36C26118R0487-096.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 01 - G000thruGS101.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
SD
SD
SD
SD
H
H H H H H
HH
HH
H H H H H H
H
H
HHHHH
H
H
H
H
H
G
B1
OPC
B32 B3
B22A
B31
ADD ALT.
PHASE 1PHASE 2PHASE 3
B24
E. SHIELDS AVE
E. CLINTON AVE
N B
L A
C K
S T
O N
E A
V E
E. SHIELDS AVE
E. MCKINLEY AVE
E. OLIVE AVE
N F
R E
S N
O S
T
N F
IR
S
T S
T
N C
E D
A R
A V
E
N M
A P
L E
A V
E
VACCHCS
PROJECT REVIEW
DATE: APPROVED: DIRECTOR
DATE: APPROVED: CHIEF OF STAFF
DATE: APPROVED: CHIEF, SAFETY SERVICE
DATE: APPROVED: CHIEF ENGINEER
DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES
DATE: APPROVED: CONTRACTING OFFICER
DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
2/ 8/
2:
:5
A
M
G-000
COVER SHEET
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
(VACCHCS)
CLIENT:
Department of Veterans Affairs, Fresno
Denise R. Groves VISN 21 Contract Specialist / Contracting Officer
Office: 559-228-6932 Denise.Groves@va.gov
COR:
Calvin E. Parret, PE COR
VISN 21 Contracting Officer's Representative Office: 559-225-6100x5213
Calvin.Parret@va.gov
VISN 21 TASK ORDER 570-16-302
DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS SUBMISSION
FEBRUARY 7, 2018
ISSUED FOR CONSTRUCTION
PROJECT SCOPE
ADD ALTERNATES / DEDUCTIVE ALTERNATES
ADD ALTERNATE 1: PROVIDE ADDITIONAL CANOPY ROUTED FROM B22/B31 SIDEWALK SOUTH ALONG WEST SIDE OF B31, THEN ALONG SOUTH SIDE OF CAMPUS AND SOUTH OF THE B1 & B24 BREEZEWAY, SEE KEY PLAN THIS SHEET FOR ROUTING. THE BASE BID DOES NOT INCLUDE THIS RUN AS A
PERMANENT STRUCTURE, THE BASE BID IS A TEMPORARY COVERED PEDESTRIAN WALKWAY FOR USE
DURING CONSTRUCTION AND TO BE REMOVED AFTERWARDS.
ADD ALTERNATE 2: WIDEN SIDEWALK TO 10'-0" AS SHOWN IN DRAWINGS. SEE SHEETS AS101.1
THROUGH AS111.2.
ADD ALTERNATE 3: INSTALL SELF SUPPORTED TRANSLUCENT SKYLIGHT SYSTEM IN LIEU OF
SUPPORTED TRANSLUCENT SKYLIGHT SYSTEM.
DEDUCTIVE ALTERNATE 1: CIP COLUMNS BECOME FRAMED COLUMNS AS SHOWN ON A-502.
NORTH
VICINITY MAP
LOCATION MAP
NORTH
THE CHILLER INFRASTRUCTURE AT THE VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM REQUIRES UPDATING, UPSIZING, AND CORRECTIONS. THIS PROJECT IS TO INCREASE THE SIZE OF THE CHILLED WATER PIPING SYSTEM FROM THE CHILLED WATER PLANT TO BUILDING 1 TO INCREASE THE DISTRIBUTION CAPACITY FOR THE MAIN HOSPITAL. IT ALSO INCLUDES THE INSTALLATION OF ONE ADDITIONAL CHILLER IN THE CHILLER PLANT TO INCREASE THE CHILLED WATER CAPACITY FOR THE CAMPUS.
A. THE AE SHALL DESIGN AN OVERHEAD PEDESTRIAN CANOPY TO REPLACE THE EXISTING PEDESTRIAN CANOPY LOCATED AS
FOLLOWS:
i. NEAR THE HARVARD AND MARIPOSA CROSS STREET TO THE EAST ENTRANCE OF BUILDING 1;
ii. FROM THE WEST MAIN ENTRANCE OF BUILDING 31 CONNECTING TO (i) ABOVE;
iii. FROM THE WEST ENTRANCE OF BUILDING 31 DESCRIBED IN (ii) ABOVE EXTEND TO SERVE THE MAIN ENTRANCE OF A NEW
COMMUNITY LIVING CENTER (CLC) BUILDING TO BE LOCATED SOUTH OF BUILDING 31.
iv. THE AE SHALL EXPLORE THE USE OF OTHER WALK SURFACES IF APPROPRIATE AND SHALL CONSIDER WALK WAY
BORDERS, UNIQUE SURFACE DESIGNS OR PATTERN.
B. THE AE SHALL DESIGN THE OVERHEAD PEDESTRIAN CANOPY TO PROVIDE AN UNSEEN RACEWAY CARRYING THE FOLLOWING:
i. MAIN CHILLED WATER LINES FROM THE POINT-OF-CONNECTION (POC) WITHIN BUILDING 22A TO THE POC WITHIN BUILDING 1
SUBBASEMENT.
ii. MAIN CHILLED WATER LINES FROM POC WITHIN BUILDING 22A AND THE POC WITHIN BUILDING 31 PENTHOUSE.
iii. STEAM LINES FROM THE POC WITHIN BUILDING 22 AND THE POC WITHIN BUILDING 31 PENTHOUSE.
iv. MEDICAL OXYGEN LINES FROM THE POC WITHIN BUILDING 22 AND THE POC WITHIN BUILDING 31.
v. CONTROL/ALARM WIRING FROM THE POC WITHIN BUILDING 22 TO THE POC WITHIN BUILDING 31.
vi. THE UNSEEN RACEWAY SHALL ACCOMMODATE ADDITIONAL UTILITIES AND SERVICES FOR FUTURE EXPANSION.
C. THE AE SHALL DESIGN THE OVERHEAD PEDESTRIAN CANOPY TO PROVIDE EASE OF ACCESS AND MAINTENANCE OF THE
UNSEEN RACEWAY AND UTILITY LINES.
D. THE AE SHALL DESIGN ALTERNATE ROUTES OF TRAVEL TO ENSURE TEMPORARY ACCESS WITHOUT DISRUPTION OF CURRENT
VITAL SERVICES FOR THE LOCATIONS AS DESCRIBED IN (A) ABOVE.
E. THE AE SHALL DESIGN FOR THE REMOVAL OF THE EXISTING UTILITY PIPE STANDS CONSTRUCTED FOR PROJECT 570-13-300, “NEW BUILDING 22A AND CHILLER INFRASTRUCTURE,” INCLUDING THE SUPPORTED STEAM LINES, CHILLED WATER LINES, AND
THE MEDICAL OXYGEN LINE.
F. THE AE SHALL DESIGN FOR THE RELOCATION OF UTILITIES DESCRIBED IN (E) ABOVE INTO THE RACEWAY OF THE OVERHEAD
PEDESTRIAN CANOPY.
G. THE AE SHALL DESIGN THE CONNECTION OF THE MEDICAL OXYGEN AND VACUUM PUMP CONTROL LINES AND ALARM CONTROL
PANELS LOCATED IN BUILDING 31 AND BUILDING 2.
H. THE AE SHALL DESIGN THE INSTALLATION OF ONE (1) ADDITIONAL CHILLER UNIT TO BE IDENTIFIED AS CHILLER #4 WITHIN THE
EXISTING INFRASTRUCTURE OF BUILDING 22A (PROJECT #570-13-300 NEW BUILDING 22A AND CHILLER INFRASTRUCTURE) AND CONNECT TO THE EXISTING CHILLER INFRASTRUCTURE. THE WORK SHALL INCLUDE THE INSTALLATION OF AUTOMATED CONTROLS FOR CHILLED WATER SYSTEM COMPONENTS WHICH SHALL BE TIED INTO THE SITE-WIDE METASYS (JOHNSON
CONTROLS, 2013) COMPUTER BASED OPERATING SYSTEM CENTRALIZED IN THE BOILER PLANT.
PROJECT PROGRAMMING NOTES:
PLEASE REVIEW THESE DOCUMENTS FOR THE FOLLOWING:
1. CONNECTION POINTS AS FOLLOWS:
B22A SOUTH ENTRY AND EAST SIDES
B31 CLC WEST ENTRY
B3 ENGINEERING BUILDING
B1 EAST ENTRY
B1 & B24 BREEZEWAY NORTHWEST AND SOUTH WEST ENTRIES
FUTURE TECHNOLOGY BUILDING ENTRY
FUTURE EXTENSION POINTS OF CONNECTION
2. MATERIAL SELECTION
REYNOBOND METAL PANELS OR APPROVED EQUAL
STACKED STONE SELECTION CLADDING SOLDIER PROFILE COLUMNS
KALWALL / CPI TRANSLUCENT CANOPY ROOFS
3. ACCESS DOOR LOCATIONS
4. CROSSOVER AND CEILING LOCATIONS AND NODES
5. PHASING
6. LIGHT FIXTURES
CONCEALED LED ROPE LIGHTS AROUND COLUMN BASES
VERTICAL 6'-0" LED STRIPS ON COLUMN INTERIOR FACES
2" CAN LIGHTS STAGGERED SIDE-TO-SIDE AND EVENLY SPACED ALONG CANOPY SOFFIT
8" CAN LIGHT GRID IN DROP CEILING AT EXPANDED CANOPY AREAS, E.G. "BBQ AREA"
PASSIVE LIGHTING SOLAR TUBES AT BBQ AREA
SEAT LIGHTS ALONG BASE OF NEW 4'-0" SEAT WALLS
7. SHOPS REVIEW OF ACCESS AREA AROUND PIPE VALVES
8. CAPACITY REVIEW OF LOW VOLTAGE ELECTRICAL AND COMMUNICATIONS INNERDUCTS
9. UTILITY CONFLICTS
10. SIDEWALK WIDTH TO 10'-0" IN ADD ALTERNATE NO. 2
11. FUTURE UTILITIES
UTILITY TYPE, CAPACITY AND ROUTING TO BE BASED ON FUTURE APPROVED MASTER PLAN
1" : 1400'
NOT TO SCALE
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
_____________________________SIGNATURE ________________DATE
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018
02/07/2018
AB ANCHOR BOLT, AUGER BORING
ABS AIR BREAK SWITCH
AC AIR CONDITIONING, ASBESTOS CEMENT,
ACRES
A/C ASPHALTIC CONCRETE
ACB AIR CIRCUIT BREAKER
ACSR ALUMINUM CONDUCTOR STEEL REINFORCED
ACST ACOUSTIC
AD AREA DRAIN, ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
AL ALUMINUM
AM ACOUSTIC MATERIAL
AMP,A AMPERE
AP ACCESS PANEL APPROX APPROXIMATE
ARCH ARCHITECTURAL
ARR ARRESTOR
ASPH ASPHALT
SYMBOLS AND ABBREVIATIONS
B BASELINE
BO BOARD
BEJ BRICK EXPANSION JOINT
BLDG BUILDING
BLK BLOCK
BM BEAM
B BOTTOM
BRG BEARING
BR BOTTOM REGISTER
BSMT BASEMENT
C CELSIUS
CAP CAPACITY
CB CIRCUIT BREAKER
CD CEILING DIFFUSER
CEM CEMENT
CG CORNER GUARD
C&G CURB AND GUTTER
CH CHILLER
CI CAST IRON, COURTYARD INLET
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CJ CONTROL JOINT
CKT CIRCUIT
CLG CEILING
C CENTERLINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CMU CONCRETE MASONRY UNITS
CND,C CONDUIT
CNDS CONDENSATE
CO CLEANOUT
CODP CLEANOUT W/ DECK PLUG
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
COND CONDUCTOR
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONV CONVERTER
COP,CU COPPER
CP NON-REINFORCED CONCRETE PIPE
CR CHAIR, CRASH RAIL
CRS STAINLESS STEEL
CS CONCRETE SEALER/SURFACE
CSK COUNTERSUNK
CT CERAMIC TILE, CURRENT TRANSFORMER, COOLING TOWER
CTR CENTER, COOLING TOWER RETURN
CTS COOLING TOWER SUPPLY
CW COLD WATER
CWB CAPILLARY WATER BARRIER
CONTR CONTRACTION
CPT CARPET
D DEPTH, DEEP, DEGREE OF CURVATURE
DB DRY BULB, DECIBEL, DIRECT BURIAL
DD DIVERSION DIKE
DET DETAIL
DH DRILL HOLE
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DISTRIBUTION PANEL
DS DOWNSPOUT, STORM DRAINAGE STRUCTURE
DW DOMESTIC WATER
DWG DRAWING
DWD DRINKING WATER DISPENSER
E EAST
EA EACH
EAN EXCEPT AS NOTED
EAT ENTERING AIR TEMPERATURE
EC EMPTY CONDUIT
EF EACH FACE, EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
EMER EMERGENCY
E/P EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
EVAP EVAPORATIVE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
(E), EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
(F) FUTURE
F FIRE, FUSE, FILTER
FA FIRE ALARM FABX FIRE ALARM BOX
FC FOOT-CANDLES
FD FLOOR DRAIN, FIRE DAMPER
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FL FLOOR, FLASHING, FLOW LINE
FLUOR FLUORESCENT
4 WAY FOUR WAY
FPH FROST PROOF HYDRANT
FR FRAME
FS FULL SIZE
FTG FOOTING
FJ FELT JOINT
FW FIRE WATER
FXTR FIXTURE
G GROUND, GAS LINE,GRAM
GA GAGE
GAL GALVANIZED
GC GLAZED COATING
GFI GROUND FAULT INTERRUPT
GFMU GROUND FACE MASONRY UNIT
GL GLASS
GR GRADE
GRD GROUND
GSU GLAZED STRUCTURAL UNIT
GW GROUND WATER
GWB GYPSUM WALL BOARD GYP GYPSUM
HGT,H HEIGHT, HUMIDIFIER
HB HOSE BIBB
HC HANDICAPPED
HD HARD DRAWN
HDW HARDWARE
HGSW HORN GAP SWITCH
HID HIGH INTENSITY DISCHARGE
HORIZ HORIZONTAL
HP HIGH POINT
HPS HIGH PRESSURE SODIUM
HR HOUR
HS HIGH STRENGTH
HW HOT WATER, HEADWALL
HWL HIGH WATER LEVEL
HVY HEAVY
HZ HERTZ
ID INSIDE DIAMETER, INSIDE DIMENSION
IE INVERT ELEVATION
IMC INTERMEDIATE METAL CONDUIT
INT INTERIOR
INSUL INSULATION, INSULATED
INV INVERT
INTX INTERSECTION
IP INLET PROTECTION
IRBF INDUSTRIAL RESIN BASE FLOORING
JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
JST JOIST
K KILO
KIAC THOUSAND AMP INTERRUPT CAPACITY
KCP KEENE'S CEMENT PLASTER
KG KILOGRAM
KN KILONEWTON
KO KNOCK OUT
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
L/S LITERS PER SECOND
L LOUVER, LENGTH, LENGTH OF CURVE
LA LIGHTNING ARRESTOR
LC LEAD COVERED
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LAV LAVATORY VERTICAL
LVC LENGTH OF VERTICAL CURVE
M/S METERS PER SECOND
M METER, MEGA
MACH MACHINE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
ECH MECHANICAL
MET METAL
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MM,mm MILLIMETER
MO MOTOR OPERATED, MASONRY OPENING, MIDDLE ORDINATE
MP MEDIUM PRESSURE
MTD MOUNTED
MTG MOUNTING
MMP MEMBRANE WATERPROOFING
MULL MULLION
(N) NEW
N NORTH
NA NOT APPLICABLE
NC NON CORROSIVE
NE NORTHEAST
NDC NOSE DOWN CURB
NEC NATIONAL ELECTRIC CODE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OUTSIDE AIR
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OD OUTSIDE DIAMETER OPNG OPENING
OPP OPPOSITE
OSD OPEN SITE DRAIN
OVHD,OH OVERHEAD
Pa PASCALES
P PIPE, POLE
PB PULL BOX
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PJF PREFORMED JOINT FILLER
PL PLATE
PLAS PLASTER
PLNJ PAPER AND LEAD NEOPRENE JACKET
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PRELIM PRELIMINARY
PRESS PRESSURE
PRIM PRIMARY
PRV PRESSURE RELIEF VALVE
PS PULL SWITCH
PT POINT, POINT OF TANGENT
PTN PARTITION
PVC POINT OF VERTICAL CURVE, POLY VINYL CHLORIDE .
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT PVMT PAVEMENT
QT QUARRY TILE
(R) RELOCATED
R RADIUS, RISER, RUBBER SHEATH
RA RETURN AIR
RAD RADIUS
RB RESILIENT VINYL BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN, ROAD
RECP RECEPTACLE
RED REDUCING
REINF REINFORCEMENT
REG REGULATOR, REGISTER
REQD REQUIRED
REV REVISION
RF ROOF, RETURN FAN
RHC REHEAT COIL
RI RUBBER INSULATED
RGS RIGID GALVANIZED STEEL
RL RAIN LEADER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RVT RESILIENT VINYL TILE
S SECOND, SOUTH, SANITARY, SEWER, STRUCTURE
SAN SANITARY SEWER
SATC SUSPENDED ACOUSTICAL TILE CEILING
SCH SCHEDULE
SD SPLITTER DAMPER, STORM DRAIN
SE SOUTHEAST
SECT SECTION SERV SERVICE SF SILT FENCE
SG SUPPLY GRILLE
SH SHEET
SIM SIMILAR
1 PH SINGLE PHASE
SKCP SUSPENDED KEENE'S CEMENT PLASTER
SL SLOPE
SMH SANITARY MODULE
SP STATIC PRESSURE, SINGLE POLE
SPC SUSPENDED PLASTER CEILING
SPDT SINGLE POLE, DOUBLE THROW
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SQ SQUARE
SR SUPPLY REGISTER
SS SANITARY SEWER
ST STEAM, SINGLE THROW, STREET
STA STATION STD STANDARD
STL STEEL SUP SUPPORT
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH, SIDEWALK
SWBD SWITCHBOARD SWGR SWITCHGEAR
T TILE,TOP,TANGENT
T&B TOP AND BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
3/C THREE CONDUCTOR
3/P THREE POLE
3 WAY THREE WAY
TH TOTAL HEAD (PUMPS)
THRSLD THRESHOLD
TO TOP OF
TP TEST PIT
TR TOP REGISTER
TRANS TRANSITION
TS TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UCR UNDER COUNTER REFRIGERATOR
UGE UNDERGROUND ELECTRIC
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT,VOLT,VALVE
VA VOLT AMPRE
VAC VACUUM
VCT VINYL COMPOSITION TILE
V ASB VINYL ASBESTOS
VC VARNISH CAMBRIC, VITRIFIED CLAY
VCP VITRIFIED CLAY PIPE
VENT VENTILATING
VERT VERTICAL
VEST VESTIBULE
VPI VERTICAL POINT OF INTERSECTION
VPOC VERTICAL POINT OF CURVE
VPOT VERTICAL POINT OF TANGENT
VS VENT STACK
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WIDTH,WASTE,WATER,WATT,WEST
W WIRE, WATER LINE STRUCTURE
WA WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION
WOM WALK OFF MATT
WL WATER LEVEL WP WATERPROOF, WEATHERPROOF
WS WASTE STACK, WATER SURFACE, WATERSTOP
WT WEIGHT
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
X-STR UNIT HEATER
2:1 SL 2 HORIZONTAL TO 1 VERTICAL SLOPE
1 ON 2 1 VERTICAL ON 2 HORIZONTAL SLOPE
DEFLECTION ANGLE
Ø DIAMETER, PHASE
ARCHITECTURAL SYMBOLS
COLUMN GRID LINE
(E)
(E) TO REMAIN
(E) TO BE REMOVED
(E) TO REMAIN
(N) CONSTRUCTION
ROOM TAG
ROOM NAME
ROOM NUMBER
DOOR NUMBER
SYMBOL AND
MINIMUM
CLEARANCES
WALL LEGEND
AREA OR VOLUME
DETAIL - SECTION
POSITION ON SHEET
SHEET NUMBER
DETAIL - PLAN/ RCP
POSITION ON SHEET
SHEET NUMBER
BUILDING SECTION
POSITION ON SHEET
SHEET NUMBER
WALL SECTION
POSITION ON SHEET
SHEET NUMBER
EXTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
INTERIOR ELEVATION
POSITION ON SHEET
SHEET NUMBER
WALL TYPE TAG
FRAME TYPE -
EXTERIOR & LOUVER
CURTAIN PANEL TYPE
DRAWING NUMBER
DRAWING SCALE
DRAWING NUMBER
DRAWING SCALE
SHEET NUMBER
REFERENCING SHEET
NUMBER
VIEW TITLE
VIEW TITLE WITH REFERENCE
KEYNOTE
DRAWING REVISION
LEVEL DATUM
LEVEL NAME
LEVEL ELEVATION
NORTH ARROW
FRAME TYPE -
INTERIOR
GRAPHIC SCALE
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
18" MIN.
12" MIN. 4" MIN.
1A
A1
XX
XX
1T
X
Name Elevation
SIM
X-XXX
X
SIM
X-XXX
X
XXXX
X
X X
X
A-1 1/8" = 1'-0"
View Name
1/8" = 1'-0"
View NameA-1 A101R101
ROOM
NAME
150 SF
6'-0"
R 3'-11"
100°
DIMENSION TO FACE OF
FINISH, FACE OF
CONCRETE, COLUMN
CENTERLINE, OR AS NOTED.
CENTERLINE
COLUMN GRID LINE
(N)
MATCHLINE
FOR CONTINUATION SEE: X/X-XXX
MATCHLINE
FOR CONTINUATION SEE: X/X-XXX
VIEW REFERENCE FOR
ADDITIONAL INFORMATION
MATCHLINE AND VIEW
REFERENCE
SIM
X
X-XXX
SIM
X
X-XXX
SIM
X
X-XXX
SIM
X
X-XXX
System Name Mark
FIXTURE LABEL
SYSTEM TYPE
PIPING ACCESSORY
SEE MECHANICAL /
PLUMBING DRAWINGS
IMAGE REFERENCE
POSITION ON SHEET
SHEET NUMBER
VIEWING ANGLE / DIRECTION
BUILDING JOINT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:1
P
M
G-001
GENERAL DRAWING SHEET INDEX,
ABBREVIATIONS AND SYMBOL LEGEND
M. PERKINS N.
BLANCHARD
02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
SHEET
DISCIPLINE SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED
IN 95% CD
INCLUDED
IN 100% CD
ARCHITECTURE A-505 ARCHITECTURAL DETAILS NO NO NO YES
ARCHITECTURE A-551 ARCHITECTURAL DETAILS - FRAMING AND CEILINGS NO YES YES YES
ARCHITECTURE A-600 ARCHITECTURAL SCHEDULES NO NO YES YES
ARCHITECTURE A-901 ARCHITECTURAL GRAPHICS- COMPOSITE ISOMETRIC NO YES YES YES
ARCHITECTURE A-902 ARCHITECTURAL GRAPHICS - NEW CANOPY 3D VIEWS NO YES YES YES
ARCHITECTURE A-903 ARCHITECTURAL GRAPHICS - NEW CANOPY 3D VIEWS NO YES YES YES
ARCHITECTURE A-904 FINISH MATERIAL PALLET NO YES YES YES
ARCHITECTURE A-905 FINISH MATERIAL PALLET NO YES YES YES
PLUMBING
PLUMBING P-001 PLUMBING LEGEND NO YES YES
PLUMBING PS101 PLUMBING SITE PLAN NO YES YES
PLUMBING PS101.1 PLUMBING SITE PLAN - PHASE 1 NO YES YES
PLUMBING PS101.2 PLUMBING SITE PLAN - PHASE 2 NO YES YES
PLUMBING PS101.3 PLUMBING SITE PLAN - PHASE 3 NO YES YES
PLUMBING PS101.5 PLUMBING SITE PLAN - PHASE 1 ADD ALTERNATE NO YES YES
PLUMBING P-101 PLUMBING PARTIAL PLANS - BUILDINGS 1 AND 22 NO YES YES
PLUMBING P-102 PLUMBING FIRST FLOOR PLAN - BUILDING 31 NO YES YES
PLUMBING P-501 PLUMBING DETAILS NO YES YES
PLUMBING P-502 PLUMBING DETAILS NO NO YES
MECHANICAL
MECHANICAL M-001 MECHANICAL LEGEND NO YES YES YES
MECHANICAL MS101 MECHANICAL SITE PLAN NO YES YES YES
MECHANICAL MS101.1 MECHANICAL SITE PLAN - PHASE 1 NO YES YES YES
MECHANICAL MS101.2 MECHANICAL SITE PLAN - PHASE 2 NO YES YES YES
MECHANICAL MS101.3 MECHANICAL SITE PLAN - PHASE 3 NO YES YES YES
MECHANICAL MS101.5 MECHANICAL SITE PLAN - PHASE 1 ADD ALTERNATE NO YES YES YES
MECHANICAL MD101 MECHANICAL FIRST FLOOR DEMOLITION PLAN- BUILDING 22 - PHASE 2 NO YES YES YES
MECHANICAL MD102 MECHANICAL ROOF DEMOLITION PLAN - BUILDING 22 AND 31 PHASE 2 NO YES YES YES
MECHANICAL M-101 MECHANICAL FIRST FLOOR PLAN - BUILDING 22 - PHASE 1 NO YES YES YES
MECHANICAL M-102 MECHANICAL ROOF PLAN PLAN - BUILDING 22 AND PARTILAL BUILDING 31 - PHASE 1 NO YES YES YES
MECHANICAL M-103 MECHANICAL PARTIAL PLANS OF BUILDING 1 AND OPC - PHASE 1 NO YES YES YES
MECHANICAL M-104 MECHANICAL PARTIAL PLANS OF BUILDINGS 24, 31 AND 32 - PHASE 1 NO YES YES YES
MECHANICAL M-501 MECHANICAL DETAILS NO YES YES YES
MECHANICAL M-601 MECHANICAL FLOW DIAGRAM NO NO YES YES
MECHANICAL M-602 MECHANICAL SITE CHW FLOW DIAGRAM NO NO NO YES
MECHANICAL M-701 MECHANICAL SCHEDULES NO YES YES YES
MECHANICAL M-801 MECHANICAL INSTRUMENTATION LEGEND NO YES YES YES
MECHANICAL M-802 MECHANICAL CONTROLS NO YES YES YES
MECHANICAL M-803 MECHANICAL CONTROLS NO NO NO YES
ELECTRICAL
ELECTRICAL E-001 ELECTRICAL LEGEND NO YES YES YES
ELECTRICAL ES101.1 ELECTRICAL PATHWAY ACCENT AND CANOPY LIGHTING SITE PLANS - PHASE 1 NO YES YES YES
ELECTRICAL ES101.2 ELECTRICAL PATHWAY ACCENT AND CANOPY LIGHTING SITE PLANS - PHASE 2 NO YES YES YES
ELECTRICAL ES101.3 ELECTRICAL PATHWAY ACCENT AND CANOPY LIGHTING SITE PLANS - PHASE 3 NO YES YES YES
ELECTRICAL ES101.5A ELECTRICAL PATHWAY ACCENT AND RECEPTACLE SITE PLAN - ADD ALTERNATE NO YES YES YES
ELECTRICAL ES101.5B ELECTRICAL CANOPY LIGHTING SITE PLAN - ADD ALTERNATE NO YES YES YES
ELECTRICAL EP101 CENTRAL PLANT ELECTRICAL ROOM FLOOR PLAN NO YES YES YES
ELECTRICAL E-601 ELECTRICAL ONE-LINE DIAGRAM-NEW NO YES YES YES
ELECTRICAL E-602 GROUNDING DIAGRAM NO YES YES YES
ELECTRICAL E-701 ELECTRICAL SCHEDULES NO YES YES YES
Grand total: 134
SHEET
DISCIPLINE SHEET NAME
INCLUDED IN
35% SD
INCLUDED IN
65% DD
INCLUDED
IN 95% CD
INCLUDED
IN 100% CD
GENERAL
GENERAL G-000 COVER SHEET YES YES YES YES
GENERAL G-001 GENERAL DRAWING SHEET INDEX, ABBREVIATIONS AND SYMBOL LEGEND YES YES YES YES
GENERAL G-010 GENERAL PROJECT NOTES YES YES YES YES
GENERAL GS100 GENERAL SITE PLAN - COMPOSITE BASE BID YES YES YES YES
GENERAL GS101 LIFE SAFETY PLAN YES YES YES YES
CIVIL
CIVIL CU100.1 CIVIL UTILITY PLAN - PHASE 1 BASE BID NO NO YES YES
CIVIL CU100.2 CIVIL UTILITY PLAN - PHASE 2 BASE BID NO NO YES YES
CIVIL CU100.3 CIVIL UTILITY PLAN - PHASE 3 BASE BID NO NO YES YES
CIVIL CU100.4 CIVIL UTILITY PLAN - TEMP. CANOPY BASE BID NO NO YES YES
CIVIL CU100.5 CIVIL UTILITY PLAN - ADD ALT NO. 1 CANOPY BASE BID NO YES YES YES
CIVIL CU101.1 CIVIL UTILITY PLAN - PHASE 1 ADD ALT. NO. 2 YES YES YES YES
CIVIL CU101.2 CIVIL UTILITY PLAN - PHASE 2 ADD ALT. NO. 2 NO YES YES YES
CIVIL CU101.3 CIVIL UTILITY PLAN - PHASE 3 ADD ALT. NO. 2 NO YES YES YES
CIVIL C-501 CIVIL DETAILS - SHEET 1 NO YES YES YES
CIVIL C-502 CIVIL DETAILS - SHEET 2 NO NO YES YES
STRUCTURAL
STRUCTURAL S-001 STRUCTURAL GENERAL NOTES NO YES YES YES
STRUCTURAL S-002 STRUCTURAL INSPECTIONS AND ABBREVIATIONS NO YES YES YES
STRUCTURAL S-101.1 STRUCTURAL FOUNDATION PLAN PHASE 1 NO YES YES YES
STRUCTURAL S-101.2 STRUCTURAL FOUNDATION PLAN PHASE 2 NO YES YES YES
STRUCTURAL S-101.3 STRUCTURAL FOUNDATION PLAN PHASE 3 NO YES YES YES
STRUCTURAL S-101.5 STRUCTURAL FOUNDATION PLAN ADD ALT NO.1 NO YES YES YES
STRUCTURAL S-101.6 STRUCTURAL FOUNDATION PLAN - B1 & B24 BREEZEWAY NO YES YES YES
STRUCTURAL S-102.1 STRUCTURAL CANOPY ROOF FRAMING PLAN PHASE 1 NO YES YES YES
STRUCTURAL S-102.2 STRUCTURAL CANOPY ROOF FRAMING PLAN PHASE 2 NO YES YES YES
STRUCTURAL S-102.3 STRUCTURAL CANOPY ROOF FRAMING PLAN PHASE 3 NO YES YES YES
STRUCTURAL S-102.5 STRUCTURAL CANOPY ROOF FRAMING PLAN ADD ALT NO.1 NO YES YES YES
STRUCTURAL S-102.6 STRUCTURAL CANOPY ROOF FRAMING PLAN - B1 & B24 BREEZEWAY NO YES YES YES
STRUCTURAL S-111.2 STRUCTURAL FOUNDATION AND CANOPY ROOF FRAMING PLAN FUTURE
CONSTRUCTION
NO NO YES YES
STRUCTURAL S-501 STRUCTURAL DETAILS NO YES YES YES
STRUCTURAL S-502 STRUCTURAL DETAILS NO YES YES YES
STRUCTURAL S-503 STRUCTURAL DETAILS NO NO NO YES
STRUCTURAL S-504 STRUCTURAL DETAILS NO NO NO YES
STRUCTURAL S-505 STRUCTURAL DETAILS NO NO NO YES
STRUCTURAL S-600 STRUCTURAL SCHEDULES NO YES YES YES
ARCHITECTURE
ARCHITECTURE AS100.1 ARCHITECTURAL SITE PLAN - PHASE 1 BASE BID NO NO YES YES
ARCHITECTURE AS100.2 ARCHITECTURAL SITE PLAN - PHASE 2 BASE BID NO NO YES YES
ARCHITECTURE AS100.3 ARCHITECTURAL SITE PLAN - PHASE 3 BASE BID NO NO YES YES
ARCHITECTURE AS100.4 ARCHITECTURAL SITE PLAN - EXISTING SIDEWALKS AT TEMP. CANOPY BASE BID
PHASE 1
NO NO YES YES
ARCHITECTURE AS100.5 ARCHITECTURAL SITE PLAN - EXISTING SIDEWALKS AT PERM. CANOPY ALT. NO. 1
PHASE 1
NO NO YES YES
ARCHITECTURE AS101.1 ARCHITECTURAL SITE PLAN - PHASE 1 ADD ALT. NO. 2 YES YES YES YES
ARCHITECTURE AS101.2 ARCHITECTURAL SITE PLAN - PHASE 2 ADD ALT. NO. 2 YES YES YES YES
ARCHITECTURE AS101.3 ARCHITECTURAL SITE PLAN - PHASE 3 ADD ALT. NO. 2 YES YES YES YES
ARCHITECTURE AS101.4 ARCHITECTURAL SITE PLAN - EXPANDED SIDEWALKS ADD ALT. NO.2 AT TEMP.
CANOPY BASE BID PHASE 1
NO YES YES YES
ARCHITECTURE AS101.5 ARCHITECTURAL SITE PLAN - EXPANDED SIDEWALKS ADD ALT. NO. 2 AT PERM.
CANOPY ADD ALT. NO. 1 PHASE 1
NO YES YES YES
ARCHITECTURE AS111.2 ARCHITECTURAL SITE PLAN - FUTURE BASE BID NO YES YES YES
ARCHITECTURE AD101 ARCHITECTURAL DEMO PLANS NO YES YES YES
ARCHITECTURE AD102 ARCHITECTURAL DEMO PLANS NO YES YES YES
ARCHITECTURE AD103 ARCHITECTURAL DEMO PLANS - ADD ALTERNATE NO.1 - PHASE 1 NO YES YES YES
ARCHITECTURE AD111.2 ARCHITECTURAL DEMO PLANS - FUTURE CONSTRUCTION NO YES YES YES
ARCHITECTURE A-101 ARCHITECTURAL CANOPY PLAN - COMPOSITE NO YES YES YES
ARCHITECTURE A-101.1 ARCHITECTURAL CANOPY PLANS - PHASE 1 NO YES YES YES
ARCHITECTURE A-101.2 ARCHITECTURAL CANOPY PLANS - PHASE 2 NO YES YES YES
ARCHITECTURE A-101.3 ARCHITECTURAL CANOPY PLANS - PHASE 3 NO YES YES YES
ARCHITECTURE A-101.4 ARCHITECTURAL CANOPY PLAN - TEMPORARY PEDESTRIAN NO YES YES YES
ARCHITECTURE A-101.5 ARCHITECTURAL CANOPY PLAN - ADD ALTERNATE NO.1 NO YES YES YES
ARCHITECTURE A-101.6 ARCHITECTURAL CANOPY PLANS - B1 & B24 BREEZEWAY NO YES YES YES
ARCHITECTURE A-102 ARCHITECTURAL FLOOR PLANS - B2, B22 & B22A NO YES YES YES
ARCHITECTURE A-103 ARCHITECTURAL FLOOR PLANS - B31 NO YES YES YES
ARCHITECTURE A-111.2 ARCHITECTURAL CANOPY PLANS - FUTURE CONSTRUCTION NO YES YES YES
ARCHITECTURE A-201.1 ARCHITECTURAL EXTERIOR ELEVATIONS - PHASE 1 AND PHASE 2 NO YES YES YES
ARCHITECTURE A-201.2 ARCHITECTURAL EXTERIOR ELEVATIONS - PHASE 3 NO YES YES YES
ARCHITECTURE A-201.5 ARCHITECTURAL EXTERIOR ELEVATIONS - ADD ALT. NO. 1 NO YES YES YES
ARCHITECTURE A-211.2 ARCHITECTURAL EXTERIOR ELEVATIONS AND SECTIONS - FUTURE CONSTRUCTION NO YES YES YES
ARCHITECTURE A-301 ARCHITECTURAL SECTIONS - CANOPY NO YES YES YES
ARCHITECTURE A-302 ARCHITECTURAL SECTIONS - CANOPY NO YES YES YES
ARCHITECTURE A-303 ARCHITECTURAL SECTIONS - CANOPY NO YES YES YES
ARCHITECTURE A-304 ARCHITECTURAL SECTION - ADD ALTERNATE NO.1 NO YES YES YES
ARCHITECTURE A-305 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-306 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-307 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-308 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-309 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-310 ARCHITECTURAL SECTIONS - CANOPY ACCESS DOORS NO NO YES YES
ARCHITECTURE A-311 ARCHITECTURAL SECTIONS - ENTRANCE CANOPIES NO YES YES YES
ARCHITECTURE A-351 ARCHITECTURAL SECTIONS - ENLARGED CANOPY NO YES YES YES
ARCHITECTURE A-352 ARCHITECTURAL SECTIONS - ENLARGED CANOPY NO NO YES YES
ARCHITECTURE A-353 ARCHITECTURAL SECTIONS - ENLARGED CANOPY NO NO YES YES
ARCHITECTURE A-401 ARCHITECTURAL ENLARGED PLANS - REFLECTED CEILING PLANS NO YES YES YES
ARCHITECTURE A-402 ARCHITECTURAL ENLARGED PLANS - REFLECTED CEILING PLANS NO YES YES YES
ARCHITECTURE A-403 ARCHITECTURAL ENLARGED PLANS - REFLECTED CEILING PLANS NO NO YES YES
ARCHITECTURE A-404 ARCHITECTURAL ENLARGED PLANS - ROOF NO YES YES YES
ARCHITECTURE A-501 ARCHITECTURAL DETAILS NO YES YES YES
ARCHITECTURE A-501.1 ARCHITECTURAL DETAILS NO NO YES YES
ARCHITECTURE A-502 ARCHITECTURAL DETAILS NO YES YES YES
ARCHITECTURE A-503 ARCHITECTURAL DETAILS NO YES YES YES
ARCHITECTURE A-503.1 ARCHITECTURAL DETAILS NO NO YES YES
ARCHITECTURE A-504 ARCHITECTURAL DETAILS NO YES YES YES
NO REVISIONS DATE
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Expires 6.30.16Expires: 6/30/18
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN
REQUIRED BY 2016 CALIFORNIA BUILDING CODE STANDARDS , ALL WORK MUST BE
INSPECTED AND APPROVED BY LOCAL AUTHORITIES .
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR(S) PRIOR TO FABRICATION AND CONSTRUCTION. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THESE DRAWINGS, WHICH
AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN CONSTRUCTION
DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR
IMMEDIATELY.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL
DUCT SIZES AND LOCATIONS.
5. WALL OUTLETS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
6. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK
ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO
COMPLETE FULL SCOPE OF WORK.
7. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND
COR.
8. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION,
CONTRACTOR SHALL VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED
BY THE CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO ARCHITECT AND
COR PRIOR TO BIDDING OR PERFORMING WORK RELATED TO ANY DISCREPANCIES.
SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
9. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR
MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE
MORE COSTLY TIME, METHOD, SYSTEM, PRODUCT, SUBCONTRACT AND/OR
MATERIAL. CONTRACTOR WORK EFFORT SHALL NOT DISRUPT OR OTHERWISE
IMPACT NORMAL VA OPERATIONS WITHOUT THE EXPRESS WRITTEN CONSENT OF
THE VA. THIS MAY REQUIRE THAT THE WORK EFFORT BE PERFORMED DURING NON-
WORKING HOURS.
10. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE
CONTRACT. HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH
WORK INDICATED AS NIC.
11. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER,
INCLUDING STAGING AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF
WORK, NOISY OPERATIONS, INTERRUPTION OF UTILITIES, ETC. SEE
SPECIFICATIONS.
12. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF
EACH TRADE'S WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S
OPERATION OR FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS, FLOORS, WALLS AND
CEILING SPACES. SEE SPECIFICATIONS.
13. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND
COR, BETWEEN DISSIMILAR METALS. SEE SPECIFICATIONS.
14. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES,
DEVICES, MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL,
INTERIOR, MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION
COORDINATION.
15. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS TO BE
COORDINATED WITH COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE
SPECIFICATIONS.
16. ALL EXCAVATIONS AND TRENCHES 24 INCHES IN DEPTH OR GREATER SHALL
REQUIRE A WRITTEN TRENCHING AND EXCAVATION PERMIT AS REQUIRED BY THE
SPECIFICATIONS.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM DIMENSIONS WITH
ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS CONTRACTOR
SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION
RELATED TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION
TOLERANCES MAY BE +/- 1/4").
6. THE CANOPY ROOF GLAZING BASIS OF DESIGN IS CPI, 12 MM CUSTOM STRUCTURAL LOW RISE VAULT.
ALTERNATE SOLUTIONS REQUIRE ENGINEERING SUBMISSIONS TO BE DEVELOPED BY A LICENSED CA SE IN CONJUNCTION WITH THE SELECTED SYSTEM AND SUBMITTED TO THE VA/DOR FOR APPROVAL. PRODUCTS
AND SYSTEMS WITH AN INFERIOR WARRANTY AND/OR PERFORMANCE WILL NOT BE CONSIDERED.
ALTERNATE SYSTEMS THAT CHANGE THE STRUCTURAL DESIGN OF THE CANOPY MUST BE SUBMITTED WITH FULLY ENGINEERED STRUCTURAL DRAWINGS AT THE TIME OF PRODUCT SUBMISSION. WHEN RESIZING OF STRUCTURAL ELEMENTS IMPACTS THE CHARACTER, USEFULNESS, OR LIFESPAN OF THE DESIGN SOLUTION IT SHALL RESULT IN A REJECTION OF THE SUBMITTED ALTERNATE SYSTEMS.
STRUCTURAL STEEL IS DESIGNED FOR ASSUMED HORIZONTAL THRUST FORCES FROM TRANSLUCENT
PANELS.
FLOOR PLAN DIMENSIONS
1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE
GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.
2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
4. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS BETWEEN CANOPY COLUMNS, ARE NOTED "CLR"
OR "CLEAR" AND ARE SHOWN TO THE FACES OF FINISHES.
5. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.
VERTICAL DIMENSIONS
1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.
ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING
OR SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES
SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION
4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.
5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT
TO IT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE
EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH
EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL
EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRINKLER SYSTEMS ARE TO BE MAINTAINED.
EXIT AND EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC GUIDELINES.
RATED DOOR AND WINDOW ASSEMBLIES
1. BUILDINGS 2, 22 AND 22A (CENTRAL PLANT) ARE EQUIPPED WITH RATED DOOR ASSEMBLIES AND THEY
ARE NOT AFFECTED WITH THIS PROJECT. EXISTING RATINGS ARE TO BE MAINTAINED.
2. BUILDINGS 1, 24, 31, 32 AND OPC ARE EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS
ARE TO BE MAINTAINED. .
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED
MANNER.
2. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A UL APPROVED METHOD AND MATERIAL APPROVED BY BUILDING, MEETING THE EXISTING FLOOR/
WALL RATING.
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL
FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,
SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND
REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER
TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS
(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,
UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL
NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND
EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED
METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND
ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND
MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND
PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE
INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT
TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE
SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE
MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED
FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT
PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET
PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM
OR SURFACE, CONTACT THE COR FOR INSTRUCTIONS PRIOR TO PAINTING.
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,
BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED
AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF
PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AT COMPLETION OF WORK.
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS. PROPER
PRIMING MUST BE USED WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, CONTACT THE
ARCHITECT.
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND
VERTICAL CONCRETE JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL BE
USED AT MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE
PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT
UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED EQUIPMENT
FRAMES AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS
(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE
ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.
FIRE LIFE SAFETY NOTES
1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING
CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.
2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF
EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE-
RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS,
TEMPORARY CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL
TIMES PER LOCAL FIRE DEPARTMENT.
2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL
TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.
3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE
NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE
MARSHAL OR LOCAL FIRE DEPARTMENT.
4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE
CODES.
6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER
LOCAL FIRE CODES.
7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY EXITING SHALL BE APPROVED BY THE STATE FIRE MARSHAL OR BY THE LOCAL
FIRE DEPARTMENT.
8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME-
RETARDANT.
10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN
REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS
MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.
11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT
VEHICLE ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE
PRIOR TO AND DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED
WITH LOCAL FIRE DEPARTMENT IN THE FIELD.
1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES
INDICATE EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES.
COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE
ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF
THE WALL AND/OR ROOF.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING
AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO
CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE CIVIL DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY & DEMOLITION WORK AND PROJECT
PHASING NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH OWNER AND TENANTS.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:1
P
M
G-010
GENERAL PROJECT NOTES
M. PERKINS K. LUKE02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION AND PHASING NOTES
BUILDING CODE DATA
APPLICABLE BUILDING CODES
1. 2015 NFPA 101 LIFE SAFETY CODE & NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE & NFPA 13
STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS
2. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
3. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
4. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
5. 2011 NATIONAL ELECTRICAL CODE (NEC)
6. INTERNATIONAL PLUMBING CODE (IPC)
7. ASME BOILER AND PRESSURE VESSEL CODE
8. ASME CODE FOR PRESSURE PIPING
9. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
10. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE
AND COMMENTARY (ACI 318)
11. MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
12. ENERGY POLICY ACT OF 2005 (EPACT)
13. DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10
CFR PARTS 433, 434 AND 435
14. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
15. EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT
16. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
17. SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007
18. 2015 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA STANDARDS
19. VA FIRE PROTECTION DESIGN GUIDE, 6TH EDITION (2011)
NO REVISIONS DATE
R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
SOLAR PANELS
SOLAR PANELS
H
H H H H
H H H H H H
H
HHHHH
H
H
H
H
H
G
G a s
M A
T C
H L
IN
E
P H
A S
E
M A
T C
H L
IN
E
P H
A S
E
M A
T C
H L
IN
E
P H
A S
E
M A
T C
H L
IN
E
P H
A S
E
TEMPORARY COVERED PEDESTRIAN LINK,
ALTERNATE ACCESS DURING CONSTRUCTION.
PROVIDE 10' CLEAR MIN. WALKWAY
NEW INTEGRATED
SYSTEMS CANOPY
NEW PEDESTRIAN ENTRY
CANOPY
AS100.1
AS100.2
AS100.3
SEE M/P/E DRAWINGS
FOR WORK IN CLC
SEE M/P/E DRAWINGS
FOR BLDG INTERIORS
AREA OF SITE WORK,
SEE ALL DISCIPLINES
DRAWINGS FOR
ADDITIONAL
INFORMATION
AS100.4
AS100.5
TEMPORARY
PEDESTRIAN
LINK
ADD
ALTERNATE
PHASE 1
PHASE 2
PHASE 3
MATCHLINE PHASE 1
PEDESTRIAN LINK
B25 B31
(CLC)
B2
B22
B22A
B36 B3
B8
B7
LOT C
LOT A
B27
LOT B
LOT C
LOT C
TRAILERS
B1
B19
LOT D
B34
B17
B24B1 & B24 BREEZEWAY
LOT E
B32
LOT F
STAGING AREA
7,900 SF
DO NOT ENCROACH ON
STAINED CONCRETE
SLAB ON GRADE
EXISTING
STREETLIGHT
TO REMAIN,
CONTRACTOR
TO PROTECT
MATCHLINE
PHASE 3
EXIT ONLY,
NO ACCESS
MATCHLINE PHASE 1
PEDESTRIAN LINK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AS100.3
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Departmen…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.