ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 3
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement HMA-01 12x12 Floor Tile & Adhesive No ACM HMA-04 Pipe Insulation & Fittings HMA-05 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 12x12 Floor Tile & Adhesive HMA-02 9x9 Floor Tile & Adhesive
HMA-03 Floor Adhesive No ACM HMA-04 Pipe Insulation & Fittings HMA-05 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
2 HMA-01 12x12 Floor Tile & Adhesive No ACM HMA-04 Pipe Insulation & Fittings HMA-05 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Attic No ACM No ACM HMA-04 Pipe Insulation & Fittings HMA-06 Transite Shingles
Building 3 - Basement
Building 3 - 1st Floor
Building 3 - 2nd Floor
Building 3 - Attic
BASEMENT
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 001-03-JB magnesia pipe lagging 30 lf 0 4.00 001-03-JB magnesia pipe lagging 12 lf 0 6.00 001-03-JB magnesia pipe lagging 20 lf 0 8.00 001-03-JB magnesia pipe lagging 2 lf 0 12.00 001-03-JB mudded joint ftg on mag pipe lagging 0 ea 14 4.00 001-03-JB mudded joint ftg on mag pipe lagging 0 ea 8 6.00 001-03-JB mudded joint ftg on mag pipe lagging 0 ea 12 8.00 001-03-JB mudded joint ftg on mag pipe lagging 0 ea 2 12.00
002-03-JB magnesia pipe lagging 3 lf 0 4.00 002-03-JB magnesia pipe lagging 32 lf 0 6.00 002-03-JB mudded joint ftg on mag pipe lagging 0 ea 3 6.00 002-03-JB mudded joint ftg on wrapped pipe 0 ea 3 4.00
005-03-JB magnesia pipe lagging 10 lf 0 4.00 005-03-JB magnesia pipe lagging 10 lf 0 6.00 005-03-JB mudded joint ftg on mag pipe lagging 0 ea 1 4.00 005-03-JB mudded joint ftg on wrapped pipe 0 ea 3 4.00 005-03-JB wrapped paper pipe lagging 13 lf 0 4.00
006-03-JB magnesia pipe lagging 30 lf 0 4.00 006-03-JB magnesia pipe lagging 33 lf 0 6.00 006-03-JB mudded joint ftg on mag pipe lagging 0 ea 10 4.00 006-03-JB mudded joint ftg on mag pipe lagging 0 ea 8 6.00
008-03-JB magnesia pipe lagging 40 lf 0 4.00 008-03-JB mudded joint ftg on mag pipe lagging 0 ea 14 4.00
235 78
Building 3 - Basement
TOTALS
1st FLOOR
2ND FLOOR
ATTIC
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 300-03-JB mudded joint ftg on wrapped pipe 0 ea 54 4.00 300-03-JB wrapped paper pipe lagging 265 lf 0 4.00
265 54
Building 3 - Attic
TOTALS
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 3 Basement 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 3 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-05 3 Basement Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-01 3 1 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-02 3 1 9x9 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 3 1 Floor Adhesive No No 10 Intact 1 Access 9
HMA-04 3 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-05 3 1 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
Removal Priority 3
Building 3 - 1st Floor
Current Condition 1
Building 3 - Basement
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor Material Description
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB3 00 001 JB-3-00-T-001-1 Magnesia pipe lagging JB3 00 002 JB-3-00-T-002-2 Off-white TSI JB3 00 005 JB-3-00-T-005-3 White TSI JB3 00 002 JB-3-00-T-002-4 Mudded joint fitting on magnesia pipe lagging JB3 00 002 JB-3-00-T-002-5 White TSI JB3 00 001 JB-3-00-T-001-6 Gray TSI JB3 00 005 JB-3-00-T-005-7 Wrapped paper pipe lagging JB3 00 008 JB-3-00-T-008-8 Gray TSI JB3 00 008 JB-3-00-T-008-9 Gray TSI JB3 00 005 JB-3-00-T-005-10 Mudded joint fitting on wrapped pipe JB3 00 008 JB-3-00-T-008-11 White TSI JB3 00 008 JB-3-00-T-008-12 White TSI JB3 00 018 JB-3-00-T-018-13 Mudded joint fitting on fiberglass JB3 00 005 JB-3-00-T-005-14 Gray TSI JB3 00 015 JB-3-00-T-015-15 Gray TSI JB3 00 H004 JB-3-00-M-H004-16 2x2 white w/worm & pinholes ceiling tile JB3 00 H004 JB-3-00-M-H004-17 4" charcoal cove base JB3 00 S003 JB-3-00-M-S003-18 4" black cove base JB3 00 S003 JB-3-00-M-S003-19 White/brown drywall JB3 00 008 JB-3-00-S-008-20 Beige smooth hardwall plaster JB3 00 018 JB-3-00-S-018-21 Gray textured hardwall plaster JB3 00 005 JB-3-00-M-005-22 White vinyl duct connector JB3 01 100 JB-3-01-M-100-1 2x2 white w/worm & pinholes ceiling tile JB3 01 H103 JB-3-01-M-H103-2 2x2 white w/gouges ceiling tile JB3 01 H101 JB-3-01-M-H101-3 2x2 white w/fissure pattern ceiling tile JB3 01 100 JB-3-01-M-100-4 4" black cove base JB3 01 H103 JB-3-01-M-H103-5 4" brown cove base JB3 01 101 JB-3-01-M-101-6 4" taupe cove base JB3 01 S102 JB-3-01-M-S102-7 4" ivory cove base JB3 01 S102 JB-3-01-M-S102-8 Tan stair tread JB3 01 122A JB-3-01-M-122A-9 Offwhite/brown gypsum drywall JB3 01 H103 JB-3-01-S-H103-10 Gray smooth hardwall plaster JB3 01 100 JB-3-01-S-100-11 Beige textured hardwall plaster JB3 01 100 JB-3-01-M-100-12 Black vinyl duct connector JB3 02 200 JB-3-02-M-200-1 2x2 white w/worm & pinholes ceiling tile JB3 02 H203 JB-3-02-M-H203-2 2x2 white w/gouges ceiling tile JB3 02 233 JB-3-02-M-233-3 4" black cove base JB3 02 206A JB-3-02-M-206A-4 4" brown cove base JB3 02 S202 JB-3-02-M-S202-5 4" ivory cove base JB3 02 S202 JB-3-02-M-S202-6 Tan stair tread JB3 02 200 JB-3-02-M-200-7 White/brown gypsum drywall JB3 02 H203 JB-3-02-S-H203-8 Off-white smooth hardwall plaster JB3 02 200 JB-3-02-S-200-9 Beige textured hardwall plaster JB3 02 208 JB-3-02-M-208-10 Dark green canvas duct connector JB3 03 300-Attic JB-3-03-T-300-1 Wrapped paper pipe lagging
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB3 03 300-Attic JB-3-03-T-300-2 Brown/gray TSI JB3 03 300-Attic JB-3-03-T-300-3 Brown/gray TSI JB3 03 300-Attic JB-3-03-T-300-4 Mudded joint fitting on wrapped pipe JB3 03 300-Attic JB-3-03-T-300-5 White TSI JB3 03 300-Attic JB-3-03-T-300-6 White TSI JB3 03 300-Attic JB-3-03-T-300-7 Dark green canvas duct connector
JB3 00 019 JB-03-00-F-019-001A Light brown 12x12 floor tile, black mastic JB3 00 H004 JB-03-00-S-H004-002A Tan textured wall material JB3 00 H004 JB-03-00-S-H004-003A Tan textured ceiling material JB3 00 018 JB-03-00-T-018-004A 2" elbow - white wrap, white block insulation JB3 00 018 JB-03-00-T-018-005A 2" vertical - white wrap, yellow fiberglass insulation JB3 00 018 JB-03-00-M-018-006A Brown vibration JB3 00 006 JB-03-00-T-006-007A 6" elbow - white wrap, white block insulation JB3 00 006 JB-03-00-T-006-008A 6" vertical - brown wrap, brown insulation JB3 00 011 JB-03-00-T-011-009A 6" elbow - white wrap, white block insulation JB3 00 011 JB-03-00-T-011-010A 4" horizontal - white wrap, yellow fiberglass JB3 00 012 JB-03-00-F-012-011A Layer 1 - Gray 12x12 floor tile JB3 00 012 JB-03-00-F-012-011A Layer 2 - Yellow mastic JB3 00 008 JB-03-00-M-008-012A Black paneling material JB3 01 100 JB-03-01-F-100-013A Layer 1 - Green 9x9 floor tile JB3 01 100 JB-03-01-F-100-013A Layer 2 - Black mastic JB3 01 111 JB-03-01-F-111-014A Layer 1 - Brown 9x9 floor tile, black mastic JB3 01 111 JB-03-01-F-111-014A Layer 2 - Black mastic JB3 01 S102 JB-03-01-F-S102-015A Gray 12x12 floor tile, black mastic JB3 01 112 JB-03-01-F-112-016A Layer 1 - Brown 9x9 floor tile JB3 01 112 JB-03-01-F-112-016A Layer 2 - Black mastic JB3 01 101 JB-03-01-F-101-017A Layer 1 - Tan 12x12 floor tile JB3 01 101 JB-03-01-F-101-017A Layer 2 - Yellow mastic JB3 01 101 JB-03-01-F-101-017A Layer 3 - Brown 9x9 floor tile JB3 01 101 JB-03-01-F-101-017A Layer 4 - Black mastic JB3 01 109 JB-03-01-T-109-018A Black mastic, piping JB3 01 109 JB-03-01-M-109-019A Brown vibration isolator JB3 01 103 JB-03-01-T-103-020A White wrap, brown cardboard insulation JB3 01 107 JB-03-01-F-107-021A Layer 1 - Brown 9x9 floor tile JB3 01 107 JB-03-01-F-107-021A Layer 2 - Black mastic JB3 01 106 JB-03-01-F-106-022A Brown 9x9 floor tile, black mastic, felt JB3 01 105 JB-03-01-F-105-023A Layer 1 - Gray 12x12 floor tile JB3 01 105 JB-03-01-F-105-023A Layer 2 - Yellow mastic JB3 01 105 JB-03-01-F-105-023A Layer 3 - Brown 9x9 floor tile JB3 01 105 JB-03-01-F-105-023A Layer 4 - Black mastic JB3 01 105 JB-03-01-F-105-023A Layer 5 - Felt JB3 01 126 JB-03-01-F-126-024A Black mastic, brown 9x9 floor tile, black mastic, felt JB3 01 125 JB-03-01-F-125-025A Carpet adhesive, black mastic JB3 01 H102 JB-03-01-F-H102-026A Layer 1- Green 9x9 floor tile JB3 01 H102 JB-03-01-F-H102-026A Layer 2 - Black mastic
2008 Asbestos Reinspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB3 01 100 JB-03-01-F-100-027A Layer 1 - Green 9x9 floor tile JB3 01 100 JB-03-01-F-100-027A Layer 2 - Black mastic JB3 02 S202 JB-03-02-F-S202-028A Gray 12x12 floor tile, black mastic JB3 01 Exterior JB-03-01-S-EXT-029A Tan textured material JB3 03 Roof JB-03-03-S-RF-030A Gray roofing shingle, felt
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB3 00 002 JB-3-00-T-002-2 Off-white TSI JB3 00 005 JB-3-00-T-005-3 White TSI JB3 00 002 JB-3-00-T-002-4 Mudded joint fitting on magnesia pipe lagging JB3 00 002 JB-3-00-T-002-5 White TSI JB3 00 005 JB-3-00-T-005-7 Wrapped paper pipe lagging JB3 00 008 JB-3-00-T-008-8 Gray TSI JB3 00 008 JB-3-00-T-008-9 Gray TSI JB3 00 005 JB-3-00-T-005-10 Mudded joint fitting on wrapped pipe JB3 00 008 JB-3-00-T-008-11 White TSI JB3 00 008 JB-3-00-T-008-12 White TSI JB3 03 300-Attic JB-3-03-T-300-1 Wrapped paper pipe lagging JB3 03 300-Attic JB-3-03-T-300-2 Brown/gray TSI JB3 03 300-Attic JB-3-03-T-300-3 Brown/gray TSI JB3 03 300-Attic JB-3-03-T-300-4 Mudded joint fitting on wrapped pipe JB3 03 300-Attic JB-3-03-T-300-5 White TSI JB3 03 300-Attic JB-3-03-T-300-6 White TSI
JB3 00 019 JB-03-00-F-019-001A Light brown 12x12 floor tile, black mastic JB3 00 006 JB-03-00-T-006-007A 6" elbow - white wrap, white block insulation JB3 00 012 JB-03-00-F-012-011A Layer 1 - Gray 12x12 floor tile JB3 01 100 JB-03-01-F-100-013A Layer 1 - Green 9x9 floor tile JB3 01 111 JB-03-01-F-111-014A Layer 1 - Brown 9x9 floor tile, black mastic JB3 01 S102 JB-03-01-F-S102-015A Gray 12x12 floor tile, black mastic JB3 01 112 JB-03-01-F-112-016A Layer 1 - Brown 9x9 floor tile JB3 01 101 JB-03-01-F-101-017A Layer 3 - Brown 9x9 floor tile JB3 01 107 JB-03-01-F-107-021A Layer 1 - Brown 9x9 floor tile JB3 01 105 JB-03-01-F-105-023A Layer 1 - Gray 12x12 floor tile JB3 01 H102 JB-03-01-F-H102-026A Layer 1- Green 9x9 floor tile JB3 01 100 JB-03-01-F-100-027A Layer 1 - Green 9x9 floor tile JB3 02 S202 JB-03-02-F-S202-028A Gray 12x12 floor tile, black mastic
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 Reinspection Inspection Logs
Client: Date: October 8, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-03-00-F-019-001A Light brown 12x12 floor tile, black mastic 00 019 Southeast corner of room 019
JB-03-00-S-H004-002A Tan textured wall material 00 H004 East wall by elevator
JB-03-00-S-H004-003A Tan textured ceiling material 00 H004 Above 2x2 ceiling tile on east wall
JB-03-00-T-018-004A 2" elbow - white wrap, white block insulation 00 018 Southeast quadrant on air handling unit
JB-03-00-T-018-005A 2" vertical - white wrap, yellow fiberglass insulation 00 018 Southeast quadrant on air handling unit
JB-03-00-M-018-006A Brown vibration 00 018 Southwest corner of room 018 on air handler unit
JB-03-00-T-006-007A 6" elbow - white wrap, white block insulation 00 006 Southwest corner of room 006
JB-03-00-T-006-008A 6" vertical - brown wrap, brown insulation 00 006 Southwest corner of room 006
JB-03-00-T-011-009A 6" elbow - white wrap, white block insulation 00 011 Northeast quadrant of room 011
JB-03-00-T-011-010A 4" horizontal - white wrap, yellow fiberglass 00 011 Northeast quadrant of room 011
JB-03-00-F-012-011A Layer 1 - Gray 12x12 floor tile 00 012 Southwest corner of room 012
JB-03-00-F-012-011A Layer 2 - Yellow mastic 00 012 Southwest corner of room 012
JB-03-00-M-008-012A Black paneling material 00 008 Southeast quadrant of room 008 bathroom stall wall
JB-03-01-F-100-013A Layer 1 - Green 9x9 floor tile 01 100 Northeast corner of room 100
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 3 St. Louis V. A. Medical Center
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 3 St. Louis V. A. Medical Center
JB-03-01-F-100-013A Layer 2 - Black mastic 01 100 Northeast corner of room 100
JB-03-01-F-111-014A Layer 1 - Brown 9x9 floor tile, black mastic 01 111 Northeast corner of room 111 behind door
JB-03-01-F-111-014A Layer 2 - Black mastic 01 111 Northeast corner of room 111 behind door
JB-03-01-F-S102-015A Gray 12x12 floor tile, black mastic 01 S102 Northeast corner of room S102 behind door
JB-03-01-F-112-016A Layer 1 - Brown 9x9 floor tile 01 112 Northeast corner of room 112 behind door
JB-03-01-F-112-016A Layer 2 - Black mastic 01 112 Northeast corner of room 112 behind door
JB-03-01-F-101-017A Layer 1 - Tan 12x12 floor tile 01 101 Southwest quadrant of room 101 by door
JB-03-01-F-101-017A Layer 2 - Yellow mastic 01 101 Southwest quadrant of room 101 by door
JB-03-01-F-101-017A Layer 3 - Brown 9x9 floor tile 01 101 Southwest quadrant of room 101 by door
JB-03-01-F-101-017A Layer 4 - Black mastic 01 101 Southwest quadrant of room 101 by door
JB-03-01-T-109-018A Black mastic, piping 01 109 Above ceiling tile behind door
JB-03-01-M-109-019A Brown vibration isolator 01 109 Above ceiling tile behind door
JB-03-01-T-103-020A White wrap, brown cardboard insulation 01 103 Southwest corner of room 103 behind door in pipe chase
JB-03-01-F-107-021A Layer 1 - Brown 9x9 floor tile 01 107 In front of entrance to 107A
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 3 St. Louis V. A. Medical Center
JB-03-01-F-107-021A Layer 2 - Black mastic 01 107 In front of entrance to 107A
JB-03-01-F-106-022A Brown 9x9 floor tile, black mastic, felt 01 106 Southwest corner of room 106
JB-03-01-F-105-023A Layer 1 - Gray 12x12 floor tile 01 105 Southeast corner of room 105
JB-03-01-F-105-023A Layer 2 - Yellow mastic 01 105 Southeast corner of room 105
JB-03-01-F-105-023A Layer 3 - Brown 9x9 floor tile 01 105 Southeast corner of room 105
JB-03-01-F-105-023A Layer 4 - Black mastic 01 105 Southeast corner of room 105
JB-03-01-F-105-023A Layer 5 - Felt 01 105 Southeast corner of room 105
JB-03-01-F-126-024A Black mastic, brown 9x9 floor tile, black mastic, felt 01 126 Southwest corner of room 126
JB-03-01-F-125-025A Carpet adhesive, black mastic 01 125 Southwest corner of room 125
JB-03-01-F-H102-026A Layer 1- Green 9x9 floor tile 01 H102 Northwest corner of room H102
JB-03-01-F-H102-026A Layer 2 - Black mastic 01 H102 Northwest corner of room H102
JB-03-01-F-100-027A Layer 1 - Green 9x9 floor tile 01 100 Southeast corner of room 100
JB-03-01-F-100-027A Layer 2 - Black mastic 01 100 Southeast corner of room 100
JB-03-02-F-S202-028A Gray 12x12 floor tile, black mastic 02 S202 Northeast corner of room S202
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 3 St. Louis V. A. Medical Center
JB-03-01-S-EXT-029A Tan textured material 01 Exterior Northeast quadrant of building
JB-03-03-S-RF-030A Gray roofing shingle, felt 03 Roof Southeast quadrant above entrance to building
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
BASEMENT
1st FLOOR
2ND FLOOR
ATTIC
2008 Reinspection Photographs
BUILDING 3
sample does not contain asbestos
JB-03-00-F-019-001A JB-03-00-S-H004-002A
JB-03-00-S-H004-003A JB-03-00-T-018-004A
sample contains asbestos
JB-03-00-T-018-005A JB-03-00-M-018-006A
JB-03-00-T-006-007A JB-03-00-T-006-008A
JB-03-00-T-011-009A JB-03-00-T-011-010A
JB-03-00-F-012-011A JB-03-00-M-008-012A
JB-03-01-F-100-013A JB-03-01-F-111-014A
JB-03-01-F-S102-015A JB-03-01-F-112-016A
JB-03-01-F-101-017A JB-03-01-T-109-018A
JB-03-01-M-109-019A JB-03-01-T-103-020A
JB-03-01-F-107-021A JB-03-01-F-106-022A
JB-03-01-F-105-023A JB-03-01-F-126-024A
JB-03-01-F-125-025A JB-03-01-F-H102-026
JB-03-01-F-100-027A JB-03-02-F-S202-028A
JB-03-00-S-EXT-029A
JB-03-00-S-RF-030A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805097
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/09/08 4:15 PM
VAMC Reinspection VAMC Reinspection JB Building 03 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/10/2008Analysis Date:
Report Date: 10/10/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-00-F-019-
001A floortile 390805097-0001 lt brn 12x12 ft blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
JB-03-00-F-019-
001A adhesive 390805097-0001A lt brn 12x12 ft blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)86% Quartz2%
JB-03-00-S-H004-
002A 390805097-0002 tan textured wall material
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-00-S-H004-
003A 390805097-0003 tan textured ceiling material
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-00-T-018-
004A 390805097-0004
2" elbow wht wrap/wht block insulation
White None Detected
Non-Fibrous
Heterogeneous
Fibrous (other)3% Min. Wool37%
Non-fibrous (other)60%
JB-03-00-T-018-
005A 390805097-0005
2" vert pipe/wht wrap/ylw fiberglass insulation
Various None Detected
Fibrous
Heterogeneous
Cellulose4% Glass2% Min. Wool86%
Non-fibrous (other)8%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (14) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805097
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/09/08 4:15 PM
VAMC Reinspection VAMC Reinspection JB Building 03 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/10/2008Analysis Date:
Report Date: 10/10/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-00-M-018-
006A 390805097-0006 brown vibrator Brown None Detected
Fibrous
Heterogeneous
Fibrous (other)89% Non-fibrous (other)11%
JB-03-00-T-006-
007A 390805097-0007
6" elbow/wht wrap/wht block insulation
White Fibrous
Heterogeneous
Chrysotile38%Fibrous (other)6% Gypsum48% Non-fibrous (other)8%
JB-03-00-T-006-
008A 390805097-0008
6" vert pipe/brn wrap/brn insulation
Brown None Detected
Fibrous
Heterogeneous
Cellulose81% Fibrous (other)6% Synthetic4%
Non-fibrous (other)9%
JB-03-00-T-011-
009A 390805097-0009
6" elbow/wht wrap/wht block insulation
White None Detected
Non-Fibrous
Heterogeneous
Fibrous (other)3% Min. Wool37%
Non-fibrous (other)60%
JB-03-00-T-011-
010A 390805097-0010
4" hz pipe/wht wrap/ylw fiberglass insulation
Various None Detected
Fibrous
Heterogeneous
Cellulose4% Glass2% Min. Wool86%
Non-fibrous (other)8%
JB-03-00-F-012-
011A floortile 390805097-0011 gray 12x12 ft Gray Non-Fibrous
Heterogeneous
Chrysotile6%Non-fibrous (other)94%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805097
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/09/08 4:15 PM
VAMC Reinspection VAMC Reinspection JB Building 03 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/10/2008Analysis Date:
Report Date: 10/10/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-00-F-012-
011A adhesive 390805097-0011A gray 12x12 ft Yellow None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-00-M-008-
012A 390805097-0012 black paneling material
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805099
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/09/08 4:15 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 03 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/10/2008Analysis Date:
Report Date: 10/10/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-01-F-100-
013A floortile 390805099-0001 grn 9x9 ft blk mastic
Green Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-03-01-F-100-
013A adhesive 390805099-0001A grn 9x9 ft blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-03-01-F-111-
014A floortile 390805099-0002 brn 9x9 ft blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-03-01-F-111-
014A adhesive 390805099-0002A brn 9x9 ft blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-03-01-F-S102-
015A floortile 390805099-0003 gray 12x12 ft blk mastic
Gray Non-Fibrous
Heterogeneous
Chrysotile7%Non-fibrous (other)93%
JB-03-01-F-S102-
015A adhesive 390805099-0003A gray 12x12 ft blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-03-01-F-112-
016A floortile 390805099-0004 brn 9x9 ft blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (8)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805099
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/09/08 4:15 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 03 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/10/2008Analysis Date:
Report Date: 10/10/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-01-F-112-
016A adhesive 390805099-0004A brn 9x9 ft blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose4% Non-fibrous (other)96%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (8)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805135
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/10/08 5:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 03 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/13/2008Analysis Date:
Report Date: 10/13/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-01-F-101-
017A flooring 390805135-0001 tan 12x12/ylw mastic/wood/brn 9x9/blk mastic
Tan None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-01-F-101-
017A adhesive 390805135-0001A tan 12x12/ylw mastic/wood/brn 9x9/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)96% Quartz2%
JB-03-01-F-101-
017A floortile 390805135-0001B tan 12x12/ylw mastic/wood/brn 9x9/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-03-01-F-101-
017A adhesive 390805135-0001C tan 12x12/ylw mastic/wood/brn 9x9/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-03-01-T-109-
018A 390805135-0002 blk mastic on piping
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose9% Non-fibrous (other)91%
JB-03-01-M-109-
019A 390805135-0003 brn vibration isolator
Brown None Detected
Fibrous
Heterogeneous
Fibrous (other)89% Non-fibrous (other)11%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (25)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805135
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/10/08 5:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 03 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/13/2008Analysis Date:
Report Date: 10/13/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-01-T-103-
020A 390805135-0004 wht wrap/brn cardboard insulation
Various None Detected
Fibrous
Heterogeneous
Cellulose88% Fibrous (other)4% Hair6%
Non-fibrous (other)2%
JB-03-01-F-107-
021A floortile 390805135-0005 brn 9x9 w/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-03-01-F-107-
021A adhesive 390805135-0005A brn 9x9 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-03-01-F-106-
022A flooring 390805135-0006 brn 9x9 w/blk mastic/felt/wood
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose17% Non-fibrous (other)83%
JB-03-01-F-106-
022A adhesive 390805135-0006A brn 9x9 w/blk mastic/felt/wood
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-01-F-106-
022A felt 390805135-0006B brn 9x9 w/blk mastic/felt/wood
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose49% Non-fibrous (other)51%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805135
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/10/08 5:45 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 03 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/13/2008Analysis Date:
Report Date: 10/13/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-03-01-F-105-
023A floortile 390805135-0007 grey 12x12/ylw mastic/wood/brn 9x9/bm/felt/wood
Gray Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-03-01-F-105-
023A adhesive 390805135-0007A grey 12x12/ylw mastic/wood/brn 9x9/bm/felt/wood
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-03-01-F-105-
023A flooring 390805135-0007B grey 12x12/ylw mastic/wood/brn 9x9/bm/felt/wood
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose17% Non-fibrous (other)83%
JB-03-01-F-105-
023A adhesive 390805135-0007C grey 12x12/ylw mastic/wood/brn 9x9/bm/felt/wood
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-03-01-F-105-
023A felt 390805135-0007D grey 12x12/ylw mastic/wood/brn 9x9/bm/felt/wood
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose47% Synthetic2%
Non-fibrous (other)51%
JB-03-01-F-126-
024A flooring 390805135-0008 blk mastic/wood/brn 9x9/blk mastic/felt/wood
Brown None Detected
Non-Fibrous
Heterogeneous
Cellulose17% Non-fibrous (other)83%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.