36C26118R0487-0002050.pdf
PDF 15 MB Posted
- Solicitation number
- 36C26118R0487
About this file
36C26118R0487 0002 570-16-302_AS100thurAS111.2.pdf
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
B31
(CLC)
B2
B22
B22A
B36
LOT F
P H
A S
E
P H
A S
E
S E
E S
H E
E T
A S
0.
B
A S
E B
ID
TEMP. PEDESTRIAN CANOPY
SEE AS100.5
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
6' -0
6'
-0
5'-0" 5'-0"
10'-0"
VERIFY
6'-9"
2'-3"
6' -0
6'
-0
V E
R
IF
Y
5' -0
V E
R
IF
Y
3' -1
1"
V E
R
IF
Y
2' -6
E X
IS
TI
N G
6' -0
AREA OF WORK
10 3
12 97.25'
90.00°N W
.0
.0
S W
25.74'
90.00°N W
13 VERIFY
6'-8"
E
SDCO (E)
(E) XFMR
T -1
T -6 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS100.1
ARCHITECTURAL SITE PLAN - PHASE 1 BASE
BID
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0"
SITE PLAN - PHASE 1 BASE BID
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY,
SEE SHEET S-101.1
2 EXISTING CONCRETE WALK TO REMAIN
3 CONNECT TO (E) CONCRETE SIDEWALK PER DETAIL D4, SHEET C-501-
MATCH EXISTING GRADE
4 (E) SIDEWALK JOINTS TO REMAIN
5 PIPE BRIDGE (E) TO REMAIN UNTIL PHASE 2
6 STAIRS TO ROOF (E) TO REMAIN
7 FENCE AND GATE/SECURE PERIMETER TO REMAIN IN PLACE THROUGHOUT
CONSTRUCTION
8 CENTERLINE OF CANOPY (N)
9 UTILITY OVERFLOW (E), PROTECT IN PLACE
10 GATE (E) TO BE RELOCATED 4 LF EAST, REPLACE ADJACENT FENCE AS
NEEDED
11 EXISTING COLUMN / CANOPY TO REMAIN
12 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
13 PHASE 1 - BASE BID - (E) ELEC MANHOLE #7 AND VAULT TO BE REMOVED
AND REPLACED BY (N) MANHOLE AND VAULT (DEDUCTIVE ALTERNATE 2 IS
TO REPAIR IN PLACE THE EXISTING MANHOLE AND VAULT)
14 (N) TEMPORARY SHORING WHERE COLUMN IS REMOVED FROM EXISTING
PIPE BRIDGE
15 PHASE 1 - BASE BID - (N) UTILITY TRENCH, DUCTBANK AND 12 kV
ELECTRICAL LINES TO (N) MANHOLE/VAULT LOCATION. SEE CIVIL UTILITY
AND ELECTRICAL DRAWINGS. (NOT REQUIRED FOR DEDUCT ALTERNATE 2,
CONTRACTOR TO REPAIR MANHOLE/VAULT IN-PLACE AT (E) LOCATION)
16 PHASE 1 - BASE BID - (N) ELEC MANHOLE #7 AND VAULT SEE ELECTRICAL
FOR DETAILS. (DEDUCTIVE ALTERNATE 2 IS TO REPAIR IN PLACE THE
EXISTING MANHOLE AND VAULT)
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
NO REVISIONS DATE
Expires 6.30.16Expires: 6/30/18
2/7/2018
P H
A S
E
P H
A S
E
S E
E S
H E
E T
A S
0.
B
A S
E B
ID
AREA OF WORK
AREA OF WORK
AREA OF WORK
P H
A S
E
S E
E S
H E
E T
A S
0.
B
A S
E B
ID
P H
A S
E
ADD ALT. NO 1/TEMP. PEDESTRIAN CANOPY
SEE AS100.4 & AS100.5
AREA OF WORK
B36
B3
B24
PHASE 3
SEE SHEET AS100.3 BASE BID
5' -0
5'
-0
5' -0
5'
-0
5' -0
5'
-0
A R
E A
O F
W O
R K
U N
T
IL
F U
T U
R E
C O
N S
T R
U C
T
IO
N (E
C
A N
O P
Y T
O R
E M
A
IN
E
2 14
T -8
T -9
(E) XFMR
(E) XFMR
(E) XFMR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS100.2
ARCHITECTURAL SITE PLAN - PHASE 2 BASE
BID
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0"
SITE PLAN - PHASE 2
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY, SEE
STRUCTURAL DRAWINGS
2 (E) CONCRETE SIDEWALK TO REMAIN
3 (E) 2' RETAINING WALL TO REMAIN
4 (E) RAISED PLANTER AREA TO REMAIN
5 PROPOSED TRENCHING, REMOVE AND REPLACE ENTIRE SECTION OF
SIDEWALK BETWEEN (E) SIDEWALK JOINTS
6 LOCATION OF (N) DOWNSPOUR TO SPLASH BLOCK BELOW
7 (E) SIDEWALK JOINTS TO REMAIN
8 PLANTER (E) WITH TREE (E) TO REMAIN, PROTECT IN-PLACE TO PRESERVE
INTEGRITY
9 (E) TUNNEL TO REMAIN, UNDISTURBED
10 PORTION OF (E) CANOPY, RAMP AND RAILING TO REMAIN UNTIL (F) TECH
BLDG
11 (E) PLANTER AREA AND (E) DRAIN TO REMAIN
12 PHASE 1 - BASE BID - (E) ELEC MANHOLE #7 AND VAULT TO BE REMOVED AND
REPLACED BY (N) MANHOLE AND VAULT (DEDUCTIVE ALTERNATE 2 IS TO
REPAIR IN PLACE THE EXISTING MANHOLE AND VAULT)
13 PHASE 1 - BASE BID - (N) UTILITY TRENCH, DUCTBANK AND 12 kV ELECTRICAL
LINES TO (N) MANHOLE/VAULT LOCATION. SEE CIVIL UTILITY AND
ELECTRICAL DRAWINGS. (NOT REQUIRED FOR DEDUCT ALTERNATE 2,
CONTRACTOR TO REPAIR MANHOLE/VAULT IN-PLACE AT (E) LOCATION)
14 PHASE 1 - BASE BID - (N) ELEC MANHOLE #7 AND VAULT SEE ELECTRICAL
FOR DETAILS. (DEDUCTIVE ALTERNATE 2 IS TO REPAIR IN PLACE THE
EXISTING MANHOLE AND VAULT)
15 PHASE 1 - (E) ELEC MANHOLE #5 TO REMAIN -PROVIDE 6" DIA CORE DRILLED
FLOOR DRAINS AT EACH VAULT CORNER WITH 1" GRAVEL BACKFILL,
MINIMUM 6' DEPTH BELOW VAULT WITH METAL GRATING INLET COVER.
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
NO REVISIONS DATE
a s
P H
A S
E
S E
E S
H E
E T
A S
0.
B
A S
E B
ID
P H
A S
E
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
PHASE 3
PHASE 2
SEE SHEET AS100.2 BASE BID
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
B3
B1
B17
B24
B1 & B24 BREEZEWAY
B32
12'-0"
20 A R
E A
O F
W O
R K
T5
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
S L O
P E
D O
W N
SDCO (E)
A R
E A
O F
W O
R K
B1 & B24 BREEZEWAY
7'-8"
5'-1"
4'-0"
A
AS100.3
B
AS100.3
D4
C-501 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS100.3
ARCHITECTURAL SITE PLAN - PHASE 3 BASE
BID
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0"
SITE PLAN - PHASE 3 BASE BID
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY, SEE
SHEET S-101.3
2 (E) RAILING TO REMAIN
3 (E) CONCRETE SIDEWALK TO REMAIN
4 CONSTRUCT (N) 2' SEAT WALL PER DETAIL F1, SHEET A-501. CONSTRUCT
RETAINING WALL PER DETAIL B7, C-501, ADD. ALT. NO. 2.
5 REMOVE PORTION OF (E) HANDRAIL AT NEW SEATWALL
7 LOCATION OF (N) DOWNSPOUT TO SPLASH BLOCK BELOW
8 (E) RETAINING WALL TO REMAIN, BASE BID
9 CONSTRUCT CONCRETE SIDEWALK PER DETAIL F4, SHEET C-501 AND
CONNECT TO (E) CONCRETE SIDEWALK PER DETAIL D4, SHEET C-501, MATCH
(E) GRADE
10 (N) FENCING SEE DETAIL A2/C-502, AS REQUIRED TO MAINTAIN SECURE
PERIMETER. REMOVE (E) FENCE IN CONFLICT WITH NEW COLUMNS AND
LIGHTING, RELOCATE 8' EAST MAXIMUM, COORDINATE WITH THE COR.
11 (E) FENCING TO REMAIN, AS REQUIRED TO MAINTAIN SECURE PERIMETER
12 VA TO RELOCATE (E) CONNEX STORAGE PRIOR TO CONSTRUCTION
13 (E) MANHOLE TO REMAIN
14 EXISTING CONCRETE TO REMAIN
15 ELECTRICAL PANEL BOARD (E) INSIDE B32 - SEE ELECTRICAL SHEETS
16 CONSTRUCT CONCRETE RETAINING WALL PER DETAIL D6, SHEET C-501 AND
CONNECT TO (E) CONCRETE SIDEWALK PER DETAIL D4, SHEET C-501
17 (E) 6' MAX RETAINING WALL TO BE REMOVED
18 REMOVE, RETAIN AND REPLACE EXISTING SIGN
19 REFINISH (E) FLOORING UNDER THE BREEZEWAY AT B24. OPTION 1: REMOVE
SEALER/REBROADCAST FLOORING AT CORRIDOR WITH SHIELD TOP US-1/16"
SYSTEM-PREVAILING, OPTION 2: GRIND AND REINSTALL FLOORING AT
CORRIDOR WITH URI-3/16" SYSTEM-PREVAILING. COORDINATE WITH COR TO
DETERMINE THE OPTION TO BE USED
20 (E) ROCK FEATURE/LANDSCAPING, PROTECT IN PLACE AND REPLACE AS
REQUIRED. COORDINATE WITH COR.
21 PROVIDE (N) RAMP LANDING TO T-5, COORDINATE WITH PROPOSED CANOPY
COLUMN FOUNDATIONS. COORDINATE WITH COR.
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
1" = 10'-0"
SITE PLAN - PHASE 3 BASE BID
MATCHLINE - SEE THIS SHEET RIGHT
MATCHLINE - SEE THIS SHEET LEFT
A
AS100.3
PHASE 3 - B24 AUDITORIUM RAMP RETAINING WALL TO BE RELOCATED, LANDSCAPING
TO BE REMOVED AND REPLACED WITH SIDEWALK
B
AS100.3
PHASE 3 - B1 & B24 LANDSCAPING TO BE REMOVED AND REPLACED WITH
WIDENED SIDEWALK, SIGN TO BE RELOCATED
NO REVISIONS DATE
10'-0"
3 3
R A
M P
D N
P H
A S
E
S E
E S
H E
E T
A S
0.
B
A S
E B
ID
PHASE 1
SEE SHEET AS100.1 BASE BID
PHASE 2
SEE SHEET AS100.2 BASE BID
B25
B31
(CLC)
B24
B1 & B24
BREEZEWAY
R A
M P
D N
R
A M
P D
N
RAMP
DN.
RAM
PDN.
RAM
PDN.
RAMP
DN. RAM
PDN.
RAMP
DN.
RAMP
DN.
EXISTING SIDEWALK TO REMAIN
EXISTING SIDEWALK
TO REMAIN
(BASE BID)
PARKING STALLS
PARKING STALLS
DO NOT ENCROACH ON
STAINED CONCRETE
SLAB ON GRADE
(E) ELECTRICAL
PULLBOX #3,
POC FOR NEW
12 kV LINE
FROM (N)
MANHOLE 7.
BASE BID - (N) 12 kV
ELECTRICAL LINE
FROM (N) MH-7 TO (E)
PULLBOX 3
TO MH-13
VERIFY (N) TRENCH ROUTING
WITH COR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS100.4
ARCHITECTURAL SITE PLAN - EXISTING
SIDEWALKS AT TEMP. CANOPY BASE BID
PHASE 1
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B
B19& B19A
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
1" = 10'-0"
SITE PLAN - TEMPORARY PEDESTRIAN CANOPY BASE BID
1 CONSTRUCT TEMPORARY ADA ACCESSIBLE RAMP TO (E) GRADE (5% MAX
SLOPE)
2 INSTALL 10' CLEAR PREFABRICATED TEMPORARY CANOPY AND WALKWAY,
TO BE REMOVED AFTER CONSTRUCTION IS COMPLETE
3 MATCH (E) GRADE AT (E). SIDEWALK
4 (E) PARKING SIGN TO REMAIN IN PLACE
5 MAINTAIN (E) PEDESTRIAN PASSAGE ROUTE DURING CONSTRUCTION
6 (E) SIGNAGE TO REMAIN, RELOCATE AS NECESSARY
7 RELOCATE STLT BASE (E) 4' OUTSIDE SIDEWALK
8 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
9 IRRIGATION CONTROL BOX (E) TO REMAIN, PROTECT IN PLACE-MAINTAIN
ACCESS
10 ELECTRICAL PULLBOX (E) TO REMAIN, PROTECT IN PLACE-MAINTAIN ACCESS
NO REVISIONS DATE
EXISTING PARKING
SIGNS TO REMAIN
EXIST. CONC. SWALE
P H
A S
E
S E
E S
H E
E T
A S
.3
B A
S E
B
ID
PHASE 1
SEE SHEET AS100.1 BASE BID
PHASE 2
SEE SHEET AS100.2 BASE BID
'-0
10'-0"
B25
B24
F4
C-501
TYP.
F4
C-501
TYP.
F4
C-501
TYP.
5'-0" 5'-0"
DO NOT ENCROACH ON
STAINED CONCRETE
SLAB ON GRADE
12'-0"
117.09'
90.00°S E
.4
.0
N E
98.52'
45.00°
S
E
77.98'
90.00°S E
135°
'-0
" V
ERIF
Y
'-0
V
E R
IF
Y
V E
R
IF
Y
'-1
0"
V E
R
IF
Y
'-9
'-0
5' -0
5'
-0
6'- 0"
6'- 0"
VERIF
Y
'-1
1"
.0
.0
N E
AREA OF WORK
AREA OF WORK
A R
EA O
F W O R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
6 (TYP.)
(TYP.)
6(TYP.)
(TYP.)
6 (TYP.)
(TYP.)
EXISTING SIDEWALK TO REMAIN
9'-
7'-
EXISTING SIDEWALK
TO REMAIN
(BASE BID)
EXIS
TIN
G 7'-
135°
5' -0
5'
-0
'-0
B1 & B24
BREEZEWAY
PARKING STALLS
PARKING STALLS
VERIFY (N) TRENCH ROUTING
WITH COR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
/2
7/
:4 3:
P
M
AS100.5
ARCHITECTURAL SITE PLAN - EXISTING
SIDEWALKS AT PERM. CANOPY ALT. NO. 1
PHASE 1
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
1" = 10'-0"
SITE PLAN - ADD ALT NO. 1, BASE BID SIDEWALKS
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
1 CONSTRUCT 4" THICK CONCRETE SIDEWALK PER DETAIL F4, SHEET C-501
2 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY,
SEE SHEET S-102.4
3 MATCH (E) GRADE AT (E) SIDEWALK
4 (E) SIGN TO BE RELOCATED
5 (N) 8" CHWS/R IN (E) UTILITY TUNNEL FROM B22A TO (N) B31 POC, PHASE 1
BASE BID. CONTRACTOR TO PROTECT WALK OF HONOR ABOVE TUNNEL.
SEE MECHANICAL AND COORDINATE WITH COR.
6 CONSTRUCT (N) SIDEWALK EXPANSION JOINT PER DETAIL F4, SHEET C-501
7 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
8 (E) SIGN TO REMAIN
9 (F) CHASE TO CONNECT (F) BUILDINGS UNDERGROUND, NOT IN SCOPE
10 RELOCATE ELECTRICAL PULLBOX - SEE SHEET CU100.4
11 RELOCATE IRRIGATION CONTROL BOX - SEE SHEETS CU100.4
NO REVISIONS DATE
2 Revision 2 11/20/18
02/08/18
EXPIRES: 12/31/18
H
A S
E
P H
A S
E
S E
E S
H E
E T
A S
0.
A S
1.
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
97.25'
90.00°N W
.0
.0
S W
25.74'
90.00°N W
'-0
ADD ALTERNATE NO. 1
PERMANENT PED. CANOPY
SEE AS100.5 & AS101.5
B31
(CLC)
B2
B22
B22A
B36
LOT F
D4
C-501
6' -0
6'
-0
7.78'
74.49° S
E T Y
P
6' -0
T Y
P
6' -0
8' -4
V E
R
IF
Y
9' -2
VERIFY
9'-9"
TYP.
5'-0"
AT STOOP
B R
ID
G
E
(E
P
IP
E
VERIFY
9'-11"
(TYP.)
4(TYP.)
D4
C-501
D4
C-501
D4
C-501
A
AS101.1
6'-9"
VERIFY
IN
FIELD
TYP
5'-0"
D4
C-501
AREA OF WORK
V E
R
IF
Y
5' -3
V E
R
IF
Y
4' -9
F4
C-501
TYP.
F4
C-501
TYP.
T Y
P
5' -0
(E) XFMR
SDCO (E)
E
T -1
T -6
(E) XFMR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS101.1
ARCHITECTURAL SITE PLAN - PHASE 1 ADD
ALT. NO. 2
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F3
SITE PLAN - PHASE 1 ADD ALT. NO. 2
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY, SEE
SHEET S-101.1
2 CONSTRUCT ADD ALT #2 (N) 10'-0" WIDE x 4" THICK CONCRETE SIDEWALK
3 CONNECT TO (E) CONCRETE SIDEWALK- MATCH EXISTING GRADE
4 CONSTRUCT (N) SIDEWALK SCORED JOINT
5 PIPE BRIDGE (E) TO REMAIN UNTIL PHASE 2
6 STAIRS TO ROOF (E) TO REMAIN
7 FENCE AND GATE - SECURE PERIMETER TO REMAIN
8 CENTERLINE OF CANOPY (N)
9 UTILITY OVERFLOW (E), PROTECT IN PLACE
10 GATE (E) TO BE RELOCATED 4 LF EAST, REPLACE ADJACENT FENCE AS
NEEDED
11 EXISTING COLUMN / CANOPY TO REMAIN UNTIL PHASE 2 CONSTRUCTION
12 PHASE 1 - BASE BID - (E) ELEC MANHOLE #7 AND VAULT TO BE REMOVED AND
REPLACED BY (N) MANHOLE AND VAULT (DEDUCTIVE ALTERNATE 2 IS TO
REPAIR IN PLACE THE EXISTING MANHOLE AND VAULT)
13 PHASE 1 - BASE BID - (N) UTILITY TRENCH, DUCTBANK AND 12 kV ELECTRICAL
LINES TO (N) MANHOLE/VAULT LOCATION. SEE CIVIL UTILITY AND ELECTRICAL
DRAWINGS. (NOT REQUIRED FOR DEDUCT ALTERNATE 2, CONTRACTOR TO
REPAIR MANHOLE/VAULT IN-PLACE AT (E) LOCATION)
14 PHASE 1 - BASE BID - (N) ELEC MANHOLE #7 AND VAULT SEE ELECTRICAL FOR
DETAILS. (DEDUCTIVE ALTERNATE 2 IS TO REPAIR IN PLACE THE EXISTING
MANHOLE AND VAULT)
15 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
A
AS101.1
BUILDING 22A DOOR, STOOP, AND UTILITY OVERFLOW TO BE PROTECTED IN PLACE
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
NO REVISIONS DATE
H
A S
E
P H
A S
E
S E
E S
H E
E T
A S
1.
A
D D
A L
T . N
O . 2
AREA OF WORK
AREA OF WORK
AREA OF WORK
P H
A S
E
93.84'
74.49° N
W
116.78'
90.00°N W
'-0
AREA OF WORK
B36B3
B24
1D4
C-501
PHASE 3
SEE SHEET AS101.3 ADD ALT. NO. 2
D4
C-501
D4
C-501
D4
C-501
T Y
P
5' -0
T Y
P
5' -0
V E
R
IF
Y
7' -3
V E
R
IF
Y
'-8
PHASE 2
SEE SHEET AS100.5 & AS101.5 ADD ALTERNATE NO. 1
A R
E A
O F
W O
R K
P H
A S
E
S E
E S
H E
E T
A S
1.
A
D D
A L
T . N
O . 2
F4
C-501
TYP.
B4
C-501
D4
C-501
E
16 15
T -8
T -9
(E) XFMR
(E) XFMR
(E) XFMR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS101.2
ARCHITECTURAL SITE PLAN - PHASE 2 ADD
ALT. NO. 2
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F1
SITE PLAN - PHASE 2 ADD ALT. NO. 2
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY, SEE
STRUCTURAL DRAWINGS
2 CONSTRUCT 4" THICK CONCRETE SIDEWALK
3 CONNECT TO (E) CONCRETE SIDEWALK, MATCH (E) GRADE
4 (E) 2' RETAINING WALL TO BE RELOCATED. SEE STRUCTURAL DETAIL
F4/S-501 AND ARCHITECTURAL DETAIL F1/A-502
6 CONNECT PROPOSED RET. WALL TO (E) RET. WALL, MATCH (E)
7 LOCATION OF (N) ROOF DRAIN AND OVERFLOW TO SPLASH BLOCK BELOW
8 CONSTRUCT (N) SIDEWALK SCORED JOINT
9 PLANTER (E) WITH TREE (E) TO REMAIN, PROTECT IN-PLACE TO PRESERVE
INTEGRITY
10 ALIGN EDGE OF (N) SIDEWALK WITH EDGE OF (E) SIDEWALK
11 PORTION OF (E) CANOPY, RAMP AND RAILING TO REMAIN UNTIL (F) TECH
BLDG
12 PHASE 1 - BASE BID - (E) ELEC MANHOLE #7 AND VAULT TO BE REMOVED AND
REPLACED BY (N) MANHOLE AND VAULT (DEDUCTIVE ALTERNATE 2 IS TO
REPAIR IN PLACE THE EXISTING MANHOLE AND VAULT)
13 PHASE 1 - (E) ELEC MANHOLE #5 TO REMAIN -PROVIDE 6" DIA CORE DRILLED
FLOOR DRAINS AT EACH VAULT CORNER WITH 1" GRAVEL BACKFILL,
MINIMUM 6' DEPTH BELOW VAULT WITH METAL GRATING INLET COVER.
14 PHASE 1 - BASE BID - (N) ELEC MANHOLE #7 AND VAULT SEE ELECTRICAL
FOR DETAILS. (DEDUCTIVE ALTERNATE 2 IS TO REPAIR IN PLACE THE
EXISTING MANHOLE AND VAULT)
15 PHASE 1 - BASE BID - (N) UTILITY TRENCH, DUCTBANK AND 12 kV ELECTRICAL
LINES TO (N) MANHOLE/VAULT LOCATION. SEE CIVIL UTILITY AND
ELECTRICAL DRAWINGS. (NOT REQUIRED FOR DEDUCT ALTERNATE 2,
CONTRACTOR TO REPAIR MANHOLE/VAULT IN-PLACE AT (E) LOCATION)
16 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING
IMPACTED BY WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22,
B24 & B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK
AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL
HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING
MATERIAL. SEE MECHANICAL AND PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL
SYSTEMS AND SHALL PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN REQUIRED EQUIPMENT ACCESS AND
SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER
FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE
THE LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN
TO BE MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT
SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM
CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED
TO COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND
PAINT AND RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED ROUTE IS
REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY
RELOCATED AS NECESSARY FOR CONTINUED UNINTERUPTED
OPERATION, ACCESS, MAINTENANCE AND / OR VISIBILITY.
NO REVISIONS DATE
a s
P H
A S
E
S E
E S
H E
E T
A S
1.
A
D D
A L
T . N
O . 2
P H
A S
E
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
PHASE 3
PHASE 2
SEE SHEET AS101.2 ADD ALT. NO. 2
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
B3
B1
B17
B24
B1 & B24 BREEZEWAY
B32
D4
C-501
D4
C-501
F1
A-502
SIM
D4
C-501
10'-0" M
IN
11'-3"
'-0
" M
IN
10'-0" +/-
6 (TYP.)
F1
A-502
F1
A-502
A
AS101.3
E Q
E Q
B
AS101.3
C
AS101.3
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
SDCO (E)
D4
C-501 o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS101.3
ARCHITECTURAL SITE PLAN - PHASE 3 ADD
ALT. NO. 2
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F3
SITE PLAN - PHASE 3 ADD ALT. NO. 2
1 PROPOSED STRUCTURAL COLUMN - LOCATION FOR REFERENCE ONLY, SEE
SHEET S-101.3
2 CONSTRUCT (N) 10'-0" WIDE x 4" THICK CONCRETE SIDEWALK
3 CONNECT TO (E) CONCRETE SIDEWALK - MATCH (E) GRADE
4 CONSTRUCT (N) 2' SEAT WALL PER DETAIL F1, SHEET A-501. CONSTRUCT
RETAINING WALL PER DETAIL B7, C-501
5 REMOVE PORTION OF (E) HANDRAIL AT NEW SEATWALL
6 CONSTRUCT (N) SIDEWALK SCORED JOINT
7 LOCATION OF (N) DOWNSPOUT TO SPLASH BLOCK BELOW
8 (N) FENCING SEE DETAIL A2/C-502, AS REQUIRED TO MAINTAIN SECURE
PERIMETER. REMOVE (E) FENCE IN CONFLICT WITH NEW COLUMNS AND
LIGHTING, RELOCATE 8' EAST MAXIMUM, COORDINATE WITH THE COR.
9 (E) EDGE OF SIDEWALK TO REMAIN
10 PORTION OF (E) HANDRAIL TO REMAIN
11 ELECTRICAL PANEL BOARD (E) INSIDE B32 - SEE ELECTRICAL SHEETS
12 CONSTRUCT CONCRETE SIDEWALK PER DETAIL F4, SHEET C-501 AND
CONNECT TO (E) CONCRETE SIDEWALK PER DETAIL D4, SHEET C-501, MATCH
(E) GRADE
13 CONSTRUCT CONCRETE RETAINING WALL PER DETAIL D6, SHEET C-501 AND
CONNECT TO (E) CONCRETE SIDEWALK PER DETAIL D4, SHEET C-501
14 REMOVE, RETAIN AND REPLACE EXISTING SIGN
15 (E) ROCK FEATURE/LANDSCAPING, PROTECT IN PLACE AND REPLACE AS
REQUIRED. COORDINATE WITH COR.
16 PROVIDE (N) RAMP LANDING TO T-5, COORDINATE WITH PROPOSED CANOPY
COLUMN FOUNDATIONS. COORDINATE WITH COR.
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION
WARRANTY REQUIREMENTS FOR ANY MODIFICATIONS TO
ROOFING TO ENSURE NO VIOLATIONS OCCUR OF THE WARRANTY.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR
MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED
PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 &
B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO
THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE
PROOF CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY
OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND
FIELD VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY
DIFFER FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY
IN ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO
DIFFER SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS
WITH ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR
SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING
CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW
EXPOSED EXTERIOR PIPE PENETRATIONS AND SEAL
COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED
ROUTE IS REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN
BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND
SYSTEMS OR PEDESTRIAN CONTROL DEVICES WITHIN THE
TEMPORARY ACCESSIBLE PATHWAY SHALL BE PROTECTED IN
PLACE OR TEMPORARILY RELOCATED AS NECESSARY FOR
CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
A
AS101.3
BUILDING 22A DOOR, STOOP, AND UTILITY OVERFLOW TO BE PROTECTED IN PLACE
B
AS101.3
PHASE 3 NORTHERN CANOPY RUN TO EAST HARVARD AVENUE
B
AS101.3
PHASE 3 B1 & B24 BREEZEWAY STAIR CANOPY CONNECTION
NO REVISIONS DATE
3 3
R A
M P
D N
P H
A S
E
S E
E S
H E
E T
A S
1.
A
D D
A L
T . N
O . 2
PHASE 1
SEE SHEET AS101.1 ADD ALT. NO. 2
PHASE 2
SEE SHEET AS101.2 ADD ALT. NO. 2
B25
B31
(CLC)
B24
B1 & B24
BREEZEWAY
R A
M P
D N
R A
M P
D N
RAMP
DN.
RAM
PDN.
RAM
PDN.
RAMP
DN.
RAM
PDN.
RAMP
DN.
RAMP
DN.
EXISTING SIDEWALK TO BE REPLACED,
ADD ALT. NO. 2
EXISTING SIDEWALK
TO REMAIN
(BASE BID)
(E) CONCRETE CURB
TO REMAIN FOR
TEMP. CANOPY
77.98'
90.00°S E
98.52'
45.00°
S
E
116.49'
90.00°S E
.4
.0
N E
.6
.0
N E
38.10'
45.00°
S
E
DO NOT ENCROACH ON
STAINED CONCRETE
SLAB ON GRADE
VERIFY (N) TRENCH ROUTING
WITH COR
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
ISSUED FOR CONSTRUCTION
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
B
IM
0-
-3
V A
F re sn o
C hi lle r
P la nt P
/5
-1
6-
V
A F re sn o C hi lle r P la nt
.r vt
4/
/2
:2 0:
A
M
AS101.4
ARCHITECTURAL SITE PLAN - EXPANDED
SIDEWALKS ADD ALT. NO.2 AT TEMP. CANOPY
BASE BID PHASE 1
M. PERKINS D. YOUNG02/07/2018
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
100% CONSTRUCTION DOCUMENTS
SUBMISSION
2615 E Clinton Ave, Fresno, CA 93703
1" = 10'-0" F1
SITE PLAN - TEMPORARY PEDESTRIAN CANOPY PHASE 1 ADD ALT. NO. 2
1 CONSTRUCT TEMPORARY ADA ACCESSIBLE RAMP TO (E) GRADE (5% MAX
SLOPE)
2 INSTALL 10' CLEAR PREFABRICATED TEMPORARY CANOPY AND WALKWAY,
TO BE REMOVED AFTER CONSTRUCTION IS COMPLETE
3 MATCH (E) GRADE AT (E). SIDEWALK
4 (E) PARKING SIGN TO REMAIN IN PLACE
5 MAINTAIN (E) PEDESTRIAN PASSAGE ROUTE DURING CONSTRUCTION
6 (E) SIGNAGE TO REMAIN, RELOCATE AS NECESSARY
7 RELOCATE STLT BASE (E) 4' OUTSIDE SIDEWALK
8 (N) UTILITY TRENCH, SEE CIVIL UTILITY DRAWINGS
9 IRRIGATION CONTROL BOX (E) TO REMAIN, PROTECT IN PLACE-MAINTAIN
ACCESS
10 ELECTRICAL PULLBOX (E) TO REMAIN, PROTECT IN PLACE-MAINTAIN ACCESS
GENERAL SHEET NOTES
KEYNOTES
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
TEMP CANOPY
B27
B34
B
B19& B19A
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION
WARRANTY REQUIREMENTS FOR ANY MODIFICATIONS TO
ROOFING TO ENSURE NO VIOLATIONS OCCUR OF THE WARRANTY.
CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR
MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED
PRIOR TO CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY
WORK INCLUDE, AND MAY NOT BE LIMITED TO: B1, B3, B22, B24 &
B31.
B. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR
SMOKE RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN
WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO
THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE
PROOF CAULKING MATERIAL. SEE MECHANICAL AND PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND
CONDUIT PIPING WITH STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEMS AND SHALL PROVIDE NECESSARY
OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
D. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND
FIELD VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY
DIFFER FROM THOSE INDICATED. CONTRACTOR TO FIELD VERIFY
IN ADVANCE THE LOCATION AND CONDITION OF THOSE EXISTING
SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO
DIFFER SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS
WITH ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED
AT CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS
REQUIRED TO COMPLETE THIS PROJECT, THE CONTRACTOR
SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING
CONDITIONS AND FINISHES.
H. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW
EXPOSED EXTERIOR PIPE PENETRATIONS AND SEAL
COMPLETELY.
I. CONTRACTOR TO PROVIDE TEMPORARY COVERED ACCESSIBLE
PATHWAY PRIOR TO PHASE 1 INTEGRATED SYSTEMS CANOPY
CONSTRUCTION AND/OR DEMOLITION. AN ACCESSIBLE BED
ROUTE IS REQUIRED TO BE MAINTAINED AT ALL TIMES BETWEEN
BUILDINGS.
J. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND
SYSTEMS OR PEDESTRIAN CONTROL DEVICES WITHIN THE
TEMPORARY ACCESSIBLE PATHWAY SHALL BE PROTECTED IN
PLACE OR TEMPORARILY RELOCATED AS NECESSARY FOR
CONTINUED UNINTERUPTED OPERATION, ACCESS,
MAINTENANCE AND / OR VISIBILITY.
NO REVISIONS DATE
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.