36C26118R0487-102.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 07 - A2011thruA2112.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
123567
C3
A-301
B31
B22A
3 4
P H
A S
E
P H
A S
E
F1
A-301
D1
A-310
B1
A-310
E1
A-306
BEYOND
HIDDEN FOR
CLARITY
'-7
29222929
(N) 1-VCHS-06
(N) 1-VCHR-06
A-551
D4
7.9
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
1 2 3
B22A
B31
F1
A-301
E1
A-306
C1
A-306
A-505
C7
A-551
D4
S-504
C6
B
B
B
B
B
B
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
03_ROOF
120' - 0"
ABCDEF
F1
A-302
B31
HIDDEN FOR CLARITY
A D
D A
L T
E R
N A
T E
T
E M
P C
A N
O P
Y
P H
A S
E
C5
A-306 C1
A-305
F1
A-305
B25
BEYOND
B22
ABEYOND
A-501
F1
SIMILAR
29 29
25 25
B22.4
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
Z
B1
A-303
W.0
B24
BBQ AREA
X.0
B1
A-307
E1
A-307
'-0
'-0
"18 '-6
Y
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
43 44 45 46 47 48
B22
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
HIDDEN FOR
CLARITY
40.9
18B25
B24
B3BBQ AREA
B5
A-503
42.8
HIDDEN FOR CLARITY
BEYOND
'-0
'-7
EQEQ
B1
A-503
SIMILAR
A-503
B6
F5
A-303
AT B3
GUTTERD6
A-504
7.9 42.1
10 10
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
BBQ AREA
P H
A S
E
P H
A S
E
B24
2324 24 24
BEYOND
25 25
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
Z
B1
A-303
W.0X.0
B1
A-307
E1
A-307
B24
Y
MATERIALS LEGEND
CONCRETE, (CAST OR
PRECAST)
STONE VENEER (EL
DORADO, BLACK RIVER
STACKED STONE)
METAL PANEL WALL
SYSTEM (36"X36")
TRANSLUCENT SKYLIGHT
CONCRETE MASONRY
UNITS (E)
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F5
A-302
B4
A-303
40.9
B5
A-503
42.8
B24
HIDDEN FOR CLARITYP
H A
S E
P H
A S
E
P H
A S
E
P H
A S
E
2525 2525
22 24
(N) 2-VCHR-03
(N) 2-VCHS-03
F5
A-303
7.942.1 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:2
P
M
A-201.1
ARCHITECTURAL EXTERIOR ELEVATIONS -
PHASE 1 AND PHASE 2
M. PERKINS A. DANSO02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" B4
CANOPY SOUTH ELEVATION - PHASE 1
KEYNOTES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT
WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY
MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL. SEE
MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO
MAINTAIN REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE PATHWAY
PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY CONSTRUCTION
AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS REQUIRED TO BE
MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
HOUSING - PHASE 1
2 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
3 (N) CANOPY DORMER TO HIDE UTILITIES FROM CENTRAL PLANT POC
4 (N) CANOPY WITH (F) UTILITY CAPACITY- ADD ALTERNATE NO. 1
5 (N) UTILITY POC AT B31, SEE MPE DRAWINGS.
6 (N) UTILITY PIPE PENETRATIONS, B22A. CONNECT TO (E) VALVES AT POC.
7 (E) CHW AND STEAM PIPE PENETRATIONS TO B31 PENTHOUSE
8 (F) CANOPY CONTINUES IN PHASE 2
9 (N) OXYGEN LINE FROM B1 TO B31, SEE MPE DRAWINGS.
10 (N) STEEL COLUMNS WITH (F) CUSTOM SOLDIER PROFILE TO BE ADDED
WHEN (E) B3 IS REMOVED. SEE A-111.2.
11 (N) CYLINDRICAL CONCRETE COLUMN, TYP. ON CANOPY GRIDS, SEE
STRUCTURAL SHEETS
12 (N) FLUSH STAINLESS STEEL ACCESS DOOR CONTINUOUS ALONG ENTIRE
CANOPY LENGTH WITH GAS CYCLINDER LIFT ASSIST, KICK-STAND TO
LOCK OPEN, TYP. SEE A-600 FOR ACCESS DOOR DETAILS AND SCHEDULE
13 (N) STONE VENEER SEAT WALL WITH ROUNDED CAP STONE, WHEN BOTH
SIDES OF THE WALL ARE VISABLE THE WALL WILL HAVE A STONE VENEER
ON EACH SIDE, SEE F1/A-502.
14 ISOLATION VALVES FOR POC FOR B24, CONCEALED IN METAL PANEL PIPE
CHASE
15 (N) CANOPY INTERSECTION - BBQ AREA
16 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED UTILITY
PIPE BANK EACH SIDE - PHASE 2
17 ISOLATION VALVES FOR POC FOR (F) TECHNOLOGY BUILDING,
CONCEALED IN SOFFIT
18 (F) CANOPY CONTINUES IN PHASE 3
19 (E) MECH. SCREEN WALL TO REMAIN, BEYOND
20 (E) STAIRS AND RAILING TO REMAIN, HIDDEN FOR CLARITY
21 (E) COOLING TOWERS
22 (E) UTILITY OVERFLOW DRAIN LINES TO REMAIN, SEE CIVIL DRAWINGS
23 (N) 10'-0" SIDEWALKS ADD ALTERNATE NO. 2
24 (E) UTILITY TO REMAIN
25 (N) METAL PANEL WALL SYSTEM ON METAL FRAMING
26 (N) DOWNSPOUT TO SPLASH BLOCK BELOW
27 SECTION THROUGH (E) CANOPY TO REMAIN UNTIL B3 IS REPLACED
28 (E) SCREEN WALL FOR CHILLERS TO REMAIN PROTECT IN PLACE
29 (E) BUILDING EXIT
30 (N) UTILITY PIPE PENETRATIONS TO B31
1" = 10'-0" C7
CANOPY NORTH ELEVATION - PHASE 1
1" = 10'-0" B1
CANOPY EAST ELEVATION - PHASE 1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0" C1
CANOPY EAST ELEVATION - PHASE 2
1" = 10'-0" F1
CANOPY NORTH ELEVATION - PHASE 2
1" = 10'-0" C3
CANOPY SOUTHWEST SKEWED ELEVATION - PHASE 2
1" = 10'-0" F6
CANOPY EAST ELEVATION - PHASE 2 BBQ AREA
1" = 10'-0" D1
CANOPY SOUTH ELEVATION - PHASE 2
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018
02_CANOPY LEVEL
110' - 0"
F1
A-303
B32
P H
A S
E
P H
A S
E
B1 B24
A-502
F1
CC
BEYOND
BEYOND
'-7
'-6
/2
'-0
19 T5
HIDDEN FOR CLARITY
49.9 DD
F1
A-309
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
D4
A-311
B1 B24
B24
UTILITY SERVICE TUNNEL
F4
A-504
CC
ADD ALTERNATE NO. 1
BEYOND
49.9DD VV UU
F1
A-309
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
Z
D1
A-303
B1SLOPE OF GRADE SLOPE OF GRADE
B24
X.0
BEYOND
'-0
16 16
T5
Y 59
MATERIALS LEGEND
CONCRETE, (CAST OR
PRECAST)
STONE VENEER (EL
DORADO, BLACK RIVER
STACKED STONE)
METAL PANEL WALL
SYSTEM (36"X36")
TRANSLUCENT SKYLIGHT
CONCRETE MASONRY
UNITS (E)
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
525354555657
D1
A-503
B24
HIDDEN FOR CLARITY
T5
HIDDEN FOR CLARITY
STORAGE TRAILER
HIDDEN FOR CLARITY
1 2
19 1817
161616
58.9 58.1 57.5 57.258.5
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
F1
A-303
D4
A-311
B24
HIDDEN FOR CLARITY
16 16
15 15
T5
BEYOND
49.9 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:3
P
M
A-201.2
ARCHITECTURAL EXTERIOR ELEVATIONS -
PHASE 3
M. PERKINS A. DANSO02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" B6
CANOPY NORTH ELEVATION - PHASE 3
1" = 10'-0"
B1
CANOPY SOUTH ELEVATION B1 & B24 BREEZEWAY - PHASE 3
1" = 10'-0" F1
CANOPY WEST ELEVATION - PHASE 3
KEYNOTES
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - PHASE 3
2 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY - PHASE 3
3 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - PHASE 2
4 ISOLATION VALVES FOR POC FOR (F) CHW CAPACITY IN B1, CONCEALED
IN SOFFIT
5 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
6 (N) CANOPY TRIANGLE INTERSECTION - PHASE 3
7 TO B1 & B24 BREEZEWAY
8 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY, ADD ALTERNATE NO. 1
9 (N) STONE VENEER SEAT WALL WITH ROUNDED CAP STONE, WHEN BOTH
SIDES OF THE WALL ARE VISABLE THE WALL WILL HAVE A STONE
VENEER ON EACH SIDE, SEE F1/A-502.
10 (E) RETAINING WALL TO REMAIN
11 (N) CANOPY AND PIPE CHASE AT B1 & B24 BREEZEWAY
BEYOND
12 (N) SIDEWALK AS NECESSARY, SEE CIVIL DRAWINGS
13 (E) B1 GUARD RAIL OVER LOADING DOCK
14 (E) MODULAR BUILDING TO BE REMOVED DURING (F) PHASE
15 (N) COLUMN PILE AND PILE CAP, SEE STRUCTURAL SHEETS
16 (N) METAL PANEL WALL SYSTEM ON METAL FRAMING
17 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
18 (N) STONE VENEER PLANTER SEAT WALL
19 (N) DOWNSPOUT TO SPLASH BLOCK BELOW
20 (E) RETAINING WALL TO LOADING DOCK BELOW
21 (E) B1 & B24 BREEZEWAY TO REMAIN
22 (E) B1 VESTIBULE CANOPY TO REMAIN
23 (N) STONE VENEER ON METAL STUD FRAMED PIPE CHASE
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0" D1
CANOPY EAST ELEVATION - PHASE 3
1" = 10'-0"
D6
CANOPY SOUTH ELEVATION - PHASE 3
NO REVISIONS DATE
02_CANOPY LEVEL
110' - 0"
38910112425262728
C3
A-301 B24
B25
BEYOND
3.9
A-201.5
F6
10 10 10 10
11 11
VV UU
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
EFGHJLMNP S T
B31
HIDDEN FOR CLARITY
F1
A-304
BEYOND
K
B25 7
A D
D A
L T
E R
N A
T E
T
E M
P C
A N
O P
Y
P H
A S
E
9 9
10 10
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
151719213031
A U
D
IT
O R
IU
M
(H
ID
D E
N F
O R
C
LA
R
IT
Y
SKEWED ANGLE
B24
B25
131620 18 1422
BEYOND
BEYOND
SKEWED ANGLE
9 999
11 11 11
10 10 10 10
MATERIALS LEGEND
CONCRETE, (CAST OR
PRECAST)
STONE VENEER (EL
DORADO, BLACK RIVER
STACKED STONE)
METAL PANEL WALL
SYSTEM (36"X36")
TRANSLUCENT SKYLIGHT
CONCRETE MASONRY
UNITS (E)
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
B24
BEYOND
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:5
P
M
A-201.5
ARCHITECTURAL EXTERIOR ELEVATIONS -
ADD ALT. NO. 1
M. PERKINS A. DANSO02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" B1
CANOPY SOUTH ELEVATION - ADD ALTERNATE NO.1
1" = 10'-0" F3
CANOPY EAST ELEVATION - ADD ALTERNATE NO.1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH (F) UTILITY
CAPACITY- ADD ALTERNATE NO. 1
2 (N) PEDESTRIAN CANOPY - ADD ALTERNATE NO. 1
3 (N) STONE VENEER ON METAL STUD FRAMED PIPE CHASE DOWN TO
UTILITY TRENCH, FOR (F) EXPANSION
4 (E) LIGHT POLE TO REMAIN
5 (E) B25 STAIR TOWER, BEYOND
6 (N) PAINTED VA LOGO CENTERED ON END METAL PANEL AT MAIN
ENTRY
7 (N) TRANSLUCENT SKYLIGHT SYSTEM CANOPY WITH INTEGRATED
UTILITY PIPE BANK EACH SIDE - PHASE 1
8 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED
STRUCTURAL STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE
STRUCTURAL SHEETS
9 (N) SIDEWALK AT ADD ALT NO. 1
10 (N) METAL PANEL WALL SYSTEM ON METAL FRAMING
11 (E) FLAG POLE TO REMAIN
KEYNOTES
1" = 10'-0" D1
CANOPY SOUTHWEST ELEVATION - ADD ALTERNATE NO.1
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
3/16" = 1'-0" F6
VA LOGO ON END PANEL AT MAIN ENTRY
NO REVISIONS DATE
MATERIALS LEGEND
CONCRETE, (CAST OR
PRECAST)
STONE VENEER (EL
DORADO, BLACK RIVER
STACKED STONE)
METAL PANEL WALL
SYSTEM (36"X36")
TRANSLUCENT SKYLIGHT
CONCRETE MASONRY
UNITS (E)
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
FUTURE CONSTRUCTION
FUTURE ENGINEERING BLDG
3.10
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
1 2
FUTURE CONSTRUCTION
FUTURE ENGINEERING BLDG
3.10
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
FUTURE CONSTRUCTION
FUTURE ENGINEERING BLDG
(BEYOND)
B
B
B
B
B
B
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
FUTURE
CONSTRUCTION
FUTURE
ENGINEERING
BLDG
F1
A-501
B
B
B
B
B
B
3.10
01_GROUND LEVEL
100' - 0"
02_CANOPY LEVEL
110' - 0"
FUTURE
CONSTRUCTION
FUTURE
ENGINEERING
BLDG
F1
A-501
B
B
B
B
B
B
3.10 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
-O P
T 4A
.rv t
2/ 7/
0:
:0
P
M
A-211.2
ARCHITECTURAL EXTERIOR ELEVATIONS AND
SECTIONS - FUTURE CONSTRUCTION
M. PERKINS A. DANSO02/07/2018
570-16-302DESIGN EXPANDED CHILLED
WATER CAPACITY, PHASE 2
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
KEYNOTES
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO
BE CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3,
B22, B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE
AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE
ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERRUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
GENERAL SHEET NOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A 1/4" = 1'-0"
E1
CANOPY NORTHWEST ELEVATION - FUTURE
1/4" = 1'-0" E4
CANOPY SOUTHEAST ELEVATION - FUTURE
1/4" = 1'-0" C1
CANOPY NORTH SECTION - CONNECTION TO B3 - FUTURE
1 (E) CANOPY WITH INTEGRATED UTILITY HOUSING - PHASE 2
2 (N) CANOPY WITH INTEGRATED UTILITY HOUSING - FUTURE CONSTRUCTION
3 SUSPENDED METAL PANEL CEILING
5 METAL PANEL WALL SYSTEM ON METAL FRAMING
6 (N) CUSTOM SOLDIER PROFILE COLUMNS WITH EMBEDDED STRUCTURAL
STEEL COLUMN, TYP. ON CANOPY GRIDS. SEE STRUCTURAL SHEETS
7 (N) 10'-0" SIDEWALK ADD ALTERNATE NO. 2
1/4" = 1'-0" C4
CANOPY SECTION EAST - CONNECTION TO B3 - FUTURE
1/4" = 1'-0"
C6
CANOPY SECTION WEST - CONNECTION TO B3 - FUTURE
NO REVISIONS DATE
| A-201.1 |
| A-201.2 |
| A-201.5 |
| A-211.2 |
File details come from the government source that posted it.