ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 70
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Ground Floor No ACM HMA-01 Silver Surfacing Material HMA-02 Pipe Insulation & Fittings HMA-04 Thermal System Coating No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Balcony No ACM No ACM HMA-02 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials Skylight &
Coal Bunker No ACM No ACM HMA-02 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Chiller Plant No ACM No ACM No ACM HMA-03 Fire Door (Assumed)
Building 70 - Ground Floor
Building 70 - Balcony
Building 70 - Skylight & Coal Bunker
Building 70A - Chiller Plant
GROUND FLOOR
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI G02-70-JB magnesia pipe lagging 80 lf 0 4.00 G02-70-JB magnesia pipe lagging 500 lf 0 6.00 G02-70-JB magnesia pipe lagging 30 lf 0 8.00 G02-70-JB magnesia pipe lagging 28 lf 0 10.00 G02-70-JB mudded joint ftg on mag pipe lag 0 ea 21 4.00 G02-70-JB mudded joint ftg on mag pipe lag 0 ea 122 6.00 G02-70-JB mudded joint ftg on mag pipe lag 0 ea 16 8.00 G02-70-JB mudded joint ftg on mag pipe lag 0 ea 8 10.00
G05-70-JB cardboard wrap pipe lagging 215 lf 0 4.00 G05-70-JB cardboard wrap pipe lagging 115 lf 0 8.00 G05-70-JB magnesia pipe lagging 55 lf 0 4.00 G05-70-JB magnesia pipe lagging 95 lf 0 8.00 G05-70-JB magnesia pipe lagging 50 lf 0 16.00 G05-70-JB mudded joint ftg on cardboard lag 0 ea 33 4.00 G05-70-JB mudded joint ftg on cardboard lag 0 ea 14 8.00 G05-70-JB mudded joint ftg on fiberglas lag 0 ea 10 4.00 G05-70-JB mudded joint ftg on fiberglas lag 0 ea 1 8.00 G05-70-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00 G05-70-JB mudded joint ftg on mag pipe lag 0 ea 30 8.00 G05-70-JB mudded joint ftg on mag pipe lag 0 ea 6 16.00 G05-70-JB patch material on boiler 1 540 sf 0 0.00 G05-70-JB patch material on boiler 2 540 sf 0 0.00 G05-70-JB patch material on boiler 3 540 sf 0 0.00
G06-70-JB magnesia pipe lagging 4 lf 0 4.00 G06-70-JB mudded joint ftg on mag pipe lag 0 ea 2 4.00
G07-70-JG magnesia pipe lagging 30 lf 0 4.00 G07-70-JG magnesia pipe lagging 24 lf 0 6.00 G07-70-JG mudded joint ftg on mag pipe lag 0 ea 10 4.00 G07-70-JG mudded joint ftg on mag pipe lag 0 ea 6 6.00
2846 285
Building 70 - Ground Floor
TOTALS
BALCONY
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 102-70-JB cardboard wrap pipe lagging 35 lf 0 4.00
104-70-JB cardboard wrap pipe lagging 90 lf 0 4.00 104-70-JB magnesia pipe lagging 300 lf 0 4.00 104-70-JB magnesia pipe lagging 335 lf 0 6.00 104-70-JB magnesia pipe lagging 90 lf 0 8.00 104-70-JB magnesia pipe lagging 120 lf 0 10.00 104-70-JB magnesia pipe lagging 90 lf 0 16.00 104-70-JB mudded joint ftg on cardboard lag 0 ea 7 4.00 104-70-JB mudded joint ftg on cardboard lag 0 ea 16 6.00 104-70-JB mudded joint ftg on fiberglas lag 0 ea 16 6.00 104-70-JB mudded joint ftg on mag pipe lag 0 ea 45 4.00 104-70-JB mudded joint ftg on mag pipe lag 0 ea 55 6.00 104-70-JB mudded joint ftg on mag pipe lag 0 ea 18 8.00 104-70-JB mudded joint ftg on mag pipe lag 0 ea 9 10.00 104-70-JB mudded joint ftg on mag pipe lag 0 ea 7 16.00 104-70-JB patch material on boiler 1 125 sf 0 0.00 104-70-JB patch material on boiler 2 100 sf 0 0.00 104-70-JB patch material on boiler 3 45 sf 0 0.00 104-70-JB tank 2 insulation 90 sf 0 2.00
1420 173
Building 70 - Balcony
SKYLIGHT AND COAL BUNKER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 203-70-JB cardboard wrap pipe lagging 70 lf 0 4.00 203-70-JB magnesia pipe lagging 60 lf 0 6.00 203-70-JB mudded joint ftg on cardboard lag 0 ea 12 4.00 203-70-JB mudded joint ftg on mag pipe lag 0 ea 16 6.00
130 28
Building 70 - Skylight & Coal Bunker
CHILLER PLANT
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 70 Ground Floor Silver Surfacing Material No No 9 Condition 2 Access 9
HMA-02 70 Ground Floor Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-04 70 Ground Floor Thermal Surface Coating Yes No 10 Intact 2 Access 8
HMA-02 70 Balcony Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-02 70 Skylight & Coal Bunker Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-03 70A Chiller Plant Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
Building 70 - Skylight & Coal Bunker
Building 70A - Chiller Plant
Removal Priority 3
Building 70 - Balcony
Current Condition 1
Building 70 - Ground Floor
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB70 00 G05 JB-70-00-T-G05-01 White magnesia pipe lagging JB70 00 G05 JB-70-00-T-G05-02 White TSI JB70 00 G05 JB-70-00-T-G05-03 White TSI JB70 00 G05 JB-70-00-T-G05-04 Off-white mudded joint fitting on magnesia pipe lagging JB70 00 G05 JB-70-00-T-G05-05 White TSI JB70 00 G05 JB-70-00-T-G02-06 White TSI JB70 00 G05 JB-70-00-T-G05-07 Brown cardboard wrap pipe lagging JB70 00 G05 JB-70-00-T-G05-08 Gray TSI JB70 00 G05 JB-70-00-T-G05-09 Brown TSI JB70 00 G05 JB-70-00-T-G05-10 White mudded joint fitting on cardboard lagging JB70 00 G05 JB-70-00-T-G05-11 White TSI JB70 00 G05 JB-70-00-T-G05-12 White TSI JB70 00 G05 JB-70-00-T-G05-13 White mudded joint fitting on fiberglass lagging JB70 00 G05 JB-70-00-T-G05-14 White TSI JB70 00 G05 JB-70-00-T-G05-15 White TSI JB70 00 G05 JB-70-00-T-G05-16 Brown access port insulation on boiler #1 JB70 00 G05 JB-70-00-T-G05-17 Brown/gray TSI JB70 00 G05 JB-70-00-T-G05-18 Brown TSI JB70 00 G05 JB-70-00-T-G05-19 Brown access port insulation on boiler #2 JB70 00 G05 JB-70-00-T-G05-20 Brown TSI JB70 00 G05 JB-70-00-T-G05-21 Brown TSI JB70 00 G05 JB-70-00-T-G05-22 Off-white access port insulation on boiler #3 JB70 00 G05 JB-70-00-T-G05-23 Gray TSI JB70 00 G05 JB-70-00-T-G05-24 Brown/gray TSI JB70 00 G05 JB-70-00-T-G05-25 Black patch material on boiler #1 JB70 00 G05 JB-70-00-T-G05-26 Brown patch material on boiler #2 JB70 00 G05 JB-70-00-T-G05-27 Brown patch material on boiler #3 JB70 00 G07 JB-70-00-T-G07-28 Green canvas duct connector JB70 00 G06 JB-70-00-S-G06-29 Off-white hardwall plaster JB70 00 G06 JB-70-00-M-G06-30 2x4 gray rough w/worm & pinhole ceiling tile JB70 00 G05 JB-70-00-M-G05-31 Brown/white gypsum drywall JB70 00 G05 JB-70-00-M-G05-32 4" brown cove base JB70 02 203 JB-70-02-T-203-01 White magnesia pipe lagging JB70 02 203 JB-70-02-T-203-02 White TSI JB70 02 203 JB-70-02-T-203-03 White TSI JB70 02 203 JB-70-02-T-203-04 White mudded joint fitting on magnesia pipe lagging JB70 02 203 JB-70-02-T-203-05 Off-white TSI JB70 02 203 JB-70-02-T-203-06 White TSI JB70 02 203 JB-70-02-T-203-07 Gray cardboard wrap pipe lagging JB70 02 203 JB-70-02-T-203-08 Gray/brown TSI JB70 02 203 JB-70-02-T-203-09 Gray TSI JB70 02 203 JB-70-02-T-203-10 White/off-white mudded joint fitting on cardboard lagging JB70 02 203 JB-70-02-T-203-12 White/off-white TSI
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB70 00 G05 JB-70-00-S-G05-001A Silver textured material JB70 00 G05 JB-70-00-S-G05-002A Silver textured material JB70 00 G05 JB-70-00-S-G05-003A Silver textured material
2008 Asbestos Reinspection
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB70 00 G05 JB-70-00-T-G05-01 White magnesia pipe lagging JB70 00 G05 JB-70-00-T-G05-02 White TSI JB70 00 G05 JB-70-00-T-G05-03 White TSI JB70 00 G05 JB-70-00-T-G05-04 Off-white mudded joint fitting on magnesia pipe lagging JB70 00 G05 JB-70-00-T-G05-05 White TSI JB70 00 G05 JB-70-00-T-G02-06 White TSI JB70 00 G05 JB-70-00-T-G05-07 Brown cardboard wrap pipe lagging JB70 00 G05 JB-70-00-T-G05-08 Gray TSI JB70 00 G05 JB-70-00-T-G05-09 Brown TSI JB70 00 G05 JB-70-00-T-G05-10 White mudded joint fitting on cardboard lagging JB70 00 G05 JB-70-00-T-G05-11 White TSI JB70 00 G05 JB-70-00-T-G05-12 White TSI JB70 00 G05 JB-70-00-T-G05-13 White mudded joint fitting on fiberglass lagging JB70 00 G05 JB-70-00-T-G05-14 White TSI JB70 00 G05 JB-70-00-T-G05-15 White TSI JB70 00 G05 JB-70-00-T-G05-26 Brown patch material on boiler #2 JB70 00 G05 JB-70-00-T-G05-27 Brown patch material on boiler #3 JB70 02 203 JB-70-02-T-203-01 White magnesia pipe lagging JB70 02 203 JB-70-02-T-203-02 White TSI JB70 02 203 JB-70-02-T-203-03 White TSI JB70 02 203 JB-70-02-T-203-04 White mudded joint fitting on magnesia pipe lagging JB70 02 203 JB-70-02-T-203-05 Off-white TSI JB70 02 203 JB-70-02-T-203-06 White TSI JB70 02 203 JB-70-02-T-203-07 Gray cardboard wrap pipe lagging JB70 02 203 JB-70-02-T-203-08 Gray/brown TSI JB70 02 203 JB-70-02-T-203-09 Gray TSI JB70 02 203 JB-70-02-T-203-10 White/off-white mudded joint fitting on cardboard lagging JB70 02 203 JB-70-02-T-203-12 White/off-white TSI
JB70 00 G05 JB-70-00-S-G05-001A Silver textured material JB70 00 G05 JB-70-00-S-G05-002A Silver textured material JB70 00 G05 JB-70-00-S-G05-003A Silver textured material
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 Reinspection Inspection Logs
Client: Date: October 17, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-70-00-S-G05-001A Silver textured material 00 G05 Back of boiler one in the middle
JB-70-00-S-G05-002A Silver textured material 00 G05 Back corner of boiler two
JB-70-00-S-G05-003A Silver textured material 00 G05 Back middle of boiler three
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 70 St. Louis V. A. Medical Center
Bulk Sample Location Drawings
GROUND FLOOR
BALCONY
SKYLIGHT AND COAL BUNKER
CHILLER PLANT
2008 Reinspection Photographs
BUILDING 70
sample contains asbestos sample does not contain asbestos
JB-70-00-S-G05-001A JB-70-00-S-G05-002A
JB-70-00-S-G05-003A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805285
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 8:00 AM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 70
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 10/21/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-70-00-S-G05-
001A 390805285-0001 silver textured material on boiler
Silver Non-Fibrous
Heterogeneous
Chrysotile4%Non-fibrous (other)96%
JB-70-00-S-G05-
002A 390805285-0002 silver textured material on boiler
Silver Non-Fibrous
Heterogeneous
Chrysotile4%Non-fibrous (other)96%
JB-70-00-S-G05-
003A 390805285-0003 silver textured material on boiler
Silver Non-Fibrous
Heterogeneous
Chrysotile4%Non-fibrous (other)96%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)