ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
John Cochran Division 915 North Grand Boulevard
St. Louis, Missouri
Building 6
Prepared for:
St. Louis V. A. Medical Center 915 North Grand Boulevard
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
2008 ASBESTOS REINSPECTION REPORT
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
2008 ASBESTOS REINSPECTION REPORT
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JOHN COCHRAN DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
1 HMA-01 12x12 Floor Tile & Adhesive HMA-02 9x9 Floor Tile No ACM HMA-03 Pipe Insulation
HMA-04 Ductwork Insulation HMA-05 Transite
HMA-06 Lab Countertops
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
2 HMA-02 9x9 Floor Tile No ACM HMA-03 Pipe Insulation No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
3 No ACM No ACM HMA-03 Pipe Insulation No ACM
Building 6 - 1st Floor
Building 6 - 2nd Floor
Building 6 - Penthouse and Roof
1st FLOOR
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 5 cardboard wrap pipe lagging 2 lf 0 4.00 5 mudded joint fitting on cardboard l 0 ea 1 4.00
10 cardboard wrap pipe lagging 134 lf 0 4.00 10 duct insulation 136 sf 0 1.00 10 magnesia pipe lagging 24 lf 0 6.00 10 mudded joint fitting on cardboard l 0 ea 40 4.00 10 mudded joint fitting on mag pipe la 0 ea 5 6.00
11 duct insulation 46 sf 0 0.00
11A cardboard wrap pipe lagging 6 lf 0 4.00
11B cardboard wrap pipe lagging 4 lf 0 4.00 11B mudded joint fitting on cardboard l 0 ea 5 4.00
12 cardboard wrap pipe lagging 6 lf 0 4.00 12 duct insulation 75 sf 0 0.00 12 magnesia pipe lagging 16 lf 0 4.00 12 mudded joint fitting on cardboard l 0 ea 2 4.00 12 mudded joint fitting on mag pipe la 0 ea 3 4.00
13 cardboard wrap pipe lagging 20 lf 0 4.00 13 magnesia pipe lagging 15 lf 0 4.00 13 mudded joint fitting on cardboard l 0 ea 2 4.00 13 mudded joint fitting on mag pipe la 0 ea 3 4.00
14 cardboard wrap pipe lagging 8 lf 0 4.00 14 mudded joint fitting on cardboard l 0 ea 3 4.00
21 magnesia pipe lagging 7 lf 0 4.00 21 magnesia pipe lagging 128 lf 0 6.00 21 mudded joint fitting on mag pipe la 0 ea 5 4.00 21 mudded joint fitting on mag pipe la 0 ea 25 6.00
22 magnesia pipe lagging 10 lf 0 6.00 22 mudded joint fitting on mag pipe la 0 ea 5 6.00
24 magnesia pipe lagging 40 lf 0 4.00 24 mudded joint fitting on mag pipe la 0 ea 7 4.00
21A magnesia pipe lagging 20 lf 0 6.00
Building 6 - 1st Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 21A mudded joint fitting on mag pipe la 0 ea 3 6.00 21A tank insulation 10 lf 0 2.00
22A magnesia pipe lagging 6 lf 0 4.00 22A magnesia pipe lagging 11 lf 0 6.00 22A mudded joint fitting on fbglass lag 0 ea 8 4.00 22A mudded joint fitting on fbglass lag 0 ea 21 6.00 22A mudded joint fitting on mag pipe la 0 ea 4 4.00 22A mudded joint fitting on mag pipe la 0 ea 2 6.00
22B magnesia pipe lagging 8 lf 0 4.00 22B mudded joint fitting on fbglass lag 0 ea 6 6.00 22B mudded joint fitting on mag pipe la 0 ea 3 4.00
24A magnesia pipe lagging 17 lf 0 4.00 24A mudded joint fitting on mag pipe la 0 ea 0 4.00
G5 magnesia pipe lagging 25 lf 0 4.00 G5 magnesia pipe lagging 1 lf 0 6.00 G5 mudded joint fitting on mag pipe la 0 ea 12 4.00 G5 mudded joint fitting on mag pipe la 0 ea 3 6.00 133 mudded joint fitting on mag pipe la 0 4 4.00
775 172TOTALS
2ND FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI C23-6-JC magnesia pipe lagging 10 lf 0 4.00 C23-6-JC mudded joint fitting 0 ea 4 4.00
10 4
Building 6 - 2nd Floor
TOTALS
PENTHOUSE AND ROOF
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI HVAC Room magnesia pipe lagging 15 lf 0 4.00 HVAC Room mudded joint fitting 0 ea 6 4.00
15 6
Building 6 - Penthouse & Roof
TOTALS
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 6 1 12x12 Floor Tile and Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-02 6 1 9x9 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 6 1 Pipe Insulation Yes No 7 Damage 2 Access 6
HMA-04 6 1 Ductwork Insulation No No 10 Intact 1 Maintenance 9
HMA-05 6 1 Transite No No 10 Intact 1 Access 9
HMA-06 6 1 Lab Countertops No Yes 10 Intact 1 Maintenance 10
HMA-02 6 2 9x9 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 6 2 Pipe Insulation Yes No 7 Damage 2 Access 6
HMA-03 6 3 Pipe Insulation Yes No 7 Damage 2 Access 6
Homogeneous Area No. Bldg Floor Material Description
Building 6 - Penthouse and Roof
Removal Priority 3
Building 6 - 2nd Floor
Current Condition 1
Building 6 - 1st Floor
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JC06 01 6 JC-06-01-M-06-02 6" brown cove base JC06 01 06 JC-06-01-M-06-04 Gray/white gypsum drywall JC06 01 10 JC-06-01-M-10-06 2x2 white smooth ceiling tile JC06 01 20A JC-06-01-M-20A-05 2x2 white plastic rgh texture ceiling tile JC06 01 21 JC-06-01-M-21-07 2x4 w/long worms & pinhole ceiling tile JC06 01 21 JC-06-01-M-21-08 2x4 white w/fissure & pinhole ceiling tile JC06 01 22B JC-06-01-M-22B-01 4" black cove base JC06 01 25 JC-06-01-M-25-30 Black vinyl duct connector JC06 01 20A JC-06-01-S-21A-03 Off-white hardwall plaster JC06 01 10 JC-06-01-T-10-09 Gray duct insulation JC06 01 12 JC-06-01-T-12-10 Gray TSI JC06 01 12 JC-06-01-T-12-11 Gray TSI
JC06 01 12 JC-06-01-T-12-16 TSI
JC06 01 12 JC-06-01-T-12-19 Gray TSI JC06 01 13 JC-06-01-T-13-15 Gray cardboard wrap pipe lagging JC06 01 13 JC-06-01-T-13-18 Gray mudded joint fitting on cardboard lagging JC06 01 13 JC-06-01-T-13-23 Gray TSI JC06 01 13 JC-06-01-T-13-26 Gray TSI
JC06 01 14 JC-06-01-T-14-17 TSI
JC06 01 14 JC-06-01-T-14-20 Gray TSI JC06 01 21A JC-06-01-T-21A-12 Gray tank insulation JC06 01 21A JC-06-01-T-21A-13 Pink TSI JC06 01 21A JC-06-01-T-21A-14 Pink TSI JC06 01 21A JC-06-01-T-21A-21 Magnesia pipe lagging JC06 01 21A JC-06-01-T-21A-24 Mudded joint fitting on magnesia pipe lagging JC06 01 22A JC-06-01-T-22A-22 White TSI JC06 01 22A JC-06-01-T-22A-25 Gray TSI JC06 01 22A JC-06-01-T-22A-27 Gray/white TSI JC06 01 22A JC-06-01-T-22A-29 Gray TSI JC06 01 22B JC-06-01-T-22B-28 Mudded joint fitting on fiberglass lagging
JC06A 01 101 JC-06A-01-M-101-08 1x1 white fissured ceiling tile JC06A 01 111C JC-06A-01-M-111C-06 Black condensate wrap JC06A 01 C11 JC-06A-01-M-C11-07 2x2 rough textured plastic ceiling tile JC06A 01 C12 JC-06A-01-M-C12-05 6" black cove base JC06A 01 104 JC-06A-01-S-104-04 Off-white hardwall plaster JC06A 01 101A JC-06A-01-T-101A-01 Calcium silicate pipe lagging JC06A 01 101A JC-06A-01-T-101A-02 White TSI JC06A 01 101A JC-06A-01-T-101A-03 White TSI JC06A 02 201 JC-06A-02-M-201-07 4" black cove base JC06A 02 205 JC-06A-02-M-205-02 1x1 white fissured ceiling tile JC06A 02 205 JC-06A-02-M-205-04 1x1 white w/worm & pinhole ceiling tile JC06A 02 205 JC-06A-02-M-205-05 6" black cove base JC06A 02 213 JC-06A-02-M-213-03 1x1 white w/small & medium pinholes ceiling tile JC06A 02 213A JC-06A-02-M-213-06 6" tan cove base JC06A 02 C21 JC-06A-02-M-C21-01 2x2 rough textured plastic ceiling tile
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JC06A 02 C21A JC-06A-02-M-C21A-08 Gypsum drywall JC06A 02 203 JC-06A-02-S-203-09 Off-white hardwall plaster JC06A 03 301 JC-06-03-M-301-01 Black vinyl duct connector JC06A 03 301 JC-06-03-S-301-02 Off-white hardwall plaster
JC06 1 1 JC-6-01-F-01-001A White 12x12 floor tile, black mastic JC06 1 2 JC-6-01-F-02-002A White 12x12 floor tile, black mastic JC06 1 2 JC-6-01-T-02-003A 3" T - white wrap, white block insulation JC06 1 2 JC-6-01-T-02-004A 3" horizontal - brown wrap, yellow insulation JC06 1 08A JC-6-01-F-08A-005A Gray 9x9 floor tile, yellow mastic JC06 1 9 JC-6-01-F-09-006A Tan 12x12 floor tile, yellow mastic JC06 1 H03 JC-6-01-F-H03-007A White 12x12 floor tile, black mastic JC06 1 19 JC-6-01-M-19-008A Transite vent hood JC06 1 19 JC-6-01-M-19-009A Black lab countertop JC06 1 C12 JC-6-01-F-C12-010A Layer 1 - White 9x9 floor tile JC06 1 C12 JC-6-01-F-C12-010A Layer 2 - Black mastic JC06 1 107 JC-6-01-F-107-011A Layer 1 - White 9x9 floor tile JC06 1 107 JC-6-01-F-107-011A Layer 2 - Black mastic JC06 1 101 JC-6-01-M-101-012A 12x12 ceiling tile, glue dot JC06 1 101 JC-6-01-F-101-013A Layer 1 - White 9x9 floor tile JC06 1 101 JC-6-01-F-101-013A Layer 2 - Black mastic JC06 1 C12A JC-6-01-F-C12A-014A Brown 12x12 floor tile, yellow mastic JC06 1 Elevator JC-6-01-F-ELV-015A Black 12x12 floor tile, yellow mastic JC06 2 C23 JC-6-02-T-C23-016A 8" elbow - white wrap, white block insulation JC06 2 C23 JC-6-02-T-C23-017A 8" vertical - white wrap, white block insulation JC06 2 213A JC-6-02-M-213A-018A 12x12 wall tile, glue dot JC06 2 C21A JC-6-02-F-C21A-019A Light white 12x12 floor tile, black mastic JC06 2 205 JC-6-02-M-205-020A 12x12 ceiling tile, glue dot
2008 Asbestos Reinspection
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JC06 01 10 JC-06-01-T-10-09 Gray duct insulation JC06 01 12 JC-06-01-T-12-10 Gray TSI JC06 01 12 JC-06-01-T-12-11 Gray TSI JC06 01 12 JC-06-01-T-12-19 Gray TSI JC06 01 13 JC-06-01-T-13-15 Gray cardboard wrap pipe lagging JC06 01 13 JC-06-01-T-13-18 Gray mudded joint fitting on cardboard lagging JC06 01 13 JC-06-01-T-13-23 Gray TSI JC06 01 13 JC-06-01-T-13-26 Gray TSI
JC06 01 14 JC-06-01-T-14-17 TSI
JC06 01 14 JC-06-01-T-14-20 Gray TSI JC06 01 21A JC-06-01-T-21A-12 Gray tank insulation JC06 01 21A JC-06-01-T-21A-13 Pink TSI JC06 01 21A JC-06-01-T-21A-14 Pink TSI JC06 01 21A JC-06-01-T-21A-21 Magnesia pipe lagging JC06 01 21A JC-06-01-T-21A-24 Mudded joint fitting on magnesia pipe lagging JC06 01 22A JC-06-01-T-22A-22 White TSI JC06 01 22A JC-06-01-T-22A-25 Gray TSI JC06 01 22B JC-06-01-T-22B-28 Mudded joint fitting on fiberglass lagging
JC06A 01 111C JC-06A-01-M-111C-06 Black condensate wrap
JC06 1 1 JC-6-01-F-01-001A White 12x12 floor tile, black mastic JC06 1 2 JC-6-01-F-02-002A White 12x12 floor tile, black mastic JC06 1 2 JC-6-01-T-02-003A 3" T - white wrap, white block insulation JC06 1 H03 JC-6-01-F-H03-007A White 12x12 floor tile, black mastic JC06 1 19 JC-6-01-M-19-008A Transite vent hood JC06 1 19 JC-6-01-M-19-009A Black lab countertop JC06 1 C12 JC-6-01-F-C12-010A Layer 1 - White 9x9 floor tile JC06 1 107 JC-6-01-F-107-011A Layer 1 - White 9x9 floor tile JC06 1 101 JC-6-01-F-101-013A Layer 1 - White 9x9 floor tile JC06 2 C23 JC-6-02-T-C23-016A 8" elbow - white wrap, white block insulation JC06 2 C23 JC-6-02-T-C23-017A 8" vertical - white wrap, white block insulation
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 Reinspection Logs
Client: Date: September 16, 2008 Location: Inspector(s): Brandon Odom and Eric Clipps Address: 915 North Grand Boulevard, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JC-6-01-F-01-001A White 12x12 floor tile, black mastic 1 1 North side of room 01
JC-6-01-F-02-002A White 12x12 floor tile, black mastic 1 2 South side of room 02
JC-6-01-T-02-003A 3" T - white wrap, white block insulation 1 2 West side of room 02
JC-6-01-T-02-004A 3" horizontal - brown wrap, yellow insulation 1 2 West side of room 02
JC-6-01-F-08A-005A Gray 9x9 floor tile, yellow mastic 1 08A Center of room 08A
JC-6-01-F-09-006A Tan 12x12 floor tile, yellow mastic 1 9 South side of room 9
JC-6-01-F-H03-007A White 12x12 floor tile, black mastic 1 H03 South side of room H03
JC-6-01-M-19-008A Transite vent hood 1 19 Northwest corner of room 19
JC-6-01-M-19-009A Black lab countertop 1 19 South side of room 19
JC-6-01-F-C12-010A Layer 1 - White 9x9 floor tile 1 C12 Southeast corner of room C12
JC-6-01-F-C12-010A Layer 2 - Black mastic 1 C12 Southeast corner of room C12
JC-6-01-F-107-011A Layer 1 - White 9x9 floor tile 1 107 Northwest corner of room 107
JC-6-01-F-107-011A Layer 2 - Black mastic 1 107 Northwest corner of room 107
JC-6-01-M-101-012A 12x12 ceiling tile, glue dot 1 101 Northeast corner of room 101
JC-6-01-F-101-013A Layer 1 - White 9x9 floor tile 1 101 Northeast corner of room 101
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
John Cochran Division - Building 6 St. Louis V. A. Medical Center
Client: Date: September 16, 2008 Location: Inspector(s): Brandon Odom and Eric Clipps Address: 915 North Grand Boulevard, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
John Cochran Division - Building 6 St. Louis V. A. Medical Center
JC-6-01-F-101-013A Layer 2 - Black mastic 1 101 Northeast corner of room 101
JC-6-01-F-C12A-014A Brown 12x12 floor tile, yellow mastic 1 C12A North side of room C12A
JC-6-01-F-ELV-015A Black 12x12 floor tile, yellow mastic 1 Elevator Northeast corner of elevator
JC-6-02-T-C23-016A 8" elbow - white wrap, white block insulation 2 C23 South side of room C23
JC-6-02-T-C23-017A 8" vertical - white wrap, white block insulation 2 C23 South side of room C23
JC-6-02-M-213A-018A 12x12 wall tile, glue dot 2 213A West side of room 213A
JC-6-02-F-C21A-019A Light white 12x12 floor tile, black mastic 2 C21A North side of room C21A
JC-6-02-M-205-020A 12x12 ceiling tile, glue dot 2 205 Southeast quadrant of room 205
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
1st FLOOR
2ND FLOOR
PENTHOUSE AND ROOF
2008 Reinspection Photographs
BUILDING 6
sample contains asbestos sample does not contain asbestos
JC-6-01-F-01-001A JC-6-01-F-02-002A
JC-6-01-T-02-003A and JC-6-01-T-02-004A JC-6-01-F-08A-005A
BUILDING 6
JC-6-01-F-09-006A JC-6-01-F-H03-007A
JC-6-01-M-19-008A JC-6-01-M-19-009A
BUILDING 6
JC-6-01-F-C12-010A JC-6-01-F-107-011A
JC-6-01-M-101-012A JC-6-01-F-101-013A
BUILDING 6
JC-6-01-F-C12A-014A JC-6-01-F-ELV-015A
JC-6-02-T-C23-016A and JC-6-02-T-C23-017A JC-6-02-M-213A-018A
BUILDING 6
JC-6-02-F-C21A-019A JC-6-02-M-205-020A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390804577
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 09/17/08 4:50 PM
08-14529 VAMC REINSPECTION JC BUILDING 6
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
9/18/2008Analysis Date:
Report Date: 9/18/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JC-6-01-F-01-001A
Floortile 390804577-0001
WHT 12X12 FT
W/BLK MASTIC
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JC-6-01-F-01-001A
Adhesive 390804577-0001A
WHT 12X12 FT
W/BLK MASTIC
Black Non-Fibrous
Heterogeneous
Chrysotile19%Non-fibrous (other)81%
JC-6-01-F-02-002A
Floortile 390804577-0002
WHT 12X12 FT
W/BLK MASTIC
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JC-6-01-F-02-002A
Adhesive 390804577-0002A
WHT 12X12 FT
W/BLK MASTIC
Black Non-Fibrous
Heterogeneous
Chrysotile19%Non-fibrous (other)81%
JC-6-01-T-02-003A
390804577-0003
3" T, WHT
WRAP, WHT
BLOCK INS
White Non-Fibrous Heterogeneous
Chrysotile9%Min. Wool39% Non-fibrous (other)52%
JC-6-01-T-02-004A
390804577-0004
3" HZ, BRN
WRAP, YLW INS
Various None Detected
Fibrous Heterogeneous
Cellulose9% Glass4% Min. Wool77%
Non-fibrous (other)10%
JC-6-01-F-08A-
005A Floortile 390804577-0005
GREY 9X9 FT
W/YLW MASTIC
Gray None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (14) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390804577
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 09/17/08 4:50 PM
08-14529 VAMC REINSPECTION JC BUILDING 6
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
9/18/2008Analysis Date:
Report Date: 9/18/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JC-6-01-F-08A-
005A Adhesive 390804577-0005A
GREY 9X9 FT
W/YLW MASTIC
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-09-006A
Floortile 390804577-0006
TAN 12X12 FT
W/YLW MASTIC
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-09-006A
Adhesive 390804577-0006A
TAN 12X12 FT
W/YLW MASTIC
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-H03-
007A Floortile 390804577-0007
WHT 12X12 FT
W/BLK MASTIC
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JC-6-01-F-H03-
007A Adhesive 390804577-0007A
WHT 12X12 FT
W/BLK MASTIC
Black Non-Fibrous
Heterogeneous
Chrysotile19%Non-fibrous (other)81%
JC-6-01-M-19-008A
390804577-0008
TRANSITE VENT
HOOD
Gray Non-Fibrous Heterogeneous
Chrysotile19%Non-fibrous (other)81%
JC-6-01-M-19-009A
390804577-0009
BLK LAB
COUNTERTOP
Black Non-Fibrous Heterogeneous
Chrysotile19%Non-fibrous (other)81%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (14)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390804615
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 09/18/08 4:50 PM
08-14529 VAMC Reinspection JC Building 6
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
9/18/2008Analysis Date:
Report Date: 9/19/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JC-6-01-F-C12-
010A floortile 390804615-0001 wht 9x9 ft w/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JC-6-01-F-C12-
010A adhesive 390804615-0001A wht 9x9 ft w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-107-
011A floortile 390804615-0002 wht 9x9 ft w/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JC-6-01-F-107-
011A adhesive 390804615-0002A wht 9x9 ft w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-M-101-
012A ceiling tile 390804615-0003
12x12 ct w/glue dot Various None Detected
Fibrous
Heterogeneous
Min. Wool77% Non-fibrous (other)23%
JC-6-01-M-101-
012A adhesive 390804615-0003A
12x12 ct w/glue dot Brown None Detected
Non-Fibrous
Heterogeneous
Wollastonite6% Non-fibrous (other)94%
JC-6-01-F-101-
013A floortile 390804615-0004 wht 9x9 ft w/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (20)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390804615
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 09/18/08 4:50 PM
08-14529 VAMC Reinspection JC Building 6
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
9/18/2008Analysis Date:
Report Date: 9/19/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JC-6-01-F-101-
013A adhesive 390804615-0004A wht 9x9 ft w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JC-6-01-F-C12A-
014A floortile 390804615-0005 brn 12x12 ft w/ylw mastic
Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-C12A-
014A adhesive 390804615-0005A brn 12x12 ft w/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JC-6-01-F-ELV-
015A floortile 390804615-0006 blk 12x12 ft w/ylw mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-01-F-ELV-
015A adhesive 390804615-0006A blk 12x12 ft w/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-02-T-C23-
016A 390804615-0007
8" elbow, wht wrap, wht block ins
White Non-Fibrous
Heterogeneous
Chrysotile9%Min. Wool19% Non-fibrous (other)72%
JC-6-02-T-C23-
017A 390804615-0008
8" vt, wht wrap, wht block ins
White Non-Fibrous
Heterogeneous
Chrysotile6%Glass9% Non-fibrous (other)6% Perlite79%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390804615
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 09/18/08 4:50 PM
08-14529 VAMC Reinspection JC Building 6
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
9/18/2008Analysis Date:
Report Date: 9/19/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JC-6-02-M-213A-
018A ceiling tile 390804615-0009
12x12 wall tile w/glue dot
Various None Detected
Fibrous
Heterogeneous
Cellulose28% Min. Wool37%
Non-fibrous (other)7% Perlite28%
JC-6-02-M-213A-
018A adhesive 390804615-0009A
12x12 wall tile w/glue dot
Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-02-F-C21A-
019A floortile 390804615-0010 lt wht 12x12 ft w/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-02-F-C21A-
019A adhesive 390804615-0010A lt wht 12x12 ft w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JC-6-02-M-205-
020A ceiling tile 390804615-0011
12x12 ct and glue dot
Cream None Detected
Fibrous
Heterogeneous
Min. Wool79% Non-fibrous (other)21%
JC-6-02-M-205-
020A adhesive 390804615-0011A
12x12 ct and glue dot
Brown None Detected
Non-Fibrous
Heterogeneous
Wollastonite6% Non-fibrous (other)94%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.