36C26118R0487-103.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 08 - A301thruA353.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
D E
10'-0"
B22
A-351
F2
C1
A-305
F1
A-305
B22.4
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
B22
B22.4
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
03_ROOF
120' - 0"
A BB31.E B31.F
F1
A-302
A-502
D4
SIM
A-503
F6
A-503
E5
12'-0"
B31
E1
A-505
C6
S-504
B31
BEYOND
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:1
P
M
A-301
ARCHITECTURAL SECTIONS - CANOPY
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1/4" = 1'-0" F3
CANOPY SECTION EAST - B22 POC
1/4" = 1'-0" C3
CANOPY SECTION - B22 POC - DEMO
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 1
2 (E) CANOPY TO BE REMOVED
3 (N) SUSPENDED METAL PANEL CEILING SYSTEM
4 (E) OVERHEAD SUPPORTS TO BE REMOVED AFTER NEW CONNECTION IS
OPERATIONAL
5 (N) METAL PANEL WALL SYSTEM ON METAL FRAMING
6 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
7 (N) PATHWAY LIGHTING ON COLUMNS. SEE CEILING PLANS ON A-101.1
THROUGH A-101.6 AND ELECTRICAL SHEETS.
9 (N) PIPE PENTRATIONS THROUGH METAL PANEL WALL SYSTEM
10 (E) PIPING TO BE REMOVED AFTER CONNECTION TO CLC IS OPERATIONAL
11 CONTRACTOR TO PROVIDE CONSTRUCTION PROTECTION OF
LANDSCAPING AND WALK OF HONOR ELEMENTS IN THIS AREA, TYPICAL
12 (N) FLUSH STAINLESS STEEL ACCESS DOOR, CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
13 (E) HONOR WALL TO REMAIN, PROTECT IN PLACE
14 (E) PIPES AND PIPE BRIDGE TO BE DEMOED IN PHASE 1 ONCE (N) UTILITY
CONNECTIONS ARE MADE IN B31
15 (E) PIPES TO BE DEMOED IN PHASE 1 ONCE (N) UTILITY CONNECTIONS ARE
MADE IN B31
16 (E) MECHANICAL SCREEN WALL TO REMAIN
17 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1/4" = 1'-0" F1
CANOPY SECTION EAST - PHASE 1
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018
02_CANOPY LEVEL
110' - 0"
Z
B24
FUTURE B3
(HIDDEN FOR CLARITY)
B1
A-307
E1
A-307
(N) 2-VCHR-02
(N) 2-VCHS-02
A-502
F1
Y
D8
A-505
REMOVE EXISTING
CANOPY WITH
FUTURE B3
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
A-502
C2
B24
B31718
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
03_B22A_TO_STEEL_DECK
122' - 11"
1 2 3 B22.CB31.1
B31
A-351
C2
F1
A-301
B22
B
B
B
E1
A-306
C1
A-306
VERIFY
5'-1" +/-
VERIFY
8'-9" +/-
A-551
D7
A-505
C2
B
B
B
BLDG JOINT
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
03_B22A_TO_STEEL_DECK
122' - 11"
B22.CB31.1B31.2
B22A
11'-6" +/-
B31
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:3
P
M
A-302
ARCHITECTURAL SECTIONS - CANOPY
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 1
2 (E) CANOPY TO BE REMOVED
3 (N) EXTERIOR WALL PENETRATION
4 (E) OVERHEAD SUPPORTS TO BE REMOVED AFTER NEW CONNECTION IS
OPERATIONAL
5 (N) METAL PANEL SOFFIT FOR SYSTEMS CROSSOVER EACH SIDE - PHASE 1
6 (E) SUN SCREEN TO BE REMOVED
7 PORTION OF (E) ROOF OVERHANG TO BE REMOVED
8 (N) RETAINING WALL, SEE CIVIL DRAWINGS
9 (N) METAL PANEL SOFFIT FOR SYSTEMS CROSSOVER
10 (N) METAL PANEL SOFFIT
11 DEMO. ROOF OVERHANG PHASE 2 (LEAVE 2" OVERHANG, REMOVE AND
REPLACE STORM GUTTER)
12 STRUCTURAL COLUMN CREATED IN PHASE 2. STONE CLADDING INSTALLED
DURING (F) CONSTRCUTION OF TECHNOLOGY BUILDING
13 (E) STEPS AND RAILING TO REMAIN, ACCESS TO B3 TO BE MAINTAINED, DEMO
DURING CONSTRCUTION OF TECHNOLOGY BUILDING
14 (E) SECURITY FENCE AND GATE TO BE REPLACED, MAINTAIN SECURE
PERIMETER DURING CONSTRUCTION
15 (N) SEAT WALL WITH STEP LIGHTS INSTALLED AT THE BASE
16 (F) 2" BLDG JOINT AND EXTERIOR WALL PENETRATION
17 (E) STEPS AND RAILING TO REMAIN, BLDG ACCESS TO REMAIN OPERABLE
18 (E) RETAINING WALL TO BE RELOCATED
19 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
20 ISOLATION VALVES AND (N) POC
21 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
22 (E) MECHANICAL SCREEN WALL TO REMAIN
1/4" = 1'-0" F5
CANOPY SECTION WEST - B3 - FUTURE POC
1/4" = 1'-0" C5
CANOPY SECTION WEST - B3/B24 CORRIDOR - DEMO
1/4" = 1'-0" F1
CANOPY SECTION - B22A TO B31
1/4" = 1'-0" C1
CANOPY SECTION - B22A TO B31 - DEMO
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
NO REVISIONS DATE
02_CANOPY LEVEL
110' - 0"
F1
A-303
T O
P O
F W
A
LL
'-0
S E
E S
T R
U C
T U
R A
L D
R A
W
IN
G S
T O
P O
F S
T E
E L
'-4
8 8
A-502
F1
5" / 1'-0"
B
B
B
B
B
B
B
B
B
B
B
B
SKEWED ANGLE
TYP.
TYP.
49.9
B
B
B
OPPOSITE HAND
A-504
B7
A-504
B7
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
D1
A-303
6 6
T O
P O
F W
A
LL
'-0
S E
E S
T R
U C
T U
R A
L D
R A
W
IN
G S
T O
P O
F S
T E
E L
'-4
A-502
F1
B
B
B
B
B
B
B
B
B
B
B
B
8 89 92 1313
SKEWED ANGLE
B
B
B
12 12
TYP.
TYP.
OPPOSITE HAND
A-504
B7
A-504
B7
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
Z
B1
A-303
W.0X.0
A-503
B1
6' -0
'-0
B24
HIDDEN FOR CLARTY
'-0
B1
A-307
E1
A-307
SIM
A-504
D3
Y
15 15
TYP. TYP. TYP.
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
B4
A-303
43 40.9
42.8
B3
SIM
A-504
D3
A-503
B1
SIM
TYP. TYP.
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
Z
B1
A-307
E1
A-307
B24 B3A-504
D6
Y
3 5/8"
V E
R
IF
Y 1'
-2
/2
TYP.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:4
P
M
A-303
ARCHITECTURAL SECTIONS - CANOPY
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1/4" = 1'-0" D1
CANOPY SECTION NORTH - TRIANGLE INTERSECTION - PHASE 3
1/4" = 1'-0" F1
CANOPY SECTION WEST - TRIANGLE INTERSECTION - PHASE 3
1/4" = 1'-0" B4
CANOPY SECTION EAST - INTERSECTION - BBQ AREA -PHASE 2
1/4" = 1'-0" B1
CANOPY SECTION NORTH - INTERSECTION - BBQ AREA - PHASE 2
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 3
2 (N) STONE VENEER SEAT WALL WITH ROUNDED CAP STONE, WHEN BOTH
SIDES OF THE WALL ARE VISABLE THE WALL WILL HAVE A STONE VENEER
ON EACH SIDE, SEE F1/A-502.
3 (E) BBQ AREA
4 (N) METAL PANEL SOFFIT
6 CONTINUOUS GUTTER AND DOWNSPOUT
7 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
8 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
9 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
10 (N) CEILING SUPPORTS PER STRUCTURAL DETAIL
11 (N) DOWNSPOUT TO SPLASH BLOCK BELOW
12 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
13 (N) STONE VENEER PLANTER SEAT WALL, SEE F1/A-502
14 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY - PHASE 3
15 COLUMN TYPE 2, TYPICAL OF (4) AT BBQ AREA CANOPY
SEE DETAIL D7 / A-502
16 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 2
17 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
18 (N) STEEL COLUMNS WITH (F) CUSTOM SOLDIER PROFILE TO BE ADDED
WHEN (E) B3 IS REMOVED. SEE A-111.2.
1/4" = 1'-0" F5
CANOPY SECTION WEST - B3/B24 CORRIDOR - FUTURE DEMO
NO REVISIONS DATE
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
2 3
EXISTING UTILITY
TUNNEL BELOW
A-501.1
F4
A-501
F1
BASE BID
SUPPORTED
ADD ALTERNATE NO. 3
SELF SUPPORTING
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
262728
A4
A-504
BEYOND
B24
BREEZEWAY
B24
BEYOND
BEYOND
(E) SIDEWALK
10'-0"
TYP.
TYP.
VV UU
B24
AUDITORIUM
1'-6"
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
E F
13 12
A D
D A
L T
E R
N A
T E
N O
B A
S E
B
ID
P H
A S
E
C6
A-503
F6
A-503
A-501
F1
5 5
A-501.1
F4
BASE BID
SUPPORTED
ADD ALTERNATE NO. 3
SELF SUPPORTING
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:5
P
M
A-304
ARCHITECTURAL SECTION - ADD ALTERNATE
NO.1
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B
B19& B19A
1/2" = 1'-0" F1
ADD ALT. NO. 1 - CANOPY SECTION AT CROSSOVER / PIPE CHASE
1/4" = 1'-0" B4
ADD ALT. NO.1 - CANOPY SECTION TO B1 & B4 BREEZEWAY
1/4" = 1'-0"
B1
ADD ALT. NO. 1 - CANOPY SECTION AT PIPE BRIDGE
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE FOR (F) PIPING, ADD ALTERNATE NO. 1
2 (N) FLUSH STAINLESS STEEL ACCESS DOOR, CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
3 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
4 (N) FIXED STAINLESS STEEL METAL PANEL SYSTEM TO MATCH ACCESS
DOORS
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (F) DUCTBANK TO BE INSTALLED AFTER PIPE BRIDGE HAS BEEN REMOVED
7 (N) LIGHT FIXTURE, SEE ELECTRICAL SHEETS
8 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
9 (E) SIDEWALK TO REMAIN (BASE BID) OR PARTIALLY REMOVED, (ADD
ALTERNATE NO. 1). SEE ARCHITECTURAL SITE PLANS
10 (E) PIPE BRIDGE TO BE REMOVED AFTER CONNECTION TO B31 IS
OPERATIONAL, CONTRACTOR TO PROVIDE SHORING FOR (E) PIPE BRIDGE AS
NECESSARY WHERE POSTS ARE REMOVED FOR CIRCULATION PRIOR TO
REMOVAL OF ENTIRE PIPE BRIDGE
11 (E) UTILITY PIPES TO BE REMOVED AFTER CONNECTION TO B31 IS
OPERATIONAL, CONTRACTOR TO PROVIDE SHORING FOR (E) PIPE BRIDGE AS
NECESSARY WHERE POSTS ARE REMOVED FOR CIRCULATION PRIOR TO
REMOVAL OF ENTIRE PIPE BRIDGE
12 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 1
13 PATCH AND REPAIR SIDEWALK AFTER PIPE BRIDGE HAS BEEN REMOVED
14 (N) METAL PANEL WALL SYSTEM ON METAL FRAMING
15 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 1
16 (N) STRUCTURAL STEEL FRAMING , SEE STRUCTURAL SHEETS
17 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY, ADD ALTERNATE NO. 1 TO BE
CONSTRUCTED PRIOR TO REMOVAL OF PIPE BRIDGE
18 (E) RETAINING WALL TO REMAIN (BASE BID) OR PARTIALLY REMOVED, (ADD
ALTERNATE NO. 1). SEE ARCHITECTURAL SITE PLANS
NO REVISIONS DATE
02_CANOPY LEVEL
110' - 0"
2 3 5 6 7
D1
A-310
B1
A-310
E1
A-306
C1
A-306
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
6'-11" 4'-1" 3'-9" 2'-7"
C6
A-503
F6
A-503
B
B
B
B
B
B
TYP.
TYP.
TYP.
TYP. TYP.
P H
A S
E
P H
A S
E
7.9
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F3
A-301
23567 C3
A-301
E1
A-306
C1
A-306
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
'-1
" 15 '-9
'-0
2'-6" 3'-9" 6'-3" 6'-11"
C6
A-503
F6
A-503
B
B
B
B
B
B
44 55
99 9
TYP.TYP.
TYP. TYP. TYP.
P H
A S
E
P H
A S
E
7.9
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:0
P
M
A-305
ARCHITECTURAL SECTIONS - CANOPY
ACCESS DOORS
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1/4" = 1'-0" F1
CANOPY SECTION SOUTH - ACCESS DOORS - PHASE 1
1/4" = 1'-0" C1
CANOPY SECTION NORTH - ACCESS DOORS - PHASE 1
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
HOUSING - PHASE 1
2 CONSTRUCT STRUCTURAL FRAMING REQUIRED TO SUPPORT NEW PIPING
WHILE (E) PIPE BRIDGE REMAINS. WALLS AND SOFFIT TO BE INSTALLED
AFTER (E) PIPE BRIDGE HAS BEEN REMOVED
3 (N) PIPING, SEE PLUMBING / MECHANICAL DRAWINGS
4 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
5 (N) SUSPENDED METAL PANEL CEILING SYSTEM
6 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
7 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
8 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
9 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
10 (N) FIXED STAINLESS STEEL METAL PANEL SYSTEM TO MATCH ACCESS
DOORS
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
NO REVISIONS DATE
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
ABCDE
F1
A-302
C5
A-306
B
B
B
B
B
B
C1
A-305
F1
A-305
1'-10" 1'-7" C6
A-503
F6
A-503
TYP.
B
B
B
TYP.
3 3
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
A B C D E
F1
A-302
C5
A-306
C1
A-305
F1
A-305
B
B
B
B
B
B
B
B
B
1'-7" 1'-10" C6
A-503
F6
A-503
TYP.
TYP.
3 3 3
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F1
A-301
B
B
B
B
B
B
E1
A-306
C1
A-306
4'-0" 2'-4" 4"
TYP.
TYP. 2
55 5
F6
A-503
C6
A-503
9 9
B31
B22 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:1
P
M
A-306
ARCHITECTURAL SECTIONS - CANOPY
ACCESS DOORS
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 1
2 (N) PIPING, SEE PLUMBING / MECHANICAL DRAWINGS
3 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
4 (N) SUSPENDED METAL PANEL CEILING SYSTEM
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
7 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
8 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
9 (N) FIXED STAINLESS STEEL METAL PANEL SYSTEM TO MATCH ACCESS
DOORS
10 (N) 4" BLDG JOINT
11 (N) 2" BLDG JOINT
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
KEYNOTES
1/4" = 1'-0" E1
CANOPY SECTION WEST - ACCESS DOORS - PHASE 1
1/4" = 1'-0" C1
CANOPY SECTION EAST - ACCESS DOORS - PHASE 1
1/4" = 1'-0"
C5
CANOPY SECTION NORTH - ACCESS DOORS - PHASE 1
NO REVISIONS DATE
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F5
A-302
B4
A-303
434445464748
B5
A-503
A-503
F6
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B3
BEYOND
11'-4" 1'-4" 1'-6" 10" 3'-2" C6
A-503
F6
A-503
F5
A-303
TYP.
TYP.
TYP.
TYP.
6 6 6 6
A-503
B6
P H
A S
E
P H
A S
E
42.1
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F5
A-302
B4
A-303
43 44 45 46 47 48
A-503
B6
42.8
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
3'-2" 10" 1'-6" 1'-5" 11'-3" 4'-7"C6
A-503
F6
A-503
F5
A-303
TYP.
4 4
TYP.
TYP.
TYP.
OPPOSITE
HAND
A-503
F6
B5
A-503
F1
A-502
P H
A S
E
P H
A S
E
42.1
7' -9
A-505
D8 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:1
P
M
A-307
ARCHITECTURAL SECTIONS - CANOPY
ACCESS DOORS
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 2
2 (N) PIPING, SEE PLUMBING / MECHANICAL DRAWINGS
3 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
4 (N) SUSPENDED METAL PANEL CEILING SYSTEM
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (N) STEEL COLUMNS WITH (F) CUSTOM SOLDIER PROFILE TO BE ADDED WHEN
(E) B3 IS REMOVED. SEE A-111.2.
7 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
8 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
9 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
10 (N) FIXED STAINLESS STEEL METAL PANEL SYSTEM TO MATCH ACCESS
DOORS
12 (N) ACCESS DOORS INSTALLED IN PHASE 3
13 (N) STONE VENEER SEAT WALL WITH ROUNDED CAP STONE, WHEN BOTH
SIDES OF THE WALL ARE VISABLE THE WALL WILL HAVE A STONE VENEER ON
EACH SIDE, SEE F1/A-502.
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
KEYNOTES
1/4" = 1'-0" B1
CANOPY SECTION NORTH - ACCESS DOORS - PHASE 2
1/4" = 1'-0" E1
CANOPY SECTION SOUTH - ACCESS DOORS - PHASE 2
NO REVISIONS DATE
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
34363841 3940 37 35 33
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
7"
1'-3"1'-3" 2'-7" 1'-11"
2' -8
2'
-8
2' -0
C6
A-503
F6
A-503
TYP.
TYP.
TYP.
12 12
P H
A S
E
P H
A S
E
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
34 36 38 4139 40373533
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
1'-1" 8'-5"
2' -0
2'
-8
2' -8
C6
A-503
F6
A-503
TYP.
1 1
12 6
TYP.
TYP.
F1
A-502
P H
A S
E
P H
A S
E
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
48 49
F1
A-502
C6
A-503
F6
A-503
A-504
B7
P H
A S
E
P H
A S
E
B
B
B
B
B
B
TYP.
TYP.
49.9 3'-3" 2'-9"
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
3'-4"
C6
A-503
F6
A-503
B
B
B
B
B
B
TYP.
TYP.
A-504
B7
OPPOSITE
HAND
P H
A S
E
P H
A S
E 249.9 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:2
P
M
A-308
ARCHITECTURAL SECTIONS - CANOPY
ACCESS DOORS
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1/4" = 1'-0" C1
CANOPY SECTION NORTH EAST - ACCESS DOORS - PHASE 2
1/4" = 1'-0" D1
CANOPY SECTION SOUTH WEST - ACCESS DOORS - PHASE 2
1/4" = 1'-0" F3
CANOPY SECTION SOUTH - ACCESS DOORS - PHASE 3
1/4" = 1'-0"
F1
CANOPY SECTION NORTH - ACCESS DOORS - PHASE 3
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 2
2 (E) ACCESS DOORS INSTALLED IN PHASE 2
3 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
4 (N) SUSPENDED METAL PANEL CEILING SYSTEM
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
7 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
8 (N) STORM GUTTER ATTACHED TO PERIMETER OF THE HEXEGON CANOPY
9 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
11 (N) STONE VENEER SEAT WALL WITH ROUNDED CAP STONE, WHEN BOTH
SIDES OF THE WALL ARE VISABLE THE WALL WILL HAVE A STONE VENEER ON
EACH SIDE, SEE F1/A-502.
12 (N) FIXED STAINLESS STEEL METAL PANEL SYSTEM TO MATCH ACCESS
DOORS
13 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 3
NO REVISIONS DATE
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT
AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
C6
A-503
F6
A-503
F1
A-502
TYP.
TYP.
58.958.5
B
B
B
B
B
B
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
C6
A-503
F6
A-503
1 1
5 5
TYP.
TYP.
A-504
B7
F1
A-502
58.9 58.158.5
B
B
B
B
B
B
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
B
B
B
B
B
B
B
B
B
B
B
B
E Q E Q
F6
A-503
C6
A-503
A-502
F1
A-504
B7
SIM
A-503
F5
OPPOSITE
HAND
TYP.
A-504
B7
TYP.
58.157.5
B1
BEYOND
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
C1
A-353
6263 6061
B
B
B
B
B1
BEYOND
TYP.
14 15
F6
A-503
C6
A-503
SIM
NEW 4" ROOF-TO-WALL
BLDG JOINT ON EXISTING
B24 BREEZEWAY ROOF,
BEYOND
18 18
(N) 3-VCHR-03 (N) 3-VCHS-03(N) 3-VCHR-02(N) 3-VCHS-01
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:3
P
M
A-309
ARCHITECTURAL SECTIONS - CANOPY
ACCESS DOORS
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1/4" = 1'-0" B1
CANOPY SECTION EAST - ACCESS DOORS - PHASE 3
1/4" = 1'-0"
B5
CANOPY SECTION WEST - ACCESS DOORS - PHASE 3
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 3
2 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
3 (N) PIPING, SEE PLUMBING / MECHANICAL DRAWINGS
4 (N) 10'-0" SIDEWALKS ADD ALTERNATE NO. 2
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO LOCK
OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
7 (N) STORM…
This is the start of the file's text. The full file is on GovTribe.