36C25518Q0169-00002039.pdf

PDF 10 MB Posted

Attached to
657-18-1-1582-0008 Asbestos Lead Survey - STL
Solicitation number
36C25518Q0169
Issued by

About this file

36C25518Q0169 00002 08-14529 JB Bldg 18 Report.pdf

View the file

Other files

File Type Posted
36C25518C0113-000.docx DOCX document
36C25518Q0169-00003004.pdf PDF
36C25518Q0169-00003005.pdf PDF
36C25518Q0169-00003007.pdf PDF
36C25518Q0169-00003010.pdf PDF
36C25518Q0169-00003008.pdf PDF
36C25518Q0169-00003000.docx DOCX document
36C25518Q0169-00003002.pdf PDF
36C25518Q0169-00003003.pdf PDF
36C25518Q0169-00003001.pdf PDF
36C25518Q0169-00003009.pdf PDF
36C25518Q0169-00003006.pdf PDF
36C25518Q0169-00002033.pdf PDF
36C25518Q0169-00002050.pdf PDF
36C25518Q0169-00002031.pdf PDF
36C25518Q0169-00002055.pdf PDF
36C25518Q0169-00002047.pdf PDF
36C25518Q0169-00002053.pdf PDF
36C25518Q0169-00002038.pdf PDF
36C25518Q0169-00002045.pdf PDF
36C25518Q0169-00002052.pdf PDF
36C25518Q0169-00002037.pdf PDF
36C25518Q0169-00002032.pdf PDF
36C25518Q0169-00002036.pdf PDF
36C25518Q0169-00002040.pdf PDF
36C25518Q0169-00002043.pdf PDF
36C25518Q0169-00002042.pdf PDF
36C25518Q0169-00002048.pdf PDF
36C25518Q0169-00002028.docx DOCX document
36C25518Q0169-00002054.pdf PDF
36C25518Q0169-00002035.pdf PDF
36C25518Q0169-00002041.pdf PDF
36C25518Q0169-00002058.pdf PDF
36C25518Q0169-00002030.pdf PDF
36C25518Q0169-00002049.pdf PDF
36C25518Q0169-00002046.pdf PDF
36C25518Q0169-00002044.pdf PDF
36C25518Q0169-00002057.pdf PDF
36C25518Q0169-00002029.pdf PDF
36C25518Q0169-00002051.pdf PDF
36C25518Q0169-00002034.pdf PDF
36C25518Q0169-00002056.pdf PDF
36C25518Q0169-00001000.docx DOCX document
36C25518Q0169-004.pdf PDF
36C25518Q0169-002.pdf PDF
36C25518Q0169-001.docx DOCX document
36C25518Q0169-003.pdf PDF
36C25518Q0169-000.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS ASSESSMENT

ASBESTOS REINSPECTION REPORT

Jefferson Barracks Division 1 Jefferson Barracks Drive

St. Louis, Missouri

Building 18

Prepared for:

St. Louis V. A. Medical Center 1 Jefferson Barracks Drive

St. Louis, Missouri

Prepared by:

1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867

(888) 776-0670 (318) 687-3771

INTRODUCTION

2008 ASBESTOS REINSPECTION REPORT

ST. LOUIS V. A. MEDICAL CENTER

JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS

SCOPE OF WORK

1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.

2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).

3. Each facility inspection was performed by an accredited inspector.

4. For each facility, the inspector performed the following tasks:

a. Visually reinspected and reassessed the condition of all friable known or assumed

ACBM.

b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.

c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.

d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.

e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.

f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.

g. Reassessed the condition of friable known or assumed ACBM previously identified.

h. Recorded above information on field inspection forms for each facility.

5. A Management Planner reviewed the above information and performed the following required functions:

a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.

b. Reviewed the results of each reinspection and assessment.

c. Recommended in writing, the appropriate response actions.

d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.

6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.

a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.

b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.

c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.

MANAGEMENT PLAN RECOMMENDATIONS

The following general notes are for all facilities inspected during the Asbestos Reinspection.

These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.

1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.

2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.

3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.

4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.

5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.

Provide a copy of the notification to each facility and include a copy in the Management Plan.

6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.

7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.

8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.

9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.

10. The existing Management Plan (original) is updated by this Three-Year Reinspection.

All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.

11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.

12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.

13. Notification should be provided to “outside contractors” about ACM within the facility.

This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.

14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.

A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.

15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.

REPORT SECTION

This report includes the following sections:

ACM Homogeneous Areas Summary Table and Drawings

This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.

Condition and Removal Priority Table

This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.

Master Summary Table – Asbestos Bulk Samples

This table provides a listing of all asbestos bulk samples taken to date.

Asbestos-Containing Bulk Samples

This table provides a listing of all asbestos-containing bulk samples.

2008 Reinspection – Inspection Logs

This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.

Bulk Sample Location Drawings

This section provides drawings with sample locations for all asbestos bulk samples.

2008 Reinspection – Photographs

This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.

2008 Reinspection – Laboratory Reports

This section provides all laboratory analytical results.

Certifications

This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.

Periodic Surveillance Forms

This section includes the forms completed during the periodic surveillance inspections required every six (6) months.

Management Plan Updates

This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.

Response Actions

This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.

Training Documents

This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.

Annual Notification Letters

This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.

Initial Inspection

This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.

CONTRACTORS

This 2008 Asbestos Reinspection was provided by:

Contractor: Subcontractor:

FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.

1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047

(888) 776-0670 (Office) (318) 687-3771 (Office)

(877) 776-0670 (Fax) (318) 687-9923 (Fax)

INSPECTORS:

Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348

Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589

Justin L. Holcomb LA Certificate No. 9I00306

MANAGEMENT PLANNER:

Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner

Accreditation Agency: Louisiana Department of Environmental Quality

ACM Homogeneous Areas Summary Table and Drawings

JEFFERSON BARRACKS DIVISION

2008 THREE-YEAR ASBESTOS REINSPECTION

ACM HOMOGENEOUS AREAS SUMMARY TABLE

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

Crawlspace No ACM No ACM HMA-05 Thermal Insulation Debris HMA-06 Pipe Insulation & Fittings No ACM

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

Basement HMA-01 9"x9" Floor Tile & Adhesive HMA-04 Tan Exterior Surfacing Material HMA-05 Thermal Insulation Debris HMA-06 Pipe Insulation & Fittings No ACM

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

1 HMA-02 12"x12" Floor Tile HMA-03 Flooring Adhesive HMA-04 Tan Exterior Surfacing Material HMA-06 Pipe Insulation & Fittings No ACM

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

2 No ACM HMA-04 Tan Exterior Surfacing Material HMA-06 Pipe Insulation & Fittings HMA-07 Fire Doors (Assumed)

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

3 HMA-02 12"x12" Floor Tile HMA-04 Tan Exterior Surfacing Material No ACM HMA-07 Fire Doors (Assumed)

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

Attic No ACM HMA-04 Tan Exterior Surfacing Material No ACM No ACM

Building 18 - 3rd Floor

Building 18 - Attic

Building 18 - Crawlspace

Building 18 - Basement

Building 18 - 1st Floor

Building 18 - 2nd Floor

CRAWLSPACE

ST. LOUIS V.A. MEDICAL CENTER

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI Z002-18-JB cardboard wrap pipe lagging 750 lf 0 4.00 Z002-18-JB mudded joint ftg on mag pipe lagging 0 ea 300 4.00

750 300

Building 18 - Crawlspace

TOTALS

BASEMENT

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI B101-18-JB magnesia pipe lagging 8 lf 0 4.00 B101-18-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00

B102-18-JB cardboard wrap pipe lagging 95 lf 0 2.00 B102-18-JB cardboard wrap pipe lagging 100 lf 0 4.00 B102-18-JB magnesia pipe lagging 100 lf 0 4.00 B102-18-JB magnesia pipe lagging 60 lf 0 6.00 B102-18-JB magnesia pipe lagging 6 lf 0 10.00 B102-18-JB mudded joint ftg on cardboard lag 0 ea 33 2.00 B102-18-JB mudded joint ftg on cardboard lag 0 ea 13 4.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 25 6.00 B102-18-JB mudded joint ftg on mag pipe lagging 0 ea 3 10.00

B103-18-JB cardboard wrap pipe lagging 70 lf 0 2.00 B103-18-JB magnesia pipe lagging 70 lf 0 4.00 B103-18-JB mudded joint ftg on cardboard lag 0 ea 12 2.00 B103-18-JB mudded joint ftg on mag pipe lagging 0 ea 30 4.00

B104-18-JB cardboard wrap pipe lagging 1 lf 0 4.00

B105-18-JB magnesia pipe lagging 40 lf 0 4.00 B105-18-JB mudded joint ftg on mag pipe lagging 0 ea 20 4.00

B107-18-JB cardboard wrap pipe lagging 25 lf 0 2.00 B107-18-JB magnesia pipe lagging 40 lf 0 4.00 B107-18-JB mudded joint ftg on cardboard lag 0 ea 10 2.00 B107-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00

B108-18-JB cardboard wrap pipe lagging 50 lf 0 4.00 B108-18-JB magnesia pipe lagging 85 lf 0 4.00 B108-18-JB mudded joint ftg on cardboard lag 0 ea 8 4.00 B108-18-JB mudded joint ftg on mag pipe lagging 0 ea 20 4.00

B110-18-JB magnesia pipe lagging 75 lf 0 4.00 B110-18-JB mudded joint ftg on cardboard lag 0 ea 10 4.00 B110-18-JB mudded joint ftg on mag pipe lagging 0 ea 25 4.00

B111-18-JB cardboard wrap pipe lagging 40 lf 0 2.00 B111-18-JB magnesia pipe lagging 80 lf 0 4.00 B111-18-JB mudded joint ftg on cardboard lag 0 ea 20 2.00 B111-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00

Building 18 - Basement

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI

H003-18-JB cardboard wrap pipe lagging 4 lf 0 4.00 H003-18-JB magnesia pipe lagging 10 lf 0 4.00 H003-18-JB mudded joint ftg on cardboard lag 0 ea 1 4.00 H003-18-JB mudded joint ftg on mag pipe lagging 0 ea 5 4.00

Z001-18-JB magnesia pipe lagging 298 lf 0 4.00 Z001-18-JB magnesia pipe lagging 252 lf 0 6.00 Z001-18-JB mudded joint ftg on mag pipe lagging 0 ea 162 4.00 Z001-18-JB mudded joint ftg on mag pipe lagging 0 ea 33 6.00

1509 512TOTALS

1st FLOOR

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI 101-18-JB cardboard wrap pipe lagging 30 lf 0 4.00 101-18-JB magnesia pipe lagging 50 lf 0 4.00 101-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

102-18-JB magnesia pipe lagging 40 lf 0 4.00 102-18-JB mudded joint ftg on mag pipe lagging 0 ea 14 4.00

102A-18-JB magnesia pipe lagging 40 lf 0 4.00 102A-18-JB mudded joint ftg on mag pipe lagging 0 ea 15 4.00

117-18-JB magnesia pipe lagging 40 lf 0 4.00 117-18-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00

119-18-JB cardboard wrap pipe lagging 20 lf 0 4.00

220 49

Building 18 - 1st Floor

TOTALS

2ND FLOOR

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI 202-18-JB magnesia pipe lagging 22 lf 0 4.00 202-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

204-18-JB magnesia pipe lagging 12 lf 0 4.00 204-18-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00

205-18-JB magnesia pipe lagging 20 lf 0 4.00 205-18-JB mudded joint ftg on mag pipe lagging 0 ea 13 4.00

205A-18-JB magnesia pipe lagging 60 lf 0 4.00 205A-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

206-18-JB magnesia pipe lagging 37 lf 0 4.00 206-18-JB mudded joint ftg on mag pipe lagging 0 ea 7 4.00

207-18-JB magnesia pipe lagging 56 lf 0 4.00 207-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

207A-18-JB magnesia pipe lagging 46 lf 0 4.00 207A-18-JB mudded joint ftg on mag pipe lagging 0 ea 22 4.00

207B-18-JB magnesia pipe lagging 70 lf 0 4.00 207B-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

208-18-JB magnesia pipe lagging 5 lf 0 4.00 208-18-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00

209-18-JB magnesia pipe lagging 54 lf 0 4.00 209-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

210-18-JB magnesia pipe lagging 60 lf 0 4.00 210-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

210A-18-JB magnesia pipe lagging 75 lf 0 4.00 210A-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

210B-18-JB magnesia pipe lagging 80 lf 0 4.00 210B-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

211-18-JB magnesia pipe lagging 22 lf 0 4.00 211-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00

Building 18 - 2nd Floor

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI 214-18-JB magnesia pipe lagging 20 lf 0 4.00 214-18-JB mudded joint ftg on mag pipe lagging 0 ea 17 4.00

215-18-JB magnesia pipe lagging 6 lf 0 4.00 215-18-JB mudded joint ftg on mag pipe lagging 0 ea 2 4.00

215A-18-JB magnesia pipe lagging 12 lf 0 4.00 215A-18-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00

216-18-JB magnesia pipe lagging 60 lf 0 4.00 216-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

217-18-JB magnesia pipe lagging 20 lf 0 4.00 217-18-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00

217A-18-JB magnesia pipe lagging 40 lf 0 4.00 217A-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

217B-18-JB magnesia pipe lagging 40 lf 0 4.00 217B-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

217C-18-JB magnesia pipe lagging 80 lf 0 4.00 217C-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

217D-18-JB magnesia pipe lagging 50 lf 0 4.00 217D-18-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00

217E-18-JB magnesia pipe lagging 60 lf 0 4.00 217E-18-JB mudded joint ftg on mag pipe lagging 0 ea 15 4.00

1007 350TOTALS

3RD FLOOR

ATTIC

Condition and Removal Priority Table

Qualitative Ranking Numerical Rating

Good 8, 9, 10

Fair 4, 5, 6, 7

Poor 1, 2, 3

Physical Disturbance Environmental Disturbance

Low 1, 2, 3

Medium 4, 5, 6, 7

High 8, 9, 10

Qualitative Ranking Numerical Rating High 1, 2, 3

Medium 4, 5, 6, 7

Low 8, 9, 10

1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition

2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance

Assessment FactorsQualitative Ranking Numerical Rating

Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.

Address with on-going maintenance procedures

Maintain in good condition

Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..

3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority

Description of Current Condition Address short-term

Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Accessibility: accessibility during normal operations

Activities: activities that people do and how often they do them

Vibration: vibration from operating machinery, HVAC equipment, and so forth

Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material

Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix

Water Damage: water damage from leaking roof, pipe or other source

2008 THREE-YEAR ASBESTOS REINSPECTION

CONDITION AND REMOVAL PRIORITY TABLE

Rating Based On Rating Based On

HMA-05 18 Crawlspace Thermal Insulation Debris Yes Yes 5 Debris 7 Accessibility 6

HMA-06 18 Crawlspace Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-01 18 Basement 9"x9" Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7

HMA-04 18 Basement Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9

HMA-05 18 Basement Thermal Insulation Debris Yes Yes 5 Debris 7 Accessibility 6

HMA-06 18 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-02 18 1 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7

HMA-03 18 1 Flooring Adhesive No No 10 Intact 1 Access 9

HMA-04 18 1 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9

HMA-06 18 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-04 18 2 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9

HMA-06 18 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-07 18 2 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10

Accessibility Yes/No

Restricted

Potential for Disturbance 2

Homogeneous Area No. Bldg Floor Material Description

Building 18 - 1st Floor

Building 18 - 2nd Floor

Removal Priority 3

Building 18 - Basement

Current Condition 1

Building 18 - Crawlspace

Friable Yes/No

2008 THREE-YEAR ASBESTOS REINSPECTION

CONDITION AND REMOVAL PRIORITY TABLE

Accessibility Yes/No

Restricted

Potential for Disturbance 2

Homogeneous Area No. Bldg Floor Material Description

Removal Priority 3

Current Condition 1Friable Yes/No

HMA-02 18 3 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7

HMA-04 18 3 Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9

HMA-07 18 3 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10

HMA-04 18 Attic Tan Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9

Building 18 - Attic

Building 18 - 3rd Floor

Master Summary Table Asbestos Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

JB18 00 002 JB-18-00-T-002-01 Magnesia pipe lagging JB18 00 003 JB-18-00-T-003-02 White TSI JB18 00 003 JB-18-00-T-003-03 White TSI JB18 00 002 JB-18-00-T-002-04 Mudded joint fitting on magnesia pipe lagging JB18 00 002 JB-18-00-T-002-05 White TSI JB18 00 003 JB-18-00-T-003-06 White TSI JB18 00 H003 JB-18-00-T-H003-07 Cardboard wrap pipe lagging JB18 00 002 JB-18-00-T-002-08 Gray TSI JB18 00 003 JB-18-00-T-003-09 Gray TSI JB18 00 002 JB-18-00-T-002-10 Mudded joint fitting on cardboard lagging JB18 00 H003 JB-18-00-T-H003-11 Gray TSI JB18 00 003 JB-18-00-T-003-12 Gray TSI JB18 00 002 JB-18-00-T-002-13 Calcium silicate lagging w/metal jacket JB18 00 002 JB-18-00-T-002-14 White TSI JB18 00 Z002 JB-18-00-T-Z002-15 White TSI JB18 00 H001 JB-18-00-M-H001-16 2x2 white w/pinhole and fissure ceiling tile JB18 00 007 JB-18-00-M-007-17 2x4 white w/pinhole and fissure ceiling tile JB18 00 010 JB-18-00-M-010-18 2x4 white w/pinholes and worms ceiling tile JB18 00 002 JB-18-00-T-002-19 Musdded joint fitting on fiberglass lagging JB18 00 002 JB-18-00-T-002-20 Gray TSI JB18 00 002 JB-18-00-T-002-21 Black/white TSI JB18 00 005 JB-18-00-M-005-22 Black rubberized duct connector JB18 00 001 JB-18-00-M-001-23 Green canvas duct connector JB18 00 002 JB-18-00-M-002-24 Brown cork ceiling material JB18 00 007 JB-18-00-M-007-25 4" brown cove base JB18 00 010 JB-18-00-M-010-26 4" black cove base JB18 00 003 JB-18-00-M-003-27 White duct tape JB18 00 H001 JB-18-00-M-H001-28 White/brown gypsum drywall JB18 00 003 JB-18-00-S-003-29 White hardwall plaster JB18 01 101 JB-18-01-T-101-01 Magnesia pipe lagging JB18 01 102 JB-18-01-T-102-02 White TSI JB18 01 102A JB-18-01-T-102A-03 White TSI JB18 01 101 JB-18-01-T-101-04 Mudded joint fitting on magnesia pipe lagging JB18 01 102 JB-18-01-T-102-05 White TSI JB18 01 102A JB-18-01-T-102A-06 White TSI JB18 01 101 JB-18-01-T-101-07 Cardboard wrap pipe lagging JB18 01 101 JB-18-01-T-101-08 Gray TSI JB18 01 119 JB-18-01-T-119-09 Gray TSI JB18 01 106 JB-18-01-M-106-10 Skim coat on plaster JB18 01 H102 JB-18-01-M-H102-11 1x1 white w/gouges ceiling tile JB18 01 H102 JB-18-01-M-H102-12 2x2 white w/pinhole and fissure ceiling tile JB18 01 H102 JB-18-01-S-H102-13 Off-white hardwall plaster JB18 01 H102A JB-18-01-M-H102A-14 White/brown gypsum drywall JB18 01 H102 JB-18-01-M-H102-15 4" brown cove base JB18 01 H103 JB-18-01-M-H103-16 White duct tape

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

1994 Initial Asbestos Inspection

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

JB18 02 201 JB-18-02-T-201-01 Magnesia pipe lagging JB18 02 202 JB-18-02-T-202-02 White TSI JB18 02 214 JB-18-02-T-214-03 White TSI JB18 02 201 JB-18-02-T-201-04 Mudded joint fitting on magnesia pipe lagging JB18 02 202 JB-18-02-T-202-05 White TSI JB18 02 214 JB-18-02-T-214-06 White TSI JB18 02 H203 JB-18-02-M-H203-07 2x2 white w/pinhole and fissure ceiling tile JB18 02 206 JB-18-02-M-206-08 2x4 white w/pinhole and fissure ceiling tile JB18 02 217E JB-18-02-M-217E-09 2x2 white w/pinholes and worms ceiling tile JB18 02 202 JB-18-02-S-202-10 Off-white hardwall plaster JB18 02 202 JB-18-02-M-202-11 White/brown gypsum drywall JB18 02 H203 JB-18-02-M-H203-12 White duct tape JB18 02 H202 JB-18-02-M-H202-13 4" brown cove base JB18 03 302 JB-18-03-S-302-01 Off-white hardwall plaster JB18 03 302 JB-18-03-M-302-02 White/gray gypsum drywall JB18 03 H302 JB-18-03-M-H302-03 4" brown cove base JB18 03 321 JB-18-03-M-321-04 6" brown cove base JB18 03 305A JB-18-03-M-305A-05 2x2 white wpinhole and fissure ceiling tile JB18 03 320 JB-18-03-M-320-06 2x4 white w/pinhole and fissure ceiling tile JB18 03 H304 JB-18-03-M-H304-07 White duct tape JB18 03 310 JB-18-03-M-310-08 2x4 white w/pinholes and worms ceiling tile JB18 03 H304 JB-18-03-M-H304-09 2x2 white w/pinholes and worms ceiling tile JB18 04 400 JB-18-04-M-400-01 Black canvas duct connector

JB18 00 Z001 JB-18-00-T-Z001-001A White block TSI insulation debris JB18 00 Z001 JB-18-00-T-Z001-002A Brown paper insulation (piping) debris JB18 00 S002 JB-18-00-F-S002-003A White 12x12 floor tile, black mastic JB18 00 010 JB-18-00-F-010-004A Layer 1 - White 12x12 floor tile JB18 00 010 JB-18-00-F-010-004A Layer 2 - Yellow mastic JB18 00 010 JB-18-00-F-010-004A Layer 3 - Gray floor tile JB18 00 010 JB-18-00-F-010-004A Layer 4 - Black mastic JB18 00 008 JB-18-00-F-008-005A Layer 1 - White 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 2 - Yellow mastic JB18 00 008 JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 4 - Black mastic JB18 01 115C JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile JB18 01 115C JB-18-01-F-115C-006A Layer 2 - Yellow mastic JB18 01 114 JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile JB18 01 114 JB-18-01-F-114-007A Layer 2 - Carpet adhesive, yellow mastic JB18 01 H105 JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile JB18 01 H105 JB-18-01-F-H105-008A Layer 2 - Carpet adhesive, yellow mastic JB18 01 H102 JB-18-01-M-H102-009A Brown glue dot JB18 01 H101 JB-18-01-M-H101-010A Brown glue dot JB18 01 122 JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 2 - Carpet adhesive JB18 01 122 JB-18-01-F-122-011A Layer 3 - Black mastic

2008 Asbestos Reinspection

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

JB18 01 H102 JB-18-01-M-H102-012A Brown glue dot JB18 02 215A JB-18-02-F-215A-013A Carpet adhesive, brown flooring material, cloth backing JB18 02 216 JB-18-02-F-216-014A Carpet adhesive, brown flooring material, cloth backing JB18 02 H201 JB-18-02-F-H201-015A Carpet adhesive, brown flooring material, cloth backing JB18 03 Roof JB-18-03-S-RF-016A Roofing shingles JB18 03 Roof JB-18-03-S-RF-017A Roofing tar JB18 00 011 JB-18-00-F-011-018A Layer 1 - White 12x12 floor tile JB18 00 011 JB-18-00-F-011-018A Layer 2 - Yellow mastic JB18 00 011 JB-18-00-F-011-018A Layer 3 - Tan 12x12 floor tile JB18 00 011 JB-18-00-F-011-018A Layer 4 - Black mastic

Asbestos-Containing Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

LIST OF ASBESTOS-CONTAINING SAMPLES

Building Floor Room Sample ID Material Description

JB18 00 002 JB-18-00-T-002-01 Magnesia pipe lagging JB18 00 003 JB-18-00-T-003-02 White TSI JB18 00 003 JB-18-00-T-003-03 White TSI JB18 00 002 JB-18-00-T-002-04 Mudded joint fitting on magnesia pipe lagging JB18 00 002 JB-18-00-T-002-05 White TSI JB18 00 003 JB-18-00-T-003-06 White TSI JB18 00 H003 JB-18-00-T-H003-07 Cardboard wrap pipe lagging JB18 00 002 JB-18-00-T-002-08 Gray TSI JB18 00 003 JB-18-00-T-003-09 Gray TSI JB18 00 002 JB-18-00-T-002-10 Mudded joint fitting on cardboard lagging JB18 00 H003 JB-18-00-T-H003-11 Gray TSI JB18 00 003 JB-18-00-T-003-12 Gray TSI JB18 01 101 JB-18-01-T-101-01 Magnesia pipe lagging JB18 01 102 JB-18-01-T-102-02 White TSI JB18 01 102A JB-18-01-T-102A-03 White TSI JB18 01 101 JB-18-01-T-101-04 Mudded joint fitting on magnesia pipe lagging JB18 01 102 JB-18-01-T-102-05 White TSI JB18 01 102A JB-18-01-T-102A-06 White TSI JB18 01 101 JB-18-01-T-101-07 Cardboard wrap pipe lagging JB18 01 101 JB-18-01-T-101-08 Gray TSI JB18 01 119 JB-18-01-T-119-09 Gray TSI JB18 02 201 JB-18-02-T-201-01 Magnesia pipe lagging JB18 02 202 JB-18-02-T-202-02 White TSI JB18 02 214 JB-18-02-T-214-03 White TSI JB18 02 201 JB-18-02-T-201-04 Mudded joint fitting on magnesia pipe lagging JB18 02 202 JB-18-02-T-202-05 White TSI JB18 02 214 JB-18-02-T-214-06 White TSI

JB18 00 Z001 JB-18-00-T-Z001-001A White block TSI insulation debris JB18 00 Z001 JB-18-00-T-Z001-002A Brown paper insulation (piping) debris JB18 00 010 JB-18-00-F-010-004A Layer 4 - Black mastic JB18 00 008 JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile JB18 00 008 JB-18-00-F-008-005A Layer 4 - Black mastic JB18 01 115C JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile JB18 01 114 JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile JB18 01 H105 JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile JB18 01 122 JB-18-01-F-122-011A Layer 3 - Black mastic JB18 00 011 JB-18-00-F-011-018A Layer 4 - Black mastic

1994 Initial Asbestos Inspection

2008 Asbestos Reinspection

2008 Reinspection Inspection Logs

Client: Date: October 22, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

JB-18-00-T-Z001-001A White block TSI insulation debris 00 Z001 Southwest quadrant of crawlspace

JB-18-00-T-Z001-002A Brown paper insulation (piping) debris 00 Z001 Southwest quadrant of crawlspace

JB-18-00-F-S002-003A White 12x12 floor tile, black mastic 00 S002 Southeast quadrant by stairs

JB-18-00-F-010-004A Layer 1 - White 12x12 floor tile 00 010 Northwest corner under window

JB-18-00-F-010-004A Layer 2 - Yellow mastic 00 010 Northwest corner under window

JB-18-00-F-010-004A Layer 3 - Gray floor tile 00 010 Northwest corner under window

JB-18-00-F-010-004A Layer 4 - Black mastic 00 010 Northwest corner under window

JB-18-00-F-008-005A Layer 1 - White 12x12 floor tile 00 008 Northwest quadrant of room under light switches

JB-18-00-F-008-005A Layer 2 - Yellow mastic 00 008 Northwest quadrant of room under light switches

JB-18-00-F-008-005A Layer 3 - Tan 12x12 floor tile 00 008 Northwest quadrant of room under light switches

JB-18-00-F-008-005A Layer 4 - Black mastic 00 008 Northwest quadrant of room under light switches

JB-18-01-F-115C-006A Layer 1 - Gray 12x12 floor tile 01 115C Northwest quadrant of room 115C in front of door

JB-18-01-F-115C-006A Layer 2 - Yellow mastic 01 115C Northwest quadrant of room 115C in front of door

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center

JB-18-01-F-114-007A Layer 1 - Gray 12x12 floor tile 01 114 Northeast corner of room 114

JB-18-01-F-114-007A Layer 2 - Carpet adhesive, yellow mastic 01 114 Northeast corner of room 114

JB-18-01-F-H105-008A Layer 1 - Gray 12x12 floor tile 01 H105 Southwest corner of hall H105 by door

JB-18-01-F-H105-008A Layer 2 - Carpet adhesive, yellow mastic 01 H105 Southwest corner of hall H105 by door

JB-18-01-M-H102-009A Brown glue dot 01 H102 Middle of hall H102 by round column above 2x2 ceiling tile

JB-18-01-M-H101-010A Brown glue dot 01 H101 Northwest quadrant of hall H101 above ceiling

JB-18-01-F-122-011A Layer 1 - White 12x12 floor tile 01 122 Below window on west wall

JB-18-01-F-122-011A Layer 2 - Carpet adhesive 01 122 Below window on west wall

JB-18-01-F-122-011A Layer 3 - Black mastic 01 122 Below window on west wall

JB-18-01-M-H102-012A Brown glue dot 01 H102 Middle of hall H102 in between curved wall and pillar above 2x2 ceiling tile

JB-18-02-F-215A-013A Carpet adhesive, brown flooring material, cloth backing 02 215A Northeast quadrant of room 215A in between doors to 212 and 211

JB-18-02-F-216-014A Carpet adhesive, brown flooring material, cloth backing 02 216 Northeast quadrant of room 216

JB-18-02-F-H201-015A Carpet adhesive, brown flooring material, cloth backing 02 H201 South quadrant of hall H201 next to column

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 18 St. Louis V. A. Medical Center

JB-18-03-S-RF-016A Roofing shingles 03 Roof Western wall outside window above elevator shaft

JB-18-03-S-RF-017A Roofing tar 03 Roof Western wall outside window above elevator shaft

JB-18-00-F-011-018A Layer 1 - White 12x12 floor tile 00 011 Northwest quadrant of room

JB-18-00-F-011-018A Layer 2 - Yellow mastic 00 011 Northwest quadrant of room

JB-18-00-F-011-018A Layer 3 - Tan 12x12 floor tile 00 011 Northwest quadrant of room

JB-18-00-F-011-018A Layer 4 - Black mastic 00 011 Northwest quadrant of room

GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3

Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:

Bulk Sample Location Drawings

CRAWLSPACE

BASEMENT

1st FLOOR

2ND FLOOR

3RD FLOOR

ATTIC

2008 Reinspection Photographs

BUILDING 18

sample does not contain asbestos

JB-18-00-T-Z001-001A JB-18-00-T-Z001-002A

JB-18-00-F-S002-003A JB-18-00-F-010-004A

sample contains asbestos

JB-18-00-F-008-005A JB-18-01-F-115C-006A

JB-18-01-F-114-007A JB-18-01-F-H105-008A

JB-18-01-M- H102-009A JB-18-01-M- H101-010A

JB-18-01-F-122-011A JB-18-01-M-H102-012A

JB-18-02-F-215A-013A JB-18-02-F-216-014A

JB-18-02-F-H201-015A JB-18-03-S-RF-016A

JB-18-03-S-RF-017A

JB-18-00-F-011-018A

2008 Reinspection Laboratory Reports

Sample Location Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805370

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 10/24/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-18-00-T-Z001-

001A 390805370-0001 wht block TSI insulation debris

White Non-Fibrous

Heterogeneous

Chrysotile29%Non-fibrous (other)71%

JB-18-00-T-Z001-

002A 390805370-0002 brn paper insulation/(piping) debris

Brown Fibrous

Heterogeneous

Chrysotile9%Cellulose89% Non-fibrous (other)2%

JB-18-00-F-S002-

003A Floortile 390805370-0003 wht 12x12 w/blk mastic

White None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-00-F-S002-

003A Adhesive 390805370-0003A wht 12x12 w/blk mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-00-F-010-

004A Floortile 390805370-0004 wht 12x12/ylw mastic/grey 9x9/blk mastic

White None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-00-F-010-

004A Adhesive 390805370-0004A wht 12x12/ylw mastic/grey 9x9/blk mastic

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-18-00-F-010-

004A Floortile 390805370-0004B wht 12x12/ylw mastic/grey 9x9/blk mastic

Gray None Detected

Non-Fibrous

Heterogeneous

Cellulose4% Non-fibrous (other)96%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

Sue Ferrario (12) mailto:saintlouislab@emsl.com

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805370

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 Basement

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 10/24/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-18-00-F-010-

004A Adhesive 390805370-0004C wht 12x12/ylw mastic/grey 9x9/blk mastic

Black Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-18-00-F-008-

005A Floortile 390805370-0005 wht 12x12/ylw mastic/grey 9x9/blk mastic

White None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-00-F-008-

005A Adhesive 390805370-0005A wht 12x12/ylw mastic/grey 9x9/blk mastic

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

JB-18-00-F-008-

005A Floortile 390805370-0005B wht 12x12/ylw mastic/grey 9x9/blk mastic

Gray Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-18-00-F-008-

005A Adhesive 390805370-0005C wht 12x12/ylw mastic/grey 9x9/blk mastic

Black Non-Fibrous

Heterogeneous

Chrysotile12%Non-fibrous (other)88%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

THIS IS THE LAST PAGE OF THE REPORT.

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805369

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor (amended report issued 11/25/08).

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 11/25/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-18-01-F-115C-

006A Floortile 390805369-0001 grey 12x12 w/ylw mastic

Gray Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-18-01-F-115C-

006A Adhesive 390805369-0001A grey 12x12 w/ylw mastic

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-18-01-F-114-

007A Floortile 390805369-0002 carpet glue/grey 12x12/ylw mastic

Gray Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-18-01-F-114-

007A Adhesive 390805369-0002A carpet glue/grey 12x12/ylw mastic

Various None Detected composite adhesive result

Non-Fibrous

Heterogeneous

Synthetic2% Non-fibrous (other)98%

JB-18-01-F-H105-

008A Floortile 390805369-0003 carpet glue/grey 12x12/ylw mastic

Gray Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-18-01-F-H105-

008A Adhesive 390805369-0003A carpet glue/grey 12x12/ylw mastic

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805369

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 1st floor

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 10/24/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-18-01-M-H101-

010A 390805369-0005 brn glue dot Brown None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-18-01-F-122-

011A Floortile 390805369-0006 carpet glue/wht 12x12/blk mastic

White Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-18-01-F-122-

011A Adhesive 390805369-0006A carpet glue/wht 12x12/blk mastic

Yellow None Detected

Non-Fibrous

Heterogeneous

Synthetic2% Non-fibrous (other)98%

JB-18-01-F-122-

011A Adhesive 390805369-0006B carpet glue/wht 12x12/blk mastic

Black Non-Fibrous

Heterogeneous

Chrysotile12%Non-fibrous (other)86% Quartz2%

JB-18-01-M-H102-

012A 390805369-0007 brn glue dot Brown None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

THIS IS THE LAST PAGE OF THE REPORT.

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805371

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 10/24/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-18-02-F-215A-

013A Adhesive 390805371-0001 carpet glue/brn flooring material/cloth backing

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-02-F-215A-

013A Flooring 390805371-0001A carpet glue/brn flooring material/cloth backing

Brown None Detected

Non-Fibrous

Heterogeneous

Cellulose9% Non-fibrous (other)91%

JB-18-02-F-215A-

013A Felt 390805371-0001B carpet glue/brn flooring material/cloth backing

Tan None Detected

Fibrous

Heterogeneous

Cellulose89% Non-fibrous (other)11%

JB-18-02-F-216-

014A Adhesive 390805371-0002 carpet glue/brn flooring material/cloth backing

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-18-02-F-216-

014A Flooring 390805371-0002A carpet glue/brn flooring material/cloth backing

Brown None Detected

Non-Fibrous

Heterogeneous

Cellulose9% Non-fibrous (other)91%

JB-18-02-F-216-

014A Felt 390805371-0002B carpet glue/brn flooring material/cloth backing

Tan None Detected

Fibrous

Heterogeneous

Cellulose89% Non-fibrous (other)11%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

Sue Ferrario (9)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390805371

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 10/23/08 4:50 PM

VAMC Reinspection 08-14529 VAMC Reinspection JB Building 18 2nd floor

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

10/24/2008Analysis Date:

Report Date: 10/24/2008

EMSL Analytical, Inc.

11040A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.