please provide technical specification for shiplap siding.

Siding to match what is existing in profile, material, and finish.

5. Please confirm the below mentioned queries regarding irrigation well: a‐ What is specific capacity of well?

The specific capacity of the existing well is unknown, as testing has not been performed and inadequate operational information is available to make this determination.

b‐ Well location may need to be shifted for adequate setup of rig and equipment.

Please clarify?

The well should be installed at the general area indicated on bidding documents. The actual location within this general area should be coordinated between the COR and the contractor.

c‐ Please confirm if three observation wells into the same aquifer as the new irrigation well are required (as per Attachment 2)?

A response from DEC to the permitting application has not yet been received. It is expected that that the response will include minimum observation requirements for the pumping test. It is assumed that it will be necessary to monitor water levels in the nearby existing irrigation well but that it will not be necessary to install additional observation wells.

6. Refer to drawing AE‐805, furniture schedule shows storage shelving of HCU‐X models from

“EDSEAL” that are no longer in production as per specified vendor. Please provide some alternate models for these storage shelving?

Consider the specified products basis-of-design. Similar products that may be considered include Hallowell’s Extra Heavy Duty Solid Steel, Stand-alone, Boltless, 5-Shelf line or others.

Match dimensions, shelf quantity, minimum loading, or others.

7. Refer to drawing LS‐409, detail 4 shows attic stock for sign posts. Please clarify if extra helical piles are required for these posts?

No attic stock required for helical piles.

8. Refer to drawing LS‐410, tagged notes show “Wet‐Cast Stone” Masonry Base for sign posts, whereas these are being shown as “Cast‐In‐Place” Reinforced Concrete Base. Please confirm if the base is cast‐ in‐place reinforced concrete base?

Sign bases throughout project are designed as a steel reinforced wet cast stone units to be mechanically anchored to helical piles with patched anchor holes. See spec section 04 72 00.

Shop drawings of signage assemblies that include piles, anchors, cast stone base units, sign posts, and signs will be required for VA NCA review.

9. Refer to drawings CD‐101 & CP‐201, the “Asphalt Pavement” layouts in demolition and construction drawings do not match/ align with each other at many areas. Please clarify.

Demo is for existing extent of pavement; New paving area is substantially larger.

10. Refer to drawings LS‐X drawings, note 1 says to provide construction fencing per 01 00 02 &

3/LS‐401, but extent of fence is not shown. Please clarify the extent or provide quantity for bidding purpose.

Temporarily block access to all roads leading to an area of construction with a construction fence that crosses the road while those areas are under construction, see suggested phasing plans SK01 thru SK04 included with solicitation for bid. Any excavated areas to be left overnight are to be enclosed with a 5’ high plastic fence attached to posts to ensure visitor safety. Surround committal shelters with construction fence during construction at those locations, surround public rest room building with construction fence during construction operations there. Surround areas of work at columbarium with construction fence during phases of construction there, phasing for columbarium work to be coordinated with VA NCA stakeholders. Work at public information center the parking areas and cortege lanes shall be surrounded with a construction fence.

11. Refer to Drawing No.ET‐311 there is OS4 Multimode fiber between Maintenance Building &

Public Restroom Building as per riser Diagram. Can we use OS2 Single Mode fiber or 12 Strand

Multi Mode OM2 Plenum Fiber or OM4 Multimode cable instead of OS4 Multimode fiber.

Please advise.

[Nick Esposito, Charlotte Engineers] OM4 multimode cable is acceptable, per VA OIT

Design Manual Section 4.4.4.

12. Refer to Drawing No. E‐010 & ET‐311 there is 40 PVC Direct Buried underground between Maintenance Building & Public Restroom Building but there is also trees.

Please advise on it?

[Nick Esposito, Charlotte Engineers] Route underground conduit as straight as possible without disrupting the existing trees. Trenching is preferred to be in grassy area but if an impact to the trees is unavoidable, then routing shall be adjusted to be within the nearby paved parking areas. Refer to requirements of 01 56 39 for excavation and other work within Tree Protection Zones. Excavation by supersonic air tool or hand, or use of directional boring are acceptable practices.

13. Refer to Drawing No.ET‐311 what is the depth of excavation for underground cabling

Between Maintenance Building & Public Restroom Building. Please advise.

[Nick Esposito, Charlotte Engineers] Interbuilding telecommunications shall be run in conduit within concrete encased duct bank and be minimum 24” deep, per VA OIT, Electrical, PSRDM, and TSTS Design Manuals.

14. Refer to Drawing No. I‐101 what is the depth of excavation for underground raceways between

Pump House to Water Well Pump & Pump House to Water Well Control Spool. Please advise.

Refer to Section 26 05 41 for materials and execution associated with Direct-Burial

Ducts.

15. Refer to Drawing No. EP‐510 what is the depth of excavation for New Duct Bank Between

Utility Transformer & CT/Meter. Please advise.

[Nick Esposito, Charlotte Engineers] Electric service duct bank shall be minimum 24” deep, per PSEG Long Island Redbook.

16. Refer to drawing LS‐305, detail 8A shows to saw cut & remove existing concrete paving for monument installation, whereas, as per drawing LS‐201 monuments are on landscaped areas.

Please clarify if concrete paving is to be removed & replaced as per above mentioned detail.

There is existing concrete paving at that particular monument that needs to be removed and replaced for new monument installation.

17. Refer to specification section. 01 00 02, all Testing Laboratory services will be retained and paid for by the Contractor (Spec. Sec. 01 45 29), but the number/ quantity of tests are not shown.

Please provide number/ quantity of tests for bidding purpose.

Testing requirements are indicated in 01 45 29. Additional requirements may be found in specific specification sections.

18. Refer to specification section. 01 00 02, the General Contractor shall provide unarmed guards at the project site after construction hours when theft or vandalism warrants. Please provide quantity & detail of guards for bidding purpose.

Using security guard after hours to protect contractor materials and tools is not required by the Federal Government for this project and is contractor responsibility if deemed necessary by the contractor.

19. Refer to specification section 02 83 33.13, paragraph # 1.1.A says to abate lead based paint from below mentioned items, please provide the quantity for bidding purpose.

Contractors are welcome to visit the site prior to bid opening to do their own take-offs, one can make arrangements to do so with cemetery director or assistant director.

20. Refer to “SUMMARY SCOPE ITEM 01” (distributed during walkthrough), note 1.1.1. (pointer 2) says to completely replace ceiling of committal shelters, whereas, entire ceiling replacement is not shown on drawings. Please clarify?

If not shown on bid drawings/specifications, all bid documents posted in sam.gov, it is not required.

21. Refer to “SUMMARY SCOPE ITEM 01” (distributed during walkthrough), note 1.1.1. (pointer 5) says to reconstruct overhead beams and spaces to deny bird nesting, whereas, this work is not shown on contract drawings. Please clarify?

See drawing details, they show a wall assembly infill added above beams.

22. Refer to “SUMMARY SCOPE ITEM 01” (distributed during walkthrough), note 1.1.1. (pointer 3) says to clean paving, repair if and as required, whereas, this work is not shown on contract drawings. Please clarify the extent or provide quantity of repair for bidding purpose?

If not shown on bid drawings/specifications, all bid documents posted in sam.gov, it is not required.

23. Refer to “SUMMARY SCOPE ITEM 02” (distributed during walkthrough), note 1.2.1. (pointer 10) says to add gravesite locator kiosk, whereas, this work is not shown on contract drawings. Please clarify?

See sheet AE-311, keynote 8 and detail 3 on sheet AE-312. Gravesite locator Kiosk is government furnished, contractor installed.

24. Refer to “SUMMARY SCOPE ITEM 02” (distributed during walkthrough), note 1.2.1. (pointer 11) shows septic tank in building, whereas, this work is not shown on contract drawings. Please clarify?

Existing septic system noted for information only, no work on actual septic system required.

25. Refer to “SUMMARY SCOPE ITEM 03” (distributed during walkthrough), note 1.3.1. (pointer 2) says to do minor sidewalk repairs, whereas, this work is not shown on contract drawings.

Please clarify the extent or provide quantity for bidding purpose?

Note legend on LS sheets, circumscribed symbol 1, Where this symbol is shown on the LS plans an estimated square footage of concrete flatwork replacement is next to the plan symbol. I only see one location but there may be more.

26. Refer to “SUMMARY SCOPE ITEM 03” (distributed during walkthrough), note 1.3.1. (pointer 3) says to add two benches per wall, both sides of wall and required concrete bench pads., whereas this work is not shown on contract drawings. Please clarify?

See sheet LS-303 plan details 1,4,6, and detail 5/LS-402

27. Refer to “SUMMARY SCOPE ITEM 05” (distributed during walkthrough), note 1.5.2. (pointer 2) says to Replace (3) 12" gates, whereas, this work is not shown on contract drawings. Please clarify?

This refers to gate valves, see sheet 1-501 detail 4.

28. Refer to “SUMMARY SCOPE ITEM 10” (distributed during walkthrough), note 1.10.1. (pointer 4) says to provide sanitary sewer hook up to septic system, whereas, this work is not shown on contract drawings. Please clarify?

See sheet PP-311 keynote 1.

29. Refer to “SUMMARY SCOPE ITEM 14” (distributed during walkthrough), note 1.14.1 (pointer 1 &

2) say to jet/vacuum all curb inlets, pipes, and infiltration vaults and jully rejuvenate and clean

12 of the infiltration vaults, whereas, this work is not shown on contract drawings. Please clarify?

300 – 3’x3’ inlet structures to be jetted and vacuumed with a total of 100 cubic yards of material to be disposed of. Material can be dumped in spoils area at the cemetery. Debris material to be disposed of shall be measured and calculated in place prior to removal from storm structure.

300 – 8’ diameter infiltration vaults to be jetted and vacuumed with a total of 280 cubic yards of material to be disposed of. Material can be dumped in spoils area at the cemetery. Debris material to be disposed of shall be measured and calculated in place prior to removal from storm structure.

50 – 4’ diameter man holes to be jetted and vacuumed with a total of 25 cubic yards of material to be disposed of. Material can be dumped in spoils area at the cemetery. Debris material to be disposed of shall be measured and calculated in place prior to removal from storm structure.

2,400 total linear feet of storm pipe to be jetted.

Contractor is to assume the quantities above for their construction cost proposal. Proposal shall clearly indicate unit costs for this work which will include general contractor’s costs/overhead and profit markups. Quantities to be verified by contractor during construction operations, contract modifications may be required based on actual work required/completed.

30. Could you please confirm whether the project utilizes a Campus BMS on site or if each building has its own local controls system in place?

There is no campus BMS, each building has its own local HVAC controls.

31. We have not come across any specifications indicating the requirement for acoustical lining in any of the projects. Could you kindly inform us if such lining has been implemented?

Acoustic lining is not required for any duct work, insulation wrap is per specs.

A.2 OTHER ATTACHMENTS

See attached document: LINC PRFI 01.

See attached document: LINC PRFI 02.

See attached document: LINC PRFI 02A.

See attached document: LINC PRFI 03.

See attached document: LINC PRFI 04R.

See attached document: LINC PRFI 05.

See attached document: LINC PRFI 06.