36C26118R0487-0002042.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 0002 15 - 570-16-302_ELECTRICAL.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
EX
A
X a
WALL
CEILING
WALL
CEILING
OS
OS
208Y/120V T1A 75kVA K-4
E4E3
A
DRAWING NUMBER WHERE TAKEN
DRAWING NUMBER WHERE DETAILED
SECTION/ELEVATION LETTER OR DETAIL
NUMBER
A
E4
E4
+44"
DRAWING NUMBER WHERE DETAILED
SECTION/ELEVATION LETTER OR DETAIL
NUMBER
VAV-9
(NOT ALL SYMBOLS APPLY TO THIS PROJECT)
NORTH ARROW OR MATCH ARCHITECT'S
SCALE BAR OR MATCH ARCHITECT'S
SURFACE
WALL
CEILING
ONE-LINE DIAGRAM
SPD
3000/5
CIRCUIT BREAKER; TRIP SETTING/FRAME SIZE OR NO. OF POLES.
SETTINGS AND PROTECTION AS NOTED ON PLANS
DRAWOUT CIRCUIT BREAKER
MEDIUM VOLTAGE DRAWOUT
CIRCUIT BREAKER
POTENTIAL TRANSFORMER.
DISCONNECT SWITCH. "300A"
DENOTES AMPERAGE RATING
FUSE. "300A" DENOTES AMPERAGE
RATING
GROUND CONNECTION
TRANSFER SWITCH. SEE PLANS
FOR TYPE OF SWITCH
SURGE ARRESTOR
SURGE PROTECTIVE DEVICE
KILOWATT METER
ELECTRONIC METER
KIRK KEY INTERLOCK No.1
RELAY No.1
AMMETER SWITCH
AMMETER
VOLTMETER SWITCH
VOLTMETER
DELTA CONNECTED
WYE CONNECTED
LIGHTING
RECESSED MOUNTED LUMINAIRE. SMALL CASE
"a" DENOTES SWITCHING, NUMBER "3" DENOTES
BRANCH CIRCUITING. SYMBOL "A" DENOTES
LUMINAIRE TYPE
WALL MOUNTED LUMINAIRES
STRIP LUMINAIRE
LINEAR DIRECT/INDIRECT LUMINAIRE. CABLE
OR STEM MOUNTED
DOWN LIGHT LUMINAIRE; CEILING MOUNTED
EXIT LUMINAIRE. SHADED SIDE INDICATES
FACE SIDE. PROVIDE DIRECTIONAL ARROW(S)
AS INDICATED ON PLANS
EMERGENCY BATTERY PACK LUMINAIRE
(BUG-EYE/FROG-EYE)
DOUBLE HEAD, POLE MOUNTED LUMINAIRE
TRACK MOUNTED LUMINAIRES
SURFACE
AS
DETAILED
CEILING
EXTERIOR
WALL
DEMOLITION
DASHED SYMBOL INDICATES EXISTING
DEVICE OR EQUIPMENT TO BE REMOVED
SOLID SYMBOL, LIGHTER IN COLOR
INDICATES EXISTING DEVICE OR EQUIPMENT
TO REMAIN
EXISTING CONDUIT TO BE REUSED
REMOVE EXISTING RACEWAY IN ALL ACCESSIBLE
AREAS. CAPPED AND ABANDONED IF IN
UNACCESSIBLE AREA
SYMBOL DEFINITION
REFERENCE TAGS
KEYED NOTE REFERENCE
MECHANICAL EQUIPMENT REFERENCE
DENOTES MOUNTING HEIGHT AFF
KITCHEN EQUIPMENT REFERENCE
MEDICAL EQUIPMENT REFERENCE
GENERAL DRAWING SYMBOLS
TRIP SETTING
FRAME SIZE
VARIES
R E
F E
R T
O L
IG
H
T
IN
G S
C H
E D
U
LE
EMERGENCY, CRITICALEC
EMERGENCY, LIFE SAFETYEL
EMERGENCY, EQUIPMENTEQ
TELEVISIONTV
EXISTING(E)
GROUND FAULT PROTECTIONGFP
SWITCHSW
FEEDERFDR
UNDERGROUND ELECTRICUGE
MANHOLEMH
MIXED MEDIAMM
UNDERGROUNDU/G
POWER MONITORING AND CONTROL SYSTEMPMCS
AUTOMATIC TRANSFER SWITCH CONTROLATSC
TEMPORARYTEMP
SECURITYSEC
DEFINITIONABBREV.
ABBREVIATIONS
A
ADA
AFF
AFG
AWG
ANSI
AIC
C
CCTV
CLF
CO
GFI
GND
HOA
G OR GFCI
FACP
AMPS, AMPERE, AMPERAGE
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
AMERICANS WITH DISABILITIES ACT
AVAILABLE INTERRUPTING CURRENT
AMERICAN NATIONAL STANDARDS INSTITUTE
GROUND FAULT CIRCUIT INTERRUPTER
HAND-OFF-AUTOMATIC.
GROUND.
GROUND FAULT INTERRUPTER
CURRENT LIMITING FUSE
AMERICAN WIRE GAUGE
CLOSED CIRCUIT TELEVISION
FIRE ALARM CONTROL PANEL
CONDUIT ONLY
CONDUIT
HP
IEEE
KV
KVA
KW
KWH
MVA
MCC
NEC
NEMA
NIC
NFPA
NM
P
PA
PC
NC
POLE
KILOVOLT AMPS
NATIONAL FIRE PROTECTION ASSOCIATION
PHOTOCELL
PUBLIC ADDRESS
NEW MEXICO
NOT IN CONTRACT
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS
MOTOR CONTROL CENTER
MEGAVOLT AMPS
NORMALLY CLOSED
KILOWATT HOUR.
KILOWATT
HORSEPOWER
KILOVOLT
TVSS
UPS
UON
V
VFD
XFER
XFMR (TRANSF)
VARIABLE FREQUENCY DRIVE
UNINTERRUPTABLE POWER SUPPLY
TRANSIENT VOLTAGE SURGE SUPPRESSER
TRANSFORMER
TRANSFER
UNLESS OTHERWISE NOTED
VOLTS, VOLTAGE
TTB TELEPHONE TERMINAL BOARD
INSTITUTE OF ELECTRICAL AND ELECTRONICS
CEILING MOUNTED OCCUPANCY SENSOR; TYPE
AS INDICATED ON PLANS
DISTRIBUTION POLE FOR OVERHEAD ELECTRICAL OR
COMMUNICATIONS AS INDICATED ON PLAN.
OVERHEAD UTILITY AND OR SYSTEM DISTRIBUTION.X
X
3PH = THREE PHASE
X X
UT UTILITY OR FACILITY TRANSFORMER
S
CC
PAD MOUNTED SWITCH
CONNECTION CABINET (UTILITY
METER MOUNT)
MH
MANHOLE - POWER OR COMMUNICATION
AS INDICATED ON PLANS
HH HAND HOLE - POWER OR COMMUNICATION
AS INDICATED ON PLANS
1PH = SINGLE PHASE
S = ELECTRICAL SECONDARY
P = ELECTRICAL PRIMARY
T = TELECOMMUNICATION
TV = TELEVISION
E = EMERGENCY POWER
ATSC = AUTOMATIC TRANSFER SWITCH CONTROL
PM PRIMARY SITE METER ENCLOSURE
EG ENGINE GENERATOR
TP TELECOMMUNICATION PEDESTAL
TVP TELEVISION PEDESTAL
METER ENCLOSURE. EITHER ON BUILDING OR ON UTILITY
EQUIPMENTME
CT CT ENCLOSURE. EITHER ON BUILDING OR ON UTILITY EQUIPMENT
GENERATOR
a =
2 = 3 = 4 = P = M = K =
WP =
T =
D =
AC ABOVE COUNTER
AL ALUMINUM
ATS AUTOMATIC TRANSFER SWITCH
CKT CIRCUIT
CU COPPER
DL DAY-LIGHTING
DIA DIAMETER
FA FIRE ALARM
KCMIL THOUSAND CIRCULAR MILS
MAX MAXIMUM
MIN MINIMUM
NEUT NEUTRAL
PH PHASE
RSC RIGID STEEL CONDUIT
UC UNDER COUNTER
WP WEATHERPROOF
WALL MOUNTED OCCUPANCY SENSOR; TYPE
AS INDICATED ON PLANS
HATCHING INDICATES EMERGENCY LIGHTING.
HATCH WILL BE MODIFIED FOR EACH
LUMINAIRE TYPE. EMERGENCY LUMINAIRE
DESIGNATED WITH "E" IN TYPE DESIGNATION.
VARIES
SURFACE MOUNTED LUMINAIRE.
LUMINAIRE TYPE AS INDICATED ON PLANS
REFER TO
DEMOLITION
PLANS FOR
ADDITIONAL
INFORMATION
(F) FUTURE
LSIG LONG TIME, SHORT TIME, INSTANTANEOUS,
(N) NEW
W WALL MOUNTED
NL NORMAL
MTS MANUAL TRANSFER SWITCH
UL UNDERWRITERS' LABORATORIES
EMERGENCYE
IG ISOLATED GROUND
KVAR KILOVOLT AMPS REACTIVE
NO NORMALLY OPEN
SURGE PROTECTIVE DEVICESPD
REFER TO LUMINAIRE SCHEDULE FOR ALL LUMINAIRE TYPES WHETHER WALL MOUNTED
OR CEILING MOUNTED.
GROUND FAULT PROTECTION
SHUNT TRIP OPERATOR
TYP. TYPICAL
TRIP SETTING
FRAME SIZE
300A
300A
N/A NOT APPLICABLE
O/H OVERHEAD
GEN GENERATOR
ENGINE GENERATOREG
SYMBOL DESCRIPTION MOUNTING
HT.LOC.
SINGLE HEAD, POLE MOUNTED LUMINAIRE
DOUBLE FACE EXIT LUMINAIRE. SHADED SIDE
INDICATES FACE SIDE. PROVIDE DIRECTIONAL
ARROW(S) AS INDICATED ON PLANS
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION NOTES
ASSOCIATION
AND GROUND FAULT PROTECTION
ENGINEERS
UTILITIES
DESCRIPTIONSYMBOL
NORTH
ELECTRICAL SYMBOL LEGEND
E3 E4
TRANSFORMER. TRANSFORMER NAME, TRANSFORMER kVA RATING, PRIMARY VOLTAGE AND WIRING CONFIGURATION, SECONDARY
VOLTAGE, K RATING (IF APPLICABLE)
G
ST
0 10' 20' 40' 80'
1" = 40'-0"
DEVICE INDICATOR LETTER. "X" EQUALS
DESIGNATION BELOW
(TYPICAL FOR MOST SWITCH TYPES):
SMALL CASE LETTER DENOTES SWITCHING
CONTROL
DOUBLE POLE TOGGLE SWITCH
THREE-WAY TOGGLE SWITCH
FOUR-WAY TOGGLE SWITCH
PILOT LIGHT TOGGLE SWITCH
MOMENTARY CONTACT SWITCH
KEY OPERATED SWITCH
WEATHERPROOF TOGGLE SWITCH
MANUAL MOTOR STARTER SWITCH WITH
THERMAL OVERLOAD PROTECTION
DIMMER SWITCH
KW
M
K1
R1
AS
A
VS
V
VFD CONNECTION
MOTOR CONNECTION
UPS
VFD
J
T
30/3R
0/1
1/30/3R
F
30/1
30/3R
DEVICES
CODE SIZE JUNCTION BOX
WALL MOUNTED CODE SIZE J-BOX
CODE SIZE PULLBOX (OR AS SIZED ON PLAN)
ENCLOSED CIRCUIT BREAKER.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
NON-FUSED DISCONNECT SWITCH.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
FUSED DISCONNECT SWITCH.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
MOTOR STARTER. STARTER SIZE INDICATED
BY NUMBER/NEMA ENCLOSURE RATING,
SINGLE SPEED UON
COMBINATION FUSIBLE DISCONNECT SWITCH
AND MOTOR STARTER. NEMA STARTER
SIZE/AMPERAGE/NEMA ENCLOSURE RATING, 3
POLE UON
MOTOR. NUMBER INDICATES HORSEPOWER
RATING FOR 1HP AND LARGER
THERMOSTAT
PHOTOCELL
LIGHTNING PROTECTION AIR TERMINAL
PUSHBUTTON (EMERGENCY POWER OFF - EPO)
SYMBOL DESCRIPTION MOUNTING
+44"
UON
N/A
VARIES
HT.LOC.
WALL
ROOF
VARIES
N/A
VARIES
MULTI-OULET ASSEMBLY (SURFACE MOUNTED
RACEWAY) VARIES
SEE
PLANS
VARIES
SEE
PLANS
MOTOR. "F" INDICATES FRACTIONAL
HORSEPOWER
VARIES
SEE
PLANS
VARIES
SEE
PLANS
VARIES
DEVICE INDICATOR LETTER. "X" EQUALS DESIGNATION BELOW
(TYPICAL FOR MOST RECEPTACLE TYPES):
BLANK FOR NORMAL POWER
G = GFCI RATED
IG = ISOLATED GROUND
T = TAMPERPROOF
WG = WEATHERPROOF AND GFCI
WP = WEATHERPROOF (IN-USE COVER)
CL = CLOCK
TV = TELEVISION
+18", UON
FLUSH
IN FLOOR DUPLEX RECEPTACLE.
CONFIGURATION AS INDICATED ON PLANS
IN FLOOR DOUBLE DUPLEX (QUADPLEX)
RECEPTACLE. CONFIGURATION AS INDICATED ON
PLANS
CEILING MOUNTED DUPLEX RECEPTACLE
CEILING MOUNTED DOUBLE DUPLEX
(QUADPLEX) RECEPTACLE
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE
DOUBLE DUPLEX (QUADPLEX) RECEPTACLE
EMERGENCY DOUBLE DUPLEX (QUADPLEX)
RECEPTACLE
SPECIAL PURPOSE RECEPTACLE. NEMA
CONFIGURATION AND AMPERAGE AS NOTED ON
PLANS
COMBINATION POWER/COMMUNICATION POLE.
CONFIGURATION AS NOTED ON PLANS
FLOOR
CEILING
WALL,
UON
IN FLOOR EMERGENCY DUPLEX RECEPTACLE.
CONFIGURATION AS INDICATED ON PLANS
CEILING MOUNTED EMERGENCY DUPLEX
RECEPTACLE
EMERGENCY DUPLEX RECEPTACLE
COMBINATION POWER/COMMUNICATION IN
CEILING OUTLET. CONFIGURATION AS
INDICATED ON PLANS
COMBINATION DUPLEX RECEPTACLE AND
COMMUNICATIONS FLOORBOX. DEVICE
CONFIGURATION AS INDICATED ON PLANS.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
J
P
IN FLOOR EMERGENCY DOUBLE DUPLEX
(QUADPLEX) RECEPTACLE. CONFIGURATION AS
INDICATED ON PLANS
X
A, B, C, = SEQUENCE OF PANELS OF THIS TYPE
1, 2, 3, . . = SUBFED PANEL
1, 2, 3, . . = FLOOR LEVEL
H L
T
BLANK FOR NORMAL POWER
EL
EC
EQ
= EMERGENCY-LIFE SAFETY-BRANCH
= EMERGENCY-CRITICAL-BRANCH
= EMERGENCY-EQUIPMENT-BRANCH
GROUND BAR
MAIN SWITCHBOARD. DASHED LINES INDICATE CLEARANCES.
VARIABLE FREQUENCY DRIVE
SYMBOL
EQUIPMENT
DESCRIPTION
EQUIPMENT NAMING CONVENTION
= HIGH VOLTAGE PANELBOARD (480Y/277V)
= LOW VOLTAGE PANELBOARD (208Y/120V)
= TRANSFORMER
= DISTRIBUTION BOARDDB
= MAIN SWITCH BOARDMSB
MCC= MOTOR CONTROL CENTER
= UNINTERRUPTABLE POWER SUPPLYUPS
= POWER DISTRIBUTION UNIT
ATS = AUTOMATIC TRANSFER SWITCH
PDU
= ISOLATED PANELBOARDI
B = BUSWAY
MSB
FLUSH MOUNTED PANELBOARD. DASHED LINES INDICATE CLEARANCES.
SURFACE MOUNTED PANELBOARD. DASHED LINES INDICATE
CLEARANCES.
H1A
L1A
MCC
MOTOR CONTROL CENTER. DASHED LINES INDICATE CLEARANCES.
T1A
UNINTERRUPTABLE POWER SUPPLY. DASHED LINES INDICATE
CLEARANCES.
AUTOMATIC TRANSFER SWITCH. DASHED LINES INDICATE CLEARANCES.
DRY TYPE TRANSFORMER (15kVA OR ABOVE), WITH EQUIPMENT TAG
(TAG INSIDE OR OUTSIDE, DEPENDING ON SIZE). IN MOST CASES,
ACTUAL SIZE SHOWN ON PLANS (ELECTRICAL ROOMS).
E = EMERGENCY
DISTRIBUTION BOARD. DASHED LINES INDICATE CLEARANCES.
DB
UPS-A
ATS-1
EXAMPLES:
A. SES1 (SERVICE ENTRANCE SECTION #1)
B. 1H1A (SERVED FROM SES#1, 480/277 NORMAL, LEVEL 1, FIRST BOARD)
C. 1EQH1A (SERVED FROM MAIN EMER SWBD #1, 480/277 EQUIP POWER, LEVEL 1,
FIRST BOARD)
SES
G
= GROUND
= HOT/PHASE
= NEUTRAL
= SWITCH LEG
CONDUCTOR IDENTIFICATION SYMBOLS. REFER TO
PLANS FOR COMBINATION USE. CONDUCTOR
IDENTIFICATION MOSTLY USED IN HOMERUN
LOCATION, BUT CAN ALSO BE USED IN BRANCH
CIRCUITING WHERE APPLIED. GROUND
CONDUCTORS WILL BE INSTALLED IN ALL RACEWAYS
WHETHER SHOWN OR NOT.
LA-1
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT
BREAKER(S). CONDUCTOR IDENTIFICATION SYMBOL
INDICATES NUMBER OF CONDUCTORS IN HOMERUN.
MINIMUM #12 CONDUCTORS AND 3/4" RACEWAY PATH
WILL BE PROVIDED IN HOMERUN UON. ALL HOMERUNS
WILL INCLUDE GROUND CONDUCTOR.
LA-7
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL TWO OR THREE POLE CIRCUIT
BREAKERS. CONDUCTOR IDENTIFICATION SYMBOL
INDICATES NUMBER OF CONDUCTORS IN HOMERUN.
MINIMUM #12 CONDUCTORS AND 3/4" RACEWAY PATH
WILL BE PROVIDED IN HOMERUN UON. NEUTRAL MAY BE
USED WHERE INDICATED ON PLAN. ALL HOMERUNS WILL
INCLUDE GROUND CONDUCTOR.
LA-13
CONCEALED RACEWAY BETWEEN DEVICES AND OR
EQUIPMENT IN WALLS OR IN CEILING SPACE
UNDERGROUND RACEWAY BETWEEN DEVICES AND
OR EQUIPMENT
EXPOSED RACEWAY BETWEEN DEVICES AND OR
EQUIPMENT ON WALLS OR CEILINGS
CONDUIT TURNS
DOWN UP
B BUSWAY
GROUNDING CONDUCTORG
CABLE TRAY - POWER AND TELECOMMUNICATIONS
T TELECOMMUNICATIONS RACEWAY
D DATA RACEWAY
FA FIRE ALARM RACEWAY
CONDUIT STUBBED AND CAPPED
VOICE/DATA COMBINATION RACEWAYV/D
BRANCH CIRCUIT GENERAL INFORMATION:
BRANCH CIRCUITS FROM OVERCURRENT PROTECTION (20A) TO FURTHEST DEVICE SHALL NOT
EXCEED 75 FEET FOR #12AWG COPPER AND 150 FEET FOR #10AWG COPPER MEASURED ALONG
CONDUCTORS ROUTING PATH. BRANCH CIRCUITS EXCEEDING 150 FEET WILL BE SIZED SO THAT
VOLTAGE DROP DOES NOT EXCEED 5%. 2% FOR FEEDERS AND 3% FOR BRANCH CIRCUITS. REF:
CEC 210.19(A).
LA-1,3
LA-5,7,9
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT
BREAKER(S). SYMBOL REPRESENTS A MULTI-BRANCH
CIRCUIT. NUMBER OF CONDUCTORS IN HOMERUN WILL
INCLUDE A SEPERATE NEUTRAL FOR EACH CIRCUIT PHASE
CONDUCTOR. MINIMUM #12 CONDUCTORS AND 3/4"
RACEWAY PATH WILL BE PROVIDED IN HOMERUN UON.
ALL HOMERUNS WILL INCLUDE GROUND CONDUCTOR.
RACEWAY & CONDUCTORS
CURRENT TRANFORMER, NUMBER
"3000/5" DENOTES RATIO.
WG WEATHERPROOF AND GFCI
R REMOVED/REMOVAL
RC ROOM CONTROLLER
FAA FIRE ALARM ANNUNCIATOR
FMS FACILITY MANAGEMENT SYSTEM
GROUND FAULT EQUIPMENT PROTECTIONGFEP
CB CIRCUIT BREAKER
D DIMMING
DC DIRECT CURRENT
UPS
NUMBER OR MAIN EMERG SWBD NUMBER
= SERVICE ENTRANCE SECTION
(SB=SUB-BASEMENT, B=BASEMENT, M=MEZZANINE,
P=PENTHOUSE)
CEILING MOUNTED EMERGENCY DOUBLE
DUPLEX (QUADPLEX) RECEPTACLEX
PC
UNDERGROUND UTILITY AND OR SYSTEM DISTRIBUTION.
X
X
N = NEW
EX = EXISTING
DL DAY-LIGHTING SENSOR; TYPE AS INDICATED
ON PLANS
RC ROOM CONTROLLER; TYPE AS INDICATED
ON PLANS
480V
CL CLOCK
CB
FATC FIRE ALARM TERMINAL CABINET
UPDATED: 03/03/2014
A/V AUDIO/VISUAL
DRY TYPE TRANSFORMER (LESS THAN 15kVA), WITH NO EQUIPMENT TAG.
SIZE, TYPE AND LOCATION NOTED ON PLANS.
A/C ALTERNATING CURRENT
DESCRIPTIONSYMBOL
T
VFD
FC FOOTCANDLES
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:43
PM
E-001
ELECTRICAL LEGEND
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
CONTRACTOR IS TO PROVIDE NEW CONTROLS, LIGHTS AND OUTLETS AS IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS. ALL LIGHTING TO BE 5-7 FC ALONG WALKWAY. COORDINATE ALL SHUTDOWNS WITH THE COR 30 DAYS IN ADVANCE AND AGAIN 2 DAYS IN ADVANCE TO ENSURE ALL
SAFETY PRECAUTIONS ARE IN PLACE AND OPERATIONAL IMPACTS ARE MINIMIZED. NIGHT AND
WEEKEND WORK WILL BE REQUIRED FOR THIS CONTRACT.
ELECTRICAL SCOPE OF WORK:
GENERAL
CONTRACTOR SHALL INFORM HIMSELF OF ANY ELECTRICAL INFORMATION THAT
MIGHT BE SHOWN IN OTHER DISCIPLINES OF THIS PROJECT AND NOT SHOWN IN
ELECTRICAL DIVISION. COORDINATE ALL WORK DISCREPANCIES WITH ARCHITECT
PRIOR TO BID. SHOULD COORDINATION NOT OCCUR, IT IS UNDERSTOOD THAT THE
CONTRACTOR FOUND NO DISCREPANCIES AND SHALL PROVIDE AND INSTALL
ELECTRICAL RACEWAY, CONDUCTORS, DEVICES, AND EQUIPMENT AT NO
ADDITIONAL COST TO THE OWNER.
THE CONTRACTOR SHALL REFER TO DIVISION 26 SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS. THE SPECIFICATIONS ARE A PART OF THE
CONSTRUCTION DOCUMENT SET AND MAY CONTAIN INFORMATION NOT SHOWN ON
THE DRAWING SET.
THESE DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES
GATHERED BY SITE INSPECTION AND PREVIOUS CONSTRUCTION DRAWINGS. THE
EXACT LOCATION, ARRANGEMENT, AND SIZES OF EXISTING DEVICES MAY BE
DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS. ALL BIDDERS ARE
REQUIRED TO INVESTIGATE EXISTING BUILDING CONDITIONS PRIOR TO
SUBMITTING THEIR BIDS AND PROVIDE ALL REQUIRED FILED MEASUREMENTS
PRIOR TO ORDERING OF NEW COMPONENTS AND DEVICES.
THE WORD "PROVIDE" SHALL MEAN TO FURNISH AND INSTALL. EXCEPTIONS SHALL
BE NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS.
DO NOT SCALE THE ELECTRICAL DRAWING TO DETERMINE THE LOCATIONS OF
LUMINAIRIES, OUTLETS, OR EQUIPMENT. REFER TO THE ARCHITECTURAL
DRAWINGS AND FIELD MEASUREMENTS FOR ALL PROJECT DIMENSIONS.
THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVALS WITH OWNER AUTHORIZED REPRESENTATIVE AND
SHALL CONFORM TO THEIR REQUIREMENTS.
THE CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES
PRIOR TO START OF WORK AND INSTALLATION OF EQUIPMENT.
ALL EXPOSED CONDUIT, FITTING, BOXES, HANGERS, CLIPS, SUPPORTS, ETC. IN
FINISHED AREAS SHALL BE PAINTED PER THE ENGINEERS INSTRUCTIONS.
ALL DEVICES, RACEWAY, CONDUCTORS AND LUMINAIRES ARE EXISTING AND SHALL
REMAIN UNLESS INDICATED BOLDLY OR OTHERWISE INDICATED BY KEYED NOTE.
IN THE CASE OF CONFLICTS NOT CLARIFIED PRIOR TO THE BIDDING DEADLINE, USE
THE MOST COSTLY ALTERNATIVE (BETTER QUALITY, GREATER QUANTITY, AND
LARGER SIZE) IN PREPARING THE BID.
CONTRACTORS SHALL VERIFY AND COORDINATE WITH EXACT MOUNTING HEIGHTS
AND LOCATIONS OF ALL DEVICES WITH ARCHITECT PRIOR TO ROUGH-IN. ALL
RACEWAYS FOR RECEPTACLES TO RUN CONCEALED BENEATH COUNTER AS
REQUIRED.
ALL GROUNDING CABLE IN THE WHOLE ELECTRICAL DISTRIBUTION SYSTEM SHALL
SHOW ZERO CURRENT (AFTER THE SYSTEM IS ENERGIZED) - IF ANY CURRENT IS
FOUND IN THE SYSTEM, THEN THE CONTRACTOR IS RESPONSIBLE TO RESOLVE
THE PROBLEM AND REMOVE OBJECTIONABLE CURRENT FROM THE GROUNDING
SYSTEM.
CIRCUITS
REFER TO GROUNDING DIAGRAM FOR GROUNDING INFORMATION.
ALL TERMINATIONS AT EQUIPMENT SHALL BE RATED AT 75 C MINIMUM. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
LIGHTING
THE LUMAIRE DESCRIPTION SHALL TAKE PRECEDENCE OVER A LUMINAIRE
MANUFACTURER MODEL NUMBER SHOULD A CONFLICT OCCUR.
EQUIPMENT
REFER TO MECHANICAL DRAWINGS FOR CONTROL DIAGRAMS AND/OR SEQUENCE
OF OPERATION DESCRIPTIONS.
REFER TO MECHANICAL DRAWINGS FOR EQUIPMENT SCHEDULES.
SWITCHES CONTROLLING MECHANICAL EQUIPMENT SHALL BE LABELED FOR THE
EQUIPMENT SERVED.
SIZE ALL FUSES PER THE EQUIPMENT MANUFACTURERS RECOMMENDATION.
PROVIDE FEEDERS BETWEEN THE VFD AND MECHANICAL EQUIPMENT SIZED PER
THE HOMERUN.
PROVIDE FEEDERS BETWEEN THE STARTERS AND DISCONNECT SWITCHES SIZED
PER THE HOMERUN.
THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL AND
PLUMBING DRAWINGS FOR EXACT LOCATION OF EQUIPMENT CONNECTIONS.
ALL NEW BREAKERS SHALL BE RATED WITH AN AIC RATING OF THE EXISTING
PANELBOARD IN WHICH THEY WILL BE INSTALLED IN ACCORDANCE WITH NEC
110.3(B) AND 110.9.
A
A.01
A.02
A.03
A.04
A.05
A.06
A.07
A.08
A.09
A.10
A.11
A.12
B
B.01
B.02
C
C.01
D
D.01
D.02
D.03
D.04
D.05
D.06
D.07
D.08
GENERAL NOTES
NO REVISIONS DATE
A
B
C
D
E
W
X
7.9
EPP
EP - 26
(E)(E)
BUILDING 22
BUILDING 31
BUILDING 22A
ADD ALTERNATE
SEE SHEET ES101.5B
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C8lE
(E)
EP - 40
ELECTRICAL
ROOM
BLl
C2lE
BLl
BLl BLl
BLl
LCP
BLlBLl
BLl BLl
35 35 BLl BLl BLl BLl
BLlBLlBLlBLlBLlBLl
BLl
35 35 35 35 35 40
403535353535
BLl
BLl
BLl
BLl
BLl
BLl
A
B
C
D
E
W
X
7.9
EPP
(E)
EP - 25
L1Sl
L1Sl
L1Sl L1Sl
L1SlL1Sl
L1Sl
L1Sl
L1SlL1Sl L1SlL1Sl L1Sl
ADD ALTERNATE
SEE SHEET ES101.5A
BUILDING 22
BUILDING 31
BUILDING 22A
L1SlL1SlL1SlL1Sl L1Sl
181818
18 18 18 18
P - 18
L1Sl
ZL
ZL ZL
ZL ZL ZL
ZL ZL
ZL
ZL
ZLZLZLZLZL
ZLZLZLZL
ZL18
L1Sl
ELECTRICAL
ROOM
(E) (E)
LCP
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:54
PM
ES101.1
ELECTRICAL PATHWAY ACCENT AND CANOPY
LIGHTING SITE PLANS - PHASE 1
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
0' 5' 10' 20'
SCALE: 1" = 10'-0"2 ELECTRICAL CANOPY LIGHTING SITE PLAN - PHASE 1
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3 B32
P1 B24
B25
B2
B22A
B1
OPC
B27
B34
B3
B19& B19A
1. PROVIDE RECESSED LINEAR LUMINAIRE WITH FLANGE (N). COORDINATE WITH
ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR
ADDITIONAL INFORMATION.
2. PROVIDE RECESSED DOWNLIGHT (N). COORDINATE WITH ARCHITECT FOR EXACT
LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR ADDITIONAL
INFORMATION.
3. PROVIDE GFCI RATED RECEPTACLE WITH "EXTRA DUTY" IN-USE WEATHERPROOF
METAL COVER (N). COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO
ROUGH-IN.
4. REFER TO SHEET EP101 FOR ADDITIONAL INFORMATION IN THIS AREA.
5. PROVIDE LED ROPE LIGHT (N) UNDER COLUMN. COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEETS E-701 AND A-502 FOR
ADDITIONAL INFORMATION.
6. PROVIDE LED TAPE LUMINAIRE (N). MOUNT ON MIDDLE HSS STRUCTURAL FRAMING.
COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER
TO SHEETS E-701, M-501 AND A-501 FOR ADDITIONAL INFORMATION.
7. PROVIDE PUSHBUTTON DOOR SWITCH (N) FOR LED TAPE LUMINAIRE. COORDINATE
WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN.
8. ROUTE CIRCUIT THROUGH NEXT SPARE CONTACT ON LIGHTING CONTROL PANEL
(LCP). SET TO "DUSK TO DAWN" UNLESS REQUIRED OTHERWISE BY OWNER.
(TYP.)
(TYP.)
(TYP.)4
SCALE: 1" = 10'-0"1 ELECTRICAL PATHWAY ACCENT LIGHTING SITE PLAN - PHASE 1 0' 5' 10' 20'
(TYP.)
(TYP. FOR ALL DOORS)
(TYP.)
D
E
W
X
4344454647
Z
W.0
40.9
X.0
42.8
Y
B22.4
3.10
3.11
3.12
7.9
42.1
B22.4
B22.3
B22.2
P H
A S
E
S E
E S
H E
E T
E S
1.
P H
A S
E
S E
E S
H E
E T
E S
1.
BUILDING 3
BUILDING 36
BUILDING 24
C8lE
C8lE
ADD ALTERNATE
SEE SHEET ES101.5B
C8lE
C8lE
C8lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
26 26
26 26
26 26
26262626
26 26
C8lE
C8lE C8lE
C8lE
C8lE
C8lE
C8lE
C8lEC8lEC8lE
C8lE
C8lE
C2lE C2lE
C2lEC2lEC2lEC2lE
C2lE C2lE C2lE
C2lE
28 28 28
C2lE
C2lE
EP - 28
C2lE
C2lE
EP - 37
EP - 39
EP - 5
BLl BLl BLl
BLlBLlBLl
5 5 5
BLl BLl BLl BLl BLl BLl
BLlBLlBLlBLlBLlBLl
39 39 39 39 39 39
393939393939
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
D
E
W
X
4344454647
Z
W.0
40.9
X.0
42.8
Y
B22.4
3.10
3.11
3.12
7.9
42.1
B22.4
B22.3
B22.2
P H
A S
E
S E
E S
H E
E T
E S
1.
P H
A S
E
S E
E S
H E
E T
E S
1.
BUILDING 3
BUILDING 36
BUILDING 24
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl 20
20L1SlL1Sl L1Sl
2020 20
SLl20
20 20 20 20SLl SLl SLl SLl SLl
SLl
ZLZL
ZL ZL
272727
ZL
ZL
ZL
ZL
ZL
ZL
ZLZLZL ZL ZL ZL ZL
L1Sl L1Sl L1Sl L1Sl
L1SlL1Sl
EP - 27
SLl
P - 20
ADD ALTERNATE
SEE SHEET ES101.5A
ZL
ZL
L1Sl
L1Sl
L1Sl
20 SLl
ZL
20 20
TO
CENTRAL
PLANT
TO CLC
TO B27
T-8 B25
T-9 B24
MH-NP1
(MH6)
MH-NP2
(MH7)
EX
EX
EX
EX EX
X
X
X
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:58
PM
ES101.2
ELECTRICAL PATHWAY ACCENT AND CANOPY
LIGHTING SITE PLANS - PHASE 2
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
SCALE: 1" = 10'-0"2 ELECTRICAL CANOPY LIGHTING SITE PLAN - PHASE 2 0' 5' 10' 20'
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
1. PROVIDE RECESSED STEPLIGHT (N). COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR
ADDITIONAL INFORMATION.
2. PROVIDE RECESSED LINEAR LUMINAIRE WITH FLANGE (N). COORDINATE
WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO
SHEET E-701 FOR ADDITIONAL INFORMATION.
3. PROVIDE RECESSED DOWNLIGHT (N). COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR
ADDITIONAL INFORMATION.
4. PROVIDE GFCI RATED RECEPTACLE WITH "EXTRA DUTY" IN-USE
WEATHERPROOF METAL COVER (N). COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN.
5. PROVIDE LED ROPE LIGHT (N) UNDER COLUMN. COORDINATE WITH
ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO
SHEETS E-701, A-502, AND A-503 FOR ADDITIONAL INFORMATION.PROVIDE
LED STRIP LINEAR LUMINAIRE (N). COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEETS E-701 AND
A-501 FOR ADDITIONAL INFORMATION.
6. PROVIDE LED TAPE LUMINAIRE (N). MOUNT ON MIDDLE HSS STRUCTURAL
FRAMING. COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO
ROUGH-IN. REFER TO SHEETS E-701, M-501 AND A-501 FOR ADDITIONAL
INFORMATION.
7. PROVIDE PUSHBUTTON DOOR SWITCH (N) FOR LED TAPE LUMINAIRE.
COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-
IN.
8. ROUTE CIRCUIT THROUGH NEXT SPARE CONTACT ON LIGHTING CONTROL
PANEL IN ELECTRICAL ROOM 102. REFER TO SHEET ES101.1 FOR
ADDITIONAL INFORMATION. SET TO "DUSK TO DAWN" UNLESS REQUIRED
OTHERWISE BY OWNER.
9. FUTURE CONSTRUCTION PHASE. REFER TO SHEET AS111.2 FOR
ADDITIONAL INFORMATION.
10. EXISTING MANHOLE LOCATED SOUTH OF BUILDING 3 TO BE REPAIRED.
11. CORE DRILL EXISTING MANHOLE AND PROVIDE NEW 5" SLEEVES FOR
ROUTING NEW CABLES.
12. PROVIDE NEW 15KV CABLE IN CONCRETE ENCASED DUCTBANK. CABLE
SHALL BE INSTALLED PRIOR TO REMOVING EXISTING CABLE. SIZE TO
MATCH EXISTING.
13. EXISTING 15KV CABLE SHALL BE REMOVED AFTER INSTALLATION OF NEW
CABLE.
14. CORE DRILL EXISTING MANHOLE FOR NEW I5KV BYPASS FEEDER FROM
MH-NP1.
15. MANHOLE TO BE REPAIRED.
16. CONTRACTOR TO FIELD VERIFY EXACT ROUTING OF EXISTING PRIMARY
UNDERGROUND ELECTRICAL FEEDS. LOCATION TO BE VERIFIED WITH
NEW COLUMN LOCATIONS.
17. PRIMARY CABLE FROM SITE SWITCHGEAR.
18. CABLE TO MH-NP2 (MH-7).
19. PROPOSED NEW COREDRILL.
20. CABLE TO MH-NP1 (MH-6).
(TYP.)
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3 B32
B24 B25
B2
B22A
B1
OPC
B27
B34
B3
B19& B19A
(TYP.)
2 (TYP.)
(TYP.)
(TYP.)
(TYP.)
SCALE: 1" = 10'-0"1 ELECTRICAL PATHWAY ACCENT LIGHTING SITE PLAN - PHASE 2 0' 5' 10' 20'
(TYP.)
(TYP.) 7
(TYP. FOR ALL DOORS)
MH-NP1 (MH-6)
NTS
MH-NP2 (MH-7)
NTS
TO CLC
TO B22
TO B27
TO B25
TO B24
Z
AA
BB
FF
HH
CC
GG
Y
58.9
58.1
57.5
57.2
49.9
GG.1
FF.1
HH.1DD
58.5
P H
A S
E
S E
E S
H E
E T
E S
1.
BUILDING 3
BUILDING 24
BUILDING 1
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
BLl
BLl
C2lE
EP - 4
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
BLl
C8lE
Z
AA
BB
FF
HH
CC
GG
Y
58.9
58.1
57.5
57.2
49.9
GG.1
FF.1
HH.1DD
58.5
P H
A S
E
S E
E S
H E
E T
E S
1.
BUILDING 3
BUILDING 24
BUILDING 1
L1Sl
L1Sl
SLl
SLl
SLl
SLl
SLl
SLl
SLl
SLl22
SLl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
ZL
ZL
ZL
ZL
ZL
ZL
ZL
ZL
ZL
L1Sl
L1Sl
L1Sl
ZL
ZL
SLl
EP - 29
SLl
L1Sl 22
P - 22
L1Sl
L1Sl
22 ZL
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:02
PM
ES101.3
ELECTRICAL PATHWAY ACCENT AND CANOPY
LIGHTING SITE PLANS - PHASE 3
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
SCALE: 1" = 10'-0"2 ELECTRICAL CANOPY LIGHTING SITE PLAN - PHASE 3 0' 5' 10' 20'
(TYP.)
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3 B32
B24 B25
B2
B22A
B1
OPC
B27
B34
B3
B19& B19A
1. PROVIDE RECESSED STEPLIGHT (N). COORDINATE WITH ARCHITECT FOR EXACT
LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR ADDITIONAL
INFORMATION.
2. PROVIDE RECESSED LINEAR LUMINAIRE WITH FLANGE (N). COORDINATE WITH
ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701
FOR ADDITIONAL INFORMATION.
3. PROVIDE RECESSED DOWNLIGHT (N). COORDINATE WITH ARCHITECT FOR EXACT
LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR ADDITIONAL
INFORMATION.
4. PROVIDE GFCI RATED RECEPTACLE WITH "EXTRA-DUTY" IN-USE WEATHERPROOF
METAL COVER (N). COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR
TO ROUGH-IN.
5. EXISTING CONTROL BOARD TO REMAIN.
6. PROVIDE LED ROPE LIGHT (N) UNDER COLUMN. COORDINATE WITH ARCHITECT
FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEETS E-701 AND A-502
FOR ADDITIONAL INFORMATION.
7. PROVIDE LED TAPE LUMINAIRE (N). MOUNT ON MIDDLE HSS STRUCTURAL
FRAMING. COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-
IN. REFER TO SHEETS E-701, M-501 AND A-501 FOR ADDITIONAL INFORMATION.
8. PROVIDE PUSHBUTTON DOOR SWITCH (N) FOR LED TAPE LUMINAIRE.
COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN.
9. ROUTE CIRCUIT THROUGH NEXT SPARE CONTACT ON LIGHTING CONTROL PANEL IN
ELECTRICAL ROOM 102. REFER TO SHEET ES101.1 FOR ADDITIONAL INFORMATION.
SET TO "DUSK TO DAWN" UNLESS REQUIRED OTHERWISE BY OWNER.
(TYP.)
(TYP.)
(TYP.)
SCALE: 1" = 10'-0"1 ELECTRICAL PATHWAY ACCENT LIGHTING SITE PLAN - PHASE 3 0' 5' 10' 20'
(TYP.)
(TYP.)
(TYP. FOR ALL DOORS)
J J J JJJ
J
J
E
F
G
B31.K
B31.L
H
J
L
M
N
P
S
T
89101112
2425262728
Q
R
W
31U
V
37 35 33
K
3.9
7.9
VV UU
WW
XX
PHASE 1
SEE SHEET ES101.1
PHASE 2
SEE SHEET ES101.2
PHASE 3
SEE SHEET ES101.3
L1Sl
L1Sl
24 24
24 24
24 24
24 24
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
L1Sl
P - 24
EP - 31
ZLZL
ZL
L1SlL1SlL1SlL1Sl L1Sl
ZLZLZL
ZLZLZLZL ZL
ZL
ZL
ZL ZL
ZL
ZL
ZL
ZL
ZL ZL
ZL
ZL
ZL
L1SlL1SlL1Sl L1Sl
24242424
24 24 24 24 24
ZL
ZL
L1Sl
L1Sl
L1Sl
EP - 33
P - 17
P - 19
ZL
ZL
L1Sl
L1Sl
24 24
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:03
PM
ES101.5A
ELECTRICAL PATHWAY ACCENT AND
RECEPTACLE SITE PLAN - ADD ALTERNATE
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
SCALE: 1" = 10'-0"1 ELECTRICAL ACCENT LIGHTING SITE AND RECEPTACLE PLAN - ADD ALTERNATE
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
1. PROVIDE RECESSED LINEAR LUMINAIRE WITH FLANGE (F). COORDINATE WITH
ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR
ADDITIONAL INFORMATION.
2. PROVIDE GFCI RATED RECEPTACLE WITH "EXTRA DUTY" IN-USE WEATHERPROOF
METAL COVER (F). COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO
ROUGH-IN.
3. PROVIDE LED ROPE LIGHT (F) UNDER COLUMN. COORDINATE WITH ARCHITECT FOR
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO SHEETS E-701 AND A-502 FOR
ADDITIONAL INFORMATION.
4. ROUTE CIRCUIT THROUGH NEXT SPARE CONTACT ON LIGHTING CONTROL PANEL IN
ELECTRICAL ROOM 102. REFER TO SHEET ES101.1 FOR ADDITIONAL INFORMATION.
SET TO "DUSK TO DAWN" UNLESS REQUIRED OTHERWISE BY OWNER.
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3 B32
B24 B25
B2
B22A
B1
OPC
B27
B34
B3
B19& B19A
(TYP.)
(TYP.)
(TYP.)
0' 5' 10' 20'
E
F
G
H
J
L
M
N
P
S
T
89101112
2425262728
Q
R
W
31U
V
37 35 33
K
3.9
7.9
VV UU
WW
XX
PHASE 1
SEE SHEET ES101.1
PHASE 2
SEE SHEET ES101.2
PHASE 3
SEE SHEET ES101.3
EP - 30
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lEC2lEC2lEC2lEC2lE
C2lE C2lEC2lEC2lEC2lEC2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lE
C2lEC2lE
C2lE
C2lE
C2lE
C2lE
C2lE C2lE
C2lE
EP - 32
EP - 34
EP - 36
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLl BLl
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLlBLl
BLl BLl
BLl
32 32
32 32
32 32
34 34
34 34
34 34
34 34
36 36
36 36
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:11
PM
ES101.5B
ELECTRICAL CANOPY LIGHTING SITE PLAN -
ADD ALTERNATE
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
SCALE: 1" = 10'-0"1 ELECTRICAL CANOPY LIGHTING SITE PLAN - ADD ALTERNATE
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
1. PROVIDE RECESSED DOWNLIGHT (N). COORDINATE WITH ARCHITECT FOR EXACT
LOCATION PRIOR TO ROUGH-IN. REFER TO SHEET E-701 FOR ADDITIONAL
INFORMATION.
2. PROVIDE LED TAPE LUMINAIRE (N). MOUNT ON MIDDLE HSS STRUCTURAL FRAMING.
COORDINATE WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN. REFER
TO SHEETS E-701, M-501 AND A-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE PUSHBUTTON DOOR SWITCH (N) FOR LED TAPE LUMINAIRE. COORDINATE
WITH ARCHITECT FOR EXACT LOCATION PRIOR TO ROUGH-IN.
4. ROUTE CIRCUIT THROUGH NEXT SPARE CONTACT ON LIGHTING CONTROL PANEL IN
ELECTRICAL ROOM 102. REFER TO SHEET ES101.1 FOR ADDITIONAL INFORMATION.
SET TO "DUSK TO DAWN" UNLESS REQUIRED OTHERWISE BY OWNER.
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3 B32
B24 B25
B2
B22A
B1
OPC
B27
B34
B3
B19& B19A
(TYP.)
(TYP.)
(TYP. ALL DOORS)
0' 5' 10' 20'
UP
B3
B36
B24
T-8 B25 (E)
T-9 B24 (E)
MH-5 (E)
(N)
MH-7 (N)
(N) (N)
(N)
(N)
(N)
XFMR (E)
(E)
(N)
(N) (N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
EX
EX
MH-13
(E)
PB-3
(E)
B2
B22
B22A
B31
B25
(E)
T-6 B2 (E)
D
G E
R
L
A
CI
R T
C E
L
REENIGNELANOISSEFOR
P
D E
R E
T S I
CIFITRE
C .
O
N
ETA
A
TE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2021
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
4-13-18
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
E le c.
rv t
4/
/2
:5 8:
P
M
ES201
ELECTRICAL UNDERGROUND SITE PLAN -
NEW
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
SCALE: 1" = 20'-0"1
ELECTRICAL 15kV UNDERGROUND SITE PLAN - NEW
GENERAL SHEET NOTES
KEYNOTES
A. 12.47KV CABLE INSTALLATION WILL REQUIRE ELECTRICAL SHUTDOWNS. THE
FOLLOWING BUILDINGS WILL BE AFFECTED: B2, B22, B22A, B24, B25, B27, CLC
B. TEMPORARY GENERATORS SHALL BE PROVIDED AT EACH BUILDING AFFECTED
BY THE SHUTDOWN DURING CABLE SWITCHOVER.
1. PROVIDE CONCRETE ENCASED DUCTBANK AND 12.47KV CABLE. REFER TO
SHEET E501 FOR ADDITIONAL INFORMATION.
2. EXISTING DUCTBANK TO REMAIN.
3. PROVIDE NEW LOAD BREAKS AND CONNECT TO 12.47KV CABLE. REFER TO
SHEET E501 FOR ADDITIONAL INFORMATION.
4. PROVIDE NEW MANHOLE. REFER TO MANHOLE 7 DEATIL ON SHEET E501 FOR
ADDITIONAL INFORMATION.
5. REFER TO PB-3 DETAIL ON SHEET E501 FOR ADDITIONAL INFORMATION.
6. REFER TO MH-5 DETAIL ON SHEET E501 FOR ADDITIONAL INFORMATION.
NO REVISIONS DATE
UP
B3
B36
B24
T-8 B25 (E)
T-9 B24 (E)
MH-5
(E)
MH-7
(X)
EX
X
X
X
X X
X
X
B22A
B22
B25
B2
B31
TRAILER T5
X
X
X
EX
EX
MH-13
(E)
PB-3
(E)
XFMR
(E)
T-10 (E)
X
X
X
EX
X
T-6 B2 (E)
D
G E
R
L
A
CI
R T
C E
L
REENIGNELANOISSEFOR
P
D E
R E
T S I
CIFITRE
C .
O
N
ETA
A
TE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2021
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
4-13-18
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
E le c.
rv t
4/
/2
:5 7:
P
M
ESD201
ELECTRICAL 15kV UNDERGROUND SITE PLAN
- DEMOLITION
Checker R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
A. REFER TO SHEET E701 FOR MANHOLE AND DUCTBANK DETAILS.
B. TEMPORARY GENERATORS SHALL BE PROVIDED AT EACH BUILDING AFFECTED
BY THE SHUTDOWN DURING CABLE SWITCHOVER.
BUILDING TEMPORARY GENERATOR SIZE
2 750kVA
22 OLD CHILLER ROOM
24 500kVA 25 225kVA 27 500kVA 31 225kVA
1. REMOVE 12.47KV CABLE AND ADD PULLWIRE IN EXISTING CONCRETE ENCASED
DUCTBANK. ABANDON CONDUIT AND DUCTBANK IN PLACE.
2. EXISTING 12.47KV CABLE AND DUCTBANK TO REMAIN.
3. REMOVE EXISTING 12.47KV CABLE AND DUCTBANK.
4. REMOVE MANHOLE IN ITS ENTIRETY.
5. EXISTING MANHOLE TO REMAIN.
6. EXISTING PULLBOX TO REMAIN. REFER TO SHEET ES201 FOR ADDITIONAL
INFORMATION.
7. EXISTING MANHOLE TO REMAIN. EXISTING 15KV CABLE TO BE SPLICED.
SCALE: 1" = 20'-0"1
ELECTRICAL 15kV UNDERGROUND SITE PLAN - DEMOLITION
NO REVISIONS DATE
EPP
B22.A
B22.4
B22.3
B22.2
B22.B B22.C
(E)(E)
CHILLER 1 (E)
CHILLER 2 (E)
T (E)(E)
ATS (E)
SN-B22 SWBD
(E)
SN-B22 SWBD
(E)
SN-B22 SWBD
(E)
MCC-7 - 1
MCC1-2B - 1
CHILLER 3 (N)
CHILLER 4 (N)
CHWP-1 (E)
CHWP-2 (E)
CHWP-3 (E)
CHP-1 (E)
CHP-2 (E)
CHP-3 (E)
CHP-4 (E)
ELECTRICAL
ROOM
CHILLER PLANT
BLDG 22A
CHILLER PLANT
BLDG 22A
EQUIPMENT
ROOM
CHILLER ROOM
CHILLERS, BLDG
VFD-CWP-1
(N)
VFD-CWP-2
(N)
VFD-CWP-3
(N)
VFD-CWP-4
(N)
LCP
(E)
SUBSTATION(E)
(E)
E-B22 SWBD
MAIN
BREAKER
MCC-7
MCC-7
MCC-7
MCC-6
MCC-6
MCC-6
MCC-E1
MCC-E1
MCC-E1
(E)
MCC-E1
MCC-E1
STACKED
TRANSFORMERS
"EX", "NX"
MCC-E1
MCC-6
PULL BOX
(E)
MCC1-2B
(E)
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re e-ei g ht h in ch o ne fo o t o n e-h al f i n ch o n e fo o t th re e-qu ar te rs in ch o ne fo o t
6" o n e in ch o n e fo o t o n e an d o ne -h al f i n ch o ne fo o t th re e in ch es o ne fo o t
6"
6"
6"
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
2-2-18
BIM
0:/ /57
0-1 6-3
VA
Fr es no C hil ler
Pl an t P 2 1
6/V
A F res no C hil ler
Pl an t E lec
.rv t
2/5 /20
5:
:49
PM
EP101
CENTRAL PLANT ELECTRICAL ROOM FLOOR
PLAN
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
SCALE: 1/4" = 1'-0"A1 CENTRAL PLANT ELECTRICAL ROOM FLOOR PLAN
GENERAL SHEET NOTES
KEYNOTES
1. EXISTING PANEL TO REMAIN. REFER TO SHEET E-701 FOR ADDITIONAL
INFORMATION.
2. REFER TO SHEET E-601 FOR ADDITIONAL INFORMATION.
3. REFER TO SHEET E-601 AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
A. REFER TO SHEET E-001 FOR GENERAL NOTES.
0' 4' 8' 16'
NO
RT
H
FR
ES
NO
S
TR
EE
T
EAST HARVARD AVENUE
NO
RT
H
AN
GU
S
ST
RE
ET
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3 B32
B24 B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B3
B19& B19A
NOT IN CONTRACT.
BY OTHERS
1 1 1
Z
MH-5 PLAN
8'-0"
"3
1 CUBIC YARD OF
GRAVEL MINIMUM
PULLING IRON
8" A
2'-0"±
3'-5
8'-0"
A
SECTION A-A
MANHOLE COVER AND
FRAME, LID TO BE
LETTERED ``ELECTRIC''.
DROP HANDLES SHALL
BE PROVIDED. NEENAH
#R-1640-C, OR EQUAL.
NEW 12.47 KV CABLE FROM MANHOLE 7.
PROVIDE NEW LOAD BREAK JUNCTION AND
LOAD BREAK ELBOWS FOR CABLE.
MANHOLE 5: PROVIDE 4'' COREDRILL AT
BOTTOM OF MANHOLE. PROVIDE METAL
GRATE AT TOP OF HOLES. TYPICAL OF 4.
8"
2'-0"±
Z
TO MH-4
TO MH-7
2 1
TRENCH
GRADE
WARNING TAPE
3"
(TYP)
P
12"
MINIMUM
36" MINIMUM
6"
COMPACTED
BACKFILL
5" CONDUIT. REFER
TO DRAWINGS FOR
ADDITIONAL
INFORMATION
P 5"5"
C1A C1B
#4/0 COPPER GROUND CONDUCTOR
UNDISTURBED EARTH
18"
6" SAND BED.
CONCRETE
DUCTBANK.
3"4"4"3" 3"
M
IN
#4/0 BARE CU. GROUND, FULL
LENGTH OF TRENCH
FINISHED GRADE
OR SURFACE
4" PVC CONDUIT
(TYP. OF 2).
YELLOW PLASTIC WARNING
TAPE. PROVIDE LABEL
"HIGH VOLTAGE" FOR
12.5kV DUCTBANKS.
COMPACTED TO 90% RELATIVE
DENSITY. FREE FROM LARGE
ROCKS AND DEBRIS.
(COMPACTED IN 6" LAYERS).
Z
PB-3 PLAN
8'-0"
"3
PULLING IRON
A 3'-5
8'-0" 8
A
SECTION A-A
MANHOLE COVER AND
FRAME, LID TO BE
LETTERED ``ELECTRIC''.
DROP HANDLES SHALL
BE PROVIDED. NEENAH
#R-1640-C, OR EQUAL.
NEW 12.47 KV CABLE FROM MANHOLE 7.
PROVIDE NEW LOAD BREAK JUNCTION AND
LOAD BREAK ELBOWS FOR CABLE.
Z
TO MH-13
TO MH-7
2 1
Z
MH-7 NEW WORK PLAN
8'-0"
"3
PULLING IRON
A 3'-5
8'-0"
A
SECTION A-A
MANHOLE COVER AND
FRAME, LID TO BE
LETTERED ``ELECTRIC''.
DROP HANDLES SHALL
BE PROVIDED. NEENAH
#R-1640-C, OR EQUAL.
PROVIDE NEW LOAD BREAK JUNCTION AND
LOAD BREAK ELBOWS FOR CABLE.
ZTO
MH-5 TO B-22
Z
TO
B-24
Z
TO
B-25
Z
TO
B-27
Z
TO
B-2/B-31
12"12"
1 CUBIC YARD OF
GRAVEL MINIMUM
8"
2'-0"±
8"
2'-0"±
Z Z
PROVIDE 12'' THICK AGGREGATE BASE ROCK.2
D
G E
R
L
A
CI
R T
C E
L
REENIGNELANOISSEFOR
P
D E
R E
T S I
CIFITRE
C .
O
N
ETA
A
TE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2021
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
ISSUED FOR CONSTRUCTION
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
SUBMISSION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
4-13-18
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
E le c.
rv t
4/
/2
:5 3:
P
M
E501
ELECTRICAL DETAILS
J. MONTANO R. RIBA02/02/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
2615 E Clinton Ave, Fresno, CA 93703
N.T.S.
SINGLE MANHOLE MH-5 MODIFICATIONS
N.T.S.
PRIMARY LOOPING DUCTBANK SECTION
N.T.S.
PRIMARY DUCT BANK
NO REVISIONS DATE
N.T.S.
SINGLE MANHOLE PB-3
N.T.S.
SINGLE MANHOLE MH-7 NEW WORK
M
(OFF)
RATED
HP
NEC FULL LOAD
CURRENT AT
480V, 3PH (AMPS)
MOTOR CALCULATED kVA
AT 480V, 3PH
NORMAL MOTORS LOADS
3 4.8 3.8
CHILLER CH-2
40 31.9COOLING TOWER 1 HEATER
PUMP CHWP2
PUMP CHP-2
CHILLER CH-3
FAN COIL FC-2
124 98.8
1 1.8 1.4FAN COIL FC-1
RATED
HP
NEC FULL LOAD
CURRENT AT
480V, 3PH (AMPS)
MOTOR CALCULATED kVA
AT 480V, 3PH
EMERGENCY MOTORS LOADS
TOTAL LOAD CONCEPT C-3
680.7
COOLING TOWER CT-1
30 40 31.9COOLING TOWER CT-2
CHILLER CH-1
PUMP CHWP-1
31.9
PUMP CHP-1
575 460
124 98.8
21 16.715
21 16.715
PUMP CWP-2
PUMP CWP-1 52 41.440
52 41.440
40 31.9COOLING TOWER 2 HEATER
575 460
PUMP CHWP3 124 98.8100
PUMP CHP-3 21 16.715
PUMP CWP-3 52 41.440
PUMP CWP-4 52 41.440
MOTORS LOAD SUMMARY
EXISTING MOTORS LOAD ON MCC1-2B
EMERGENCY MOTOR LOADS
NORMAL MOTOR LOADS
325.4 kVA
680.7 kVA
1,521.2 kVA
TOTAL MOTOR LOADS ON DSB-B22 2,527.3 kVA
L
E
N
MANHOLE MH-22 (E)
PRIMARY FEEDERS "SW-6" (E)
TEMPORARY FEED
PAD MOUNTED OIL
FILLED TRANSFORMER
'T-6' (E)
RELOCATED
TRANSFORMER "T-10"
1500kVA (E)
MANHOLE MH-2 (E)
DISTRIBUTION SWITCHBOARD SECTION
277/ 480V, 3PH, 4W, NEMA 3R, 4000 A, 100,000 AIC (E)
DRY-TYPE SUB-STATION TRANSFORMER SECTION
3000 KVA, NEMA 1, 12.47 KV: 277/480V (E)
MEDIUM VOLTAGE SWITCH SECTION
12.47 KV, 3PH, 3W, 95 KV BIL, NEMA 1, 25 KAIC (E)
(E) MANHOLE "MH-EDP"
(E) PRIMARY FEEDERS
200A
150E
MOTOR CONTROL CENTER MCC-6
1200A, 480V, 3PH, 3W, 65KAIC (E)
MOTOR CONTROL CENTER MCC-7
1200A, 480V, 3PH, 3W, 65KAIC (E)
XFMR "NX"
45KVA,
480-208V/120V
3PH-4W,
DRY-TYPE (E)
1 2 3 4 1 2 3 4 5
SPACE FOR
(2) 800A BREAKERS
MOTOR CONTROL CENTER MCC-E1
1200A, 480V, 3PH, 3W, 65KAIC (E)
1 2 3 4 5
XFMR "EX"
45KVA,
480-208V/120V
3PH-4W,
DRY-TYPE (E)
MANHOLE "MH-NP1" (E) (MH-6)
5 66 6 7
AUTOMATIC TRANSFER SWITCH "ATSE"
AND DISTRIBUTION SWITCHBOARD "SWBD E-B22" (E)
ATS 3-POLE, 2000A, 480V, SWBD TEST BY-PASS SWBD
480V, 3PH, 3W, 2000A, 100,000KAIC (E)
UNITS SUB-STATION "SN-B22" (E)
TO GND. BAR "G2"
TO GND. BAR "G2" TO GND. BAR "G2"
CUSTOMER OWNED METER (E)
8 8
SOLID
SEPARATOR
SSR-2
(15 HP)
TO GND. BAR "G2"
INFORMATION BELOW TAKEN FROM AS-BUILT
DRAWINGS, PROJECT NUMBER 570-13-300,
DATED 4-17-2015
UNLESS OTHERWISE SPECIFIED, ALL
DISTRIBUTION EQUIPMENT, BREAKERS,
DISCONNECTS, SWITCHES AND CONDUIT
ARE EXISTING TO REMAIN.
(E)
PUMP
CHP-3
(15 HP)
PUMP
CHWP3
(100 HP)
PUMP
CWP-3
(40 HP)
PUMP
CWP-4
(40 HP)
FAN
COIL
FC-1
FAN
COIL
FC-2
CHILLER
CH-3
(575 MCA)
SOLID
SEPARATOR
SSR-1
(15 HP)
PUMP
CHP-2
(15 HP)
PUMP
CHWP2
(100 HP)
PUMP
CWP-2
(40 HP)
COOLING
TOWER 1
HEATER
COOLING
TOWER 2
HEATER
SANIPAK
CHILLER
CH-2
(575 MCA)
(E)
CHILLER
CH-4
(213 FLA)
PUMP
CHWP1
(100 HP)
CHILLER
CH-1
(575 MCA)
PUMP
CHP-1
(15 HP)
PUMP
CWP-1
(40 HP)
COOLING
TOWER
CT-2
(30HP)
EXHAUST
FAN
EF-1
(1.5HP)
COOLING
TOWER
CT-1
(30HP)
PUMP 22-P3
(7.5 HP, 10.3 FLA)
RO UNIT
PANEL
"P" (E)
PANEL
"EP"
(E)
225A 225A
(E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E)(E)(E)(E)(E)(E)(E)(E)
(E)(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E) (E) (E)
(E) (E)
(E)
(E)
(E) (E) (E) (E) (E) (E) (E)
(E)
(N) (E) (E) (E) (E) (E) (E)
(E)
(N)
G
(E)
(E)
(E) (E)
(E) (E) (E) (E)
(E)(E)
(N)
(N)
G G G G
M
G G
G
Δ
Y
Δ
Y
(E)
3P
MCP
MOTOR CONTROL CENTER MCC1-2B
1600A, 480V, 3PH, 3W, 65KAIC (E)
TOTAL LOAD CONCEPT C-3 1521.2
VFD VFDVFD
CHILLER CH-4 213 177
VFD VFD(N) (N)VFD (N)VFD (N)
MANHOLE "MH-NP2" (E) (MH-7)
(N)
TO BLDG
TO BLDG
(E) (E)
TO
BOILER
'EDP2'
TO CLC
(E) (E)
PB-2
TO
BLDG 22
(E)
(E)
TO CLC
EXPANSION
TO BLDG
PB-3
(E)
D
GE R
L
A
CI
RT
CE
L
REENIGNELANOISSEFORP
DERET
S I
CIFITREC .ON
ETA
ATE
S I GNED
A R I Z ON A U . S . A .
E
38934
JOHN M.
MONTANO
EXPIRES 3/31/2018
o n e-ei g h th in ch o n e fo o t o n e-q u ar te r in ch o n e fo o t th re…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.