36C26118R0487-0002049.pdf

PDF 9 MB Posted

Attached to
Phase II of Chiller Infrastructure Project 570-18-3-775-0055 Project # 570-16-302
Solicitation number
36C26118R0487
Issued by

About this file

36C26118R0487 0002 570-16-302_AD101thurAD111.2.pdf

View the file

Other files

File Type Posted
36C26118R0487-0005000.docx DOCX document
36C26118R0487-0004000.docx DOCX document
36C26118R0487-0003001.pdf PDF
36C26118R0487-0003000.docx DOCX document
36C26118R0487-0002045.pdf PDF
36C26118R0487-0002037.pdf PDF
36C26118R0487-0002042.pdf PDF
36C26118R0487-0002039.pdf PDF
36C26118R0487-0002043.pdf PDF
36C26118R0487-0002040.pdf PDF
36C26118R0487-0002048.pdf PDF
36C26118R0487-0002050.pdf PDF
36C26118R0487-0002044.pdf PDF
36C26118R0487-0002046.pdf PDF
36C26118R0487-0002041.pdf PDF
36C26118R0487-0002047.pdf PDF
36C26118R0487-0002038.pdf PDF
36C26118R0487-0002036.docx DOCX document
36C26118R0487-0001001.pdf PDF
36C26118R0487-0001000.docx DOCX document
36C26118R0487-0001003.pdf PDF
36C26118R0487-0001002.pdf PDF
36C26118R0487-101.pdf PDF
36C26118R0487-093.pdf PDF
36C26118R0487-096.pdf PDF
36C26118R0487-099.pdf PDF
36C26118R0487-109.pdf PDF
36C26118R0487-107.pdf PDF
36C26118R0487-090.pdf PDF
36C26118R0487-106.pdf PDF
36C26118R0487-094.pdf PDF
36C26118R0487-110.pdf PDF
36C26118R0487-104.pdf PDF
36C26118R0487-089.docx DOCX document
36C26118R0487-100.pdf PDF
36C26118R0487-102.pdf PDF
36C26118R0487-108.pdf PDF
36C26118R0487-098.pdf PDF
36C26118R0487-105.pdf PDF
36C26118R0487-092.xls XLS spreadsheet
36C26118R0487-091.doc DOC document
36C26118R0487-097.pdf PDF
36C26118R0487-095.pdf PDF
36C26118R0487-103.pdf PDF
36C26118R0487-000.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C3

A-301

B22 & B22A

SEE SHEET A-102

B31

SEE SHEET A-103

TEMPORARY/ADD

ALTERNATE NO. 1 CANOPY

SEE SHEET A-101.4/ A-101.5

P H

A S

E

P H

A S

E

S E

E S

H E

E T

A D

1/

E

D

AD101

C

AD101

A

AD101

B

AD101

9 10

15BBQ AREA

C6

S-504

P H

A S

E

S E

E S

H E

E T

A D

1/

B

P H

A S

E

P H

A S

E

S E

E S

H E

E T

A D

C5

A-302

B3

B24

SEATING

AREA

BBQ

(GRILLING)

AREA

7 8

(E) TREE TO REMAIN

C2

A-502

V E

R

IF

Y 4'

-6

F

AD101

E

AD101

AREA OF WORK

AREA OF WORK

AREA OF WORK

A R

E A

O F

W O

R K

AREA OF WORK

AREA OF WORK

A-201.1

D1 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

ISSUED FOR CONSTRUCTION

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

B

IM

0-

-3

V A

F re sn o

C hi lle r

P la nt P

/5

-1

6-

V

A F re sn o C hi lle r P la nt

-O P

T 4A

.rv t

4/

/2

2:

:5

P

M

AD101

ARCHITECTURAL DEMO PLANS

M. PERKINS D. YOUNG02/07/2018

570-16-302DESIGN EXPANDED CHILLED

WATER CAPACITY, PHASE 2

100% CONSTRUCTION DOCUMENTS

SUBMISSION

2615 E Clinton Ave, Fresno, CA 93703

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P2 B31

B3

B32 P1

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

1 (E) OVERHEAD SUPPORTS TO BE REMOVED AFTER (N) CONNECTION IS

OPERATIONAL

2 (E) CANOPY TO BE REMOVED

3 (E) EYEBROW ABOVE B3 ENTRANCE TO BE REMOVED

4 (E) RETAINING WALL TO BE REMOVED AND REPLACED FOR (N) 10' WIDE

SIDEWALK, SEE AS AND CIVIL DRAWINGS.

5 PREP AND CLEAR PATH FOR (F) TEMPORARY PEDESTRIAN LINK. SEE

SHEET A-101.4. SEE A-101.5 FOR PERMANENT ADD ALTERNATE NO. 1

CANOPY.

6 (E) RAILING TO REMAIN

7 (E) CANOPY OVER RAMP. DEMO DURING PHASE 2 UP TO SUPPORTING

COLUMNS. MAKE ROOM FOR NEW CANOPY.

8 (E) ROOF OVERHANG TO BE REMOVED FOR (N) CANOPY CONSTRUCTION.

(LEAVE 2" OVERHANG AND REPLACE STORM GUTTER)

9 OUTLINE OF (N) PEDESTRIAN LINK (TEMPORARY OR ADD. ALTERNATE NO.

1) TO BE OPERATIONAL PRIOR TO START OF ANY SYSTEM UPGRADE AND

UPDATE AS INDICATED IN THE MECHANICAL PLUMBING AND ELECTICAL

DRAWINGS

10 (E) PIPE BRIDGE AT PEDESTIAN LINK TO BE MAINTAINED UNTIL PERMINATE

CONNECTION TO B31 IS OPERATIONAL. COORDINATE AND PROVIDE

CLEARANCES AND SAFETY MEASURES FOR PEDESTRIAN TRAFFIC AS

NECESSARY.

11 (DIAGONAL CROSSHATCH) PORTION OF NEW INTEGRATED SYSTEMS

CANOPY TO BE CONSTRUCTED AS PART OF THE PEDESTRIAN LINK PRIOR

TO START OF ANY SYSTEM UPGRADE AND UPDATE AS INDICATED IN THE

MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS

12 AFTER PEDESTRIAN LINK IS IN PLACE AND THE (E) CANOPY HAS BEEN

REMOVED, PROVIDE CONNECTION TO B31 OVERHEAD USING (N) CANOPY

SOFFIT STEEL FRAME TO ALLOW FOR DEMOLITION OF THE (E) PIPE

BRIDGE PRIOR TO CONSTRUCTION OF (N) PERMANENT CANOPY.

COORDINATE ROUTE WITH ALL TRADES ON-SITE WITH VA COR.

13 (E) WINDOW AWNINGS TO BE REMOVED

14 SECONDARY TEMPORARY PEDESTRIAN LINK THAT ENABLES ACCESS TO

B31 WHEN (N) CANOPY AND UTILITY CONNECTIONS BETWEEN B22A AND

B31 IS BEING CONSTRUCTED. SEE MPE DRAWINGS FOR ADDITIONAL

INFORMATION.

15 (E) SECURITY FENCE AND GATE WITH PIN LOCK TO BE REPLACED,

MAINTAIN SECURE PERIMETER DURING CONSTRUCTION

16 ADD ALTERNATE NO. 2; (E) SIDEWALK TO BE REMOVED, WIDENED AND

REPLACED. SEE AS101.1 THROUGH AS111.2 FOR ADD ALTERNATE NO. 2,

SEE AS100.1 THROUGH AS100.5 FOR BASE BID.

1" = 10'-0" B5

ARCHITECTURAL DEMOLITION PLAN - PHASE 1

1" = 10'-0" E5

ARCHITECTURAL DEMOLITION PLAN - PHASE 2

KEYNOTES

EXISTING B22A CHILLED WATER SERVICE TO BE

EXTENDEDED TO NEW CANOPY

EXISTING B31 CANOPY TO BE REPLACED WITH NEW CANOPY

HOUSING UTILITY CHASE

EXISTING B3 EAVE AND EYEBROW TO BE REMOVED

EXISTING RETAINING WALL

EXISTING PIPE BRIDGE AND CHILLED WATER SERVICE TO BE REMOVED

EXISTING PIPE BRIDGE AND CHILLED WATER SERVICE TO BE MOVED

TO NEW CANOPY UTILITY CHASE

D

AD101

C

AD101

A

AD101

B

AD101

E

AD101

F

AD101

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A

CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE

INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO

BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING

IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,

B22, B24 & B31.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS

FOR ADDITIONAL INFORMATION.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE

THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN

TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT

SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM

CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH

ALL TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED

TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND

PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE

PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY

CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS

REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.

J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY

RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED

OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.

GENERAL SHEET NOTES

NO REVISIONS DATE

Expires 6.30.16Expires: 6/30/18

2/7/2018

A-201.2

B1

4'-3"

B

S U

B -B

A S

E M

E N

T C

R A

W L

S P

A C

E

UTILITY TUNNEL BELOW GRADE

B24

BASEMENT

U T

IL

IT

Y T

U N

N E

L B

E L

O W

G R

A D

E

PHASE 2

SEE SHEET AD101/E5

PHASE 3

SEE SHEET AD102/F1

TEMPORARY/ADD

ALTERNATE CANOPY

SEE SHEET AD103

C

AD102

D

AD102

5' -5

B1 & B24 BREEZEWAY

(ABOVE)

A R

E A

O F

W O

R K

AREA OF WORK

AREA OF WORK

AREA OF WORK

(E

'-0

P H

A S

E

S E

E S

H E

E T

A D

-1

/E

A-201.2

B6

B1

B3

L O

A D

IN

G

D O

C K

T5

A

AD102

B

AD102

P

H A

S E

B1 & B24 BREEZEWAY

AREA OF WORK

AREA OF WORK

AREA OF WORK

A R

E A

O F

W O

R K

A R

E A

O F

W O

R K

A-201.2

D1

A-201.2

D6

F1

A-309

A-201.2

B1

(E

'-0

V E

R

IF

Y

8' -5

7'

-0

B24

A

AD102

B1 & B24 BREEZEWAY

AREA OF WORK

TEMPORARY/ADD

ALTERNATE CANOPY

SEE SHEET AD103

B1 & B24 BREEZEWAYA

R

E A

O F

W O

R K

AREA OF WORK

AREA OF WORK

AREA OF WORK

B24

F1

A-309 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

ISSUED FOR CONSTRUCTION

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

B

IM

0-

-3

V A

F re sn o

C hi lle r

P la nt P

/5

-1

6-

V

A F re sn o C hi lle r P la nt

-O P

T 4A

.rv t

4/

/2

2:

:0

P

M

AD102

ARCHITECTURAL DEMO PLANS

M. PERKINS D. YOUNG02/07/2018

570-16-302DESIGN EXPANDED CHILLED

WATER CAPACITY, PHASE 2

100% CONSTRUCTION DOCUMENTS

SUBMISSION

2615 E Clinton Ave, Fresno, CA 93703

1" = 10'-0" B5

ARCHITECTURAL DEMOLITION PLAN - UTILITY TUNNEL - PHASE 3

1 (E) UTILITY TUNNEL ROOF AND (N) CHW PIPING CONNECTIONS TO BE

MADE INSIDE (E) UTILITY TUNNEL

2 (E) CANOPY TO BE REMOVED

3 (E) PEDESTRIAN CANOPIES TO BE REMOVED AND REPLACED, ABOVE

4 (E) CANOPIES ON BUILDING TO BE REMOVED, ABOVE

5 OUTLINE OF BUILDING 24, ABOVE

6 PEDESTRIAN, PATIENT AND STAFF ACCESS TO BE RE-ROUTED AS

NECESSARY DURING CONSTRUCTION

7 (E) SIDEWALK TO REMAIN

8 OUTLINE OF BUILDING 24, ABOVE

9 (E) B1 & B24 BREEZEWAY, ABOVE

10 ROUTE OF (N) TEMPORARY / ADD ALTERNATE COVERED PEDESTRIAN,

PATIENT AND STAFF ACCESS FROM CLC

11 (N) CANOPY, PHASE 2

12 (E) MODULAR BUILDING TO BE REMOVED IN (F) PHASE TO ALLOW FOR

CONSTRUCTION OF (F) CANOPY SOFFIT.

13 (E) GUARD RAIL TO BE REMOVED AND REPLACED WITH (N) SEAT WALL,

PHASE 3

14 (E) FENCE TO BE RELOCATED. SEE AS100.3 AND AS101.3 FOR LOCATION.

15 (E) FENCE TO REMAIN

16 SHORE (E) CANOPY AS NECESSARY

17 B24 (E) STAIRS TO REMAIN. COORDINATE BLOCKAGE AND DOWNTIME OF

(E) EMERGENCY BLDG EXITS WITH VA COR.

18 VA TO RELOCATE (E) CONNEX STORAGE PRIOR TO CONSTRUCTION

19 (E) B1 ACCESS TO REMAIN OPERATIONAL AT ALL TIMES

20 REMOVE PORTION OF (E) WALL AND ADJACENT SITE FOR (N) SIDEWALK

AND RAMP TO B24 AUDITORIUM. SEE AS SHEETS FOR DETAILS.

KEYNOTES

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P3 B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

1" = 10'-0" D2

ARCHITECTURAL DEMOLITION PLAN - PHASE 3 - ADD ALTERNATE NO. 2

A

AD102

(E) PEDESTRIAN CANOPY TO BE REMOVED AND REPLACED

(B1 & B24 BREEZEWAY)

B

AD102

(E) PEDESTRIAN CANOPY TO BE REMOVED AND REPLACED

(B1 & B24 BREEZEWAY)

C

AD102

(E) UTILITY TUNNEL, LOCATION OF (N) PIPE PENETRATIONS

AND POC/B1 CRAWLSPACE ENTRANCE

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A

CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE

INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO

BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING

IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,

B22, B24 & B31.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS

FOR ADDITIONAL INFORMATION.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE

THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN

TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT

SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM

CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH

ALL TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED

TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND

PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE

PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY

CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS

REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.

J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY

RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED

OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.

GENERAL SHEET NOTES

D

AD102

(N) UTILITY CHASE TO UTILITY TUNNLE BELOW AT B1/B24

ENTRANCE CANOPY

1" = 10'-0" E5

ARCHITECTURAL DEMOLITION PLAN - PHASE 3 - B1 & B24 BREEZEWAY

NO REVISIONS DATE

B24 B25

'-0

E Q

E Q

'-1

0"

'-5

'-3

'-1

0"

10'-0"

VERIF

Y36

'-8

A

AD103

DO NOT ENCROACH ON

STAINED CONCRETE

SLAB ON GRADE

B

AD103

C

AD103

D

AD103

PHASE 1

SEE SHEET A-101.1

B1 & B24 - BREEZEWAY

SEE SHEET AD102

PHASE 2

SEE SHEET A-101.2

PHASE 3

SEE SHEET A-101.3

V

IF

3' -1

1"

AREA OF WORK

AREA OF WORK

AREA OF WORK

A R

EA O

F W O R K

AREA OF WORK

A R

E A

O F

W O

R K

AREA OF WORK

A R

E A

O F

W O

R K

V E

R

IF

Y

'-7

(E) WALL AND

SIDEWALK TO BE

REMOVED AS

NECESSARY

VERIFY

14'-1"

V E

R

IF

Y

'-7 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

ISSUED FOR CONSTRUCTION

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

B

IM

0-

-3

V A

F re sn o

C hi lle r

P la nt P

/5

-1

6-

V

A F re sn o C hi lle r P la nt

-O P

T 4A

.rv t

4/

/2

2:

:1

P

M

AD103

ARCHITECTURAL DEMO PLANS - ADD

ALTERNATE NO.1 - PHASE 1

M. PERKINS D. YOUNG02/07/2018

570-16-302DESIGN EXPANDED CHILLED

WATER CAPACITY, PHASE 2

100% CONSTRUCTION DOCUMENTS

SUBMISSION

2615 E Clinton Ave, Fresno, CA 93703

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32 P1

ADD- ALT.

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

KEYNOTES

1" = 10'-0" F1

ARCHITECTURAL DEMOLITION PLAN - ADD ALTERNATE NO.1

1 ALTERNATE PEDESTRIAN ROUTE, PREP GRADE FOR (N) SIDEWALK, SEE

CU100.4 AND AS101.4 FOR ADDITIONAL INFORMATION.

2 (E) DRAIN TO BE RELOCATED, SEE CIVIL DRAWINGS FOR ADDITIONAL

INFORMATION

3 LOCATION OF (F) CONNECTION TO (E) TUNNEL FOR (F) PROJECTS

4 (E) SPRINKLER UTILITIES TO BE RELOCATED, SEE CIVIL DRAWINGS FOR

ADDITIONAL INFORMATION

5 (E) UTILITIES TUNNEL, BELOW

6 (E) PIPE BRIDGE TO REMAIN UNTIL SUPPORTING UTILITIES HAVE BEEN

RELOCATED FOR SERVICE TO CLC (B31).

7 REMOVAL OF (E) TREES FOR (N) CANOPY. COORDINATE WITH VA ON

REMOVAL.

8 (E) CONCRETE CAP W/ ELECTRICAL CONNECTION

9 REMOVAL OF (E) TREES FOR (N) CANOPY. COORDINATE WITH VA ON

REMOVAL.

(E) TREES TO BE REMOVED FOR ADD ALT.

(COORDINATE WITH COR)

A

AD103

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A

CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE

INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO

BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING

IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,

B22, B24 & B31.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS

FOR ADDITIONAL INFORMATION.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE

THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN

TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT

SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM

CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH

ALL TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED

TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND

PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE

PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY

CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS

REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.

J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY

RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED

OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.

GENERAL SHEET NOTES

(N) ADD ALTERNATE / TEMPORARY

CANOPY ROUTEB

AD103

(N) ADD ALTERNATIVE / TEMPORARY

CANOPY ROUTEC

AD103

(N) ADD ALTERNATIVE / TEMPORARY

CANOPY ROUTED

AD103

NO REVISIONS DATE

B3

SEATING

AREA

(E) B3 TO REMAIN

AREA OF WORK

AREA OF WORK

AREA OF WORK

(E) BUILDING 3 TO REMAIN UNTIL

(F) CONSTRUCTION OF THE

TECHNOLOGY BUILDING

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

ISSUED FOR CONSTRUCTION

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

B

IM

0-

-3

V A

F re sn o

C hi lle r

P la nt P

/5

-1

6-

V

A F re sn o C hi lle r P la nt

-O P

T 4A

.rv t

4/

/2

2:

:1

P

M

AD111.2

ARCHITECTURAL DEMO PLANS - FUTURE

CONSTRUCTION

M. PERKINS D. YOUNG02/07/2018

570-16-302DESIGN EXPANDED CHILLED

WATER CAPACITY, PHASE 2

100% CONSTRUCTION DOCUMENTS

SUBMISSION

2615 E Clinton Ave, Fresno, CA 93703

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P2 B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

KEYNOTES

1" = 10'-0" C2

ARCHITECTURAL DEMOLITION PLAN - FUTURE CONSTRUCTION PHASE

1 (E) CANOPY TO BE REMOVED

2 (E) EYEBROW ABOVE B3 ENTRANCE TO BE REMOVED

3 (E) RAILING TO REMAIN

4 (E) CANOPY OVER RAMP. DEMO. DURING PHASE 2 UP TO SUPPORTING

COLUMNS. MAKE ROOM FOR (N) CANOPY.

5 (N) CANOPY PHASE 1

7 (E) BASE BID SIDEWALK

8 (N) ADD ALTERNATE NO. 2 SIDEWALK

9 DEMO OF (E) BUILDING 3 IS NOT IN SCOPE, SHOWN FOR REFERENCE

ONLY

A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A

CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE

INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO

BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING

IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,

B22, B24 & B31.

B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR

SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN

WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE

AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE

ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS

FOR ADDITIONAL INFORMATION.

C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND

CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL

SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID

CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND

SERVICEABILITY.

D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER

FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE

THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN

TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT

SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM

CONSTRUCTION DOCUMENTS.

E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH

ALL TRADES PRIOR TO INSTALLATION.

F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED

TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND

PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED

EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.

I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE

PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY

CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS

REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.

J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR

PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE

PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY

RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED

OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.

GENERAL SHEET NOTES

NO REVISIONS DATE

File details come from the government source that posted it.