Text version
3"
CONCEALED PINHINGE
WELDED TO FRAME
CENTER CONCEALED
HINGE WELDED TO
AND FRAME
1/4" X 1/2" SLOTS TYP.
DOOR PANEL 14 GA
(.075) STAINLESS
STEEL 304 2B
FRAME 12 GA
(.105) SAINLESS
STEEL 304 2B
S E
E S
C H
E D
U
LE
SEE SCHEDULE
1/
8"
1/ 8"
2 1/8" 2 1/8" 3 1/2"
3/
4"
S E
E S
C H
E D
U
LE
SEE SCHEDULE
1/
8"
1/ 8"
2 1/8" 2 1/8" 3 1/2"
3/
4"
TYPE 2 OR 4
TYPE 1 OR 3
LATCH: FOLDING "T" HANDLE, 3 POINT LATCHING, 2 LATCHING RODS,
ZINC PLATED STAINLESS STEEL LOCK BODY, KEY LOCKING (1)
3 1/2"
3/ 4"
1' -0
/4
3 1/2"
3/ 4"
1' -0
/4
A-600
D8
A-600
D8 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:5
P
M
A-600
ARCHITECTURAL SCHEDULES
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
DOOR AND FRAME SCHEDULE
COUNT DESCRIPTION
TYPE
MARK
DIMENSIONS PANEL FRAME
NOTESW H T TYPE MATERIAL FINISH TYPE MATERIAL
FRAME DETAIL
HEAD JAMB SILL
70 TYPE 1 ADD ALT A1 10' - 4" 2' - 8" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
35 TYPE 2 ADD ALT A2 10' - 4" 2' - 0" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
134 TYPE 1 BASE BID B1 10' - 4" 2' - 8" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
60 TYPE 2 BASE BID B2 10' - 4" 2' - 0" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
58 TYPE 3 BASE BID B3 8' - 4" 2' - 8" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
10 TYPE 4 BASE BID B4 8' - 4" 2' - 0" 3 1/2" FLUSH STAINLESS STEEL SS_2B 1 5/8" x 1 5/8" UNISTRUT OR APPROVED EQUAL STEEL
1 1/2" = 1'-0" D8
DETAIL - (N) DUCTBANK DOOR HINGE
3/4" = 1'-0" C6
DETAIL - (N) DUCTBANK DOOR TYPES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
DOOR SCHEDULE NOTES:
1. ALL DOORS SHALL HAVE MECHANICAL LIFT
ASSISTANCE AND SHALL BE KEYED ALIKE.
2. ALL DOORS SHALL ACTUATE A PRESSURE
SWITCH TO ENERGIZE DUCT BANK LIGHTING
WHEN OPEN. SEE ELECTRICAL SHEETS FOR
LIGHTING INFORMATION.
BASIS OF DESIGN CONTACT:
ACUDOR PRODUCTS, INC.
ALAN KARP, PRESIDENT
973-575-5120
WWW.ACUDOR.COM
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018