36C26118R0487-0002046.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 0002 570-16-302_A101thurA111.2.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNDN
PHASE 1
SEE SHEET A-101.1
PHASE 2
SEE SHEET A-101.2
TEMPORARY PED LINK
SEE SHEET A-101.4
ADD ALTERNATE
SEE SHEET A-101.5
B1 & B24 BREEZEWAY
B22 & 22A
SEE SHEET A-102
B31
SEE SHEET A-103
FUTURE CONSTRUCTION
SEE SHEET A-111.2
P H
A S
E
S E
E S
H E
E T
A -1
1.
P H
A S
E
S E
E S
H E
E T
A -1
1.
PHASE 2
SEE SHEET A-101.2
L O
A D
IN
G
D O
C K
PHASE 3
SEE SHEET A-101.3
P H
A S
E
S E
E S
H E
E T
A -1
1.
P H
A S
E
S E
E S
H E
E T
A -1
1.
B31
B22AB22
B2B36
B25
B3
B24
B1
B32
ADD ALTERNATE
SEE SHEET A-101.5
T5 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
/2
7/
:5 9:
P
M
A-101
ARCHITECTURAL CANOPY PLAN - COMPOSITE
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 20'-0" F1
ARCHITECTURAL CANOPY PLAN - COMPOSITE
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) CANOPY WITH INTEGRATED UTILITY HOUSING - PHASE 1
2 (N) CANOPY WITH INTEGRATED UTILITY HOUSING - PHASE 2
3 (N) CANOPY WITH INTEGRATED UTILITY HOUSING - PHASE 3
4 (N) CANOPY INTERSECTION - BBQ AREA
5 (N) CANOPY HEXAGON INTERSECTION - PHASE 3
6 (N) CANOPY TO HIDE UTILITIES FROM CENTRAL PLANT POC
7 (N) UTILITY POC AT B31
8 (N) CHW POINT OF CONNECTION AT B1, IN UTILITY TUNNEL (BELOW). SEE
MECHANICAL AND PLUMBING DRAWINGS.
9 (N) CHW POC FOR (F) TECHNOLOGY BUILDING
10 (N) PEDESTRIAN CANOPY - PHASE 3
11 (N) PEDESTRIAN CANOPY - ADD ALT
12 (N) CANOPY WITH (F) UTILITY CAPACITY- ADD ALT
13 OUTLINE OF (N) PEDESTRIAN LINK (TEMPORARY OR ADD ALT #1) TO BE
OPERATIONAL PRIOR TO START OF ANY SYSTEMS UPGRADES AND
UPDATES, AS INDICATED IN THE MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS
14 DO NOT ENCROACH (E) STAINED CONCRETE SLAB ON GRADE
15 (N) TEMPORARY COVERED PEDESTRIAN ACCESS TO B31 DURING PHASE 1
CONSTRUCTION
16 PORTION OF (N) INTEGRATED SYSTEMS CANOPY TO BE CONSTRUCTED AS
PART OF THE PEDESTRIAN LINK
17 (E) UTILITY TUNNEL FOR CHILLED WATER LINE TO B31 ADDITION
18 (F) 8" CHW S/R FOR B31 ADDITION (100 LF + ISOLATION VALVES)
KEYNOTES
NORTH
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NO REVISIONS DATE
2 Revision 2 11/20/18
Expires 6.30.16Expires: 6/30/18
11/20/2018
(N)
A-201.1
B4
A
B
C
D
E
W
X
B22 & B22A
SEE SHEET A-102
B31
SEE SHEET A-103
TEMPORARY/ADD ALTERNATE NO.1 CANOPY
SEE SHEETS A-101.4 & A-101.5
P H
A S
E
S E
E S
H E
E T
A -1
1.
A-201.1
B1
A-201.1
C7
A-401
C1
A-401
C4
B1
A-304
B6
A-503
'-0
'-0
8' -0
'-0
MECH.
PENTOUSE
16D7
A-551
D7
A-551
E1
A-306
C1
A-306
C1
A-305
F1
A-305
12'-0" 13'-0"
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
B22.4
7.9
C6
S-504
BELOW
BELOW
F3
A-301
A-201.1
B4
A
B
C
D
E
W
X
F1
A-302
B22 & B22A
SEE SHEET A-102
A-201.1
B1
A-201.1
C7
A-401
A4
A-401
A1
A-401
A8 B1
A-304
10'-0"
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC TEMPORARY/ADD ALTERNATE NO. 1 CANOPY
SEE SHEETS A-101.4 & A-101.5
BC
BC
BC
BC
BC
BC
BC
BC
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B3
B3
B4
B3
B4
B
B
B
B
B
B
B
B
B
B
B3
B3
B3
B3
B3
B4
B
B
B
B3
B3
B4
B
B
B
B
B
B4
BC
C5
A-306
E1
A-306
C1
A-306
C1
A-305
F1
A-305
13 13
B31
SEE SHEET A-103
MECH.
PENTOUSE
(F) 1-VHPS-01
(N) 1-VCHR-02
(N) 1-VCHS-02
(F) 1-VHPR-01
(F) 1-VFS-02
(F) 1-VFW-02
(F) 1-VFS-01
(F) 1-VFW-01
(F) 1-VHPS-03
(N) 1-VHPS-04
(N) 1-VHPR-04
(N) 1-VHPS-05
(N) 1-VHPR-05
(F) 1-VHPR-03
(N) 1-VCHS-01
(N) 1-VCHR-01
(N) 1-VO-01
P H
A S
E
S E
E S
H E
E T
A -1
1.
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
B
B
B
13'-6"EQ. EQ.
4' -0
4'
-0
4' -0
4'
-0
4'-0"
4'-0"
4'-0"
4' -0
4'
-0
B22.4
6'-10" +/-
VERIFY
B3 B4
B3
7.9
RCP SYMBOL LEGEND
24" x 24" METAL PANEL CEILING SYSTEM
MANUFACT: ARMSTRONG - METAL
WORKS (OR APPROVED EQUAL)
TORSION SPRING EXTERIOR #7209 /
UNPERFORATED #M1
COLOR: GUN METAL (MYA)
12" x 22" TRANSLUCENT PANEL ROOF SYSTEM
MANUFACT: CPI (OR APPROVED EQUAL)
COLOR: WHITE
PATHWAY LIGHT AT BASE OF SEAT WALL,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
ROPE LIGHTING AT BASE OF COLUMN,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
A
B
TYPE 1 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITH SOLDIER PROFILE
ARCHITECTURAL STONE VENEER CLADDING
(SEE D4/A-502)
TYPE 3 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITHOUT CLADDING (TO BE ADDED
IN (F) PHASE)
TYPE 2 COLUMN: W12x50 STRUCTURAL
COLUMN WITH CYLINDRICAL CIP CONCRETE
SURROUND (SEE F1/A-503)
VERTICAL STRIP LIGHT AT INSIDE FACE OF
COLUMN, REFER TO A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
C
SOLAR TUBE - 22" LIGHT TUNNEL
8" RECESSED CAN LIGHT - SEE ELECTRICAL
2" RECESSED CAN LIGHT - SEE ELECTRICAL
B1, B2, ETC.
ACCESS DOORS ON INTERIOR VERTICAL FACE
OF SOFFIT, SEE A-600 FOR SCHEDULE AND
DETAILS
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
/2
7/
:5 9:
P
M
A-101.1
ARCHITECTURAL CANOPY PLANS - PHASE 1
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" C3
ARCHITECTURAL CANOPY PLAN - PHASE 1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) 14" CHW S/R AT (E) POC ON B22A ROOF, SEE MPE DRAWINGS
2 (N) CANOPY TO HIDE UTILITIES FROM CENTRAL PLANT POC
3 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY HOUSING - PHASE 1
4 (N) CANOPY WITH (F) UTILITY CAPACITY- ADD ALTERNATE NO. 1
5 (N) UTILITY POC AT B31, SEE MPE DRAWINGS
6 (N) UTILITY PIPE PENETRATIONS, B22A. CONNECT TO (E) VALVES AT POC.
SEE MPE DRAWINGS
7 (E) CHW AND STEAM PIPE PENETRATIONS TO B31 PENTHOUSE TO BE
REPAIRED AFTER REMOVAL OF THE PIPES
8 (E) COOLING TOWERS
9 (F) CANOPY CONTINUES IN PHASE 2
10 (N) OXYGEN LINE FROM B1 TO B31, SEE MPE DRAWINGS
11 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
12 (N) CHW AND OXYGEN LINES RUNNING IN NORTH SIDE OF INTEGRATED
CANOPY PIPE BANK
13 (F) CAPACITY FOR UTILITIES RUNNING IN SOUTH SIDE OF INTEGRATED
CANOPY PIPE BANK
14 (E) SCREEN WALL ABOVE TO REMAIN
15 (N) SUSPENDED METAL PANEL CEILING SYSTEM
16 (N) CHW AND STEAM PIPE PENETRATIONS TO B31 PENTHOUSE
17 (N) CHILLERS TO BE INSTALLED IN PHASE 1. SEE MECHANICAL SHEETS
18 (N) METAL GRATING ON STEEL FRAME BEWTEEN B31 PARAPETS TO
CONCEAL PIPE PENETRATIONS
19 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
20 (N) 4" BLDG JOINT
21 (N) 2" BLDG JOINT
1" = 10'-0" F3
REFLECTED CEILING PLAN - NEW CANOPY - PHASE 1
KEYNOTES
ARCHITECTURAL PIPE ACCESSORY SCHEDULE -
PHASE 1
Mark Location in Project Size
Phase 1
CHR
(F) 1-VCHS-03 COLUMN N-2.5 6"
(N) 1-VCHR-01 COLUMN D-32 14"
(N) 1-VCHR-02 COLUMN D-6 6"
(N) 1-VCHR-04 B31 PENTHOUSE 3"
(N) 1-VCHR-05 COLUMN D-6 1" Diameter
(N) 1-VCHR-06 B31 PENTHOUSE 3"
(N) 2-VO-04 14"
(N) 3-Flex 14" Flexible Connector
(N) 3-Flex 14" Flexible Connector
(N) 3-Flex 3" Flexible Connector
(N) 3-Flex 3" Flexible Connector
CHS
(F) 1-VCHR-03 COLUMN N-2.5 6"
(N) 1-VCHS-01 COLUMN D-32 14"
(N) 1-VCHS-02 COLUMN D-6 6"
(N) 1-VCHS-04 B31 PENTHOUSE 3"
(N) 1-VCHS-06 B31 PENTHOUSE 3"
(N) 3-Flex 3" Flexible Connector
(N) 3-Flex 3" Flexible Connector
FS
(F) 1-VFS-01 COLUMN E-7 4"
(F) 1-VFS-02 COLUMN E-6 4"
(F) 1-VFS-03 COLUMN N-4 4"
FW
(F)1-VFW-03 COLUMN N-4 6"
(F) 1-VFW-01 COLUMN E-7 6"
(F) 1-VFW-02 COLUMN E-6 6"
HPR
(N) 1-VHPR-04 B22 EQUIPMENT RM LFWGV-1"
(N) 1-VHPR-05 B22 EQUIPMENT RM LFWGV-1"
(N) 3-Flex 2" Flexible Connector
(N) 3-Flex 2" Flexible Connector
HPS
(F) 1-VHPS-01 COLUMN E-6 8"
(F) 1-VHPS-02 COLUMN N-4 4"
(F) 1-VHPS-03 COLUMN E-6 4"
(N) 1-VHPS-04 B22 EQUIPMENT RM 2 1/2"
(N) 1-VHPS-05 B22 EQUIPMENT RM 2 1/2"
(N) 3-Flex 2½" Flexible Connector
(N) 3-Flex 2½" Flexible Connector
O
(N) 1-VO-01 COLUMN D-32 2"
PC
(F) 1-VHPR-01 COLUMN E-6 3"
(F) 1-VHPR-02 COLUMN N-4 2"
(F) 1-VHPR-03 COLUMN E-6 2"
Grand total: 39
NORTH
NORTH
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NOTE: SEE MECHANICAL SHEETS FOR COMPLETE VALVE
INFORMATION. PHASE 1 VALVES IN B2, B22 AND B22A ARE
SHOWN ON A-102. PHASE 1 VALVES IN B31 ARE SHOWN ON
A-103. PHASE 1 VALVES INCLUDED IN ADD ALTERNATE NO.1
ARE SHOWN ON A-101.5.
NO REVISIONS DATE
2 Revision 2 11/20/18
Expires 6.30.16Expires: 6/30/18
11/20/2018
8"
F5
A-302
B4
A-303
D
E
W
X
Z
A-201.1
F1
B3
B24
P H
A S
E
S E
E S
H E
E T
A -1
1.
P H
A S
E
S E
E S
H E
E T
A -1
1.
W.0
40.9
A-201.1
C1
A-201.1
C3
B5
A-503
B6
A-503
X.0
A-201.1
F6
42.8
B36
A-402
C1
A-308 D1
A-308
B1
A-307
E1
A-307
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A-201.1
D1
F5
A-303
Y
D6
A-504
7.9
42.1
Z.0
Y.0
SIM
D8
A-505
F5
A-302
D
E
W
X
Z
A-201.1
F1
5 5
B3
B24
P H
A S
E
S E
E S
H E
E T
A -1
1.
P H
A S
E
S E
E S
H E
E T
A -1
1.
W.0W.0
40.9
A-201.1
C1
A-201.1
C3
A-401
F2 26 '-0
X.0X.0
A-201.1
F6
42.8
B36
A-402
F1
B
AAA A
BC BC
B B
B
BC
14'-0"
10'-0"
2'-0" 26'-0"
BC
BC
BC
BC
BC
BC
BC
BC
BC
AA
BC
A
B
B
B
B
B
B
B
B
B
B
B 1 B
B
B
B
B 2 B
B
B
B
B 1 B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
37 B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
C1
A-308 D1
A-308
B1
A-307
E1
A-307
2'-0"
4' -0
4'
-0
(N) 2-VCHR-03
(N) 2-VCHS-03
(N) 2-VCHR-02
(N) 2-VCHS-02
(N) 2-VCHS-01
(N) 2-VCHR-01
O 1
(N) 2-VO-02
(N) Exp-Comp
(N) Exp-Comp
(N) Exp-Comp
(N) Exp-Comp
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A-201.1
D1
4' -0
4'
-0
A
4' -0
4'
-0
4' -0
4'
-0
90°
F5
A-303
Y
D6
A-504
7.9
42.1
SIM
D8
A-505
14 14 14
RCP SYMBOL LEGEND
24" x 24" METAL PANEL CEILING SYSTEM
MANUFACT: ARMSTRONG - METAL
WORKS (OR APPROVED EQUAL)
TORSION SPRING EXTERIOR #7209 /
UNPERFORATED #M1
COLOR: GUN METAL (MYA)
12" x 22" TRANSLUCENT PANEL ROOF SYSTEM
MANUFACT: CPI (OR APPROVED EQUAL)
COLOR: WHITE
PATHWAY LIGHT AT BASE OF SEAT WALL,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
ROPE LIGHTING AT BASE OF COLUMN,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
A
B
TYPE 1 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITH SOLDIER PROFILE
ARCHITECTURAL STONE VENEER CLADDING
(SEE D4/A-502)
TYPE 3 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITHOUT CLADDING (TO BE ADDED
IN (F) PHASE)
TYPE 2 COLUMN: W12x50 STRUCTURAL
COLUMN WITH CYLINDRICAL CIP CONCRETE
SURROUND (SEE F1/A-503)
VERTICAL STRIP LIGHT AT INSIDE FACE OF
COLUMN, REFER TO A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
C
SOLAR TUBE - 22" LIGHT TUNNEL
8" RECESSED CAN LIGHT - SEE ELECTRICAL
2" RECESSED CAN LIGHT - SEE ELECTRICAL
B1, B2, ETC.
ACCESS DOORS ON INTERIOR VERTICAL FACE
OF SOFFIT, SEE A-600 FOR SCHEDULE AND
DETAILS
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
/2
7/
:5 9:
P
M
A-101.2
ARCHITECTURAL CANOPY PLANS - PHASE 2
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" C2
ARCHITECTURAL CANOPY PLAN - PHASE 2
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - PHASE 2
2 (N) CANOPY INTERSECTION - BBQ AREA
3 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
4 ISOLATION VALVES FOR POC FOR (F) TECHNOLOGY BUILDING.
5 REMOVE AND REPLACE (E) RETAINING WALL (BELOW). SEE AS AND CU
DRAWINGS.
6 REMOVE AND REPLACE AND REPLACE (E) EYEBROW ABOVE B3
ENTRANCE, SEE AD101
7 (N) METAL PANEL SOFFIT FOR SYSTEMS CROSSOVER
8 (N) CANOPY INTERSECTION - BBQ AREA METAL PANEL CEILING SYSTEM
9 (N) SOLAR TUBE DOME WITH INTERGAL CURB
10 (E) BUILDING 24 NORTHERN WINDOW SUN SHADING DEVICES - ABOVE
11 (F) UTILITY POC AT (E) B24, ISOLATION VALVES PROVIDED, SEE
MECHANICAL SHEETS.
12 (N) BBQ AREA ROOF DRAIN
13 (N) ACCESS DOORS THAT OVERLAP THE PHASE LINE TO BE INSTALLED IN
PHASE 3 AFTER STRUCTURE IS IN PLACE.
14 (N) STEEL COLUMNS WITH (F) CUSTOM SOLDIER PROFILE TO BE ADDED
WHEN (E) B3 IS REMOVED. SEE A-111.2.
15 (N) DOWNSPOUT TO SPLASHBLOCK BELOW
16 (N) LIGHT FIXTURE CENTERED IN CEILING TILE, SEE ELECTRICAL
DRAWINGS
17 (F) 2" BLDG JOINT
1" = 10'-0" F2
REFLECTED CEILING PLAN - NEW CANOPY - PHASE 2
KEYNOTES
ARCHITECTUAL PIPE ACCESSORY SCHEDULE - PHASE 2
Mark Location in Project System
Abbreviation Size
Phase 2
(N) 2-VCHS-02 COLUMN Y-46 3"-3"
(N) 2-VCHS-04 COLUMN Y-46 1"-1"
CHR
(N) 2-VCHR-01 COLUMN Y-48 CHR 14"-14"
(N) 2-VCHR-02 COLUMN Y-46 CHR 3"-3"
(N) 2-VCHR-03 BUILDING 24 CHR 4"-4"
(N) 3-VCHR-14 CHR 4"-4"
(N) Exp-Comp CHR 14"-14"-14"-14"
(N) Exp-Comp CHR 14"-14"-14"-14"
CHS
(N) 2-VCHS-01 COLUMN Y-48 CHS 14"-14"
(N) 2-VCHS-03 BUILDING 24 CHS 4"-4"
(N) 3-VCHR-13 CHS 4"-4"
(N) Exp-Comp CHS 14"-14"-14"-14"
(N) Exp-Comp CHS 14"-14"-14"-14"
O
(N) 2-VO-02 COLUMN Y-48 O 2"-2"
Grand total: 14
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NOTE: SEE MECHANICAL SHEETS FOR COMPLETE VALVE
INFORMATION. (F) VALVES FOR CONNECTION TO (F)
ENGINEERING BUILDING ARE SHOWN ON A-111.2.
NORTH
NORTH
NO REVISIONS DATE
2 Revision 2 11/20/18
Expires 6.30.16Expires: 6/30/18
Z
AA
BB
A-201.2
B6A-201.2
F1
D1
A-303
F1
A-303
P H
A S
E
S E
E S
H E
E T
A -1
1.
FF
HH
L O
A D
IN
G
D O
C K
B
T5
P H
A S
E
S E
E S
H E
E T
A -1
1.
MATCHLINE
D1
A-503
B24
B3
PHASE 3/ B1 & B24 BREEZEWAY
SEE SHEET A-101.6
A-404
F4
CC
GG
F5
A-309
F1
A-308
F3
A-308
B5
A-309
B1
A-309
B8
A-503
B1
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
11 A-201.2
D1
A-201.2
D65" / 1'-0
Y
58.9
58.1
57.5
57.2
49.9
GG.1
FF.1
HH.1
DD
58.5
F1
A-309
Z.0
Y.0
Z
AA
BB
A-201.2
B6A-201.2
F1
P H
A S
E
S E
E S
H E
E T
A -1
1.
FF
HH
D4
A-502
L O
A D
IN
G
D O
C K
B
T5
B24
MATCHLINE
D1
A-503
B8
A-503
P H
A S
E
S E
E S
H E
E T
A -1
1.
PHASE 3 / B1 & B24 BREEZEWAY
SEE SHEET A-101.6
A-403
F3
BC
BC
BC
BC
A
A
A
A
BC
A
B3
CC
BC
A
BC
A
BC
A
BC
BC
A
BC
GG
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B 3 B
B
B
B
B
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B3
B
B
B
B
B
B
A
10'-0"
F5
A-309
F1
A-308
F3
A-308
B5
A-309
B1
A-309
B1
(N) 3-VCHR-04
(N) 3-VCHS-04
(N) 3-VCHR-05
(N) 3-VCHS-05
A
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
94' -9
"4'-9"
4' -9
1' -7
1'-7"
1'-7"
A-201.2
D1
A-201.2
D6
Y
B
B
B
B
B
B
B
B
B
B
B
B
58.9
58.1
57.5
57.2
49.9
GG.1
FF.1
HH.1
DD
58.5
10'-0"
F1
A-309
Z.0
Y.0
RCP SYMBOL LEGEND
24" x 24" METAL PANEL CEILING SYSTEM
MANUFACT: ARMSTRONG - METAL
WORKS (OR APPROVED EQUAL)
TORSION SPRING EXTERIOR #7209 /
UNPERFORATED #M1
COLOR: GUN METAL (MYA)
12" x 22" TRANSLUCENT PANEL ROOF SYSTEM
MANUFACT: CPI (OR APPROVED EQUAL)
COLOR: WHITE
PATHWAY LIGHT AT BASE OF SEAT WALL,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
ROPE LIGHTING AT BASE OF COLUMN,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
A
B
TYPE 1 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITH SOLDIER PROFILE
ARCHITECTURAL STONE VENEER CLADDING
(SEE D4/A-502)
TYPE 3 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITHOUT CLADDING (TO BE ADDED
IN (F) PHASE)
TYPE 2 COLUMN: W12x50 STRUCTURAL
COLUMN WITH CYLINDRICAL CIP CONCRETE
SURROUND (SEE F1/A-503)
VERTICAL STRIP LIGHT AT INSIDE FACE OF
COLUMN, REFER TO A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
C
SOLAR TUBE - 22" LIGHT TUNNEL
8" RECESSED CAN LIGHT - SEE ELECTRICAL
2" RECESSED CAN LIGHT - SEE ELECTRICAL
B1, B2, ETC.
ACCESS DOORS ON INTERIOR VERTICAL FACE
OF SOFFIT, SEE A-600 FOR SCHEDULE AND
DETAILS
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
/2
7/
:5 9:
P
M
A-101.3
ARCHITECTURAL CANOPY PLANS - PHASE 3
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F1
ARCHITECTURAL CANOPY PLAN - PHASE 3
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 3
2 (N) ISOLATION VALVES FOR POC FOR (F) CHW CAPACITY IN B1,
CONCEALED IN SOFFIT
3 (N) CANOPY HEXAGON INTERSECTION - PHASE 3
4 (N) CANOPY CONNECTION AT B1 & B24 BREEZEWAY
5 (N) TRANSLUCENT SKYLIGHT SYSTEM PEDESTRIAN CANOPY
6 (N) EXPOSED STRUCTURAL STEEL, PAINTED
7 (N) STORM GUTTER ATTACHED TO PERIMETER OF THE HEXAGON CANOPY
8 (E) MODULAR BUILDING TO BE REMOVED IN FUTURE PHASE. (F) CANOPY
SOFFIT TO BE INSTALLED DURING FUTURE PHASE AFTER MODULAR
BUILDING IS REMOVED.
9 (N) STORM DOWNSPOUT LOCATION
10 (E) FENCING TO REMAIN, AS REQUIRED TO MAINTAIN SECURE PERIMETER
11 (N) FENCING, AS REQUIRED TO MAINTAIN SECURE PERIMETER,
COORDINATE WITH VA COR
12 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
13 VA TO RELOCATE (E) CONNEX STORAGE PRIOR TO CONSTRUCTION
14 (N) LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
1" = 10'-0" F4
REFLECTED CEILING PLAN - NEW CANOPY - PHASE 3
KEYNOTES
ARCHITECTURAL PIPE ACCESSORY SCHEDULE - PHASE
Mark Location in Project System
Abbreviation Size
Phase 3
(N) 3-VCHS-05 COLUMN BB-59 3"
CHR
(N) 3-VCHR-01 COLUMN CC-63 CHR 14"
(N) 3-VCHR-02 COLUMN DD-63 CHR 10"
(N) 3-VCHR-03 AUDITORIUM CHR 3"
(N) 3-VCHR-04 COLUMN BB-60 CHR 14"
(N) 3-VCHR-05 COLUMN BB-59 CHR 3"
(N) 3-VCHR-07 COLUMN DD-63 CHR 10"
(N) 3-VCHR-11 CHR 10" Flexible Connector
(N) 3-VCHR-12 CHR 10" Flexible Connector
(N) 3-VCHS-02 COLUMN DD-63 CHR 10"
CHS
(N) 3-VCHS-01 COLUMN CC-63 CHS 14"
(N) 3-VCHS-03 AUDITORIUM CHS 3"
(N) 3-VCHS-04 COLUMN BB-60 CHS 14"
(N) 3-VCHS-06 COLUMN CC-62 CHS 1" Diameter
(N) 3-VCHS-07 COLUMN DD-63 CHS 10"
Grand total: 15
NOTE: SEE MECHANICAL SHEETS FOR COMPLETE VALVE
INFORMATION. PHASE 3 VALVES NEAR THE B1 & B24
BREEZEWAY ARE SHOWN ON A-101.6.
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NORTHNORTH
NO REVISIONS DATE
PHASE 1
SEE SHEET AD101 AND A-101.1
PHASE 2
SEE SHEET A-101.2
B24 B25
W A
L K
O F
H O
N O
R
5 5
COVERED CANOPY ACCESS
TO B1 & B24 BREEZEWAY
B31
P H
A S
E
S E
E S
H E
E T
A -1
.3
PHASE 3
SEE SHEET A-101.3 AND A-101.6
B22A
B22
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
EA O
F W O R K
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
EA O
F W O R K
A R
EA O
F W O R K o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:5
P
M
A-101.4
ARCHITECTURAL CANOPY PLAN -
TEMPORARY PEDESTRIAN
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F2
ARCHITECTURAL ROOF PLAN - PEDESTRIAN CANOPY - TEMPORARY
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B
B19& B19A
1 TEMPORARY PRE-MANUFACTURED PEDESTRIAN CANOPY TO BE USED
DURING CONSTRUCTION 10' MIN CLEAR WALKWAY
2 TO CANOPY PHASE 1, CENTRAL PLANT AND CLC
3 TEMPORARY SUBFLOOR, RAISED TO ALLOW DRAINAGE AND PROTECT (E)
GRADE
4 (E) SIGNAGE TO BE RETAINED AND RELOCATED AS REQUIRED.
5 (E) ACCESSIBLE PARKING AREA TO REMAIN OPERATIONAL
6 TEMPORARY PEDESTRIAN LINK, (E) TRAFFIC PATTERNS SHALL NOT BE
IMPAIRED
KEYNOTES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NORTH
NO REVISIONS DATE
2/7/2018
A-201.1
B4
F
G
H
J
L
M
N
P
S
T
89101112
2425262728
Q
R
A-201.5
B1
A-201.5
F3
F1
A-304
U
V
A4
A-504
B1
A-304
A-2
.5D1
B4
A-304
D1
A-310
B1
A-310
K
B24
B25
PHASE 1
SEE SHEET A-101.1
PHASE 2
SEE SHEET A-101.2
P H
A S
E
S E
E S
H E
E T
A -1
1.
'-0
PHASE 3
SEE SHEET A-101.6
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2 A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1 A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A2
A2
A1
A1
A1 A1 A2
A1
A1
A1
A2
A2
A2
A1
A1
A1
A1 A1 A2
(F)1-VFW-03
(F) 1-VFS-03
(F) 1-VCHR-03
(F) 1-VCHS-03(F) 1-VHPR-02
(F) 1-VHPS-02
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
EA O
F W O R K
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
A R
EA O
F W O R K
A R
EA O
F W O R K
4'-0" 4'-0"
4' -0
4' -0
4' -0
4'- 0"
4'- 0"
4' -0
4'
-0
4'-0"
4'-0"
4'- 0"
4'- 0"
3.9
VV UU
WW
XX
RCP SYMBOL LEGEND
24" x 24" METAL PANEL CEILING SYSTEM
MANUFACT: ARMSTRONG - METAL
WORKS (OR APPROVED EQUAL)
TORSION SPRING EXTERIOR #7209 /
UNPERFORATED #M1
COLOR: GUN METAL (MYA)
12" x 22" TRANSLUCENT PANEL ROOF SYSTEM
MANUFACT: CPI (OR APPROVED EQUAL)
COLOR: WHITE
PATHWAY LIGHT AT BASE OF SEAT WALL,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
ROPE LIGHTING AT BASE OF COLUMN,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
A
B
TYPE 1 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITH SOLDIER PROFILE
ARCHITECTURAL STONE VENEER CLADDING
(SEE D4/A-502)
TYPE 3 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITHOUT CLADDING (TO BE ADDED
IN (F) PHASE)
TYPE 2 COLUMN: W12x50 STRUCTURAL
COLUMN WITH CYLINDRICAL CIP CONCRETE
SURROUND (SEE F1/A-503)
VERTICAL STRIP LIGHT AT INSIDE FACE OF
COLUMN, REFER TO A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
C
SOLAR TUBE - 22" LIGHT TUNNEL
8" RECESSED CAN LIGHT - SEE ELECTRICAL
2" RECESSED CAN LIGHT - SEE ELECTRICAL
B1, B2, ETC.
ACCESS DOORS ON INTERIOR VERTICAL FACE
OF SOFFIT, SEE A-600 FOR SCHEDULE AND
DETAILS
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.r vt
/2
7/
:5 9:
P
M
A-101.5
ARCHITECTURAL CANOPY PLAN - ADD
ALTERNATE NO.1
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY, ADD ALTERNATE NO. 1
2 TO CANOPY PHASE 1, CENTRAL PLANT AND CLC
3 TO B1 & B24 BREEZEWAY
4 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
5 LOCATION OF (E) UTILITY TUNNEL
6 PROVIDE (N) CROSSOVER FOR (F) UTILITY CHASE TO (E) UNDERGROUND
TUNNEL FOR (F) UTILITY ACCESS
7 (N) ACCESSIBLE CONCRETE WALK ON GRADE, BELOW, SEE CIVIL
DRAWINGS.
8 (N) CANOPY ACCESS CONNECTED TO BLDG B1 & B24 BREEZEWAY
9 (E) SIGN TO BE MOVED SEE CIVIL DRAWINGS FOR SITE WORK
10 (N) RELOCATED BUILDING SIGN, SEE CIVIL DRAWINGS FOR SITE WORK
11 (F) 8" CHW S/R TO B31 IN (E) UTILITY TUNNEL, SEE A-101 & MECHANICAL
12 (N) STORM DOWNSPOUT LOCATION
13 (N) TWO-PIECE CLIP AND GUTTER SYSTEM BY CANOPY MANUFACTURER
14 (E) SIGNAGE TO BE RETAINED AND RELOCATED AS REQUIRED.
KEYNOTES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
1" = 10'-0" F1
RELECTED CEILING PLAN - ADD ALTERNATE NO.1
ARCHITECTURAL PIPE ACCESSORY SCHEDULE -
PHASE 1
Mark Location in Project Size
Phase 1
CHR
(F) 1-VCHS-03 COLUMN N-2.5 6"
(N) 1-VCHR-01 COLUMN D-32 14"
(N) 1-VCHR-02 COLUMN D-6 6"
(N) 1-VCHR-04 B31 PENTHOUSE 3"
(N) 1-VCHR-05 COLUMN D-6 1" Diameter
(N) 1-VCHR-06 B31 PENTHOUSE 3"
(N) 2-VO-04 14"
(N) 3-Flex 14" Flexible Connector
(N) 3-Flex 14" Flexible Connector
(N) 3-Flex 3" Flexible Connector
(N) 3-Flex 3" Flexible Connector
CHS
(F) 1-VCHR-03 COLUMN N-2.5 6"
(N) 1-VCHS-01 COLUMN D-32 14"
(N) 1-VCHS-02 COLUMN D-6 6"
(N) 1-VCHS-04 B31 PENTHOUSE 3"
(N) 1-VCHS-06 B31 PENTHOUSE 3"
(N) 3-Flex 3" Flexible Connector
(N) 3-Flex 3" Flexible Connector
FS
(F) 1-VFS-01 COLUMN E-7 4"
(F) 1-VFS-02 COLUMN E-6 4"
(F) 1-VFS-03 COLUMN N-4 4"
FW
(F)1-VFW-03 COLUMN N-4 6"
(F) 1-VFW-01 COLUMN E-7 6"
(F) 1-VFW-02 COLUMN E-6 6"
HPR
(N) 1-VHPR-04 B22 EQUIPMENT RM LFWGV-1"
(N) 1-VHPR-05 B22 EQUIPMENT RM LFWGV-1"
(N) 3-Flex 2" Flexible Connector
(N) 3-Flex 2" Flexible Connector
HPS
(F) 1-VHPS-01 COLUMN E-6 8"
(F) 1-VHPS-02 COLUMN N-4 4"
(F) 1-VHPS-03 COLUMN E-6 4"
(N) 1-VHPS-04 B22 EQUIPMENT RM 2 1/2"
(N) 1-VHPS-05 B22 EQUIPMENT RM 2 1/2"
(N) 3-Flex 2½" Flexible Connector
(N) 3-Flex 2½" Flexible Connector
O
(N) 1-VO-01 COLUMN D-32 2"
PC
(F) 1-VHPR-01 COLUMN E-6 3"
(F) 1-VHPR-02 COLUMN N-4 2"
(F) 1-VHPR-03 COLUMN E-6 2"
Grand total: 39
NORTH
NO REVISIONS DATE
2 Revision 2 11/20/18
Expires 6.30.16Expires: 6/30/18
11/20/2018
8"
(N)
AABB
A-201.2
B1
D4
A-311
D1
A-311
B1
B24
BELOW
C1
A-353
31U
V
PHASE 2
SEE SHEET A-101.2
PHASE 3
SEE SHEET A-101.3
T E
M P
O R
A R
Y /A
D D
A L
T E
R N
A T
E N
O . 1
C A
N O
P Y
S E
E S
H E
E T
S A
-1
.4
A
1.
A4
A-504
CC
REFER TO SHEET A-101.3 FOR PIPING ACCESSORY SCHEDULE
A R
EA O
F W O R K
A R
EA O
F W O R K
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
58.9
DD
VV UU
WW
XX
B1 & B24 BREEZEWAY
F1
A-309
1/4" / 1'-0"
B24
AUDITORIUM
TEM
PORARY/ADD ALTERNATE
NO. 1 CANOPY
SEE SHEETS A-101.4 & A-101.5
AABB
A-201.2
B1
D4
A-311
D1
A-311
PHASE 2
SEE SHEET A-101.2
B1
B1 & B24 BREEZEWAY
B24
C1
A-353
31U
V
T E
M P
O R
A R
Y /A
D D
A L
T E
R N
A T
E N
O . 1
C A
N O
P Y
S E
E S
H E
E T
S A
-1
.4
A -1
.5
PHASE 3
SEE SHEET A-101.3
A
A-101.6
B
A-101.6
A4
A-504
CC
BC
BC
(N) 3-VCHS-03
(N) 3-VCHR-03
(N) 3-VCHS-01
(N) 3-VCHR-01
(N) 3-VCHS-02
(N) 3-VCHR-02
A R
E A
O F
W O
R K
9'-9"
EXISTING
58.9
DD
10'-0"
10'-0"
EXISTING
VV UU
WW
XX
10'-0"
11'-3"
B24
F1
A-309
B3
B1
B1
B3
BC
A4
A-504
TEM
PORARY/ADD ALTERNATE
NO. 1 CANOPY
SEE SHEETS A-101.4 & A-101.5
A-504
F4
'-0
4'-11"
1' -1
RCP SYMBOL LEGEND
24" x 24" METAL PANEL CEILING SYSTEM
MANUFACT: ARMSTRONG - METAL
WORKS (OR APPROVED EQUAL)
TORSION SPRING EXTERIOR #7209 /
UNPERFORATED #M1
COLOR: GUN METAL (MYA)
12" x 22" TRANSLUCENT PANEL ROOF SYSTEM
MANUFACT: CPI (OR APPROVED EQUAL)
COLOR: WHITE
PATHWAY LIGHT AT BASE OF SEAT WALL,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
ROPE LIGHTING AT BASE OF COLUMN,
REFER TO SHEET A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
A
B
TYPE 1 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITH SOLDIER PROFILE
ARCHITECTURAL STONE VENEER CLADDING
(SEE D4/A-502)
TYPE 3 COLUMN: 8"x8"x5/8" HSS STRUCTURAL
COLUMN WITHOUT CLADDING (TO BE ADDED
IN (F) PHASE)
TYPE 2 COLUMN: W12x50 STRUCTURAL
COLUMN WITH CYLINDRICAL CIP CONCRETE
SURROUND (SEE F1/A-503)
VERTICAL STRIP LIGHT AT INSIDE FACE OF
COLUMN, REFER TO A-502 AND ELECTRICAL
SHEETS FOR ADDITIONAL INFORMATION
C
SOLAR TUBE - 22" LIGHT TUNNEL
8" RECESSED CAN LIGHT - SEE ELECTRICAL
2" RECESSED CAN LIGHT - SEE ELECTRICAL
B1, B2, ETC.
ACCESS DOORS ON INTERIOR VERTICAL FACE
OF SOFFIT, SEE A-600 FOR SCHEDULE AND
DETAILS
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:1
P
M
A-101.6
ARCHITECTURAL CANOPY PLANS - B1 & B24
BREEZEWAY
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" C3
ARCHITECTURAL CANOPY PLAN - B1 & B24 BREEZEWAY - PHASE 3
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0" F3
REFLECTED CEILING PLAN - NEW CANOPY - (E) B1 & B24 BREEZWAY - PHASE 3
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - PHASE 3
2 (N) 14" CHW LINES THROUGH (E) B1 & B24 BREEZEWAY, SEE STRUCTURAL
AND MPE DRAWINGS.
3 (N) SUSPENDED METAL PANEL CEILING SYSTEM
5 (N) STONE VENEER ON METAL STUD FRAMED PIPE CHASE
6 (E) LIGHTS TO REMAIN
7 (N) CEILING SUSPENDED FROM STUD FRAMED CANOPY AND PIPE CHASE
TO ENCLOSE (N) PIPE WORK
8 (E) VESTIBULE CANOPY, BELOW
9 (E) BUILDING JOINT TO REMAIN
10 MAINTAIN SEPARATION FROM VESTIBULE CANOPY
11 (E) SKYLIGHTS
12 SEE MECHANICAL DRAWINGS FOR (N) PIPING
13 (E) BREEZEWAY COLUMN TO REMAIN
14 SEE MECHANICAL DRAWINGS FOR (F) PIPING
15 (N) CHW POC FOR (F) CONNECTION TO B24 AUDITORIUM
16 (N) LIGHT FIXTURE, SEE ELECTRICAL
17 (N) EXPANDED SIDEWALK BETWEEN B1 AND B24 AUDITORIUM, SEE
ARCHITECTURAL SITE PLANS
18 (N) RETAINING WALL FOR B24 RAMP, SEE ARCHITECTURAL SITE PLANS
19 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - ADD ALTERNATE NO.1 - PHASE 1
20 (N) FLASHING BETWEEN CANOPY AND EYEBROW CHASE
KEYNOTES
(E) B1 & B24 BREEZEWAY - ADD ALTERNATE NO. 1 BUILDING JOINT LOCATION
(E) B1 & B24 BREEZEWAY / EYEBROW AND VERTICAL CHASE CONNECTIONB
A-101.6
A
A-101.6
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
ARCHITECTURAL PIPE ACCESSORY SCHEDULE - PHASE 3
Mark Location in Project System
Abbreviation Type Size
Phase 3
(N) 3-VCHS-05 COLUMN BB-59 Butterfly Valve - 2-14 Inch 3"
CHR
(N) 3-VCHR-01 COLUMN CC-63 CHR Butterfly Valve - 2-14 Inch 14"
(N) 3-VCHR-02 COLUMN DD-63 CHR Butterfly Valve - 2-12 Inch 10"
(N) 3-VCHR-03 AUDITORIUM CHR Butterfly Valve - 2-14…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.