C3
A-301
B22 & B22A
SEE SHEET A-102
B31
SEE SHEET A-103
TEMPORARY/ADD
ALTERNATE NO. 1 CANOPY
SEE SHEET A-101.4/ A-101.5
P H
A S
E
P H
A S
E
S E
E S
H E
E T
A D
1/
E
D
AD101
C
AD101
A
AD101
B
AD101
9 10
15BBQ AREA
C6
S-504
P H
A S
E
S E
E S
H E
E T
A D
1/
B
P H
A S
E
P H
A S
E
S E
E S
H E
E T
A D
C5
A-302
B3
B24
SEATING
AREA
BBQ
(GRILLING)
AREA
7 8
(E) TREE TO REMAIN
C2
A-502
V E
R
IF
Y 4'
-6
F
AD101
E
AD101
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A-201.1
D1 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:5
P
M
AD101
ARCHITECTURAL DEMO PLANS
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (E) OVERHEAD SUPPORTS TO BE REMOVED AFTER (N) CONNECTION IS
OPERATIONAL
2 (E) CANOPY TO BE REMOVED
3 (E) EYEBROW ABOVE B3 ENTRANCE TO BE REMOVED
4 (E) RETAINING WALL TO BE REMOVED AND REPLACED FOR (N) 10' WIDE
SIDEWALK, SEE AS AND CIVIL DRAWINGS.
5 PREP AND CLEAR PATH FOR (F) TEMPORARY PEDESTRIAN LINK. SEE
SHEET A-101.4. SEE A-101.5 FOR PERMANENT ADD ALTERNATE NO. 1
CANOPY.
6 (E) RAILING TO REMAIN
7 (E) CANOPY OVER RAMP. DEMO DURING PHASE 2 UP TO SUPPORTING
COLUMNS. MAKE ROOM FOR NEW CANOPY.
8 (E) ROOF OVERHANG TO BE REMOVED FOR (N) CANOPY CONSTRUCTION.
(LEAVE 2" OVERHANG AND REPLACE STORM GUTTER)
9 OUTLINE OF (N) PEDESTRIAN LINK (TEMPORARY OR ADD. ALTERNATE NO.
1) TO BE OPERATIONAL PRIOR TO START OF ANY SYSTEM UPGRADE AND
UPDATE AS INDICATED IN THE MECHANICAL PLUMBING AND ELECTICAL
DRAWINGS
10 (E) PIPE BRIDGE AT PEDESTIAN LINK TO BE MAINTAINED UNTIL PERMINATE
CONNECTION TO B31 IS OPERATIONAL. COORDINATE AND PROVIDE
CLEARANCES AND SAFETY MEASURES FOR PEDESTRIAN TRAFFIC AS
NECESSARY.
11 (DIAGONAL CROSSHATCH) PORTION OF NEW INTEGRATED SYSTEMS
CANOPY TO BE CONSTRUCTED AS PART OF THE PEDESTRIAN LINK PRIOR
TO START OF ANY SYSTEM UPGRADE AND UPDATE AS INDICATED IN THE
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS
12 AFTER PEDESTRIAN LINK IS IN PLACE AND THE (E) CANOPY HAS BEEN
REMOVED, PROVIDE CONNECTION TO B31 OVERHEAD USING (N) CANOPY
SOFFIT STEEL FRAME TO ALLOW FOR DEMOLITION OF THE (E) PIPE
BRIDGE PRIOR TO CONSTRUCTION OF (N) PERMANENT CANOPY.
COORDINATE ROUTE WITH ALL TRADES ON-SITE WITH VA COR.
13 (E) WINDOW AWNINGS TO BE REMOVED
14 SECONDARY TEMPORARY PEDESTRIAN LINK THAT ENABLES ACCESS TO
B31 WHEN (N) CANOPY AND UTILITY CONNECTIONS BETWEEN B22A AND
B31 IS BEING CONSTRUCTED. SEE MPE DRAWINGS FOR ADDITIONAL
INFORMATION.
15 (E) SECURITY FENCE AND GATE WITH PIN LOCK TO BE REPLACED,
MAINTAIN SECURE PERIMETER DURING CONSTRUCTION
16 ADD ALTERNATE NO. 2; (E) SIDEWALK TO BE REMOVED, WIDENED AND
REPLACED. SEE AS101.1 THROUGH AS111.2 FOR ADD ALTERNATE NO. 2,
SEE AS100.1 THROUGH AS100.5 FOR BASE BID.
1" = 10'-0" B5
ARCHITECTURAL DEMOLITION PLAN - PHASE 1
1" = 10'-0" E5
ARCHITECTURAL DEMOLITION PLAN - PHASE 2
KEYNOTES
EXISTING B22A CHILLED WATER SERVICE TO BE
EXTENDEDED TO NEW CANOPY
EXISTING B31 CANOPY TO BE REPLACED WITH NEW CANOPY
HOUSING UTILITY CHASE
EXISTING B3 EAVE AND EYEBROW TO BE REMOVED
EXISTING RETAINING WALL
EXISTING PIPE BRIDGE AND CHILLED WATER SERVICE TO BE REMOVED
EXISTING PIPE BRIDGE AND CHILLED WATER SERVICE TO BE MOVED
TO NEW CANOPY UTILITY CHASE
D
AD101
C
AD101
A
AD101
B
AD101
E
AD101
F
AD101
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018
A-201.2
B1
4'-3"
B
S U
B -B
A S
E M
E N
T C
R A
W L
S P
A C
E
UTILITY TUNNEL BELOW GRADE
B24
BASEMENT
U T
IL
IT
Y T
U N
N E
L B
E L
O W
G R
A D
E
PHASE 2
SEE SHEET AD101/E5
PHASE 3
SEE SHEET AD102/F1
TEMPORARY/ADD
ALTERNATE CANOPY
SEE SHEET AD103
C
AD102
D
AD102
5' -5
B1 & B24 BREEZEWAY
(ABOVE)
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
AREA OF WORK
(E
'-0
P H
A S
E
S E
E S
H E
E T
A D
-1
/E
A-201.2
B6
B1
B3
L O
A D
IN
G
D O
C K
T5
A
AD102
B
AD102
P
H A
S E
B1 & B24 BREEZEWAY
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
A-201.2
D1
A-201.2
D6
F1
A-309
A-201.2
B1
(E
'-0
V E
R
IF
Y
8' -5
7'
-0
B24
A
AD102
B1 & B24 BREEZEWAY
AREA OF WORK
TEMPORARY/ADD
ALTERNATE CANOPY
SEE SHEET AD103
B1 & B24 BREEZEWAYA
R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
AREA OF WORK
B24
F1
A-309 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:0
P
M
AD102
ARCHITECTURAL DEMO PLANS
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" B5
ARCHITECTURAL DEMOLITION PLAN - UTILITY TUNNEL - PHASE 3
1 (E) UTILITY TUNNEL ROOF AND (N) CHW PIPING CONNECTIONS TO BE
MADE INSIDE (E) UTILITY TUNNEL
2 (E) CANOPY TO BE REMOVED
3 (E) PEDESTRIAN CANOPIES TO BE REMOVED AND REPLACED, ABOVE
4 (E) CANOPIES ON BUILDING TO BE REMOVED, ABOVE
5 OUTLINE OF BUILDING 24, ABOVE
6 PEDESTRIAN, PATIENT AND STAFF ACCESS TO BE RE-ROUTED AS
NECESSARY DURING CONSTRUCTION
7 (E) SIDEWALK TO REMAIN
8 OUTLINE OF BUILDING 24, ABOVE
9 (E) B1 & B24 BREEZEWAY, ABOVE
10 ROUTE OF (N) TEMPORARY / ADD ALTERNATE COVERED PEDESTRIAN,
PATIENT AND STAFF ACCESS FROM CLC
11 (N) CANOPY, PHASE 2
12 (E) MODULAR BUILDING TO BE REMOVED IN (F) PHASE TO ALLOW FOR
CONSTRUCTION OF (F) CANOPY SOFFIT.
13 (E) GUARD RAIL TO BE REMOVED AND REPLACED WITH (N) SEAT WALL,
PHASE 3
14 (E) FENCE TO BE RELOCATED. SEE AS100.3 AND AS101.3 FOR LOCATION.
15 (E) FENCE TO REMAIN
16 SHORE (E) CANOPY AS NECESSARY
17 B24 (E) STAIRS TO REMAIN. COORDINATE BLOCKAGE AND DOWNTIME OF
(E) EMERGENCY BLDG EXITS WITH VA COR.
18 VA TO RELOCATE (E) CONNEX STORAGE PRIOR TO CONSTRUCTION
19 (E) B1 ACCESS TO REMAIN OPERATIONAL AT ALL TIMES
20 REMOVE PORTION OF (E) WALL AND ADJACENT SITE FOR (N) SIDEWALK
AND RAMP TO B24 AUDITORIUM. SEE AS SHEETS FOR DETAILS.
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0" D2
ARCHITECTURAL DEMOLITION PLAN - PHASE 3 - ADD ALTERNATE NO. 2
A
AD102
(E) PEDESTRIAN CANOPY TO BE REMOVED AND REPLACED
(B1 & B24 BREEZEWAY)
B
AD102
(E) PEDESTRIAN CANOPY TO BE REMOVED AND REPLACED
(B1 & B24 BREEZEWAY)
C
AD102
(E) UTILITY TUNNEL, LOCATION OF (N) PIPE PENETRATIONS
AND POC/B1 CRAWLSPACE ENTRANCE
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
D
AD102
(N) UTILITY CHASE TO UTILITY TUNNLE BELOW AT B1/B24
ENTRANCE CANOPY
1" = 10'-0" E5
ARCHITECTURAL DEMOLITION PLAN - PHASE 3 - B1 & B24 BREEZEWAY
NO REVISIONS DATE
B24 B25
'-0
E Q
E Q
'-1
0"
'-5
'-3
'-1
0"
10'-0"
VERIF
Y36
'-8
A
AD103
DO NOT ENCROACH ON
STAINED CONCRETE
SLAB ON GRADE
B
AD103
C
AD103
D
AD103
PHASE 1
SEE SHEET A-101.1
B1 & B24 - BREEZEWAY
SEE SHEET AD102
PHASE 2
SEE SHEET A-101.2
PHASE 3
SEE SHEET A-101.3
V
IF
3' -1
1"
AREA OF WORK
AREA OF WORK
AREA OF WORK
A R
EA O
F W O R K
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
A R
E A
O F
W O
R K
V E
R
IF
Y
'-7
(E) WALL AND
SIDEWALK TO BE
REMOVED AS
NECESSARY
VERIFY
14'-1"
V E
R
IF
Y
'-7 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:1
P
M
AD103
ARCHITECTURAL DEMO PLANS - ADD
ALTERNATE NO.1 - PHASE 1
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
KEYNOTES
1" = 10'-0" F1
ARCHITECTURAL DEMOLITION PLAN - ADD ALTERNATE NO.1
1 ALTERNATE PEDESTRIAN ROUTE, PREP GRADE FOR (N) SIDEWALK, SEE
CU100.4 AND AS101.4 FOR ADDITIONAL INFORMATION.
2 (E) DRAIN TO BE RELOCATED, SEE CIVIL DRAWINGS FOR ADDITIONAL
INFORMATION
3 LOCATION OF (F) CONNECTION TO (E) TUNNEL FOR (F) PROJECTS
4 (E) SPRINKLER UTILITIES TO BE RELOCATED, SEE CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION
5 (E) UTILITIES TUNNEL, BELOW
6 (E) PIPE BRIDGE TO REMAIN UNTIL SUPPORTING UTILITIES HAVE BEEN
RELOCATED FOR SERVICE TO CLC (B31).
7 REMOVAL OF (E) TREES FOR (N) CANOPY. COORDINATE WITH VA ON
REMOVAL.
8 (E) CONCRETE CAP W/ ELECTRICAL CONNECTION
9 REMOVAL OF (E) TREES FOR (N) CANOPY. COORDINATE WITH VA ON
REMOVAL.
(E) TREES TO BE REMOVED FOR ADD ALT.
(COORDINATE WITH COR)
A
AD103
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
(N) ADD ALTERNATE / TEMPORARY
CANOPY ROUTEB
AD103
(N) ADD ALTERNATIVE / TEMPORARY
CANOPY ROUTEC
AD103
(N) ADD ALTERNATIVE / TEMPORARY
CANOPY ROUTED
AD103
NO REVISIONS DATE
B3
SEATING
AREA
(E) B3 TO REMAIN
AREA OF WORK
AREA OF WORK
AREA OF WORK
(E) BUILDING 3 TO REMAIN UNTIL
(F) CONSTRUCTION OF THE
TECHNOLOGY BUILDING
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
4/
/2
2:
:1
P
M
AD111.2
ARCHITECTURAL DEMO PLANS - FUTURE
CONSTRUCTION
M. PERKINS D. YOUNG02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
KEYNOTES
1" = 10'-0" C2
ARCHITECTURAL DEMOLITION PLAN - FUTURE CONSTRUCTION PHASE
1 (E) CANOPY TO BE REMOVED
2 (E) EYEBROW ABOVE B3 ENTRANCE TO BE REMOVED
3 (E) RAILING TO REMAIN
4 (E) CANOPY OVER RAMP. DEMO. DURING PHASE 2 UP TO SUPPORTING
COLUMNS. MAKE ROOM FOR (N) CANOPY.
5 (N) CANOPY PHASE 1
7 (E) BASE BID SIDEWALK
8 (N) ADD ALTERNATE NO. 2 SIDEWALK
9 DEMO OF (E) BUILDING 3 IS NOT IN SCOPE, SHOWN FOR REFERENCE
ONLY
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
NO REVISIONS DATE