815CM3041 LINC Bid Set Bk-15.pdf
PDF 11 MB Posted
- Solicitation number
- 36C78624B0005
About this file
This federal contract opportunity solicitation is for renovation, improvements, and repairs construction project services at the Long Island National Cemetery in Farmingdale, New York. The solicitation number is 36C78624B0005 and seeks a contractor to furnish all tools, labor, materials, equipment, and supervision to perform work described in the Statement of Work, Specifications and Drawings. The project number is 815CM3041. The work will involve facility renovation, improvements, and repairs at the Long Island National Cemetery located at 2040 Wellwood Avenue in Farmingdale, New York. The soliciting agency is the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING SYMBOLS
HWR
HW
FCO
VB
DN
ABBREVIATIONS
CO
CW
AFG
CONNECT TO EXISTING
FLOOR DRAIN
BALL VALVE
PIPE CONTINUES
ELBOW UP
ELBOW DN
GENERAL
PIPING
HOT WATER
HOT WATER RETURN
WALL CLEANOUT
FLOOR CLEANOUT
DOWN
COLD WATER
CLEANOUT
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR AFF
BACKFLOW PREVENTER BFP
FLOOR DRAIN FD
HOSE BIBB HB
SHOCK ARRESTOR & PDI SIZE SA-A
VENT THROUGH ROOF VTR
PLUMBING DRAINAGE INSTITUTE P.D.I.
VACUUM BREAKER
(E)EXISTING
WCO
DEMO TO EXISTING
SHOCK ARRESTOR
SANITARY WASTE BELOW FINISHED FLOOR
SANITARY VENT ABOVE FINISHED CEILING
COLD WATER ABOVE FINISHED CEILING
HOT WATER ABOVE FINISHED CEILING
HOT WATER RECIRC. ABOVE FINISHED CEILING
EXISTING SUMP PUMP DISCHARGE ABOVE FINISHED CEILING
(E)SPD
ROOF LEADER BELOW FINISHED FLOOR RW
BUILDING AUTOMATION SYSTEM BAS
BFFBELOW FINISHED FLOOR
HW
DESCRIPTIONSYMBOL
CONNECTIONS
VW CW HW
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND
PERFORMS EQUAL TO THE SPECIFIED PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED
UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE SPECIFICATIONS, ARE FOLLOWED. NO
PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN.
GENERAL NOTES:
1. PROVIDE TRUEBRO 'LAV-GUARD' INSULATING SAFETY COVERS FOR ADA ACCESSIBLE SINKS WITH
EXPOSED HOT AND COLD WATER SUPPLIES, DRAINS, AND P-TRAPS. COLOR SHALL MATCH THE
FIXTURE. COORDINATE WITH PROJECT ARCHITECT.
2. ALL FAUCETS, VALVES, AND EQUIPMENT SHALL BE LEAD FREE, BEARING NFS 61 APPROVAL
ACCEPTED EQUAL
SPECIFIED PRODUCT
CHICAGO, T&S BRASS,
AMERICAN STANDARD, KOHLER
MCGUIRE
ELKAY, JUST
SLOAN, ZURN
ELKAY, OASIS
ZURN, JAY R. SMITH, MiFAB
IPS, PPP INC
GUARDIAN
FAUCETS -
CHINA -
SINK TRIM -
S.S. SINKS -
FLUSH VALVES -
WATER COOLERS -
CARRIERS/INTERCEPTORS -
ICE MAKER BOX -
EMERGENCY EYEWASH/SHOWER -
P-50 MOP BASIN - 2"3" 3/4" 3/4"
SLOAN
SCRUB SINKS -
3. PROFLO, MAINLINE OR OTHER SIMILAR TYPE QUALITY EQUIPMENT AND ACCESSORIES SHALL
NOT BE SUPPLIED FOR THIS PROJECT. SUCH PRODUCT LINES WILL BE REJECTED.
BASIN - FIAT MODEL TSB3000 24"x24"x12" TERRAZZO MOP BASIN WITH STAINLESS STEEL
FACTORY INSTALLED DRAIN BODY COMPLETE WITH JOINT CONNECTOR FOR A 3" DRAIN PIPE,
COMBINATION DOME STRAINER, MOP HANGER, HOSE BRACKET WITH HOSE, STAINLESS STEEL
LINT BASKET, AND MSG WALL GUARDS.
FAUCET - AMERICAN STANDARD MODEL 8344.212 CHROME PLATED FAUCET WITH
INTEGRAL STOPS, VACUUM BREAKER, CERAMIC CARTRIDGES, GARDEN HOSE
THREAD OUTLET, PAIL HOOK, AND WALL BRACE.
P-31 2" 1/2" 1/2"LAVATORY -
INTEGRAL -
2"
LAVATORY - SOLID SURFACE INTEGRAL SINK LESS OVERFLOW.
FAUCET -
KOHLER K-7404-5A, 4" CENTERSET CHROME PLATED FAUCET WITH 4" WRIST
BLADES, 5-1/4" C-C RIGID SPOUT, 1.5GPM LAMINAR FLOW, AND CERAMIC CARTRIDGES.
ANGLE STOP - MCGUIRE MODEL LF2165LK LEAD FREE LAVATORY SUPPLY KIT WITH (2) 1/2"IPS
X 3/8"OD LOOSE KEY STOPS, 15" FLEXIBLE COPPER SUPPLY, AND SHALLOW STEEL FLANGES.
ALL COMPONENTS SHALL BE CHROME PLATED
P-TRAP - MCGUIRE MODEL 8902 1-1/4" X 1-1/2" 17GA SEAMLESS BRASS CONSTRUCTION AND
BRASS SLIP NUTS. ALL COMPONENTS SHALL BE CHROME PLATED.
DRAIN - MCGUIRE PRODRAINWCSAN OFFSET STRAINER WITH 1-1/4"X4" BRASS 17GA TAILPIECE, SANIGUARD, AND LOCK SLIP NUT.
PROVIDE FIAT 889-CC MOP HANGER
AT 60" A.F.F., PROVIDE FIAT 832-AA
HOSE AND HOSE BRACKET. SEE
DETAIL 7/P002 FOR MOUNTING
CONFIGURATION. PROVIDE WITH
CHICAGO FAUCET HOSE SILL WITH
APOLLO MODEL HBDUC 38LF-304-02
DUAL CHECK VACUUM BREAKER FOR
CHEMICAL DISTRIBUTION UNIT
PLUMBING FIXTURE SCHEDULE
REMARKS
SPECIFICATIONS
2"4" 1/2" -WATERCLOSET -
FLOOR MOUNTED -
FLUSH TANK -
ADA -
P-10 TOILET - AMERICAN STANDARD CHAMPION 4 RIGHT HEIGHT MODEL 731AA.001 1.6GPF VITREOUS
CHINA ELONGATED TOILET WITH 12" ROUGH-IN, 2-3/8" FULLY GLAZED TRAPWAY, 16-1/2" RIM
HEIGHT, 4" NON-ADJUSTABLE PISTON ACTION ACCELERATOR FLUSH VALVE, CHROME TRIP
LEVER, AND BOLT CAPS.
SUPPLY - MCGUIRE MODEL H169LK 3/8" IPS X 1/2" OD CHROME PLATED HEAVY DUTY ANGLE
STOP WITH LOOSE KEY, 12" FLEXIBLE CHROME PLATED COPPER CLOSET RISER, AND CHROME
SEAT - AMERICAN STANDARD MODEL 5901.100 EXTRA HEAVY DUTY OPEN FRONT SEAT WITH
STAINLESS STEEL CHECK HINGES LESS COVER.
1/2"
SHOWER -
P-70 2"
FD-B
2" 1/2"
ADA -
INSTALL PER MANUFACTURER'S
REQUIREMENTS FOR ADA
COMPLIANCE.
ENCLOSURE - BUILT BY OTHERS
SHOWER VALVE - LAWLER SINGLE STAGE 3800 WITH WALL TRIM ROUND FACE PLATE,
INTEGRAL CHECK VALVES, DIVERTER VALVE, AND VACUUM BREAKER.
SHOWER HEAD - DELTA RP42578, 2.5GPM SINGLE-SETTING CHROME SHOWER HEAD.
HANDHELD SHOWER - DELTA 52003-DS, 2.5GPM WITH 36" SLIDE BAR.
DRAIN - PROVIDE WITH FLOOR DRAINFD-B
PROVIDE CHECK VALVE ON HOT
WATER SIDE
SINK WILL HAVE OFFSET DRAIN
P-30
2" 1/2" 1/2"
LAVATORY -
WALL MOUNT -
ADA -
2"
LAVATORY
AMERICAN STANDARD "LUCERNE" 0356.915 20-1/2"X18-1/4" WHITE VITREOUS
FAUCET - CHICAGO FAUCETS MODEL 786-E29-245ABCP LEAD FREE DECK MOUNTED 8" SPREAD
CHROME PLATED FAUCET WITH 4" WRIST BLADES, 5-1/4" C-C RIGID SPOUT, 2.2GPM LAMINAR
FLOW, AND CERAMIC CARTRIDGES.
ANGLE STOP - MCGUIRE MODEL LF2165LK LEAD FREE LAVATORY SUPPLY KIT WITH (2) 1/2"IPS
X 3/8"OD LOOSE KEY STOPS, 15" FLEXIBLE COPPER SUPPLY, AND SHALLOW STEEL FLANGES.
ALL COMPONENTS SHALL BE CHROME PLATED
P-TRAP - MCGUIRE MODEL 8902 1-1/4" X 1-1/2" 17GA SEAMLESS BRASS CONSTRUCTION AND
BRASS SLIP NUTS. ALL COMPONENTS SHALL BE CHROME PLATED.
CARRIER - ZURN MODEL 1231 CONCEALED ARM LAVATORY CARRIER WITH DURA-COATED
RECTANGULAR STEEL UPRIGHTS WITH WELDED FEET, CAST IRON ADJUSTABLE HEADERS,
CONCEALED ARMS, STEEL SLEEVES, ALIGNMENT TRUSS, AND MOUNTING FASTENERS.
DRAIN - MCGUIRE PRODRAINWCSAN OFFSET STRAINER WITH 1-1/4"X4" BRASS 17GA TAILPIECE, SANIGUARD, AND LOCK SLIP NUT.
CHINA WALL MTD. LAVATORY WITH 8" FAUCET CENTERS, LESS OVERFLOW
PROVIDE WITH TRUBRO LAV SHEILD
#2018-AS-L
SHOCK ARRESTOR SCHEDULE
ZURN, JOSAM, SMITH, PPI, INC.
33 - 60
61 - 113
12 - 32
1 - 11
ZURN, JOSAM, SMITH, PPI, INC.
ZURN, JOSAM, SMITH, PPI, INC.
ZURN, JOSAM, SMITH, PPI, INC.
P.D.I.
SIZE
FIXTURE
TAG
FIXTURE UNITS MANUFACTURER OR EQUAL
A SA-A
SA-BB
C
D SA-D
SA-C
GENERAL NOTES:
1. ALL SHOCK ARRESTORS SHALL BE LEAD FREE, BEARING NFS 61 APPROVAL
SYMBOL
PRECISION PLUMBING PRODUCTS P1-500 WITH A DU-4 DISTRIBUTION UNIT. TRAP PRIMER SHALL BE INSTALLED ABOVE CEILING AND DISTRIBUTION
UNIT SHALL BE MOUNTED IN A ACCESSIBLE LOCATION.
TP-1
DESCRIPTION
DRAIN SCHEDULE
DESCRIPTION
TRAP PRIMER SCHEDULE
SYMBOL
ACCEPTED EQUALS -
JOSAM
J.R. SMITH
FD-A
* NOTE: SET ALL FLOOR DRAINS A MINIMUM OF 3/4" BELOW FINISHED FLOOR TO ALLOW FOR FLOOR SLOPE.*
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE
SPECIFIED PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS
INDICATED BY THE SPECIFICATIONS, ARE FOLLOWED. NO PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN.
ZURN ZS-415SS-VP FLOOR DRAIN, DURA COATED CAST IRON BODY, COMBINATION INVERTIBLE MEMBRANE CLAMP/ADJUSTABLE COLLAR, 6" DIAMETER MEDIUM DUTY VERTICALLY
ADJUSTABLE SATIN FINISH VANDAL PROOF TOP, AND FIXED STAINLESS STEEL STRAINER.
3/4"
TUB SHOWER COMBO -
P-71 3" 2" 3/4"
INSTALL PER MANUFACTURER'S
REQUIREMENTS FOR ADA
COMPLIANCE.
PROVIDE CHECK VALVE ON HOT
WATER SIDE
ENCLOSURE - AMERICAN STANDARD MODEL STUDIO 60" x 30" BATHING POOL WITH APRON.
SHOWER/TUB FAUCET - DELTA MODEL 144890-I LARKIN MONITOR 14 SERIES 1.75 GPM TUB AND
SHOWER FAUCET COMBO.
DRAIN - INTEGRAL WITH OVERFLOW DRAIN.
2"4" 1-1/4" -
WATERCLOSET -
WALL HUNG -
FLUSH VALVE -
P-11
TOILET- AMERICAN STANDARD AFWALL MILLENIUM MODEL 3351.101 1.6GPF VITREOUS CHINA
ELONGATED TOILET WITH 1-1/2" TOP SPUD, 2-1/8" TRAPWAY, 15" RIM HEIGHT, AND BOLT CAPS.
FLUSH VALVE - SLOAN ROYAL 111-1.6GPF FLUSHOMETER WITH ADA COMPLIANT HANDLE,
VANDAL RESISTANT STOP CAP WITH SET SCREW, SWEAT SOLDER ADAPTER WITH COVER
TUBE, AND CAST SET SCREW WALL FLANGE.
SEAT - AMERICAN STANDARD MODEL 5901.100 EXTRA HEAVY DUTY OPEN FRONT SEAT WITH
STAINLESS STEEL CHECK HINGES LESS COVER.
PROVIDE EACH ROUGH-IN WITH
SA-A SHOCK ARRESTOR
WALL MOUNTED, WALL
DISCHARGE
FLUSH VALVE TO BE INSTALLED
ON WIDE SIDE ACCESS.
HOT WATER RECIRCULATING PUMP SCHEDULE
PUMP
ACCEPTED EQUALS -
GRUNDFOS
NSF/ANSI 61. ANNEX
G AND NSF/ANSI 372
PRODUCTS SHALL BE
PROVIDED AND INSTALLED
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE SPECIFIED
PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE
SPECIFICATIONS, ARE FOLLOWED. NO PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN. PROVIDE CHECK VALVE AT
EACH PUMP. ALSO PROVIDE CIRCUIT SETTER TO ADJUST FLOW.
DICT 4036RCP-1
SERVICE
HOT WATER
RECIRC.
TYPE
INLINE
CAPACITY
GPM HEAD (FEET)
VOLTAGE PHASE
AND CYCLES
20 115V/ 1Ø / 60HZ
PUMP LOCATIONHORSEPOWER
1/12
MFG. AND MODEL NO.
UNIT IS BASED ON
BELL AND GOSSETT -
ECOCIRC XL 20-35
HWR
CW
V
W
EXISTING SANITARY WASTE BELOW FINISHED FLOOR
EXISTING SANITARY VENT ABOVE FINISHED CEILING
EXISTING COLD WATER ABOVE FINISHED CEILING
EXISTING HOT WATER ABOVE FINISHED CEILING
EXISTING HOT WATER RECIRC. ABOVE FINISHED CEILING
(E)HW
(E)HWR
(E)CW
(E)V
(E)W
GAS FIRED WATER HEATER SCHEDULE
HEATER
ACCEPTED EQUALS -
AO SMITH
NSF/ANSI 61. ANNEX
G AND NSF/ANSI 372
PRODUCTS SHALL BE
PROVIDED AND INSTALLED
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE SPECIFIED
PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE
SPECIFICATIONS, ARE FOLLOWED.
GWH-1
STORAGE
CAPACITY
(GALLONS)
RECOVERY @
90F RISE
(GPH)
INPUT BTU/HR
NATURAL GAS
76,000
MFG. AND MODEL NO.
UNIT IS BASED ON
STATE SHE50 73NE
LOCATION
EXISTING MECHANICAL
ROOM
REMARKS
INSTALL PER MANUFACTURERS SPECIFICATIONS. PROVIDE
VENTLESS REGULATOR.
PLATED STEEL WALL FLANGE.
ADA -
P-80 2"2" 1/2" -WATER COOLER - WATER COOLER - ELKAY MODEL LZSTL8WSLK BI-LEVEL, WALL MOUNT ELECTRIC WATER
COOLERS WITH CHILLING CAPACITY OF 5GPH. PROVIDE WITH ACCESSORY APRON ELKAY
PROVIDE WATER SUPPLY WITH
SHOCK ARRESTOR.
MODEL 98312C.
EXISTING PIPE TO BE DEMOLISHED
SYMBOL
REMARKS
MFG. AND MODEL NO.
BFP-A
APPLY AT ANY COFFEE OR BEVERAGE DISPENSER.
APOLLO 4C-100 SERIES BACKFLOW PREVENTER ASSE 1022. 100 MESH INTEGRAL STRAINER SCREEN AT THE INLET.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE SPECIFIED
PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE
SPECIFICATIONS, ARE FOLLOWED. NO PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN.
BACKFLOW PREVENTER
SYMBOL MFG. AND MODEL No.LOCATION
NO. OF
TANKS
TANK
VOLUME
DIMENSION
(INCHES)
MINIMUM
OPERATING
PRESSURE
EX-1
1 3.2 GAL. 9"Dx15"H 50 AMTROL THERM-X-TROL MODEL ST-8
HSKP.
EXPANSION TANK SCHEDULE
SYMBOL DESCRIPTION
ACCEPTED EQUALS -
FCO
GCO
JOSAM
MiFAB
J.R. SMITH
ZURN ZN-1402 LEVEL-TROL CLEANOUT, DURA-COATED CAST IRON BODY, NO-HUB CONNECTION, GAS AND WATERTIGHT TAPERED THREADED ABS PLUG. SET
CLEANOUT IN A 14"X14"X4" CONCRETE SLAB.
ZURN ZN-1400-VP LEVEL-TROL CLEANOUT, DURA-COATED CAST IRON BODY, NO-HUB CONNECTION, GAS AND WATERTIGHT TAPERED THREADED ABS PLUG AND
ROUND SCORIATED NICKEL BRONZE TOP AND VANDAL RESISTANT FASTENERS.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE SPECIFIED
PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE
SPECIFICATIONS, ARE FOLLOWED. NO PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN.
CLEANOUT SCHEDULE
P-32 - 1/2" 1/2"FAUCET REPLACEMENT -
FAUCET - KOHLER K-7404-5A, 4" CENTERSET CHROME PLATED FAUCET WITH 4" WRIST BLADES, CONFIRM EXISTING CENTERSET
DISTANCE
5-1/4" C-C RIGID SPOUT, 1.5GPM LAMINAR FLOW, AND CERAMIC CARTRIDGES.
2"2" 3/4" -
URINAL -
FLUSH VALVE -
ADA -
P-12
TOILET- AMERICAN STANDARD DECORUM HIGH EFFICIENCY URINAL, VITREOUS CHINA, DEEP
SUMP, 3/4" TOP SPUD.
FLUSH VALVE - TOTO MODEL TEU1UA12#CP .125GPF FLUSH VALVE WITH HYDROELECTRIC
PROVIDE EACH ROUGH-IN WITH
SA-A SHOCK ARRESTOR
FLUSH VALVE SYSTEM.
PIPING TO BE DEMOLISHED
CARRIER - PROVIDE WITH ZURN Z1201-N CARRIER FOR SINGLE WALL HUNG TOILETS. PROVIDE
WITH ZURN Z1202-ND CARRIER FOR BACK TO BACK WALL HUNG TOILETS.
P-40
2" 1/2" 1/2"
STAINLESS STEEL SINK -
SINGLE BOWL -
ADA -
2"
SINK - ELKAY LRAD191855 19"X18"X5.5" DEEP TOP MOUNT, FULLY UNDERCOATED, 18
GA. TYPE 304 STAINLESS STEEL SINK.
FAUCET - CHICAGO FAUCETS MODEL 201-G8AE29-317XKAB DECK MOUNTED 8" FIXED
CENTER 8"GOOSENECK, 2.2 GPM LAMINAR FLOW, 4" VANDAL PROOF WRISTBLADE
HANDELS, AND CERAMIC 1/4 TURN OPERATING CARTRIDGE.
ANGLE STOP - MCGUIRE LFH2165LK LOOSE KEY ANGLE STOP 1/2" IPS FEMALE INLET AND
3/8"x12" LONG CHROME PLATED FLEXIBLE TUBE. PROVIDE WITH CHROME PLATED OR
STAINLESS STEEL LOOSE KEY CAP.
P-TRAP - MCGUIRE NO. 8912 1-1/2"X1-1/2" P-TRAP WITH ESCUTCHEON.
DRAIN - MCGUIRE NO. 152 FLAT GRID STRAINER WITH 1-1/2"X4" TAILPIECE.
NOTE:
1. LEAD PAINT IS FOUND TO EXIST ON EXISTING EXPOSED PAINTED SURFACES. REFER TO ECS HAZARDOUS MATERIALS SURVEY, DATED JULY 28, 2021, PROJECT MANUAL, APPEMDIX II, AND SPECIFICATION(S) 02 83 33.13 - LEAD-BASED PAINT REMOVAL.
2. ASBESTOS CONTAINING MATERIALS FOUND TO EXIST IN EXISTING DIRECTOR LODGE BOILER ROOM CEILING PLASTER. REFER TO ECS
HAZARDOUS MATERIALS SURVEY, DATED JULY 28, 2021, PROJECT MANUAL, APPENDIX II, AND SPECIFICATION 02 82 11 - TRADITIONAL ASBESTOS
ABATEMENT.
SYMBOL DESCRIPTION
ACCEPTED EQUALS -
YH-A
PRIER
MAPA
WOODFORD MODEL R34 FREEZELESS YARD HYDRANT WITH 3/4" INLET, 3/4" BRASS HOSE NOZZLE, AND VACUUM BREAKER.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE MODEL WHICH MOST CLOSELY RESEMBLES AND PERFORMS EQUAL TO THE SPECIFIED
PRODUCT. ONLY THE MANUFACTURERS LISTED WILL BE ACCEPTED UNLESS THE PROCEDURES FOR SUBSTITUTION AS INDICATED BY THE
SPECIFICATIONS, ARE FOLLOWED. NO PRIVATE LABELED PRODUCTS WILL BE ACCEPTED FOR THOSE SPECIFIED WITHIN.
HYDRANT SCHEDULE
PLUMBING - DRAWING INDEX
Sheet
Number Sheet Name
P-001 PLUMBING - ABBREVIATIONS, SCHEDULES, AND SYMBOLS
P-002 PLUMBING - DETAILS
PD-110 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN EAST - DEMOLITION
PD-111 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN WEST - DEMOLITION
PD-112 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN EAST - DEMOLITION
PD-113 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN WEST - DEMOLITION
PD-114 DIRECTORS LODGE - PLUMBING - SECOND LEVEL - FLOOR PLAN - DEMOLITION
PD-211 PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN - DEMOLITION
PD-311 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - DEMOLITION
PP-110 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN EAST
PP-111 DIRECTORS LODGE - PLUMBING - BASEMENT LEVEL - FLOOR PLAN WEST
PP-112 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN EAST
PP-113 DIRECTORS LODGE - PLUMBING - GROUND LEVEL - FLOOR PLAN WEST
PP-114 DIRECTORS LODGE - PLUMBING - SECOND LEVEL - FLOOR PLAN
PP-211 PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN - GRAVITY
PP-212 PUBLIC INFORMATION CENTER - PLUMBING - GROUND LEVEL - FLOOR PLAN - PRESSURE
PP-311 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - FLOOR PLAN - GRAVITY
PP-312 PUBLIC RESTROOMS - PLUMBING - GROUND LEVEL - FLOOR PLAN - PRESSURE
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
PLUMBING - ABBREVIATIONS,
SCHEDULES, AND SYMBOLS
P-001
PP-313 PUBLIC RESTROOMS - TEMPORARY PLUMBING
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
EYE WASH PER ANSI Z358.1
INSTALL DECK MOUNT DRENCH HOSE
@85° F TEMP. IN
GUARDIAN MODEL
ACCORDANCE WITH ANSI Z
G3600LF. FACTORY SET
358.1
EMERGENCY EYEWASH DRENCH
HOSE, DECK MOUNTED.
4" WRIST BLADE
SINK
FAUCET
DIAL THERMOMETER
(30°-130° F)
COUNTER TOP
SUPPLY STOPS
NO-HUB WITH ACCESS COVER
HUB AND SPIGOT WITH COVER PLATE
TEST TEE
THREADED
CLEANOUT
PLUG
CLEANOUT
TEE
STAINLESS
STEEL ACCESS
DOOR AND
FRAME FOR
GYPBRD.
WALLS
FINISHED
WALL
SURFACE
THREADED
CLEANOUT
PLUG
STAINLESS STEEL
COVER PLATE
WITH SECURING
SCREW FOR "CMU"
WALLS
POURED LEAD
JOINT
FINISHED
WALL
SURFACE
NTS
EMERGENCY EYEWASH
NTS
NTS
FLOOR DRAIN DETAIL
NO-HUB BAND
DRAIN BODY
MEMBRANE CLAMP
FLOOR SLAB
RECESSED GRATE
FINISHED FLOOR
PIPE AS SCHEDULED
WATER PROOF
MEMBRANE
PROVIDE WATER
TIGHT SEAL
MOP BASIN
18"
72"
36"
3" PIPE
30" HOSE
HOSE BRACKET
SERVICE FAUCET
WITH VACUUM
APPLY SILICONE
BASIN AT WALLS
SETTING CEMENT
1"THICK LAYER OF
FINISHED FLOOR.
SEALANT AROUND
TOP AND SIDES OF
MOP (BY OTHERS)
AND FLOOR.
3" INTEGRAL
DRAIN.
P-51
BREAKER.
MOP HANGER
NTS
MOP SINK BASIN DETAIL
NTS
FLOW CONTROL DEVICE
NTS
FLOOR CLEANOUT DETAIL
NTS
WALL CLEANOUT
TYPE 1 CLEVIS HANGER
NTS
NTS
TYP. WHEELCHAIR LAVATORY TYPICAL SS SINK
TRAP PRIMER DETAIL
NTS
HOSE BIB FOR
CHEMICAL DISPENSER
TYPICAL @ EXTERIOR WALL
EXTERIOR WALL
PIPE THRU
PIPE SEAL
TYPE LS-500
LINK-SEAL
PIPE SLEEVE
CONC WALL
EXTERIOR
PIPE LINK SEAL
NTS
B&G CIRCUIT SETTER
UNION
STRAINER
CHECK VALVE
BALL
VALVE
(TYP.)
GENERAL NOTES:
1. PROVIDE DIELECTRIC UNIONS AT ALL CONNECTION POINTS CONNECTING DISSIMILAR
METALS.
2. PROVIDE FLOW CONTROL DEVICE SHOWN ABOVE OR APPROVED EQUAL AT ALL
LOCATIONS WHERE BALANCING VALVES ARE REQUIRED.
FINISHED FLOOR
ROUND SCORIATED
STAINLESS STEEL
TOP
CAULK INSIDE
AIR TIGHT SEAL WITH
TAPERED THREAD
BRASS PLUG
INSULATE AS REQD
ATTACH TO
STRUCTURE
TYPE 1 CLEVIS HANGER
WITH PROTECTIVE
SADDLE OR SHIELD
SLEEVE THRU
DISTRIBUTION UNIT FOR
1/2" TRAP PRIMER LINE
SLAB
FLOOR SLAB
FLOOR DRAIN
MULTIPLE LINES
TRAP PRIMER VALVE
DOMESTIC WATER LINE
1/2" TRAP PRIMER SUPPLY
FINISHED FLOOR
M
ESCUTCHEON
TRAP PARALLEL
TO WALL
OFFSET WASTE
LOOSE KEY
STOP
LAMINAR FLOW
FAUCET
SEE SCHEDULE
CONTROL DEVICE
10 3/4"
(270 MM) ±
8 " (200 MM)
WALL CLEANOUT WALL CLEANOUT FINISHED FLOOR
ESCUTCHEON
TRAP PARALLEL
TO WALL
OFFSET WASTE
LOOSE KEY
STOP
LAMINAR FLOW
FAUCET
SEE SCHEDULE
CONTROL DEVICE
5 1/2"
MAX
8 " (200 MM)
APRON. REFER TO
REMOVABLE ANGLED
ARCH'S DETAILS.
WALL CLEANOUT
WALL CLEANOUT
SEE SCHEDULE
PROSET
SYSTEMS TRAP
GUARD FITTING
GENERAL NOTES:
1. PROVIDE SINGLE 1/2"MPT X 3/8"
OD COMPRESSION QUARTER
TURN CONNECTION IN LIEU OF
HOSE CONNECTION.
2. PROVIDE STAINLESS STEEL CAP
FOR BOX PENETRATIONS NOT
USED
COUNTERTOP ICE MACHINE DETAIL
NTS
SANITARY.
2"WASTE IN WALL TO
ICE MAKER TO P-92.
ROUTE DRAIN FROM
ICE
CEILING
FINISH FLOOR
CEILING
MAKER
COUNTERTOP
2"
1/2"CW SUPPLY
CONCEALED IN WALL
WATER HAMMER ARRESTER-
SA-A
PROVIDE COMBRACO MODEL 4-500 SPILL
PROOF, PRESSURE VACUUM BREAKER
PROVIDE 3/4" AQUA-PURE MOD. AP-1610SS
STAINLESS STEEL HOUSING WITH MOD.
AP117 CARBON FILTER
MOUNT BOTTOM OF BOX 2" BELOW.
BACKSPLASH OR COUNTERTOP TO
ALLOW FOR ACCESS TO VALVE AND
DRAIN LINE.
P-92 DRAIN & SUPPLY BOX-
COORDINATE MOUNTING HEIGHT
W/EQUIPMENT PROVIDED BY
OTHERS.
CONNECT 1-1/2"V TO VENT
PIPING ABOVE CEILING.
DOMESTIC HOT WATER MIXING
ANY MIXING DEVICE
(SHOWER VALVE, MIXING
VALVE, MOP SINK FAUCET)
NTS
CHECK VALVE
(SIZED SAME AS
BRANCH LINE)
HW BRANCH LINE CW BRANCH LINE
TO DISCHARGE
NOTE: COORDINATE SINK DEPTH WITH ARCHITECTURAL MILLWORK PRIOR TO ORDERING.
4"
B&G CIRCUIT SETTER
UNION
STRAINER
CHECK VALVE
BALL
VALVE
(TYP.)
RECIRC PUMP
WITH RECIRC PUMP
WITH OUT RECIRC PUMP
GWH-1
DRAIN VALVE
DIRT LEG
1/2"
FINISHED FLOOR
GAS WATER HEATER
SET TO DELIVER 120°
HOT WATER.
EXTEND FULL SIZE
TO FLOOR DRAIN
TEMPERATURE AND
PRESSURE RELIEF
VALVE.
FLUE CONNECTIONS
BY MECHANICAL
CONTRACTOR
TANK EX-1
EXPANSION
RECIRC. PUMP RCP-1
DIELECTRIC UNION
TYP.
UNION
CHECK VALVE
BALL VALVE
AQUASTAT
GAS WATER HEATER
NTS
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
PLUMBING - DETAILS
P-002
AutoCAD SHX Text G
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
CONSULTANTS
NO WORK THIS AREA
UP
BSMT
BSMT
ST2
STAIR 2
M A
T C
H L I N
E
A
R E
A
E
A S
T
M A
T C
H L I N
E
A
R E
A
W
E S
T
M A
T C
H L I N
E
A
R E
A
E
A S
T
M A
T C
H L I N
E
A
R E
A
W
E S
T
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
1/2" = 1'-0"
DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN-EAST - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
DIRECTORS LODGE - PLUMBING
BASEMENT LEVEL - FLOOR
PLAN EAST - DEMOLITION
PD-110
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
I
(E)NATURAL GAS
WATER HEATER
(E)HW
(E)CW
(E)CW
(E)HW
E
C
W
E
H
W
(E)HW
(E)CW (E)CW
E
H
W
E
C
W
(E)CW
(E)3/4" DOMESTIC COLD WATER LINE
BELOW FINISHED FLOOR
(E)FD
(E)FD
E
W
(E)W
E
W
E
W
EXISTING 1/2"CW AND 1/2"HW UP
TO EXISTING SINK ABOVE
EXISTING 3/4"CW AND 1/2"HW
UP TO FLOOR ABOVE EXISTING 4"W UP
TO FLOOR ABOVE
1/2"
3/4"
3"
3/4" 1/2" 3"
4"
3"
3/4"
1/2"
3/4"
3/4"
3/4"
1/2"
3/4"
1/2"
1/2"
3/4"
4"
EXISTING 1/2"CW UP TO EXISTING TOILET ABOVE
UP
UP
UP
BSMT
BSMT
BSMT 004
BOILER
BSMT
ST1
STAIR 1
ST3
STAIR 3
(E)HW
PIPE CONTINUES OUTSIDE
SCOPE OF WORK
PIPE CONTINUES OUTSIDE
SCOPE OF WORK
(E)FD
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
PLUMBING SYMBOLS
HW
ABBREVIATIONS
CO
CW
CONNECT TO EXISTING
BALL VALVE
PIPE CONTINUES
ELBOW UP
ELBOW DN
GENERAL
PIPING
HOT WATER
COLD WATER
CLEANOUT
(E)EXISTING
EXISTING SANITARY WASTE BELOW FINISHED FLOOR
EXISTING COLD WATER ABOVE FINISHED CEILING
EXISTING HOT WATER ABOVE FINISHED CEILING
(E)HW
(E)CW
(E)W
1/2" = 1'-0"
DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN-WEST - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
DIRECTORS LODGE - PLUMBING
BASEMENT LEVEL - FLOOR
PLAN WEST - DEMOLITION
PD-111
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
DEMOLISH EXISTING SINK AND ROUGH-INS IN ITS ENTIRETY. DEMOLISH ALL DOMESTIC COLD
WATER, HOT WATER, AND SANITARY PIPING SERVING SINK BACK TO BELOW FLOOR AND CAP.
EXISTING 1/2"HW, 1/2"CW, AND 2"W IN WALL. EXISTING DOMESTIC WATER PIPING
ROUTED ABOVE CEILING AND EXISTING WASTE PIPING ROUTED BELOW FLOOR.
DN
ST2
STAIR 2
BEDRM 1
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
PLUMBING SYMBOLS
VERTICAL PIPE RISER
GENERAL
PIPING
PIPING TO BE DEMOLISHED
1/2" = 1'-0"
DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN-EAST - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
DIRECTORS LODGE - PLUMBING
GROUND LEVEL - FLOOR
PLAN EAST - DEMOLITION
PD-112
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
EXISTING 3/4"CW, 1/2"HW, AND 4"W UP TO FLOOR ABOVE
EXISTING 1/2"CW FROM BELOW
TO SERVE EXISTING TOILET
EXISTING 1/2"CW, 1/2"HW, AND 2"W FROM
BELOW TO SERVE EXISITNG SINK EXISTING 4"W FLOOR OUTLET
SERVING EXISTING TOILET
EXISTING 1/2"CW IN WALL
TO SERVE EXISTING TOILET
EXISTING 4"W FLOOR OUTLET
SERVING EXISTING TOILET
EXISTING 1/2"CW AND 1/2"HW IN WALL
TO SERVE EXISTING SHOWER
EXISTING SINK TO REMAIN
UP
DN
LIVING RM
SUNROOM
FOYER 1
DINING
POWDER
KITCHEN
BATH 1
PASSAGE
FOYER 2
STR3
STAIR 3
EXISTING NATURAL GAS CONNECTION
SERVING EXISTING FIREPLACE TO REMAIN
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
M A
T C
H L
I N
E
A
R E
A
E
A S
T
M A
T C
H L
I N
E
A
R E
A
W
E S
T
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
DEMOLITION KEYED NOTES
DEMOLISH EXISTING PLUMBING FIXTURE AND ROUGH-INS IN ITS ENTIRETY. MODIFY
EXISTING PLUMBING PIPING SERVING EXISTING PLUMBING FIXTURE FOR
CONNECTION TO NEW PLUMBING FIXTURE.
DEMOLISH EXISTING FLOOR DRAIN SERVING EXISTING SHOWER IN ITS ENTIRETY.
PREPARE EXISTING 3"W PIPING FOR CONNECTION TO NEW FLOOR DRAIN SERVING
NEW P-70 PLUMBING FIXTURE.
EXISTING SINK AND VANITY TO REMAIN. DEMOLISH EXISTING FAUCET AND PREPARE
SINK TO HAVE NEW FAUCET INSTALLED.
PLUMBING SYMBOLS
VERTICAL PIPE RISER
GENERAL
PIPING
PIPING TO BE DEMOLISHED
1/2" = 1'-0"
DIRECTORS LODGE - GROUND LEVEL - FLOOR PLAN-WEST - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
DIRECTORS LODGE - PLUMBING
GROUND LEVEL - FLOOR
PLAN WEST - DEMOLITION
PD-113
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
EXISTING 3/4"CW, 1/2"HW, AND 4"W FROM
BELOW TO SERVE PLUMBING FIXTURES
LOCATED ON THIS FLOOR
UP
DN
BEDRM 2
HALLWAY
BEDRM 3
BEDRM 4
BATH
STR 3
STAIR 3
EXISTING VENT PIPING UP THROUGH
ROOF TO REMAIN
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
DEMOLITION KEYED NOTES
DEMOLISH EXISTING PLUMBING FIXTURE COMPLETE BACK TO ROUGH-INS. PREPARE
ROUGH-INS FOR CONNECTION TO NEW PLUMBING FIXTURE.
DEMOLISH EXISTING PLUMBING FIXTURE AND ROUGH-INS COMPLETE. MODIFY
PIPING BELOW FLOOR FOR CONNECTION TO NEW P-10 PLUMBING FIXTURE IN NEW
LOCATION.
PLUMBING SYMBOLS
VERTICAL PIPE RISER
GENERAL
PIPING
PIPING TO BE DEMOLISHED
1/2" = 1'-0"
DIRECTORS LODGE - SECOND LEVEL - FLOOR PLAN - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
DIRECTORS LODGE - PLUMBING
SECOND LEVEL - FLOOR
PLAN - DEMOLITION
PD-114
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
111111
EXISTING CO
DN
1-1/2" CW LINE WITH SHUT OFF VALVE TO REMAIN.
EXISTING 40GAL GAS WATER
HEATER TO REMAIN.
U P
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
DEMOLITION KEYED NOTES
DEMOLISH ANY EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING IN IT'S
ENTIRETY. ALL SANITARY PIPING TO BE DEMOLISHED TO 5' OUTSIDE OF BUILDING,
CAP AND MARK LOCATION FOR CONNECTION OF NEW WORK. ALL DOMESTIC PIPING
TO BE DEMOLISHED BACK TO RISER (AFTER SHUTOFF VALVE AND HOSE BIBB) IN
BASEMENT. ALL VENT PIPING TO BE DEMOLISHED IN ITS ENTIRETY AND ALL
PENETRATIONS TO BE SEALED.
EXISTING AREA DRAIN TO REMAIN. AREA DRAIN SHALL BE SNAKED, JET, AND
CLEANED OF ALL DEBRIS AND VERIFY THAT IT DRAINS PROPERLY. ENSURE EXISTING
PERFORATED DRAIN COVER IS SECURELY ATTACHED TO THE DRAIN. DRAIN COVER
SHALL BE REPLACED IF IT IS MISSING OR BROKEN DURING CONSTRUCTION.
1/2" = 1'-0"
PUBLIC INFORMATION CENTER - GROUND LEVEL - FLOOR PLAN - DEMOLITION
1/2" = 1'-0"
PUBLIC INFORMATION CENTER - BASEMENT LEVEL - FLOOR PLAN - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
PUBLIC INFORMATION CENTER -
PLUMBING - GROUND LEVEL -
FLOOR PLAN - DEMOLITION
PD-211
PLUMBING SYMBOLS
ABBREVIATIONS
CO
PIPING
CLEANOUT
(E)EXISTING
PIPING TO BE DEMOLISHED
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
EXISTING 2" CW LINE
WITH SHUTOFF VALVE
TO REMAIN.
1 1
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
H. SEE SHEET A-001 FOR ALL HAZARDOUS MATERIALS NOTES FOR THIS PROJECT,
TYPICAL.
DEMOLITION KEYED NOTES
DEMOLISH ANY EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED PIPING IN IT'S
ENTIRETY. ALL SANITARY PIPING TO BE DEMOLISHED TO 5' OUTSIDE OF BUILDING,
CAP AND MARK LOCATION FOR CONNECTION OF NEW WORK. DOMESTIC PIPING TO
BE DEMOLISHED BACK TO RISER (AFTER SHUTOFF VALVE) IN MECHANICAL ROOM.
DEMOLISH EXISTING WATER HEATER AND ALL ASSOCIATED PIPING IN MECHANICAL
ROOM. DEMOLISH DOMESTIC WATER PIPING BACK TO RISER (AFTER SHUTOFF
VALVE).
DASHED LINE REPRESENTS APPROXIMATE AREA WHERE SLAB SHALL BE SAWCUT FOR
ROUTE OF NEW SANITARY WASTE PIPING UNDERGROUND. DEPTH OF TRENCH SHALL
ALLOW FOR A MINIMUM OF 1/8" PER FOOT SLOPE AND HIGH POINT OF PIPE SHOULD
BE A MINIMUM OF 2 FEET BELOW SLAB. EXTENT OF DEMOLITION SHOWN IS
APPROXIMATE.
1/2" = 1'-0"
PUBLIC RESTROOMS - GROUND LEVEL - FLOOR PLAN - DEMOLITION
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
KEY
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000
Project No. 4624
NOT TO SCALE
3B
2X
2Z2Y
2W 3D
2S
2R
2Q
2D
3F
3C
2U
2T
2M
2K
H
J
C
D
N
O
M L
K
A
B
G
F
2L
2P2N
2M2J
2E2G
2E2G
R
Q
P
Y Z
2A
X
V
T
US
2C
2B
2VW
3A
FACILITY RENOVATION
LONG ISLAND NATIONAL CEMETERY
815CM3041
Final Construction Documents - Issued for Construction
JRC DAS
May 22, 2023
0 1' 2' 4' 8'
PUBLIC RESTROOMS -
PLUMBING - GROUND LEVEL -
DEMOLITION
PD-311
PLUMBING SYMBOLS
PIPING
PIPING TO BE DEMOLISHED
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
NO WORK THIS AREA
UP
BSMT
BSMT
ST2
STAIR 2
GENERAL NOTES
A. VERIFY AND COORDINATE THE INSTALLATION OF THE PLUMBING SYSTEMS WITH
OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS ABOVE CEILING AND
BELOW FLOORS.
B. VERIFY ALL WASTE AND WATER REQUIREMENTS AND LOCATIONS FOR CONNECTING
OWNERS EQUIPMENT PRIOR TO INSTALLATION. PROVIDE ALL NECESSARY MATERIALS
AND COMPONENTS. VERIFY AND INSTALL PER MANUFACTURES WRITTEN
SPECIFICATIONS, INSTRUCTIONS, AND ALL LOCAL AND NATIONAL CODES.
C. COORDINATE WITH ARCHITECTURAL PLANS ALL FIRE OR SMOKE RATED BARRIERS,
WALLS, OR PARTITIONS, AND ALL LOCAL NATIONAL CODES.
D. PLUMBING CONTRACTOR SHALL NOT INSTALL SHUT-OFF VALVES ABOVE WHERE ANY
SHEET ROCK CEILINGS ARE TO BE INSTALLED. WHERE VALVES DO OCCUR, A 2'X2'
ACCESS PANEL SHALL BE INSTALLED. COR SHALL BE NOTIFIED BEFORE PANEL
IS INSTALLED.
E. VERIFY AND COORDINATE ALL PIPING INVERTS WITH EXISTING CONDITIONS
PRIOR TO NEW INSTALLATIONS. PLUMBING DOCUMENTS ARE DIAGRAMMATIC
AND ARE NOT INTENDED TO INCLUDE EVERY ASPECT OF THE REQUIRED WORK.
PLUMBING CONTRACTOR SHALL ENSURE A COMPLETE AND WORKING SYSTEM
IS INSTALLED.
F. FIELD VERIFY EXACT LOCATION AND SIZE OF WASTE, VENT, STORM, AND
WATER PIPING RISERS PRIOR TO ANY DEMOLITION AND RELOCATION. CONTACT
COR ONCE PIPING SYSTEMS HAVE BEEN UNCOVERED/EXPOSED.
G. ALL DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO PROVIDE
COORDINATION DOCUMENTS IN ACCORDANCE WITH THE SPECIFICATIONS.
ADDITIONAL TRANSITIONS REQUIRED DUE TO FIELD CONDITIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
1/2" = 1'-0"
DIRECTORS LODGE - BASEMENT LEVEL - FLOOR PLAN-EAST
LEGEND
N
C
A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
Dwg.
Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2021, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .