ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 24
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement HMA-01 12x12 Floor Tile & Adhesive HMA-03 Exterior Surfacing Material HMA-05 Pipe Insulation & Fittings HMA-06 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
1 HMA-02 9x9 Floor Tile & Adhesive HMA-03 Exterior Surfacing Material HMA-05 Pipe Insulation & Fittings HMA-06 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
2 HMA-02 9x9 Floor Tile & Adhesive HMA-03 Exterior Surfacing Material HMA-04 Wall Panels HMA-05 Pipe Insulation & Fittings HMA-06 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Attic No ACM No ACM HMA-05 Pipe Insulation & Fittings HMA-07 Vibration Isolator
Building 24 - Ground Floor
Building 24 - 1st Floor
Building 24 - 2nd Floor
Building 24 - Attic
GROUND FLOOR
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI G02-24-JB magnesia pipe lagging 60 lf 0 4.00 G02-24-JB mudded joint ftg on mag pipe lag 0 ea 15 4.00
G07-24-JB magnesia pipe lagging 45 lf 0 4.00 G07-24-JB mudded joint ftg on magnesia lag 0 ea 10 4.00
105 25
Building 24 - Ground
TOTALS
1st FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 102A-24-JB magnesia pipe lagging 24 lf 0 0.00
104-24-JB magnesia pipe lagging 30 lf 0 4.00 104-24-JB mudded joint ftg on magnesia lag 0 ea 6 4.00
107-24-JB cardboard wrap pipe lagging 30 lf 0 4.00
107A-24-JB magnesia pipe lagging 40 lf 0 4.00 107A-24-JB mudded joint ftg on magnesia lag 0 ea 5 4.00
109-24-JB cardboard wrap pipe lagging 30 lf 0 4.00
114-24-JB magnesia pipe lagging 20 lf 0 4.00 114-24-JB mudded joint ftg on magnesia lag 0 ea 8 4.00
174 19
Building 24 - 1st Floor
2ND FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 205-24-JB magnesia pipe lagging 10 lf 0 0.00 205-24-JB pipe fitting 0 ea 5 4.00
10 5
Building 24 - 2nd Floor
ATTIC
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI East Wall magnesia pipe lagging 40 lf 0 0.00 East Wall pipe fitting 0 ea 8 4.00
40 8
Building 24 - Attic
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 24 Basement 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 24 Basement Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 24 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-06 24 Basement Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-02 24 1 9x9 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 24 1 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 24 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-06 24 1 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-02 24 2 9x9 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 24 2 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-04 24 2 Wall Panels No No 10 Intact 1 Access 9
HMA-05 24 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-06 24 2 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
Building 24 - 2nd Floor
Removal Priority 3
Building 24 - 1st Floor
Current Condition 1
Building 24 - Ground Floor
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Removal Priority 3
Current Condition 1Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
HMA-05 24 Attic Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-07 24 Attic Vibration Isolator No No 10 Intact 1 Access 10
Building 24 - Attic
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB24 01 102 JB-24-01-M-102-01 2x4 gray pinhole pattern ceiling tile JB24 01 114B JB-24-01-M-114B-02 2x4 white w/pecks ceiling tile JB24 01 114 JB-24-01-M-114-03 6" light gray cove base JB24 01 114 JB-24-01-M-114-04 1x1 white w/holes ceiling tile JB24 01 104 JB-24-01-S-104-05 Gray hardwall plaster JB24 01 105A JB-24-01-M-105A-06 4" black cove base JB24 01 101D JB-24-01-M-101D-07 2x2 gray w/worm & random pinhole ceiling tile JB24 01 101C JB-24-01-M-101C-08 2x2 gray w/worm & pinhole ceiling tile JB24 01 101C JB-24-01-M-101C-09 White/gray gypsum drywall JB24 01 107A JB-24-01-M-107A-10 2x2 gray w/small & large pinhole ceiling tile JB24 01 109 JB-24-01-T-109-11 Off-white/brown cardboard wrap pipe lagging JB24 01 109 JB-24-01-T-109-12 Gray/off-white TSI JB24 01 109 JB-24-01-T-109-13 Brown/off-white TSI JB24 01 104C JB-24-01-T-104C-14 Gray/white magnesia pipe lagging JB24 01 114 JB-24-01-T-114-15 White TSI JB24 01 114 JB-24-01-T-114-16 White TSI JB24 01 104C JB-24-01-T-104C-17 Off-white mudded joint fitting on magnesia pipe lagging JB24 01 114 JB-24-01-T-114-18 White TSI JB24 01 114 JB-24-01-T-114-19 White TSI JB24 02 H205 JB-24-02-M-H205-01 2x4 off-white pinhole pattern ceiling tile JB24 02 203 JB-24-02-M-203-02 4" green cove base JB24 02 205 JB-24-02-M-205-03 1x1 white w/holes ceiling tile JB24 02 205 JB-24-02-M-205-04 4" black cove base JB24 02 205 JB-24-02-M-205-05 6" light gray cove base JB24 02 205A JB-24-02-M-205A-06 2x4 white w/pecks ceiling tile JB24 02 205A JB-24-02-M-205A-07 4" brown cove base JB24 02 217 JB-24-02-M-217-08 2x2 off-white perforated wall panels JB24 02 208 JB-24-02-M-208-09 2x2 off-white rough textured ceiling tile JB24 02 210 JB-24-02-S-210-10 Off-white hardwall plaster JB24 02 216A JB-24-02-M-216A-11 Off-white/gray gypsum drywall
JB24 00 G02B JB-24-00-F-G02B-001A Brown 12x12 floor tile, black mastic JB24 00 G10 JB-24-00-F-G10-002A White 12x12 floor tile, black mastic JB24 00 G03A JB-24-00-F-G03A-003A White 12x12 floor tile, yellow mastic JB24 00 G14 JB-24-00-F-G14-004A Cove molding adhesive, white 12x12 floor tile, black JB24 00 G05 JB-24-00-F-G05-005A Light white 12x12 floor tile, yellow mastic JB24 01 114 JB-24-01-F-114-006A Layer 1 - Black 9x9 floor tile JB24 01 114 JB-24-01-F-114-006A Layer 2 - Carpet adhesive, black mastic JB24 01 104 JB-24-01-F-104-007A Layer 1 - Black 9x9 floor tile JB24 01 104 JB-24-01-F-104-007A Layer 2 - Carpet adhesive, black mastic JB24 01 106 JB-24-01-F-106-008A Layer 1 - Light white 12x12 floor tile JB24 01 106 JB-24-01-F-106-008A Layer 2 - Yellow mastic JB24 01 106 JB-24-01-F-106-008A Layer 3 - Black 9x9 floor tile JB24 01 106 JB-24-01-F-106-008A Layer 4 - Black mastic
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB24 01 110A JB-24-01-F-110A-009A Light white 12x12 floor tile, yellow mastic JB24 01 H100 JB-24-01-F-H100-010A Layer 1 - White 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-010A Layer 2 - Black mastic JB24 01 H100 JB-24-01-F-H100-011A Layer 1 - White 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-011A Layer 2 - Black mastic JB24 01 H100 JB-24-01-F-H100-012A Layer 1 - White 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-012A Layer 2 - Black mastic JB24 02 216A JB-24-02-F-216A-013A Black 12x12 floor tile, yellow mastic JB24 02 216 JB-24-02-F-216-014A Layer 1 - Brown 9x9 floor tile JB24 02 216 JB-24-02-F-216-014A Layer 2 - Black mastic JB24 02 212 JB-24-02-F-212-015A Layer 1 - Brown 9x9 floor tile JB24 02 212 JB-24-02-F-212-015A Layer 2 - Black mastic JB24 02 205 JB-24-02-F-205-016A Layer 1 - White 9x9 floor tile JB24 02 205 JB-24-02-F-205-016A Layer 2- Black mastic JB24 02 205 JB-24-02-F-205-016A Layer 3 - Brown 9x9 floor tile JB24 02 205 JB-24-02-F-205-016A Layer 4 - Black mastic JB24 02 203 JB-24-02-F-203-017A Layer 1 - White 9x9 floor tile JB24 02 203 JB-24-02-F-203-017A Layer 2 - Black mastic JB24 02 203 JB-24-02-F-203-017A Layer 3 - Brown 9x9 floor tile JB24 02 203 JB-24-02-F-203-017A Layer 4 - Black mastic JB24 02 210 JB-24-02-S-210-018A 2x2 off-white perforated wall panels JB24 01 S101 JB-24-01-T-S101-019A White tape, foil backing, yellow fiberglass insulation JB24 00 Exterior JB-24-00-S-EXT-020A Tan textured material JB24 00 Exterior JB-24-00-S-EXT-021A Tan textured material JB24 00 Exterior JB-24-00-S-EXT-022A Tan textured material JB24 00 G02A JB-24-00-F-G02A-001AA Dark brown 12x12 floor tile, yellow mastic
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONATINING SAMPLES
Building Floor Room Sample ID Material Description
JB24 01 109 JB-24-01-T-109-11 Off-white/brown cardboard wrap pipe lagging JB24 01 109 JB-24-01-T-109-12 Gray/off-white TSI JB24 01 109 JB-24-01-T-109-13 Brown/off-white TSI JB24 01 104C JB-24-01-T-104C-14 Gray/white magnesia pipe lagging JB24 01 114 JB-24-01-T-114-15 White TSI JB24 01 114 JB-24-01-T-114-16 White TSI JB24 01 104C JB-24-01-T-104C-17 Off-white mudded joint fitting on magnesia pipe lagging JB24 01 114 JB-24-01-T-114-18 White TSI JB24 01 114 JB-24-01-T-114-19 White TSI
JB24 00 G02B JB-24-00-F-G02B-001A Brown 12x12 floor tile, black mastic JB24 01 114 JB-24-01-F-114-006A Layer 1 - Black 9x9 floor tile JB24 01 104 JB-24-01-F-104-007A Layer 1 - Black 9x9 floor tile JB24 01 106 JB-24-01-F-106-008A Layer 3 - Black 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-010A Layer 1 - White 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-011A Layer 1 - White 9x9 floor tile JB24 01 H100 JB-24-01-F-H100-012A Layer 1 - White 9x9 floor tile JB24 02 216 JB-24-02-F-216-014A Layer 1 - Brown 9x9 floor tile JB24 02 212 JB-24-02-F-212-015A Layer 1 - Brown 9x9 floor tile JB24 02 205 JB-24-02-F-205-016A Layer 1 - White 9x9 floor tile JB24 02 205 JB-24-02-F-205-016A Layer 3 - Brown 9x9 floor tile JB24 02 203 JB-24-02-F-203-017A Layer 1 - White 9x9 floor tile JB24 02 203 JB-24-02-F-203-017A Layer 3 - Brown 9x9 floor tile JB24 02 210 JB-24-02-S-210-018A 2x2 off-white perforated wall panels JB24 00 Exterior JB-24-00-S-EXT-020A Tan textured material
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 Reinspection Inspection Logs
Client: Date: October 15, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-24-00-F-G02B-001A Brown 12x12 floor tile, black mastic 00 G02B Southwest corner of room G02B
JB-24-00-F-G10-002A White 12x12 floor tile, black mastic 00 G10 Northwest corner of room G10 under light
JB-24-00-F-G03A-003A White 12x12 floor tile, yellow mastic 00 G03A Entry way behind the door
JB-24-00-F-G14-004A Cove molding adhesive, white 12x12 floor tile, black mastic 00 G14 Northwest corner of room G14
JB-24-00-F-G05-005A Light white 12x12 floor tile, yellow mastic 00 G05 Northeast quadrant of room G05 under serving bar
JB-24-01-F-114-006A Layer 1 - Black 9x9 floor tile 01 114 Northeast corner of room 114
JB-24-01-F-114-006A Layer 2 - Carpet adhesive, black mastic 01 114 Northeast corner of room 114
JB-24-01-F-104-007A Layer 1 - Black 9x9 floor tile 01 104 Southeast corner under window
JB-24-01-F-104-007A Layer 2 - Carpet adhesive, black mastic 01 104 Southeast corner under window
JB-24-01-F-106-008A Layer 1 - Light white 12x12 floor tile 01 106 Northwest corner of room 106
JB-24-01-F-106-008A Layer 2 - Yellow mastic 01 106 Northwest corner of room 106
JB-24-01-F-106-008A Layer 3 - Black 9x9 floor tile 01 106 Northwest corner of room 106
JB-24-01-F-106-008A Layer 4 - Black mastic 01 106 Northwest corner of room 106
JB-24-01-F-110A-009A Light white 12x12 floor tile, yellow mastic 01 110A Northern quadrant by stairs
JB-24-01-F-H100-010A Layer 1 - White 9x9 floor tile 01 H100 Southwest quadrant of hall H100 in between windows
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 24 St. Louis V. A. Medical Center
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 24 St. Louis V. A. Medical Center
JB-24-01-F-H100-010A Layer 2 - Black mastic 01 H100 Southwest quadrant of hall H100 in between windows
JB-24-01-F-H100-011A Layer 1 - White 9x9 floor tile 01 H100 Eastern wall underneath trash (permanent) bin
JB-24-01-F-H100-011A Layer 2 - Black mastic 01 H100 Eastern wall underneath trash (permanent) bin
JB-24-01-F-H100-012A Layer 1 - White 9x9 floor tile 01 H100 Northeast corner by vertical piping
JB-24-01-F-H100-012A Layer 2 - Black mastic 01 H100 Northeast corner by vertical piping
JB-24-02-F-216A-013A Black 12x12 floor tile, yellow mastic 02 216A Southeast corner of room 216A
JB-24-02-F-216-014A Layer 1 - Brown 9x9 floor tile 02 216 Southeast quadrant under sink
JB-24-02-F-216-014A Layer 2 - Black mastic 02 216 Southeast quadrant under sink
JB-24-02-F-212-015A Layer 1 - Brown 9x9 floor tile 02 212 Southeast corner behind door
JB-24-02-F-212-015A Layer 2 - Black mastic 02 212 Southeast corner behind door
JB-24-02-F-205-016A Layer 1 - White 9x9 floor tile 02 205 Eastern wall in the middle by heater
JB-24-02-F-205-016A Layer 2- Black mastic 02 205 Eastern wall in the middle by heater
JB-24-02-F-205-016A Layer 3 - Brown 9x9 floor tile 02 205 Eastern wall in the middle by heater
JB-24-02-F-205-016A Layer 4 - Black mastic 02 205 Eastern wall in the middle by heater
JB-24-02-F-203-017A Layer 1 - White 9x9 floor tile 02 203 Northwest corner behind door
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 24 St. Louis V. A. Medical Center
JB-24-02-F-203-017A Layer 2 - Black mastic 02 203 Northwest corner behind door
JB-24-02-F-203-017A Layer 3 - Brown 9x9 floor tile 02 203 Northwest corner behind door
JB-24-02-F-203-017A Layer 4 - Black mastic 02 203 Northwest corner behind door
JB-24-02-S-210-018A 2x2 off-white perforated wall panels 02 210 Southeast corner of room 210 above ceiling tile
JB-24-01-T-S101-019A White tape, foil backing, yellow fiberglass insulation 01 S101 Southwest corner of room S101 on duct above
JB-24-00-S-EXT-020A Tan textured material 00 Exterior Northwest quadrant of exterior by stairs
JB-24-00-S-EXT-021A Tan textured material 00 Exterior Southwest quadrant of exterior by vent
JB-24-00-S-EXT-022A Tan textured material 00 Exterior Northwest quadrant of exterior by window
JB-24-00-F-G02A-001AA Dark brown 12x12 floor tile, yellow mastic 00 G02A South side of room G02A
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
GROUND FLOOR
1st FLOOR
2ND FLOOR
ATTIC
2008 Reinspection Photographs
BUILDING 24
sample does not contain asbestos
JB-24-00-F-G02B-001A JB-24-00-F-G10-002A
JB-24-00-F-G03A-003A JB-24-00-F-G14-004A
sample contains asbestos
JB-24-00-F-G05-005A JB-24-01-F-114-006A
JB-24-01-F-104-007A JB-24-01-F-106-008A
JB-24-01-F-110A-009A JB-24-01-F-H100-010A
JB-24-01-F-H100-011A JB-24-01-F-H100-012A
JB-24-02-F-216A-013A JB-24-02-F-216-014A
JB-24-02-F-212-015A JB-24-02-F-205-016A
JB-24-02-F-203-017A JB-24-02-S-210-018A
JB-24-01-T-S101-019A JB-24-00-S-EXT-020A
JB-24-00-S-EXT-021A JB-24-00-S-EXT-022A
JB-24-00-F-G02A-001AA
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805234
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/16/08 3:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 Ground Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/17/2008Analysis Date:
Report Date: 10/17/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-00-F-G02B-
001A floortile 390805234-0001 brn 12x12/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-24-00-F-G02B-
001A adhesive 390805234-0001A brn 12x12/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Cellulose2% Non-fibrous (other)86%
JB-24-00-F-G10-
002A floortile 390805234-0002 wht 12x12/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-00-F-G10-
002A adhesive 390805234-0002A wht 12x12/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose4% Non-fibrous (other)96%
JB-24-00-F-G03A-
003A floortile 390805234-0003 wht 12x12/ylw mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-00-F-G03A-
003A adhesive 390805234-0003A wht 12x12/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-00-F-G14-
004A floortile 390805234-0004 cove molding glue/wht 12x12/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (10)
PDF created with pdfFactory trial version www.pdffactory.com mailto:saintlouislab@emsl.com http://www.pdffactory.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805234
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/16/08 3:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 Ground Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/17/2008Analysis Date:
Report Date: 10/17/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-00-F-G14-
004A adhesive 390805234-0004A cove molding glue/wht 12x12/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-24-00-F-G05-
005A floortile 390805234-0005 lt wht ft/ylw mastic White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-00-F-G05-
005A adhesive 390805234-0005A lt wht ft/ylw mastic Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (10)
PDF created with pdfFactory trial version www.pdffactory.com mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805235
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/16/08 3:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/17/2008Analysis Date:
Report Date: 10/17/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-01-F-114-
006A floortile 390805235-0001 carpet glue/blk 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-24-01-F-114-
006A adhesive 390805235-0001A carpet glue/blk 9x9/blk mastic
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-104-
007A floortile 390805235-0002 carpet glue/blk 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-24-01-F-104-
007A adhesive 390805235-0002A carpet glue/blk 9x9/blk mastic
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-106-
008A floortile 390805235-0003 lt wht 12x12/ylw mastic/blk 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-106-
008A adhesive 390805235-0003A lt wht 12x12/ylw mastic/blk 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-24-01-F-106-
008A floortile 390805235-0003B lt wht 12x12/ylw mastic/blk 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile19%Non-fibrous (other)81%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (16)
PDF created with pdfFactory trial version www.pdffactory.com mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805235
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/16/08 3:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/17/2008Analysis Date:
Report Date: 10/17/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-01-F-106-
008A adhesive 390805235-0003C lt wht 12x12/ylw mastic/blk 9x9/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-110A-
009A floortile 390805235-0004 lt wht 12x12/ylw mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-110A-
009A adhesive 390805235-0004A lt wht 12x12/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-01-F-H100-
010A floortile 390805235-0005 wht 9x9/blk mastic White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-24-01-F-H100-
010A adhesive 390805235-0005A wht 9x9/blk mastic Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-24-01-F-H100-
011A floortile 390805235-0006 wht 9x9/blk mastic White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-24-01-F-H100-
011A adhesive 390805235-0006A wht 9x9/blk mastic Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (16)
PDF created with pdfFactory trial version www.pdffactory.com mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805235
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/16/08 3:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/17/2008Analysis Date:
Report Date: 10/17/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-01-F-H100-
012A floortile 390805235-0007 wht 9x9/blk mastic White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-24-01-F-H100-
012A adhesive 390805235-0007A wht 9x9/blk mastic Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (16)
PDF created with pdfFactory trial version www.pdffactory.com mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805275
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/17/08 4:00 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 2nd Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/20/2008Analysis Date:
Report Date: 10/20/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-02-F-216A-
013A floortile 390805275-0001 blk 12x12 w/ylw mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-02-F-216A-
013A adhesive 390805275-0001A blk 12x12 w/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-02-F-216-
014A floortile 390805275-0002 brn 9x9 w/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-24-02-F-216-
014A adhesive 390805275-0002A brn 9x9 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-02-F-212-
015A floortile 390805275-0003 brn 9x9 w/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-24-02-F-212-
015A adhesive 390805275-0003A brn 9x9 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-02-F-205-
016A floortile 390805275-0004 wht 9x9 w/blk mastic/brn 9x9
White Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (19) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805275
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/17/08 4:00 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 2nd Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/20/2008Analysis Date:
Report Date: 10/20/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-02-F-205-
016A adhesive 390805275-0004A wht 9x9 w/blk mastic/brn 9x9
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-24-02-F-205-
016A floortile 390805275-0004B wht 9x9 w/blk mastic/brn 9x9
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-24-02-F-205-
016A adhesive 390805275-0004C wht 9x9 w/blk mastic/brn 9x9
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-24-02-F-203-
017A floortile 390805275-0005 wht 9x9 w/blk mastic/brn 9x9/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-24-02-F-203-
017A adhesive 390805275-0005A wht 9x9 w/blk mastic/brn 9x9/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-24-02-F-203-
017A floortile 390805275-0005B wht 9x9 w/blk mastic/brn 9x9/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-24-02-F-203-
017A adhesive 390805275-0005C wht 9x9 w/blk mastic/brn 9x9/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805275
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/17/08 4:00 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 24 2nd Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/20/2008Analysis Date:
Report Date: 10/20/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-24-02-S-210-
018A 390805275-0006
2x2 off-wht perf wall panels off-white Non-Fibrous
Heterogeneous
Chrysotile19%Non-fibrous (other)81%
JB-24-01-T-S101-
019A 390805275-0007 wht tape/foil/ylw fiberglass/ins
Various None Detected
Fibrous
Heterogeneous
Fibrous (other)29% Min. Wool49%
Non-fibrous (other)22%
JB-24-02-S-EXT-
020A 390805275-0008 tan textured material
Tan Non-Fibrous
Heterogeneous
Chrysotile2%Non-fibrous (other)98%
JB-24-02-S-EXT-
021A 390805275-0009 tan textured material
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)61% Quartz39%
JB-24-02-S-EXT-
022A 390805275-0010 tan textured material
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)61% Quartz39%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390806130
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
10100 Woolworth Road Keithville, LA 71047
Customer PO:
Received: 12/10/08 8:00 AM
VAMC Reinspection St. Louis VA Reinspection JB 08-14529
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
12/10/2008Analysis Date:
Report Date: 12/11/2008
EMSL Analytical, Inc.
302…