ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 18
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Crawlspace No ACM No ACM HMA-05 Thermal Insulation Debris HMA-06 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement HMA-01 9"x9" Floor Tile & Adhesive HMA-04 Tan Exterior Surfacing Material HMA-05 Thermal Insulation Debris HMA-06 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
1 HMA-02 12"x12" Floor Tile HMA-03 Flooring Adhesive HMA-04 Tan Exterior Surfacing Material HMA-06 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
2 No ACM HMA-04 Tan Exterior Surfacing Material HMA-06 Pipe Insulation & Fittings HMA-07 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
3 HMA-02 12"x12" Floor Tile HMA-04 Tan Exterior Surfacing Material No ACM HMA-07 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Attic No ACM HMA-04 Tan Exterior Surfacing Material No ACM No ACM
Building 18 - 3rd Floor
Building 18 - Attic
Building 18 - Crawlspace
Building 18 - Basement
Building 18 - 1st Floor
Building 18 - 2nd Floor
CRAWLSPACE
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI Z002-18-JB cardboard wrap pipe lagging 750 lf 0 4.00 Z002-18-JB mudded joint ftg on mag pipe lagging 0 ea 300 4.00
750 300
Building 18 - Crawlspace
TOTALS
BASEMENT
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI B101-18-JB magnesia pipe lagging 8 lf 0 4.00 B101-18-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
B102-18-JB cardboard wrap pipe lagging 95 lf 0 2.00 B102-18-JB cardboard wrap pipe lagging 100 lf 0 4.00 B102-18-JB magnesia pipe lagging 100 lf 0 4.00 B102-18-JB magnesia pipe lagging 60 lf 0 6.00 B102-18-JB magnesia pipe lagging 6 lf 0 10.00 B102-18-JB mudded joint ftg on cardboard lag 0 ea 33 2.00 B102-18-JB mudded joint ftg on cardboard lag 0 ea 13 4.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 25 6.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 3 10.00
B103-18-JB cardboard wrap pipe lagging 70 lf 0 2.00 B103-18-JB magnesia pipe lagging 70 lf 0 4.00 B103-18-JB mudded joint ftg on cardboard lag 0 ea 12 2.00 B103-18-JB mudded joint ftg on mag pipe lagging 0 ea 30 4.00
B104-18-JB cardboard wrap pipe lagging 1 lf 0 4.00
B105-18-JB magnesia pipe lagging 40 lf 0 4.00 B105-18-JB mudded joint ftg on mag pipe lagging 0 ea 20 4.00
B107-18-JB cardboard wrap pipe lagging 25 lf 0 2.00 B107-18-JB magnesia pipe lagging 40 lf 0 4.00 B107-18-JB mudded joint ftg on cardboard lag 0 ea 10 2.00 B107-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00
B108-18-JB cardboard wrap pipe lagging 50 lf 0 4.00 B108-18-JB magnesia pipe lagging 85 lf 0 4.00 B108-18-JB mudded joint ftg on cardboard lag 0 ea 8 4.00 B108-18-JB mudded joint ftg on mag pipe lagging 0 ea 20 4.00
B110-18-JB magnesia pipe lagging 75 lf 0 4.00 B110-18-JB mudded joint ftg on cardboard lag 0 ea 10 4.00 B110-18-JB mudded joint ftg on mag pipe lagging 0 ea 25 4.00
B111-18-JB cardboard wrap pipe lagging 40 lf 0 2.00 B111-18-JB magnesia pipe lagging 80 lf 0 4.00 B111-18-JB mudded joint ftg on cardboard lag 0 ea 20 2.00 B111-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00
Building 18 - Basement
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
H003-18-JB cardboard wrap pipe lagging 4 lf 0 4.00 H003-18-JB magnesia pipe lagging 10 lf 0 4.00 H003-18-JB mudded joint ftg on cardboard lag 0 ea 1 4.00 H003-18-JB mudded joint ftg on mag pipe lagging 0 ea 5 4.00
Z001-18-JB magnesia pipe lagging 298 lf 0 4.00 Z001-18-JB magnesia pipe lagging 252 lf 0 6.00 Z001-18-JB mudded joint ftg on mag pipe lagging 0 ea 162 4.00 Z001-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 6.00
1509 512TOTALS
1st FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 101-18-JB cardboard wrap pipe lagging 30 lf 0 4.00 101-18-JB magnesia pipe lagging 50 lf 0 4.00 101-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
102-18-JB magnesia pipe lagging 40 lf 0 4.00 102-18-JB mudded joint ftg on mag pipe lagging 0 ea 14 4.00
102A-18-JB magnesia pipe lagging 40 lf 0 4.00 102A-18-JB mudded joint ftg on mag pipe lagging 0 ea 15 4.00
117-18-JB magnesia pipe lagging 40 lf 0 4.00 117-18-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
119-18-JB cardboard wrap pipe lagging 20 lf 0 4.00
220 49
Building 18 - 1st Floor
TOTALS
2ND FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 202-18-JB magnesia pipe lagging 22 lf 0 4.00 202-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
204-18-JB magnesia pipe lagging 12 lf 0 4.00 204-18-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00
205-18-JB magnesia pipe lagging 20 lf 0 4.00 205-18-JB mudded joint ftg on mag pipe lagging 0 ea 13 4.00
205A-18-JB magnesia pipe lagging 60 lf 0 4.00 205A-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
206-18-JB magnesia pipe lagging 37 lf 0 4.00 206-18-JB mudded joint ftg on mag pipe lagging 0 ea 7 4.00
207-18-JB magnesia pipe lagging 56 lf 0 4.00 207-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
207A-18-JB magnesia pipe lagging 46 lf 0 4.00 207A-18-JB mudded joint ftg on mag pipe lagging 0 ea 22 4.00
207B-18-JB magnesia pipe lagging 70 lf 0 4.00 207B-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
208-18-JB magnesia pipe lagging 5 lf 0 4.00 208-18-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00
209-18-JB magnesia pipe lagging 54 lf 0 4.00 209-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
210-18-JB magnesia pipe lagging 60 lf 0 4.00 210-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
210A-18-JB magnesia pipe lagging 75 lf 0 4.00 210A-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
210B-18-JB magnesia pipe lagging 80 lf 0 4.00 210B-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
211-18-JB magnesia pipe lagging 22 lf 0 4.00 211-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00
Building 18 - 2nd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 214-18-JB magnesia pipe lagging 20 lf 0 4.00 214-18-JB mudded joint ftg on mag pipe lagging 0 ea 17 4.00
215-18-JB magnesia pipe lagging 6 lf 0 4.00 215-18-JB mudded joint ftg on mag pipe lagging 0 ea 2 4.00
215A-18-JB magnesia pipe lagging 12 lf 0 4.00 215A-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00
216-18-JB magnesia pipe lagging 60 lf 0 4.00 216-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
217-18-JB magnesia pipe lagging 20 lf 0 4.00 217-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00
217A-18-JB magnesia pipe lagging 40 lf 0 4.00 217A-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
217B-18-JB magnesia pipe lagging 40 lf 0 4.00 217B-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
217C-18-JB magnesia pipe lagging 80 lf 0 4.00 217C-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
217D-18-JB magnesia pipe lagging 50 lf 0 4.00 217D-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00
217E-18-JB magnesia pipe lagging 60 lf 0 4.00 217E-18-JB mudded joint ftg on mag pipe lagging 0 ea 15 4.00
1007 350TOTALS
3RD FLOOR
ATTIC
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-05 18 Crawlspace Thermal Insulation Debris Yes Yes 5 Debris 7 Accessibility 6
HMA-06 18 Crawlspace Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-01 18 Basement 9"x9" Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 18 Basement Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 18 Basement Thermal Insulation Debris Yes Yes 5 Debris 7 Accessibility 6
HMA-06 18 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-02 18 1 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 18 1 Flooring Adhesive No No 10 Intact 1 Access 9
HMA-04 18 1 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-06 18 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-04 18 2 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-06 18 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-07 18 2 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
Building 18 - 1st Floor
Building 18 - 2nd Floor
Removal Priority 3
Building 18 - Basement
Current Condition 1
Building 18 - Crawlspace
Friable Yes/No
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
Removal Priority 3
Current Condition 1Friable Yes/No
HMA-02 18 3 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 18 3 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-07 18 3 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-04 18 Attic Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
Building 18 - Attic
Building 18 - 3rd Floor
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB18 00 002 JB-18-00-T-002-01 Magnesia pipe lagging JB18 00 003 JB-18-00-T-003-02 White TSI JB18 00 003 JB-18-00-T-003-03 White TSI JB18 00 002 JB-18-00-T-002-04 Mudded joint fitting on magnesia pipe lagging JB18 00 002 JB-18-00-T-002-05 White TSI JB18 00 003 JB-18-00-T-003-06 White TSI JB18 00 H003 JB-18-00-T-H003-07 Cardboard wrap pipe lagging JB18 00 002 JB-18-00-T-002-08 Gray TSI JB18 00 003 JB-18-00-T-003-09 Gray TSI JB18 00 002 JB-18-00-T-002-10 Mudded joint fitting on cardboard lagging JB18 00 H003 JB-18-00-T-H003-11 Gray TSI JB18 00 003 JB-18-00-T-003-12 Gray TSI JB18 00 002 JB-18-00-T-002-13 Calcium silicate lagging w/metal jacket JB18 00 002 JB-18-00-T-002-14 White TSI JB18 00 Z002 JB-18-00-T-Z002-15 White TSI JB18 00 H001 JB-18-00-M-H001-16 2x2 white w/pinhole and fissure ceiling tile JB18 00 007 JB-18-00-M-007-17 2x4 white w/pinhole and fissure ceiling tile JB18 00 010 JB-18-00-M-010-18 2x4 white w/pinholes and worms ceiling tile JB18 00 002 JB-18-00-T-002-19 Musdded joint fitting on fiberglass lagging JB18 00 002 JB-18-00-T-002-20 Gray TSI JB18 00 002 JB-18-00-T-002-21 Black/white TSI JB18 00 005 JB-18-00-M-005-22 Black rubberized duct connector JB18 00 001 JB-18-00-M-001-23 Green canvas duct connector JB18 00 002 JB-18-00-M-002-24 Brown cork ceiling material JB18 00 007 JB-18-00-M-007-25 4" brown cove base JB18 00 010 JB-18-00-M-010-26 4" black cove base JB18 00 003 JB-18-00-M-003-27 White duct tape JB18 00 H001 JB-18-00-M-H001-28 White/brown gypsum drywall JB18 00 003 JB-18-00-S-003-29 White hardwall plaster JB18 01 101 JB-18-01-T-101-01 Magnesia pipe lagging JB18 01 102 JB-18-01-T-102-02 White TSI JB18 01 102A JB-18-01-T-102A-03 White TSI JB18 01 101 JB-18-01-T-101-04 Mudded joint fitting on magnesia pipe lagging JB18 01 102 JB-18-01-T-102-05 White TSI JB18 01 102A JB-18-01-T-102A-06 White TSI JB18 01 101 JB-18-01-T-101-07 Cardboard wrap pipe lagging JB18 01 101 JB-18-01-T-101-08 Gray TSI JB18 01 119 JB-18-01-T-119-09 Gray TSI JB18 01 106 JB-18-01-M-106-10 Skim coat on plaster JB18 01 H102 JB-18-01-M-H102-11 1x1 white w/gouges ceiling tile JB18 01 H102 JB-18-01-M-H102-12 2x2 white w/pinhole and fissure ceiling tile JB18 01 H102 JB-18-01-S-H102-13 Off-white hardwall plaster JB18 01 H102A JB-18-01-M-H102A-14 White/brown gypsum drywall JB18 01 H102 JB-18-01-M-H102-15 4" brown cove base JB18 01 H103 JB-18-01-M-H103-16 White duct tape
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB18 02 201 JB-18-02-T-201-01 Magnesia pipe lagging JB18 02 202 JB-18-02-T-202-02 White TSI JB18 02 214 JB-18-02-T-214-03 White TSI JB18 02 201 JB-18-02-T-201-04 Mudded joint fitting on magnesia pipe lagging JB18 02 202 JB-18-02-T-202-05 White TSI JB18 02 214 JB-18-02-T-214-06 White TSI JB18 02 H203 JB-18-02-M-H203-07 2x2 white w/pinhole and fissure ceiling tile JB18 02 206 JB-18-02-M-206-08 2x4 white w/pinhole and fissure ceiling tile JB18 02 217E JB-18-02-M-217E-09 2x2 white w/pinholes and worms ceiling tile JB18 02 202 JB-18-02-S-202-10 Off-white hardwall plaster JB18 02 202 JB-18-02-M-202-11 White/brown gypsum drywall JB18 02 H203 JB-18-02-M-H203-12 White duct tape JB18 02 H202 JB-18-02-M-H202-13 4" brown cove base JB18 03 302 JB-18-03-S-302-01 Off-white hardwall plaster JB18 03 302 JB-18-03-M-302-02 White/gray gypsum drywall JB18 03 H302 JB-18-03-M-H302-03 4" brown cove base JB18 03 321 JB-18-03-M-321-04 6" brown cove base JB18 03 305A JB-18-03-M-305A-05 2x2 white wpinhole and fissure ceiling tile JB18 03 320 JB-18-03-M-320-06 2x4 white w/pinhole and fissure ceiling tile JB18 03 H304 JB-18-03-M-H304-07 White duct tape JB18 03 310 JB-18-03-M-310-08 2x4 white w/pinholes and worms ceiling tile JB18 03 H304 JB-18-03-M-H304-09 2x2 white w/pinholes and worms ceiling tile JB18 04 400 JB-18-04-M-400-01 Black canvas duct connector
JB18 00 Z001 JB-18-00-T-Z001-001A White block TSI insulation debris JB18 00 Z001 JB-18-00-T-Z001-002A Brown paper insulation (piping) debris JB18 00 S002 JB-18-00-F-S002-003A White 12x12 floor tile, black mastic JB18 00 010 JB-18-00-F-010-004A Layer 1 - White 12x12 floor tile JB18 00 010 JB-18-00-F-010-004A Layer 2 - Yellow mastic JB18 00 010 JB-18-00-F-010-004A Layer 3 - Gray floor tile JB18 00 010 JB-18-00-F-010-004A Layer 4 - Black mastic JB18 00 008 JB-18-00-F-008-005A Layer 1 - White 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 2 - Yellow mastic JB18 00 008 JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 4 - Black mastic JB18 01 115C JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile JB18 01 115C JB-18-01-F-115C-006A Layer 2 - Yellow mastic JB18 01 114 JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile JB18 01 114 JB-18-01-F-114-007A Layer 2 - Carpet adhesive, yellow mastic JB18 01 H105 JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile JB18 01 H105 JB-18-01-F-H105-008A Layer 2 - Carpet adhesive, yellow mastic JB18 01 H102 JB-18-01-M-H102-009A Brown glue dot JB18 01 H101 JB-18-01-M-H101-010A Brown glue dot JB18 01 122 JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 2 - Carpet adhesive JB18 01 122 JB-18-01-F-122-011A Layer 3 - Black mastic
2008 Asbestos Reinspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB18 01 H102 JB-18-01-M-H102-012A Brown glue dot JB18 02 215A JB-18-02-F-215A-013A Carpet adhesive, brown flooring material, cloth backing JB18 02 216 JB-18-02-F-216-014A Carpet adhesive, brown flooring material, cloth backing JB18 02 H201 JB-18-02-F-H201-015A Carpet adhesive, brown flooring material, cloth backing JB18 03 Roof JB-18-03-S-RF-016A Roofing shingles JB18 03 Roof JB-18-03-S-RF-017A Roofing tar JB18 00 011 JB-18-00-F-011-018A Layer 1 - White 12x12 floor tile JB18 00 011 JB-18-00-F-011-018A Layer 2 - Yellow mastic JB18 00 011 JB-18-00-F-011-018A Layer 3 - Tan 12x12 floor tile JB18 00 011 JB-18-00-F-011-018A Layer 4 - Black mastic
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB18 00 002 JB-18-00-T-002-01 Magnesia pipe lagging JB18 00 003 JB-18-00-T-003-02 White TSI JB18 00 003 JB-18-00-T-003-03 White TSI JB18 00 002 JB-18-00-T-002-04 Mudded joint fitting on magnesia pipe lagging JB18 00 002 JB-18-00-T-002-05 White TSI JB18 00 003 JB-18-00-T-003-06 White TSI JB18 00 H003 JB-18-00-T-H003-07 Cardboard wrap pipe lagging JB18 00 002 JB-18-00-T-002-08 Gray TSI JB18 00 003 JB-18-00-T-003-09 Gray TSI JB18 00 002 JB-18-00-T-002-10 Mudded joint fitting on cardboard lagging JB18 00 H003 JB-18-00-T-H003-11 Gray TSI JB18 00 003 JB-18-00-T-003-12 Gray TSI JB18 01 101 JB-18-01-T-101-01 Magnesia pipe lagging JB18 01 102 JB-18-01-T-102-02 White TSI JB18 01 102A JB-18-01-T-102A-03 White TSI JB18 01 101 JB-18-01-T-101-04 Mudded joint fitting on magnesia pipe lagging JB18 01 102 JB-18-01-T-102-05 White TSI JB18 01 102A JB-18-01-T-102A-06 White TSI JB18 01 101 JB-18-01-T-101-07 Cardboard wrap pipe lagging JB18 01 101 JB-18-01-T-101-08 Gray TSI JB18 01 119 JB-18-01-T-119-09 Gray TSI JB18 02 201 JB-18-02-T-201-01 Magnesia pipe lagging JB18 02 202 JB-18-02-T-202-02 White TSI JB18 02 214 JB-18-02-T-214-03 White TSI JB18 02 201 JB-18-02-T-201-04 Mudded joint fitting on magnesia pipe lagging JB18 02 202 JB-18-02-T-202-05 White TSI JB18 02 214 JB-18-02-T-214-06 White TSI
JB18 00 Z001 JB-18-00-T-Z001-001A White block TSI insulation debris JB18 00 Z001 JB-18-00-T-Z001-002A Brown paper insulation (piping) debris JB18 00 010 JB-18-00-F-010-004A Layer 4 - Black mastic JB18 00 008 JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 4 - Black mastic JB18 01 115C JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile JB18 01 114 JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile JB18 01 H105 JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 3 - Black mastic JB18 00 011 JB-18-00-F-011-018A Layer 4 - Black mastic
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 Reinspection Inspection Logs
Client: Date: October 22, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-18-00-T-Z001-001A White block TSI insulation debris 00 Z001 Southwest quadrant of crawlspace
JB-18-00-T-Z001-002A Brown paper insulation (piping) debris 00 Z001 Southwest quadrant of crawlspace
JB-18-00-F-S002-003A White 12x12 floor tile, black mastic 00 S002 Southeast quadrant by stairs
JB-18-00-F-010-004A Layer 1 - White 12x12 floor tile 00 010 Northwest corner under window
JB-18-00-F-010-004A Layer 2 - Yellow mastic 00 010 Northwest corner under window
JB-18-00-F-010-004A Layer 3 - Gray floor tile 00 010 Northwest corner under window
JB-18-00-F-010-004A Layer 4 - Black mastic 00 010 Northwest corner under window
JB-18-00-F-008-005A Layer 1 - White 12x12 floor tile 00 008 Northwest quadrant of room under light switches
JB-18-00-F-008-005A Layer 2 - Yellow mastic 00 008 Northwest quadrant of room under light switches
JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile 00 008 Northwest quadrant of room under light switches
JB-18-00-F-008-005A Layer 4 - Black mastic 00 008 Northwest quadrant of room under light switches
JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile 01 115C Northwest quadrant of room 115C in front of door
JB-18-01-F-115C-006A Layer 2 - Yellow mastic 01 115C Northwest quadrant of room 115C in front of door
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center
JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile 01 114 Northeast corner of room 114
JB-18-01-F-114-007A Layer 2 - Carpet adhesive, yellow mastic 01 114 Northeast corner of room 114
JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile 01 H105 Southwest corner of hall H105 by door
JB-18-01-F-H105-008A Layer 2 - Carpet adhesive, yellow mastic 01 H105 Southwest corner of hall H105 by door
JB-18-01-M-H102-009A Brown glue dot 01 H102 Middle of hall H102 by round column above 2x2 ceiling tile
JB-18-01-M-H101-010A Brown glue dot 01 H101 Northwest quadrant of hall H101 above ceiling
JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile 01 122 Below window on west wall
JB-18-01-F-122-011A Layer 2 - Carpet adhesive 01 122 Below window on west wall
JB-18-01-F-122-011A Layer 3 - Black mastic 01 122 Below window on west wall
JB-18-01-M-H102-012A Brown glue dot 01 H102 Middle of hall H102 in between curved wall and pillar above 2x2 ceiling tile
JB-18-02-F-215A-013A Carpet adhesive, brown flooring material, cloth backing 02 215A Northeast quadrant of room 215A in between doors to 212 and 211
JB-18-02-F-216-014A Carpet adhesive, brown flooring material, cloth backing 02 216 Northeast quadrant of room 216
JB-18-02-F-H201-015A Carpet adhesive, brown flooring material, cloth backing 02 H201 South quadrant of hall H201 next to column
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center
JB-18-03-S-RF-016A Roofing shingles 03 Roof Western wall outside window above elevator shaft
JB-18-03-S-RF-017A Roofing tar 03 Roof Western wall outside window above elevator shaft
JB-18-00-F-011-018A Layer 1 - White 12x12 floor tile 00 011 Northwest quadrant of room
JB-18-00-F-011-018A Layer 2 - Yellow mastic 00 011 Northwest quadrant of room
JB-18-00-F-011-018A Layer 3 - Tan 12x12 floor tile 00 011 Northwest quadrant of room
JB-18-00-F-011-018A Layer 4 - Black mastic 00 011 Northwest quadrant of room
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
CRAWLSPACE
BASEMENT
1st FLOOR
2ND FLOOR
3RD FLOOR
ATTIC
2008 Reinspection Photographs
BUILDING 18
sample does not contain asbestos
JB-18-00-T-Z001-001A JB-18-00-T-Z001-002A
JB-18-00-F-S002-003A JB-18-00-F-010-004A
sample contains asbestos
JB-18-00-F-008-005A JB-18-01-F-115C-006A
JB-18-01-F-114-007A JB-18-01-F-H105-008A
JB-18-01-M- H102-009A JB-18-01-M- H101-010A
JB-18-01-F-122-011A JB-18-01-M-H102-012A
JB-18-02-F-215A-013A JB-18-02-F-216-014A
JB-18-02-F-H201-015A JB-18-03-S-RF-016A
JB-18-03-S-RF-017A
JB-18-00-F-011-018A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805370
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-00-T-Z001-
001A 390805370-0001 wht block TSI insulation debris
White Non-Fibrous
Heterogeneous
Chrysotile29%Non-fibrous (other)71%
JB-18-00-T-Z001-
002A 390805370-0002 brn paper insulation/(piping) debris
Brown Fibrous
Heterogeneous
Chrysotile9%Cellulose89% Non-fibrous (other)2%
JB-18-00-F-S002-
003A Floortile 390805370-0003 wht 12x12 w/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-S002-
003A Adhesive 390805370-0003A wht 12x12 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-010-
004A Floortile 390805370-0004 wht 12x12/ylw mastic/grey 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-010-
004A Adhesive 390805370-0004A wht 12x12/ylw mastic/grey 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-00-F-010-
004A Floortile 390805370-0004B wht 12x12/ylw mastic/grey 9x9/blk mastic
Gray None Detected
Non-Fibrous
Heterogeneous
Cellulose4% Non-fibrous (other)96%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (12) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805370
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-00-F-010-
004A Adhesive 390805370-0004C wht 12x12/ylw mastic/grey 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-18-00-F-008-
005A Floortile 390805370-0005 wht 12x12/ylw mastic/grey 9x9/blk mastic
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-00-F-008-
005A Adhesive 390805370-0005A wht 12x12/ylw mastic/grey 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)96% Quartz4%
JB-18-00-F-008-
005A Floortile 390805370-0005B wht 12x12/ylw mastic/grey 9x9/blk mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-00-F-008-
005A Adhesive 390805370-0005C wht 12x12/ylw mastic/grey 9x9/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805369
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
10100 Woolworth Road Keithville, LA 71047
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor (amended report issued 11/25/08).
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 11/25/2008
EMSL Analytical, Inc.
3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com
JB-18-01-F-115C-
006A Floortile 390805369-0001 grey 12x12 w/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-115C-
006A Adhesive 390805369-0001A grey 12x12 w/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-01-F-114-
007A Floortile 390805369-0002 carpet glue/grey 12x12/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-114-
007A Adhesive 390805369-0002A carpet glue/grey 12x12/ylw mastic
Various None Detected composite adhesive result
Non-Fibrous
Heterogeneous
Synthetic2% Non-fibrous (other)98%
JB-18-01-F-H105-
008A Floortile 390805369-0003 carpet glue/grey 12x12/ylw mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-18-01-F-H105-
008A Adhesive 390805369-0003A carpet glue/grey 12x12/ylw mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805369
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-01-M-H101-
010A 390805369-0005 brn glue dot Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-18-01-F-122-
011A Floortile 390805369-0006 carpet glue/wht 12x12/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-18-01-F-122-
011A Adhesive 390805369-0006A carpet glue/wht 12x12/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Synthetic2% Non-fibrous (other)98%
JB-18-01-F-122-
011A Adhesive 390805369-0006B carpet glue/wht 12x12/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)86% Quartz2%
JB-18-01-M-H102-
012A 390805369-0007 brn glue dot Brown None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805371
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-18-02-F-215A-
013A Adhesive 390805371-0001 carpet glue/brn flooring material/cloth backing
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-02-F-215A-
013A Flooring 390805371-0001A carpet glue/brn flooring material/cloth backing
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-18-02-F-215A-
013A Felt 390805371-0001B carpet glue/brn flooring material/cloth backing
Tan None Detected
Fibrous
Heterogeneous
Cellulose89% Non-fibrous (other)11%
JB-18-02-F-216-
014A Adhesive 390805371-0002 carpet glue/brn flooring material/cloth backing
Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-18-02-F-216-
014A Flooring 390805371-0002A carpet glue/brn flooring material/cloth backing
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-18-02-F-216-
014A Felt 390805371-0002B carpet glue/brn flooring material/cloth backing
Tan None Detected
Fibrous
Heterogeneous
Cellulose89% Non-fibrous (other)11%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (9)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805371
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/23/08 4:50 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/24/2008Analysis Date:
Report Date: 10/24/2008
EMSL Analytical, Inc.
11040A…