36C26118R0487-092.xls
XLS spreadsheet 2 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 01 00 00 Appendix A - Bid Form Template.xls
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| INSTRUCTIONS - BID FORM TEMPLATE | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square | |||||
| feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur-- | |||||
| nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per mahour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1) which are special to the contract | |||||
| and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: | In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||
| page as follows: | |||||
| 1 | TOTAL MATERIAL COSTS: | $ - 0 | (Column 5 Total) | ||
| 2 | TOTAL LABOR COSTS: | $ - 0 | (Column 8 Total) | ||
| 3 | TOTAL OTHER DIRECT COSTS: | $ - 0 | (Column 9 Total) | ||
| 4 | TOTAL DIRECT COSTS: | $ - 0 | (Column 10 Total, = Items 1 + 2 + 3) | ||
| 5 | OVERHEAD @ ____________% | $ - 0 | (Item 4 x Item 8 %) | ||
| 6 | PROFIT @ ____________% | $ - 0 | (Item 4 x Item 6 %) | ||
| 7 | SUBTOTAL: | $ - 0 | (Item 4 + 5 + 6) | ||
| 8 | BOND @ ____________% | $ - 0 | (Item 7 x Item 8 %) | ||
| 9 | TOTAL PRICE: | $ - 0 | (Item 7 + 8)) | ||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data | |||||
| (see FAR 15.804). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in their proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such negotiations prior to contract award. | |||||
| (Reverse of Construction Cost Estimate Breakdown) |
&CPage &P
CLIN 001
| CLIN 001 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 38 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 39 | 23 07 11 | HVAC and Boiler Plant Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 40 | 23 08 00 | Commissioning of HVAC Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 41 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 42 | 23 21 13 | Hydronic Piping | |||||||||||||||
| 43 | 23 22 13 | Steam and Condensate Heating Piping | |||||||||||||||
| 44 | 23 25 00 | HVAC Water Treatment | |||||||||||||||
| 45 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 26 - ELECTRICAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 46 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 47 | 26 05 13 | Medium Voltage Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 48 | 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 49 | 26 05 26 | Grounding and Bonding for Electrical Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 50 | 26 05 29 | Hangers and Supports for Electrical Systems | |||||||||||||||
| 51 | 26 05 41 | Underground Electrical Construction | |||||||||||||||
| 52 | 26 05 48 | Vibration and Seismic Controls for Electrical Systems | |||||||||||||||
| 53 | 26 05 53 | Identification for Electrical Systems | |||||||||||||||
| 54 | 26 05 73 | Overcurrent Protective Device Coordination Study | |||||||||||||||
| 55 | 26 05 74 | Overcurrent Protective Device Arc-Flash Study | |||||||||||||||
| 56 | 26 08 00 | Commissioning of Electrical Systems | |||||||||||||||
| 57 | 26 27 26 | Wiring Devices | |||||||||||||||
| 58 | 26 29 11 | Motor Controllers | |||||||||||||||
| 59 | 26 29 21 | Enclosed Switches and Circuit Breakers | |||||||||||||||
| 60 | 26 56 00 | Exterior Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 31 - EARTHWORK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 61 | 31 20 00 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 62 | 31 63 26 | Drilled Caissons | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | |||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 63 | 32 05 23 | Cement and Concrete for Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 64 | 32 31 13 | Chain Link Fences and Gates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 65 | 32 84 00 | Planting Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 66 | 32 90 00 | Planting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 33 - UTILITIES | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 67 | 33 08 00 | Commissioning of Site Utility Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 68 | 33 10 00 | Water Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 69 | 33 40 00 | Storm Sewer Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 70 | 33 46 13 | Foundation Drainage | |||||||||||||||
| 71 | 33 51 00 | Natural-Gas Distribution | |||||||||||||||
| 72 | 33 63 00 | Steam Energy Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 34 - TRANSPORTATION | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 131 | Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 132 | Active Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Design | $ - 0 | $ - 0 | $ - 0 | Work Days | 64 | ||||||||||||
| 140 | Direct Design | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 21.796875 | |||||||
| 141 | Design Support | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CLOSE-OUT DOCUMENTS | $ - 0 | $ - 0 | |||||||||||||||
| 142 | As-Built Drawings | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 143 | O&M Manuals | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 |
&CPage &P
CLIN 002
| CLIN 002 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 38 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 39 | 23 07 11 | HVAC and Boiler Plant Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 40 | 23 08 00 | Commissioning of HVAC Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 41 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 42 | 23 21 13 | Hydronic Piping | |||||||||||||||
| 43 | 23 22 13 | Steam and Condensate Heating Piping | |||||||||||||||
| 44 | 23 25 00 | HVAC Water Treatment | |||||||||||||||
| 45 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 26 - ELECTRICAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 46 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 47 | 26 05 13 | Medium Voltage Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 48 | 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 49 | 26 05 26 | Grounding and Bonding for Electrical Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 50 | 26 05 29 | Hangers and Supports for Electrical Systems | |||||||||||||||
| 51 | 26 05 41 | Underground Electrical Construction | |||||||||||||||
| 52 | 26 05 48 | Vibration and Seismic Controls for Electrical Systems | |||||||||||||||
| 53 | 26 05 53 | Identification for Electrical Systems | |||||||||||||||
| 54 | 26 05 73 | Overcurrent Protective Device Coordination Study | |||||||||||||||
| 55 | 26 05 74 | Overcurrent Protective Device Arc-Flash Study | |||||||||||||||
| 56 | 26 08 00 | Commissioning of Electrical Systems | |||||||||||||||
| 57 | 26 27 26 | Wiring Devices | |||||||||||||||
| 58 | 26 29 11 | Motor Controllers | |||||||||||||||
| 59 | 26 29 21 | Enclosed Switches and Circuit Breakers | |||||||||||||||
| 60 | 26 56 00 | Exterior Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 31 - EARTHWORK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 61 | 31 20 00 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 62 | 31 63 26 | Drilled Caissons | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | |||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 63 | 32 05 23 | Cement and Concrete for Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 64 | 32 31 13 | Chain Link Fences and Gates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 65 | 32 84 00 | Planting Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 66 | 32 90 00 | Planting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 33 - UTILITIES | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 67 | 33 08 00 | Commissioning of Site Utility Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 68 | 33 10 00 | Water Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 69 | 33 40 00 | Storm Sewer Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 70 | 33 46 13 | Foundation Drainage | |||||||||||||||
| 71 | 33 51 00 | Natural-Gas Distribution | |||||||||||||||
| 72 | 33 63 00 | Steam Energy Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 34 - TRANSPORTATION | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 131 | Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 132 | Active Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Design | $ - 0 | $ - 0 | $ - 0 | Work Days | 64 | ||||||||||||
| 140 | Direct Design | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 21.796875 | |||||||
| 141 | Design Support | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CLOSE-OUT DOCUMENTS | $ - 0 | $ - 0 | |||||||||||||||
| 142 | As-Built Drawings | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 143 | O&M Manuals | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 |
&CPage &P
CLIN 003
| CLIN 003 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 38 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 39 | 23 07 11 | HVAC and Boiler Plant Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 40 | 23 08 00 | Commissioning of HVAC Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 41 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 42 | 23 21 13 | Hydronic Piping | |||||||||||||||
| 43 | 23 22 13 | Steam and Condensate Heating Piping | |||||||||||||||
| 44 | 23 25 00 | HVAC Water Treatment | |||||||||||||||
| 45 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 26 - ELECTRICAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 46 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 47 | 26 05 13 | Medium Voltage Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 48 | 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 49 | 26 05 26 | Grounding and Bonding for Electrical Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 50 | 26 05 29 | Hangers and Supports for Electrical Systems | |||||||||||||||
| 51 | 26 05 41 | Underground Electrical Construction | |||||||||||||||
| 52 | 26 05 48 | Vibration and Seismic Controls for Electrical Systems | |||||||||||||||
| 53 | 26 05 53 | Identification for Electrical Systems | |||||||||||||||
| 54 | 26 05 73 | Overcurrent Protective Device Coordination Study | |||||||||||||||
| 55 | 26 05 74 | Overcurrent Protective Device Arc-Flash Study | |||||||||||||||
| 56 | 26 08 00 | Commissioning of Electrical Systems | |||||||||||||||
| 57 | 26 27 26 | Wiring Devices | |||||||||||||||
| 58 | 26 29 11 | Motor Controllers | |||||||||||||||
| 59 | 26 29 21 | Enclosed Switches and Circuit Breakers | |||||||||||||||
| 60 | 26 56 00 | Exterior Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 31 - EARTHWORK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 61 | 31 20 00 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 62 | 31 63 26 | Drilled Caissons | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | |||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 63 | 32 05 23 | Cement and Concrete for Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 64 | 32 31 13 | Chain Link Fences and Gates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 65 | 32 84 00 | Planting Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 66 | 32 90 00 | Planting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 33 - UTILITIES | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 67 | 33 08 00 | Commissioning of Site Utility Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 68 | 33 10 00 | Water Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 69 | 33 40 00 | Storm Sewer Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 70 | 33 46 13 | Foundation Drainage | |||||||||||||||
| 71 | 33 51 00 | Natural-Gas Distribution | |||||||||||||||
| 72 | 33 63 00 | Steam Energy Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 34 - TRANSPORTATION | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 131 | Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 132 | Active Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Design | $ - 0 | $ - 0 | $ - 0 | Work Days | 64 | ||||||||||||
| 140 | Direct Design | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 21.796875 | |||||||
| 141 | Design Support | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CLOSE-OUT DOCUMENTS | $ - 0 | $ - 0 | |||||||||||||||
| 142 | As-Built Drawings | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 143 | O&M Manuals | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 |
&CPage &P
CLIN 004
| CLIN 004 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 38 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 39 | 23 07 11 | HVAC and Boiler Plant Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 40 | 23 08 00 | Commissioning of HVAC Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 41 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 42 | 23 21 13 | Hydronic Piping | |||||||||||||||
| 43 | 23 22 13 | Steam and Condensate Heating Piping | |||||||||||||||
| 44 | 23 25 00 | HVAC Water Treatment | |||||||||||||||
| 45 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 26 - ELECTRICAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 46 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 47 | 26 05 13 | Medium Voltage Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 48 | 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 49 | 26 05 26 | Grounding and Bonding for Electrical Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 50 | 26 05 29 | Hangers and Supports for Electrical Systems | |||||||||||||||
| 51 | 26 05 41 | Underground Electrical Construction | |||||||||||||||
| 52 | 26 05 48 | Vibration and Seismic Controls for Electrical Systems | |||||||||||||||
| 53 | 26 05 53 | Identification for Electrical Systems | |||||||||||||||
| 54 | 26 05 73 | Overcurrent Protective Device Coordination Study | |||||||||||||||
| 55 | 26 05 74 | Overcurrent Protective Device Arc-Flash Study | |||||||||||||||
| 56 | 26 08 00 | Commissioning of Electrical Systems | |||||||||||||||
| 57 | 26 27 26 | Wiring Devices | |||||||||||||||
| 58 | 26 29 11 | Motor Controllers | |||||||||||||||
| 59 | 26 29 21 | Enclosed Switches and Circuit Breakers | |||||||||||||||
| 60 | 26 56 00 | Exterior Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 31 - EARTHWORK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 61 | 31 20 00 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 62 | 31 63 26 | Drilled Caissons | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | |||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 63 | 32 05 23 | Cement and Concrete for Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 64 | 32 31 13 | Chain Link Fences and Gates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 65 | 32 84 00 | Planting Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 66 | 32 90 00 | Planting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 33 - UTILITIES | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 67 | 33 08 00 | Commissioning of Site Utility Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 68 | 33 10 00 | Water Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 69 | 33 40 00 | Storm Sewer Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 70 | 33 46 13 | Foundation Drainage | |||||||||||||||
| 71 | 33 51 00 | Natural-Gas Distribution | |||||||||||||||
| 72 | 33 63 00 | Steam Energy Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 34 - TRANSPORTATION | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 131 | Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 132 | Active Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Design | $ - 0 | $ - 0 | $ - 0 | Work Days | 64 | ||||||||||||
| 140 | Direct Design | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 21.796875 | |||||||
| 141 | Design Support | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CLOSE-OUT DOCUMENTS | $ - 0 | $ - 0 | |||||||||||||||
| 142 | As-Built Drawings | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 143 | O&M Manuals | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 |
&CPage &P
CLIN 005
| CLIN 005 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 38 | 23 05 93 | Testing, Adjusting, and Balancing for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 39 | 23 07 11 | HVAC and Boiler Plant Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 40 | 23 08 00 | Commissioning of HVAC Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 41 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 42 | 23 21 13 | Hydronic Piping | |||||||||||||||
| 43 | 23 22 13 | Steam and Condensate Heating Piping | |||||||||||||||
| 44 | 23 25 00 | HVAC Water Treatment | |||||||||||||||
| 45 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 26 - ELECTRICAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 46 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 47 | 26 05 13 | Medium Voltage Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 48 | 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 49 | 26 05 26 | Grounding and Bonding for Electrical Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 50 | 26 05 29 | Hangers and Supports for Electrical Systems | |||||||||||||||
| 51 | 26 05 41 | Underground Electrical Construction | |||||||||||||||
| 52 | 26 05 48 | Vibration and Seismic Controls for Electrical Systems | |||||||||||||||
| 53 | 26 05 53 | Identification for Electrical Systems | |||||||||||||||
| 54 | 26 05 73 | Overcurrent Protective Device Coordination Study | |||||||||||||||
| 55 | 26 05 74 | Overcurrent Protective Device Arc-Flash Study | |||||||||||||||
| 56 | 26 08 00 | Commissioning of Electrical Systems | |||||||||||||||
| 57 | 26 27 26 | Wiring Devices | |||||||||||||||
| 58 | 26 29 11 | Motor Controllers | |||||||||||||||
| 59 | 26 29 21 | Enclosed Switches and Circuit Breakers | |||||||||||||||
| 60 | 26 56 00 | Exterior Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 31 - EARTHWORK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 61 | 31 20 00 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 62 | 31 63 26 | Drilled Caissons | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | |||||||
| DIVISION 32 - EXTERIOR IMPROVEMENTS | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 63 | 32 05 23 | Cement and Concrete for Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 64 | 32 31 13 | Chain Link Fences and Gates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 65 | 32 84 00 | Planting Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 66 | 32 90 00 | Planting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 33 - UTILITIES | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 67 | 33 08 00 | Commissioning of Site Utility Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 68 | 33 10 00 | Water Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 69 | 33 40 00 | Storm Sewer Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man hours | 13950 | ||||||
| 70 | 33 46 13 | Foundation Drainage | |||||||||||||||
| 71 | 33 51 00 | Natural-Gas Distribution | |||||||||||||||
| 72 | 33 63 00 | Steam Energy Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Man Days | 1395 | ||||||
| DIVISION 34 - TRANSPORTATION | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| 131 | Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 95,000.00 | 95000 | $ - 0 | |||||||
| 132 | Active Vehicle Barriers | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Design | $ - 0 | $ - 0 | $ - 0 | Work Days | 64 | ||||||||||||
| 140 | Direct Design | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 21.796875 | |||||||
| 141 | Design Support | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| CLOSE-OUT DOCUMENTS | $ - 0 | $ - 0 | |||||||||||||||
| 142 | As-Built Drawings | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 143 | O&M Manuals | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 |
&CPage &P
CLIN 006
| CLIN 006 - CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||||||||
| MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 2 | 01 00 10 | Contractor Quality Control (CQC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 3 | 01 32 16.15 | Project Schedules (Small Projects) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 4 | 01 33 23 | Shop Drawings, Product Data, and Samples | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 5 | 01 35 26 | Safety Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 6 | 01 42 19 | Reference Standards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 7 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 8 | 01 45 29 | Testing Laboratory Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 9 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 10 | 01 57 19 | Temporary Environmental Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 11 | 01 74 19 | Construction Waste Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 12 | 01 91 00 | General Commissioning Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 13 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 14 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 15 | 03 30 00 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 16 | 04 05 13 | Masonry Mortaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 17 | 04 72 00 | Cast Stone Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 05 - METALS | |||||||||||||||||
| 18 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| 19 | 05 21 00 | Steel Joist Framing | |||||||||||||||
| 20 | 05 31 00 | Steel Decking | |||||||||||||||
| 21 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | 08 80 00 | Glazing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 25 | 10 73 00 | Translucent Custom Canopies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 26 | 13 05 41 | Seismic Restraint Requirements for Non-Structural Components | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 125,688.89 | 125688.888888889 | $ - 0 | ||||||
| DIVISION 22 - PLUMBING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 27 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 28 | 22 07 11 | Plumbing Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 29 | 22 08 00 | Commissioning of Plumbing Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 30 | 22 62 00 | Vacuum Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 31 | 22 63 00 | Gas Systems for Laboratory and Healthcare Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 32 | 23 05 10 | Common Work Results for Boiler Plant and Steam Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 604,806.05 | $ 604,806.05 | $ - 0 | ||||||
| 33 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 34 | 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 311,664.12 | $ 311,664.12 | $ - 0 | ||||||
| 35 | 23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 36 | 23 05 50 | Variable Frequency Drives | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| 37 | 23 05 51 | Noise and Vibration Control for Boiler Plant | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.