36C26118R0487-0002041.pdf
PDF 11 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 0002 14 - 570-16-302_MECHANICAL.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V
HWR
HWS
DOWN
CHR
CHS
GENERAL NOTES:MECHANICAL SYMBOL LEGENDABBREVIATIONS
VALVE ASSEMBLY
XX - ## NUMBERS REFER TO SPECIFIC EQUIPMENT
SYMBOL INDICATES NEW EQUIPMENT
EQUIPMENT SYMBOLS
IDENTIFIED IN EQUIPMENT SCHEDULE
CFM
SYMBOL INDICATES GRILLE OR
DIFFUSER IDENTIFIED IN EQUIPMENT
SCHEDULE
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
LETTERS REFER TO THE EQUIPMENT TYPE
ACCESS DOOR
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ACOUSTIC LINING
ACU
AD
AFF
AL
BOP
BOD
BOTTOM OF PIPE
BOTTOM OF DUCT
CUBIC FEET PER MINUTE
CLEANOUT
CFM
CO
MOTOR CONTROL CENTERMCC
NOT APPLICABLE
NOT IN CONTRACT
NUMBER (QUANTITY)
NA
NIC
NO.
OUTSIDE AIR
OPPOSED BLADE DAMPER
OA
OBD
PSIG
PRV PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH GAGE
QUADRANT
QUANTITYQTY
QUAD
RETURN AIRR.A.
SMOKE CONTROL DAMPER SCD
EXHAUST EXH
FLAT TOP
FEET PER MINUTE
FT
FPM
DEGREES FAHRENHEIT
FAN COIL UNIT
FLOOR DRAIN
FLEXIBLE
FCU
FD
FLEX
°F
TOPT TOP OF PIPE TRAPEZE
VENT THRU ROOFVTR
VEL
VAV VARIABLE AIR VOLUME
VELOCITY
GALLONS PER HOUR
GALLONS PER MINUTE
GPH
GPM
HAND DAMPER (VOLUME DAMPER)
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HD
HEPA
INCHESIN
MAKE-UP WATER
CONDENSATE DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
PIPING SYMBOLS
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN) WATER FLOW MEASURING DEVICE
PLUG VALVE
VALVE SYMBOLS
GATE VALVE
GLOBE VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
THREE-WAY MODULATING CONTROL VALVE
TWO-WAY CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
MANUAL AIR VENT
SOLENOID VALVE
3/4" GATE VALVE WITH ADAPTER TO 3/4"
HOSE THREAD
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WCO
WH
WALL CLEANOUT
WALL HYDRANT
V
VAC
VOLTS
VOLTS, ALTERNATING CURRENT
TP TOTAL PRESSURE (INCHES OF WATER)
SP STATIC PRESSURE (INCHES OF WATER)
Rh
RPM
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
KWH
KW KILOWATT
KILOWATT HOUR
HB HOSE BIBB
FS FLOOR SINK
FCO FLOOR CLEANOUT
ENT ENTERING
DX DIRECT EXPANSION
BTU
BTUH
BRITISH THERMAL UNIT
BTU PER HOUR
BHP BRAKE HORSEPOWER
VENT
SECTION SYMBOLS
SDVV SINGLE DUCT VARIABLE VOLUME
ST SOUND TRAP
TYP. TYPICAL
CONT. CONTINUATION
D DRAIN
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
FT. FEET
F.G. FILTER GAUGE
FB FLAT BOTTOM
MA MAIN AIR (CONTROLS)
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
CD
ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES
OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING AND
1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS REQUIRED TO
PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES OCCUR ABOVE CEILING
AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE PROVIDE HOSE CONNECTION ON
VALVE.
REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE RATED
AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE AND DUCTWORK
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT
TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL.
CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE
PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT
ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES, AND
HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND PLUMBING EQUIPMENT, AND
PIPING, ETC. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND ALL
BUILDING TRADES TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND
SERVICEABILITY.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT IN A
MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING
STRUCTURAL SYSTEM.
WHERE SIZES ARE INDICATED FOR EXISTING PIPES, THESE SIZES ARE APPROXIMATE.
VERIFY IN FIELD
SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
1.
2.
3.
6.
7.
8.
XX - #
##x#
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
TEE - UP
ELBOW - UP TO TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
PIPE STRAINER
UNION - SCREWED
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE - CAPPED WITH SHUT-OFF VALVE
PIPE ANCHOR
PIPE EXPANSION JOINT
P
PS
A
F
PS
TS
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
SECTION NUMBER
DRAWING NUMBER WHERE DETAILED
DETAIL LOCATION
DRAWING NUMBER WHERE DETAILED
X#
X###
X#/X###
DETAIL LOCATION X#
SECTION LOCATION X#
SECTION
DETAIL
SCALE
SCALE
FITTING SYMBOLS
RS REFRIGERATION SUCTION
RL REFRIGERATION LIQUID
VALVE - BALL LEVER
VALVE - GATE MANUAL
VALVE - BUTTERFLY MOTORIZED
VALVE - GLOBE MANUAL
VALVE - GLOBE LEVER
VALVE - PLUG LEVER
VALVE - PLUG MANUAL
VALVE - PRESSURE REGULATING
VALVE - CHECK
VALVE - PRESSURE RELIEF
TWS TOWER WATER SUPPLY
TWR TOWER WATER RETURN
TWB TOWER WATER BYPASS
HPS STEAM - HIGH PRESSURE SUPPLY
HPR STEAM - HIGH PRESSURE RETURN
LPR STEAM - LOW PRESSURE RETURN
CND STEAM - CONDENSATE RETURN
PC STEAM - PUMPED CONDENSATE
R REFRIGERATION
MU
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
DRAIND
SOLENOID VALVE
PLUG VALVE
GATE VALVE
DIAPHRAGM VALVE
GLOBE VALVE
CIRCUIT SETTER
STEAM TRAP INVERTED BUCKET
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
END CAP
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
UNION - SCREWED
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
PIPE STRAINER
THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES
GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE PERSONNEL AND
PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION, ARRANGEMENT, AND
SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING BUILDING MAY BE DIFFERENT
FROM THAT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVALS WITH THE COR AUTHORIZED REPRESENTATIVE AND SHALL
CONFORM TO THEIR REQUIREMENTS.
DISRUPTION OF NORMAL HOSPITAL ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT
THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE MEDICAL CENTER WHICH
ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE
OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED
OUTSIDE OF THE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE MEDICAL
CENTER. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK
ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS, ETC. FOR
ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION TO MINIMIZE DUST
AND FUMES. SOME ASPECTS OF THE WORK WILL BE REQUIRED TO BE PERFORMED
DURING OFF NORMAL HOURS, INCLUDING NIGHTS AND WEEKENDS.
THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN ADVANCE TO
THE ARCHITECT AND THE COR'S AUTHORIZED REPRESENTATIVE FOR APPROVAL PRIOR
TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN OUTLINE OF ALL ACTIVITIES
OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S
AUTHORIZED REPRESENTATIVE TO ESTABLISH ACCEPTABLE ROUTING AND ACCESS
WITHIN THE MEDICAL CENTER FOR MATERIALS REQUIRED FOR THE NEW INSTALLATION.
ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON
FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT DATA.
ALL DATA OBTAINED VIA TESTING AND MEASURING OF THE EXISTING AIR HANDLING UNIT,
AND THE ASSOCIATED RETURN/RELIEF FAN, SUPPLY AIR DUCTS, EXHAUST, AND RETURN
AIR DUCTS PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW WORK SCOPE OF
WORK SHALL BE UTILIZED TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND
BALANCE DATA FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES
INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND ARCHITECTURAL.
ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT PRIOR TO
START OF WORK.
A
B
C
D
E
F
G
GENERAL DEMO NOTES:
ACCESS DOORAD
AIR HANDLING UNIT AHU
COMPRESSED AIR
CONDENSATE DRAIN
CA
CD
DETAIL REFERENCE
SECTION AND DETAIL TITLES
MPS STEAM - MEDIUM PRESSURE SUPPLY
MPR STEAM - MEDIUM PRESSURE RETURN
LPS STEAM - LOW PRESSURE SUPPLY
SCAN OR PHOTO NUMBER
LIDAR SCAN OR PHOTO
FUTURE PIPE
EXISTING(E)
(N) NEW
(F) FUTURE
RR REFRIGERATION RELIEF
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
3:
A M
M-001
MECHANICAL LEGEND
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
NO REVISIONS DATE
Digitally signed by Richard J. Reif Date: 2018.02.06 08:42:49-07'00'
DN
UP
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
SOLAR PANELS
SOLAR PANELS
H
H H H H H
HH
HH
H H H H H H
H
H
HHHHH
H
H
H
H
H
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
PHASE 1
ADD ALTERNATE SEE SHEET MS101.5
B25
B31
(CLC)
B2
B22
B22A
B36 B3
B8
B7
LOT C
LOT A
B1
B19
LOT D
B34
B17
B24
BREEZEWAY
LOT E
B32
P H
A S
E
S E
E S
H E
E T
M S
1.
P H
A S
E
S E
E S
H E
E T
M S
1.
P H
A S
E
S E
E S
H E
E T
M S
1.
P H
A S
E
S E
E S
H E
E T
M S
1.
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
OPC
SEE PLAN
2/M-103
SEE PLAN
1/M-103
SEE PLAN 2/M-102 AND
ROOF PLAN 3/M-104
SEE PLAN 1/M-101 AND
ROOF PLAN 1/M102
SEE PLAN
2/M-104
SEE PLAN
1/M-104
B27
LOT B
LOT C
10" CHS
10" CHR
10" CHR
10" CHS
4" CHR
4" CHS
B2
B22
B1
B24
B36
B24
AUDITORIUM
B25
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
4:
A M
MS101
MECHANICAL SITE PLAN
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS
ARE COORDINATED WITH THE COR 30 DAYS IN ADVANCE
AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR
TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE
INTERRUPTION DATES WITH DURATIONS, AND DETAILED
PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO
THE START OF WORK. THIS SUBMITTAL MUST BE
ACCEPTED BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY
BANK ENCLOSURE IS TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY
STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE START
OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTLITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1 MAN-
LIFT AND 1 FORKLIFT AS REQUIRED BY SPECIFICATION
01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
0' 20' 40' 80'Scale: 1" = 40'-0"
MECHANICAL SITE PLAN - OVERALL
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B
B19& B19A
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
THE OVERHEAD PEDESTRIAN CANOPIES SHALL INCLUDE AN UNSEEN RACEWAY CARRYING THE FOLLOWING:
A. CHW FROM BUILDING NO. 22A TO BUILDING NO. 1 SUB-BASEMENT.
B. CHW FROM BUILDING NO. 22A TO BUILDING NO. 31 PENTHOUSE.
C. STEAM & CONDENSATE RETURN FROM BUILDING NO. 22 TO BUILDING NO. 31 PENTHOUSE.(SEE MS-101)
D. CONTROL/ALARM WIRING FROM BUILDING NO. 22 TO BUILDING NO. 31 PENTHOUSE.
E. ADDITIONAL UTILITIES AND SERVICES FOR FUTURE EXPANSION.
REMOVAL OF EXISTING PIPE UTILITY STANDS ASSOCIATED WITH STEAM AND CHILLED WATER WHICH WERE CONSTRUCTED FOR PROJECT NO. 570-13-300, “NEW BUILDING NO. 22A AND CHILLER INFRASTRUCTURE”.
MECHANICAL PROJECT SCOPE
Scale: 1" = 40'-0"
MECHANICAL CHW PIPING SITE PLAN - OVERALL TUNNEL
0' 20' 40' 80'
NO REVISIONS DATE
Digitally signed by Richard J. Reif Date: 2018.02.06 08:46:12-07'00'
ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
B-36
BARN
B-31
CLC
B-25
MENTAL HEALTH
FREEDOM BLDG
A
B
C
D
E
F
B31.1
B31.F
W
X
B22.4
7.9
6" CHR
6" CHS
2 1/2" HPS
1" HPR
3" CHS
3" CHR
P H
A S
E
ADD ALTERNATE
SEE SHEET MS101.5
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
P H
A S
E
S E
E S
H E
E T
M S
.2
BOILER ROOM,
BLDG 2
BOILER BLDG
EQUIPMENT
ROOM
CHILLER ROOM
CHILLERS, BLDG
CHILLER PLANT
BLDG 22A
HSKPA
1A28
2 BED ROOM
1A30
2 BED ROOM
1A32
2 BED ROOM
1A33
CORRIDOR
TOILET
1A37A
DIABETIC
RESERCH
1A27
DIABETIC CLINIC
1A26
8" HPS
3" PC
(N) 1-VCHR-02
(N) 1-VCHS-02(F) 1-VHPS-01
(F) 1-VHPR-01
(F) 1-VHPS-03
(F) 1-VHPR-03
(F)
(F)(N) 1-VCHS-01
(N) 1-VCHR-01
ELECTRICAL
ROOM
(N) 1-VCHR-05
(F) (F)
IC
H A R D J. RE I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
E R
N
EW
ME X I CO
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
4/
/2
4:
:2
P
M
MS101.1
MECHANICAL SITE PLAN - PHASE 1
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
Scale: 1/8" = 1'-0"
MECHANICAL SITE PLAN - PHASE 1
GENERAL SHEET NOTES
KEYNOTES
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS
ARE COORDINATED WITH THE COR 30 DAYS IN ADVANCE
AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS
PRIOR TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE
INTERRUPTION DATES WITH DURATIONS, AND DETAILED
PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO
THE START OF WORK. THIS SUBMITTAL MUST BE
ACCEPTED BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY
BANK ENCLOSURE IS TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY
STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE START
OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1 MAN-
LIFT AND 1 FORKLIFT AS REQUIRED BY SPECIFICATION
01 00 00..
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
K SEE VALVE SCHEDULE ON SHEET M701.
1 (F) 8" HPS AND (F) 3" PC TO BUILDING 01 AND 1-1/4" PC TO
BUILDING 24. ALOWANCES ARE TO BE MADE FOR STEAM
LINES TO PITCH DOWN 1/4"/5'-0" IN THE DIRECTION OF
FLOW. STEAM RISERS ARE TO BE AT EVERY 200' OF HPS
WITH TRAP DISCHARGE INTO PUMPED CONDENSATE.
SLOPE PUMPED CONDENSATE 1/8"/5'-0" IN DIRECTION OF
FLOW. SEE DETAILS E1 & E3/M-501. SEE DETAIL F3/M-501
FOR PIPE POSITION ON RACK.
2 14" CHS/R ROUTED INSIDE WALKWAY ENCLOSURE. SEE
DETAIL F3/M-501.
3 PROVIDE 14" VALVE AND BLIND FLANGE IN (N) CHS/R FOR
FUTURE CONNECTION.
4 BRAIDED METAL FLEXIBLE PIPE CONNECTOR.
5 ROUTE 3" CHR/S, 2-1/2" HPS AND 1" PC INSIDE NEW PIPE
ENCLOSURE. PITCH DOWN 1/2"/1'-0" IN THE DIRECTION OF
FLOW.
6 3/4" PC FROM BOTTOM OF EXISTING HPS RISER TO
CONNECT TO 1" HPS. SEE DETAIL F8/M-501.
7 PROVIDE 6" VALVE AND BLIND FLANGE IN (N) CHS/R FOR
FUTURE CONNECTION.
8 (F) 4" HPS AND (F) 2" PC FOR FUTURE CLC EXPANSION AND
CANTEEN. ALOWANCES ARE TO BE MADE FOR STEAM
LINES TO PITCH DOWN 1/4"/5'-0" IN THE DIRECTION OF
FLOW. STEAM RISERS ARE TO BE AT EVERY 100' OF HPS
WITH TRAP DISCHARGE INTO PUMPED CONDENSATE.
SLOPE PUMPED CONDENSATE 1/8"/5'-0" IN DIRECTION OF
FLOW. SEE DETAILS E1 & E3/M-501. SEE DETAIL F3/M-501
FOR PIPE POSITION ON RACK.
9 PROVIDE PIPE ANCHOR FOR 14" CHS/R AT COLUMN. SEE
PIPE ANCHOR DETAIL B8/M-501.
10 ROUTE (N)3" CHR/S, (N)2-1/2" HPS AND (N)1" PC ROUTED
ABOVE ROOF TO CONNECTIONS INSIDE PENTHOUSE. SEE
SHEET M-102 FOR CONTINUATION
11 FUTURE 8" HPS AND 3" PC.
12 PROVIDE VALVE AND BLIND FLANGE FOR (F) 8" HPS AND (F)
3" PC TO BUILDING 01.
13 PROVIDE 1" BYPASS PIPE WITH BALL VALVE (NO) FOR
FREEZE PROTECTION AND CONTINUOUS CIRCULATION.
14. PROVIDE STEAM TRAP AT LOW POINT OF 2-1/2" HPS PIPE
AND PIPE TO 1" HPR.
0' 4' 8' 16'
SEE ENLARGED PLAN
SHEET 22-M101
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
FOR FUTURE
PHASE 2
CONNECTION
NO REVISIONS DATE
Richard J. Reif Digitally signed by Richard J. Reif Date: 2018.04.17 04:59:55-06'00'
ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
SEE VALVE SCHEDULE ON SHEET M701.
I
J
14" CHR
14" CHS
4" CHR4" CHS
D
E
W
X
4344454647
Z
W.0
40.9
FF
HH
X.0
42.8
Y
B22.4
7.9
42.1
58.1
57.5
49.9
GG.1
FF.1
Z.0
Y.0
14" CHR
ADD ALTERNATE
SEE SHEET MS101.5
B36B3
B24
P H
A S
E
P H
A S
E
P H
A S
E
S E
E S
H E
E T
M S
.3
P H
A S
E
S E
E S
H E
E T
M S
.1
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
3"
3" CHR
AREA OF WORK
(N) 2-VCHS-01
(N) 2-VCHR-01
(N) 2-VCHR-02
(N) 2-VCHS-02
(N) 2-VCHR-03
(N) 2-VCHS-03
14" CHR14" CHS
P H
A S
E
S E
E S
H E
E T
M S
.3
(N) 2-VCHS-04
IC
H A R D J. RE I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
E R
N
EW
ME X I CO
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
4/
/2
9:
:4
A
M
MS101.2
MECHANICAL SITE PLAN - PHASE 2
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
Scale: 1/8" = 1'-0"
MECHANICAL SITE PLAN - PHASE 2
GENERAL SHEET NOTES
KEYNOTES
1 (F) 8" HPS, 3" PC TO BUILDING 01 AND 1-1/4" PC TO
BUILDING 24. ALOWANCES ARE TO BE MADE FOR STEAM
LINES TO PITCH DOWN 1/4"/5'-0" IN THE DIRECTION OF
FLOW. STEAM RISERS ARE TO BE AT EVERY 100' OF HPS
WITH TRAP DISCHARGE INTO PUMPED CONDENSATE.
SLOPE PUMPED CONDENSATE 1/8"/5'-0" IN DIRECTION OF
FLOW. SEE DETAILS E1 & E3/M-501. SEE DETAIL F3/M-501
FOR PIPE POSITION ON RACK.
2 (N) 14" CHS/R ROUTED INSIDE WALKWAY ENCLOSURE.
SEE DETAIL F3/M-501.
3 PROVIDE VALVE AND CAP FOR 2" AND SMALLER PIPE AND
VALVE AND BLIND FLANGE FOR PIPES GREATER THAN 2"
FOR FUTURE CONNECTION.
4 CONNECT (N) 10" CHS/R TO EXISTING (E) 10" CHS/R
5 PROVIDE PIPE ANCHOR FOR (N) 14" CHS/R AT COLUMN.
SEE PIPE ANCHOR DETAIL B8/M-501.
6 PROVIDE RESTRAINED FLANGED BELLOWS FOR 1" OF
MOVEMENT. RFB TO BE PRE-COMPRESSED TO ALLOW
FOR THE CONTRATCTION.
7 PROVIDE 1" BYPASS PIPE WITH BALL VALVE (NO) FOR
FREEZE PROTECTION AND CONTINUOUS CIRCULATION
8 PIPE GUIDE LOCATION, SEE STRUCTURAL DETAIL B4/S-502.
9 BRAIDED METAL PIPE FITTING
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS
ARE COORDINATED WITH THE COR 30 DAYS IN ADVANCE
AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR
TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE
INTERRUPTION DATES WITH DURATIONS, AND DETAILED
PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO
THE START OF WORK. THIS SUBMITTAL MUST BE
ACCEPTED BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY
BANK ENCLOSURE IS TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY
STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE START
OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTLITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1 MAN-
LIFT AND 1 FORKLIFT AS REQUIRED BY SPECIFICATION
01 00 00..
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
K SEE VALVE SCHEDULE ON SHEET M701.
0' 4' 8' 16'
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
FOR FUTURE PHASE
3 CONNECTION
FOR FUTURE CONNECTION
TO BUILDING 24 CHILLED
WATER PIPING
FOR FUTURE CONNECTION
TO BUILDING 3 CHILLED
WATER PIPING
NO REVISIONS DATE
Richard J. Reif
Digitally signed by Richard J. Reif Date: 2018.04.17 05:00:11-06'00'
ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
SEE VALVE SCHEDULE ON SHEET M701.
I
3"
3" CHR
14" CHR
14" CHS
P H
A S
E
B32
B01
P H
A S
E
S E
E S
H E
E T
M S
1.
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA O
F W
O
RK
B24
(N) 3-VCHS-01
(N) 3-VCHR-01
(N) 3-VCHR-03
(N) 3-VCHS-03
(N) 3-VCHR-02
(N) 3-VCHS-02
(N) 3-VCHR-05
(N) 3-VCHS-05
AUDITORIUM
1B-1
PROJECTION
1B-2
A R
E A
O F
W O
R K
(N) 3-VCHR-04
(N) 3-VCHS-04
(N) 3-VCHS-06
3" CHR
3" CHS
IC
H A R D J. R E I F
14718
G
IN
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
E R
N
EW
ME X I CO
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/2
7/
1:
:2
A M
MS101.3
MECHANICAL SITE PLAN - PHASE 3
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
Scale: 1/8" = 1'-0"
MECHANICAL SITE PLAN - PHASE 3
GENERAL SHEET NOTES
KEYNOTES
1 CONNECT (N) 10" CHS/R TO (E) 10" CHS/R PIPING
LOCATED IN SUB-BASEMENT
2 CONNECT (N) 14" CHS/RTO (E) 14" CHS/R
3 PROVIDE VALVE AND CAP FOR 2" AND SMALLER PIPE AND
VALVE AND BLIND FLANGE FOR PIPES GREATER THAN 2"
FOR FUTURE CONNECTION.
4 (N) 14" CHS/R ROUTED INSIDE WALKWAY ENCLOSURE.
SEE DETAIL F3/M-501.
5 (N) 14" CHS/R VALVE AND BLIND FLANGE FOR FUTURE
CONNECTION
6 (F) 8" HPS, (F) 3" PC TO BUILDING 01 AND (F) 1-1/4" PC TO
BUILDING 24. ALOWANCES ARE TO BE MADE FOR STEAM
LINES TO PITCH DOWN 1/4"/5'-0" IN THE DIRECTION OF
FLOW. STEAM RISERS ARE TO BE AT EVERY 100' OF HPS
WITH TRAP DISCHARGE INTO PUMPED CONDENSATE.
SLOPE PUMPED CONDENSATE 1/8"/5'-0" IN DIRECTION OF
FLOW. SEE DETAILS E1 & E3/M-501. SEE DETAIL F3/M-501
FOR PIPE POSITION ON RACK.
7 PROVIDE PIPE ANCHOR FOR (N) 14" CHS/R AT COLUMN.
SEE PIPE ANCHOR DETAIL B8/M-501.
8 PROVIDE 1" BYPASS PIPE WITH BALL VALVE (NO) FOR
FREEZE PROTECTION AND CONTINUOUS CIRCULATION
9 CLOSE 1" BYPASS VALVE WHEN PHASE 2 CHW PIPES ARE
IN SERVICE.
10 (N) 14" CHS/R ROUTED ABOVE EXISTING WALKWAY.
11 PROVIDE 1" BYPASS PIPE WITH BALL VALVE (NO) FOR
FREEZE PROTECTION AND CONTINUOUS CIRCULATION
12 PIPE GUIDE LOCATION, SEE STRUCTURAL DETAIL B4/S-502.
13 BRAIDED METAL FLEXIBLE PIPE CONNECTOR.
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS
ARE COORDINATED WITH THE COR 30 DAYS IN ADVANCE
AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS
PRIOR TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE
INTERRUPTION DATES WITH DURATIONS, AND DETAILED
PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO
THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED
BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY
BANK ENCLOSURE IS TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY
STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE START OF
WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTLITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1 MAN-
LIFT AND 1 FORKLIFT AS REQUIRED BY SPECIFICATION
01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
K SEE VALVE SCHEDULE ON SHEET M701.
0' 4' 8' 16'
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
FOR FUTURE CONNECTION
TO EMERGENCY CHILLER
FOR FUTURE
CONNECTION TO
B32 WAREHOUSE
FOR FUTURE
CONNECTION
TO WEST
ADDITION
1 PHOTO OF EXISTING 10" CHS/R AT
TUNNEL CONNECTION TO BUILDING B1
(E) 10" CHS
(E) 10" CHR
(N) 10" CHS/R DROP INSIDE (E) TUNNEL
TO CONNECT TO (E) 10" CHS/R
(N)3-CHS-07 AND (N)3-CHR-07
LOCATED IN EXISTING CHW
PIPING IN TUNNEL BELOW
(N)3-CHS-07 AND (N)3-CHR-07
LOCATED IN EXISTING CHW
PIPING IN TUNNEL BELOW
NO REVISIONS DATE
1 Revision 2 11/20/18
HH
CANTEEN
B25
B24
AREA OF WORK
AREA OF WORK
P H
A S
E
S E
E
S H
E E
T M
S 1.
A D
D A
T E
R N
A T
E
PHASE 2 SEE
SHEET MS101.2
ADD ATERNATE
(F) 1-VHPR-02
(F) 1-VHPS-02
(F) 1-VCHS-03
(F) 1-VCHR-03
IC
H A R D J. R E I F
14718
G
IN
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
E R
N
EW
ME X I CO
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/2
7/
1:
:5
A M
MS101.5
MECHANICAL SITE PLAN - PHASE 1 ADD
ALTERNATE
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS
ARE COORDINATED WITH THE COR 30 DAYS IN ADVANCE
AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS
PRIOR TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE
INTERRUPTION DATES WITH DURATIONS, AND DETAILED
PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO
THE START OF WORK. THIS SUBMITTAL MUST BE
ACCEPTED BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY
BANK ENCLOSURE IS TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY
STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE START
OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1 MAN-
LIFT AND 1 FORKLIFT AS REQUIRED BY SPECIFICATION
01 00 00.
I ALL UTILITY PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
K SEE VALVE SCHEDULE ON SHEET M701.
1 FUTURE 8" CHS/R ROUTED INSIDE WALKWAY ENCLOSURE.
2 FUTURE 3/4" PC FROM BOTTOM OF EXISTING HPS RISER
TO CONNECT TO FUTURE 2" HPS. SEE DETAIL E1 AND
E3/M-501.
3 FUTURE 4" HPS AND FUTURE 2" PC TO FUTURE CLC
EXPANSION AND CANTEEN. ALOWANCES ARE TO BE MADE
FOR STEAM LINES TO PITCH DOWN 1/4"/5'-0" IN THE
DIRECTION OF FLOW. STEAM RISERS ARE TO BE AT
EVERY 100' OF HPS WITH TRAP DISCHARGE INTO PUMPED
CONDENSATE. SLOPE PUMPED CONDENSATE 1/8"/5'-0" IN
DIRECTION OF FLOW.
0' 5' 10' 20'
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
Scale: 1" = 10'-0"
MECHANICAL SITE PLAN - PHASE 1 ADD ALTERNATE
NO REVISIONS DATE
1 Revision 2 11/20/18
B22.A
B22.4
B22.3
B22.2
B22.1
B22.B B22.C
BOILER ROOM,
BLDG 2
BOILER BLDG
BOILER BLDG
TOILET
BOILER BLDG
BOILER BLDG
BOILER BLDG
EQUIPMENT
ROOM
CHILLERS, BLDG
CHILLER ROOM
CHILLER PLANT
BLDG 22A
B31.1
B31.E
B31.F
ELECTRICAL
ROOM
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
4:
A M
MD101
MECHANICAL FIRST FLOOR DEMOLITION
PLAN- BUILDING 22 - PHASE 2
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
1 EXISTING 2-1/2" HPS AND 1" PC TO BE REMOVED. PROVIDE 2-1/12" BLIND FLANGE
AND 1" CAP AT SHUTOFF VALVE.
2 PATCH ROOF OPENING PER SPECIFICATIONS.
3 EXISTING 3" CHS AND CHR TO BE REMOVED. PROVIDE 3" BLIND FLANGE AT
SHUTOFF VALVE.
4 EXISTING EMERGENCY OXYGEN SUPPLY CONNECTION TO BE REMOVED.
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"A1
MECHANICAL FIRST FLOOR DEMOLITION PLAN - PHASE 2 - BUILDING 22
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
PHASING INSTRUCTIONS:
AFTER THE NEW CHW/CHWR CONNECTION TO
B31 HAS BEEN COMMISSIONED, ACCEPTED, AND
IS OPERATIONAL THE EXISTING B31 PIPING AND
PIPE BRIDGE MAY BE REMOVED. THE
EQUIPMENT IS TO BE RETURNED TO THE
OWNER IN A LOCATION SELECTED BY THE
OWNER. ENSURE PIPING IS REMOVED AND
STORED IN A MANNER THAT ALLOWS IT BE
REUSED IN THE FUTURE.
CONTRACTOR TO CONTROL ACCESS, PROVIDE
SAFE ALTERNATE PEDESTRIAN ROUTE AND
BUILDNG ACCESS WITH TEMPORARY SIGNAGE,
PROTECT VEGETATION, IRRIGATION, AND
LIGHTING IN PLACE, AND MINIMIZE IMPACT TO
OPERATIONS DURING DEMO.
A CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION
DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE
ACCEPTED BY THE COR PRIOR TO THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT UTILITY BANK ENCLOSURE IS
TO BE PROVIDED AS DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES, AND TEST PORTS
WITH ACCESS PANELS. CENTER SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA UTILITY STANDARD AND AS
IDENTIFIED IN THE PAINTING SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING CONFIGURATION FOR
COR REVIEW PRIOR TO THE START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS REQUIRED BY THE
SPECIFICATIONS AND VA UTLITY STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 2 SCISSOR LIFTS AS
REQUIRED BY SPECIFICATION 010000.
I ALL UTILITY PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL INFORMATION.
1 PHOTO OF EXISTING CHS/R AND HPS/R AT
BUILDING 22A
NO REVISIONS DATE
Digitally signed by Richard J.
Reif Date: 2018.02.06 08:45:46-07'00'
ALL UTILITY PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL INFORMATION.I
B22.4
B22.3
B22.2
B22.1
B22.B B22.C
B-22
CHILLER
B-22A
CHILLER
B-2
BOILER PLANT
2 1/2"
1"
3"CHS
CHR
HPS
HPR
3" CHS
3" CHR
1" HPR
2 1/2" HPS
3" CHS
3" CHR
2 1/2" HPS
1" HPR
B31.3B31.2B31.1
B31.E
B31.F
3"
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
4:
A M
MD102
MECHANICAL ROOF DEMOLITION PLAN -
BUILDING 22 AND 31 PHASE 2
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
KEYNOTES
1 EXISTING 2-1/2" HPS, 1" PC PIPES AND SUPPORTS TO BE REMOVED. PATCH
ROOF PER SPECIFICATIONS. COORDINATE WITH SPECIFICATION SECTIONS
07 72 00 ROOF ACCESSORIES AND 07 76 00 FLASHING AND SHEET METAL.
2 EXISTING 3" CHS/R PIPES AND SUPPORTS TO BE REMOVED. PATCH ROOF PER
SPECIFICATIONS.
0' 4' 8' 16'SCALE: 1/8" = 1'-0"1
MECHANICAL CENTRAL PLANT ROOF DEMOLITION PLAN
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
Scale: 1/8" = 1'-0"
MECHANICAL PARTIAL DEMOLITION ROOF PLAN - PHASE 2 - BUILDING 31
0' 4' 8' 16'
NO REVISIONS DATE
Digitally signed by Richard J. Reif
08:45:59-07'00'
B22.4
B22.3
B22.2
B22.1
B22.B B22.C
(N) CH-4
(E) CH-3
(E) CH-2
(E)CH-1
8" CWR
10" CHR
2 1/2" HPS
1" HPR
3" CHS
3" CHR
1" HPR
2 1/2" HPS
2 1/2" HPS
1" HPR
(E) CWP-4 (E) CWP-3
(E) CWP-2
(E) CWP-1
(E)CHP-1
(E) CHP-2
(E) CHP-3
(E) CHP-4
(E) CHWP-3
(E) CHWP-2
(E) CHWP-1
(E) FC-1
(E) FC-2
(E) CHILLER 1
(E) CHILLER 2
(E) PCHP-1
(E) PCHP-2
BOILER ROOM,
BLDG 2
OFFICE
BOILER BLDG
CHILLER PLANT
BLDG 22A
8" HPS
3" PC
(N) 1-VHPS-05
(N) 1-VHPR-05
(N) 1-VHPS-04
(N) 1-VHPR-04
14" CHS
C H
R
10" CHS
EQUIPMENT
ROOM
CHILLERS, BLDG
ELECTRICAL
ROOM
CHILLER ROOM
14" CHR
(N)
VFD-CWP-1
(N)
VFD-CWP-2
(N)
VFD-CWP-3
(N)
VFD-CWP-4
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
3:
A M
M-101
MECHANICAL FIRST FLOOR PLAN - BUILDING
22 - PHASE 1
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
KEYNOTES
0' 4' 8' 16'
1 PROVIDE ISOLATION VALVE AND BLIND FLANGE ON EXISTING 2-1/2" HPS AND
VALVE AND CAP ON EXISTING 1" PC.
2 BRAIDED METAL PIPE FITTING
3 NEW CHILLER MOUNTED TO EXISTING CONCRETE PAD. SEE ANCHOR DETAIL
F1/M501.
4 CONNECT (N) 8" HPS AND (N) 3" HPC TO (E) 8" HPS AND (E) 3" HPC PIPE RISER.
5 FUTURE 8" HPS AND 3" PC.
6 REFRIGERANT RELIEF VENT UP THROUGH ROOF, ONE SIZE LARGER THAN
CONNECTION ON CHILLER. SEE DETAIL F6/M5-1.
7 OWNER FURNISHED, INSTALLED BY OTHERS ON EXISTING.
8 CONNECT (N) 8" CHS/R AND 8" CWS/R TO EXISTING VALVE AND CONNECT TO
CHILLER. SEE DETAIL F6/M-501 FOR VAVE AND FITTING INFORMATION.
9 BRAIDED METAL PIPE FITTING
Scale: 1/4" = 1'-0"
HVAC FIRST FLOOR PLAN
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 LIDAR SCAN OF EXISTING CHS/R AND
HPS/R INSIDE BUILDING 31 PENTHOUSE
2 LIDAR SCAN OF EXISTING CHS/R VALVE
AND CAP FOR CONNECTION TO CHILLER
INSIDE BUILDING 22A
NEW WORK WILL INCLUDE THE ADDITION OF A NEW 600
TON VARIABLE SPEED DRIVEN CENTRIFUGAL MAGNETIC
BEARING CHILLER (OWNER FURNISHED CONTRACTOR
INSTALLED), SYMBOL NO. CH-3, AND A NEW 300 TON
VARIABLE SPEED MAGNETIC BEARING DRIVEN CHILLER,
SYMBOL NO. CH-4, IN BUILDING 22A.
CHILLED WATER SUPPLY AND RETURN WILL BE EXTENDED
FROM THE EXISTING ISOLATION VALVES TO THE
EVAPORATOR OF CHILLER, CH-3. CONDENSER WATER
SUPPLY AND RETURN PIPING WILL BE EXTENDED FROM THE
EXISTING ISOLATION VALVES TO THE CONDENSER OF
CHILLER, CH-3. CHILLED WATER SUPPLY AND RETURN WILL
BE EXTENDED FROM THE EXISTING ISOLATION VALVES TO
THE EVAPORATOR OF CHILLER, CH-4. CONDENSER WATER
SUPPLY AND RETURN PIPING WILL BE EXTENDED FROM THE
EXISTING ISOLATION VALVES TO THE CONDENSER OF
CHILLER, CH-4.
MECHANICAL PROJECT SCOPE
NO REVISIONS DATE
Digitally signed by Richard J. Reif
08:43:22-07'00'
B22.4
B22.3
B22.2
B22.1
B22.B B22.C
C H
S
C H
R
14" CHR
14" CHR
A
B
C
D
E
B31.1
B31.A
B31.B
B31.C
B31.D
B31.E
B31.F
B31.G
B31.H
B31.I
B31.J
B31.K
B31.L
W
X
B22.4
7.9
14" CHR
14" CHR
B31.1
B31.E
B31.F 3"
3"
CHR
CHS
1"
2 1/2"
PC
HPS
1"
2"
PC
HPS
1"
2 1/2"
PC
HPS
31-P-AH1
3" CHS
3" CHR
1" HPR
2 1/2" HPS
3" CHS
3" CHR
2 1/2" HPS
1" HPR
2 1/2"
1"
3"
3"CHS
CHR HPS
HPR
B31.3B31.2B31.1
B31.E
B31.F
(N) 1-VCHS-04
(N) 1-VCHR-04
(N) 1-VCHR-06
(N) 1-VCHS-06
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
3:
A M
M-102
MECHANICAL ROOF PLAN PLAN - BUILDING 22
AND PARTILAL BUILDING 31 - PHASE 1
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
KEYNOTES
1 CONNECT (N) 14" CHS/R TO (E) 14" VALVES
2 (N) 3/4" HPS TO CONNECT TO (E) 2-1/2" HPS RISER.
3 CONNECT (N) 3" CHS/R TO (E) 3" CHS/R INSIDE MECHANICAL
PENTHOUSE.
4 CONNECT (N) 1" HPR TO (E) 1" PC INSIDE MECHANICAL
PENTHOUSE.
5 BRAIDED METAL FLEXIBLE PIPE CONNECTOR.
6 1" RELIEF VENT BELOW COOLING TOWER PLATFORM.
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"1
MECHANICAL PARTIAL ROOF PLAN - BUILDING 22 - PHASE 1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 LIDAR SCAN OF EXISTING CHS/R VALVE
AND CAP ON ROOF OF BUILDING 22A
Scale: 1/8" = 1'-0"
MECHANICAL PARTIAL ROOF PLAN - BUILDING 31 - PHASE 1
2 LIDAR SCAN OF EXISTING CHS/R AND
HPS/R INSIDE BUILDING 31 PENTHOUSE
0' 4' 8' 16'
NO REVISIONS DATE
Digitally signed by Richard J. Reif Date: 2018.02.06 08:43:34-07'00'
BOPC.A
BOPC.3 BOPC.4 BOPC.5 BOPC.6BOPC.5.A
BOPC.A.1
BOPC.B
BOPC.B.1
BOPC.C
BOPC.D
BOPC.E
EX-CONDENSING
UNIT
O P
C -P
-A H
O P
C -P
-A H
OPC-P-CC2
OPC-P-PCHWP1
OPC-P-PCHWP2
OPC-P-AS1
4" CHS
4" CHR
4" CHS
4" CHR
4" CHR
2 1/2" CHR 2 1/2" CHS
4" CHR
4" CHS
4" CHR
2 1/2" CHS
2 1/2" CHR
4" CHS
4" CHR
1" CHS
1" CHR
DPT
PENTHOUSE
EQUIPMENT
ROOM
1-G4
1-G7
1-G1
1-K4
1-K5
3" CHR
3" CHR
3" CHS
3" CHS
4" CHR
1" CHS
3/4" CHR
3/4" CHS
1" CHR
1 1/4" CHS
3/4" CHS
3/4" CHR
1" CHR
1" CHS
1" CHS
3/4" CHS
3/4" CHS
3/4" CHR
1" CHS
1" CHR
1-G3
DPT
BOIMED
EQUIPMENT
REPAIR
6B13B
AIR HANDLER
STAIR NO. 2
6B04
SLEEPING ROOM
6B02
Room
6B01
UTILIZATION
MANAGMENT
6B01B
CORRIDOR
6B-2
SERVICE
ELEVATOR
S-3
SERVICAE
ELEVATOR
S-4
BIOMED
EQUIPMENT
REPAIR
6B13
BIOMED
EQUIPMENT
REPAIR
6B13B.2
DUCT SPACE
Room
6B12
DUMBWAITER
STORAGE
6B11
CORRIDOR
6B-1
ELEVATOR
LOBBY
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
2/ 6/
:0
3:
A M
M-103
MECHANICAL PARTIAL PLANS OF BUILDING 1
AND OPC - PHASE 1
R. REIF R. SCHAMP02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E CLINTON AVE, FRESNO, CA 93703
Scale: 1/8" = 1'-0"
MECHANICAL PENTHOUSE PIPING PLAN - BUILDING OPC - PHASE 1
KEYNOTES
1. EXISING DIFFERENTIAL PRESSURE TRANSMITTER TO BE REMOVED AND
REPLACED WITH NEW DIFFERENTIAL PRESSURE TRANSMITTER. CONNECT TO
METASYS/BMS. SEE DETAIL D6/M501.
0' 4' 8' 16'
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
0' 4' 8' 16'
Scale: 1/8" = 1'-0"
MECHANICAL SIXTH FLOOR PARTIAL PIPING PLAN - BUILDING 1 - PHASE 1
NO REVISIONS DATE
Digitally signed by Richard J. Reif
08:43:49-07'00'
D P
T
B32.11.5 B32.12.5 B32.13.7 B32.14.9 B32.15.9
B32.X.7
B32.Z.3
B32.A.5
B32.B.5
B32.C.3
UNLOADING
PUBLIC
OFFICE
LOUNGE
TOILET
Room
DRUG ROOM
Room
MAIL & COPY
MAILROOM
WAREHOUSE
DPT
24-P-AH2
24-P-AH3
24-P-AH1
24-R-AH1
1 1/2" CHR
1 1/2" CHR
2" CHR
2" CHR
1 1/4" HWR
1 1/4" HWS
3" CHR
3" CHR
4" CHR
4" CHR
MECHANICAL
PENTHOUSE
P4-1
B24.DB24.CB24.C.1B24.B.1B24.B
B24.2
B24.3
B24.4
DPT
31-P-AH1 31-P-AH2
2 1/2" CHR
2 1/2" CHS
3" CHR
3" CHS
3" CHS
3" CHR
1" HPR
B31.10B31.9B31.8B31.7B31.6B31.4B31.3B31.2B31.1
B31.E
B31.F
2 1/2" HPS
(N) 1-VCHR-04
(N) 1-VCHS-04
PENTHOUSE
MECHANICAL
PLAN
IC
H A R D J. R E I F
14718
G I N
E E
R
ON
L
E
A
N
S
ROFES
ED
P
I
I R
E G
S T
ER
N
EW
ME X I C
O
R o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.