36C25518Q0169 00002 08-14529 JB Bldg 07 Report.pdf

View the file

Other files

File Type Posted
36C25518C0113-000.docx DOCX document
36C25518Q0169-00003004.pdf PDF
36C25518Q0169-00003005.pdf PDF
36C25518Q0169-00003007.pdf PDF
36C25518Q0169-00003010.pdf PDF
36C25518Q0169-00003008.pdf PDF
36C25518Q0169-00003000.docx DOCX document
36C25518Q0169-00003002.pdf PDF
36C25518Q0169-00003003.pdf PDF
36C25518Q0169-00003001.pdf PDF
36C25518Q0169-00003009.pdf PDF
36C25518Q0169-00003006.pdf PDF
36C25518Q0169-00002033.pdf PDF
36C25518Q0169-00002050.pdf PDF
36C25518Q0169-00002031.pdf PDF
36C25518Q0169-00002055.pdf PDF
36C25518Q0169-00002047.pdf PDF
36C25518Q0169-00002053.pdf PDF
36C25518Q0169-00002038.pdf PDF
36C25518Q0169-00002045.pdf PDF
36C25518Q0169-00002039.pdf PDF
36C25518Q0169-00002052.pdf PDF
36C25518Q0169-00002037.pdf PDF
36C25518Q0169-00002032.pdf PDF
36C25518Q0169-00002036.pdf PDF
36C25518Q0169-00002040.pdf PDF
36C25518Q0169-00002043.pdf PDF
36C25518Q0169-00002042.pdf PDF
36C25518Q0169-00002048.pdf PDF
36C25518Q0169-00002028.docx DOCX document
36C25518Q0169-00002054.pdf PDF
36C25518Q0169-00002041.pdf PDF
36C25518Q0169-00002058.pdf PDF
36C25518Q0169-00002030.pdf PDF
36C25518Q0169-00002049.pdf PDF
36C25518Q0169-00002046.pdf PDF
36C25518Q0169-00002044.pdf PDF
36C25518Q0169-00002057.pdf PDF
36C25518Q0169-00002029.pdf PDF
36C25518Q0169-00002051.pdf PDF
36C25518Q0169-00002034.pdf PDF
36C25518Q0169-00002056.pdf PDF
36C25518Q0169-00001000.docx DOCX document
36C25518Q0169-004.pdf PDF
36C25518Q0169-002.pdf PDF
36C25518Q0169-001.docx DOCX document
36C25518Q0169-003.pdf PDF
36C25518Q0169-000.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS ASSESSMENT

ASBESTOS REINSPECTION REPORT

Jefferson Barracks Division 1 Jefferson Barracks Drive

St. Louis, Missouri

Building 7

Prepared for:

St. Louis V. A. Medical Center 1 Jefferson Barracks Drive

St. Louis, Missouri

Prepared by:

1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867

(888) 776-0670 (318) 687-3771

INTRODUCTION

2008 ASBESTOS REINSPECTION REPORT

ST. LOUIS V. A. MEDICAL CENTER

JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS

SCOPE OF WORK

1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.

2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).

3. Each facility inspection was performed by an accredited inspector.

4. For each facility, the inspector performed the following tasks:

a. Visually reinspected and reassessed the condition of all friable known or assumed

ACBM.

b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.

c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.

d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.

e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.

f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.

g. Reassessed the condition of friable known or assumed ACBM previously identified.

h. Recorded above information on field inspection forms for each facility.

5. A Management Planner reviewed the above information and performed the following required functions:

a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.

b. Reviewed the results of each reinspection and assessment.

c. Recommended in writing, the appropriate response actions.

d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.

6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.

a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.

b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.

c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.

MANAGEMENT PLAN RECOMMENDATIONS

The following general notes are for all facilities inspected during the Asbestos Reinspection.

These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.

1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.

2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.

3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.

4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.

5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.

Provide a copy of the notification to each facility and include a copy in the Management Plan.

6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.

7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.

8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.

9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.

10. The existing Management Plan (original) is updated by this Three-Year Reinspection.

All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.

11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.

12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.

13. Notification should be provided to “outside contractors” about ACM within the facility.

This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.

14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.

A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.

15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.

REPORT SECTION

This report includes the following sections:

ACM Homogeneous Areas Summary Table and Drawings

This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.

Condition and Removal Priority Table

This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.

Master Summary Table – Asbestos Bulk Samples

This table provides a listing of all asbestos bulk samples taken to date.

Asbestos-Containing Bulk Samples

This table provides a listing of all asbestos-containing bulk samples.

2008 Reinspection – Inspection Logs

This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.

Bulk Sample Location Drawings

This section provides drawings with sample locations for all asbestos bulk samples.

2008 Reinspection – Photographs

This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.

2008 Reinspection – Laboratory Reports

This section provides all laboratory analytical results.

Certifications

This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.

Periodic Surveillance Forms

This section includes the forms completed during the periodic surveillance inspections required every six (6) months.

Management Plan Updates

This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.

Response Actions

This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.

Training Documents

This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.

Annual Notification Letters

This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.

Initial Inspection

This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.

CONTRACTORS

This 2008 Asbestos Reinspection was provided by:

Contractor: Subcontractor:

FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.

1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047

(888) 776-0670 (Office) (318) 687-3771 (Office)

(877) 776-0670 (Fax) (318) 687-9923 (Fax)

INSPECTORS:

Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348

Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589

Justin L. Holcomb LA Certificate No. 9I00306

MANAGEMENT PLANNER:

Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner

Accreditation Agency: Louisiana Department of Environmental Quality

ACM Homogeneous Areas Summary Table and Drawings

JEFFERSON BARRACKS DIVISION

2008 THREE-YEAR ASBESTOS REINSPECTION

ACM HOMOGENEOUS AREAS SUMMARY TABLE

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

1 HMA-01 9x9 Floor Tile & Adhesive HMA-02 Exterior Plaster Coating HMA-03 Roofing Mastic

HMA-04 Pipe Insulation & Fittings HMA-05 Pipe Fittings HMA-06 Transite

Building 7

1st FLOOR

ST. LOUIS V.A. MEDICAL CENTER

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI 01-07-JB cardboard wrap pipe lagging 265 lf 0 4.00 01-07-JB mudded joint ftg on cardboard lag 0 ea 19 4.00

01A-04-JB cardboard wrap pipe lagging 58 lf 0 4.00 01A-04-JB mudded joint ftg on cardboard lag 0 ea 12 4.00

07-07-JB cardboard wrap pipe lagging 30 lf 0 4.00 07-07-JB mudded joint ftg on cardboard lag 0 ea 5 4.00

09-07-JB cardboard wrap pipe lagging 45 lf 0 4.00 09-07-JB mudded joint ftg on cardboard lag 0 ea 3 4.00

10-07-JB cardboard wrap pipe lagging 30 lf 0 4.00 10-07-JB mudded joint ftg on cardboard lag 0 ea 3 4.00

11-07-JB cardboard wrap pipe lagging 15 lf 0 4.00 11-07-JB mudded joint ftg on cardboard lag 0 ea 7 4.00

11A-07-JB cardboard wrap pipe lagging 10 lf 0 4.00

12-07-JB cardboard wrap pipe lagging 25 lf 0 4.00

13-07-JB cardboard wrap pipe lagging 45 lf 0 4.00 13-07-JB mudded joint ftg on cardboard lag 0 ea 2 4.00

523 51

Building 7

TOTALS

Condition and Removal Priority Table

Qualitative Ranking Numerical Rating

Good 8, 9, 10

Fair 4, 5, 6, 7

Poor 1, 2, 3

Physical Disturbance Environmental Disturbance

Low 1, 2, 3

Medium 4, 5, 6, 7

High 8, 9, 10

Qualitative Ranking Numerical Rating High 1, 2, 3

Medium 4, 5, 6, 7

Low 8, 9, 10

1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition

2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance

Assessment FactorsQualitative Ranking Numerical Rating

Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.

Address with on-going maintenance procedures

Maintain in good condition

Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..

3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority

Description of Current Condition Address short-term

Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Accessibility: accessibility during normal operations

Activities: activities that people do and how often they do them

Vibration: vibration from operating machinery, HVAC equipment, and so forth

Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material

Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix

Water Damage: water damage from leaking roof, pipe or other source

2008 THREE-YEAR ASBESTOS REINSPECTION

CONDITION AND REMOVAL PRIORITY TABLE

Rating Based On Rating Based On

HMA-01 7 1 9x9 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7

HMA-02 7 1 Exterior Plaster Coating No Yes 9 Condition 2 Accessibility 9

HMA-03 7 1 Roofing Mastic No Restricted 10 Condition 1 Accessibility 10

HMA-04 7 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-05 7 1 Pipe Fittings Yes No 7 Damage 2 Access 6

HMA-06 7 1 Transite No No 10 Intact 1 Access 9

Material Description Removal Priority 3

Current Condition 1

Building 7

Friable Yes/No

Accessibility Yes/No

Restricted

Potential for Disturbance 2

Homogeneous Area No. Bldg Floor

Master Summary Table Asbestos Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

JB7 01 4 JB-07-01-M-4-16 White/brown gypsum drywall JB7 01 1A JB-7-01-M-1A-08 4" black cove base JB7 01 1A JB-7-01-M-1A-09 White mastic JB7 01 4 JB-7-01-M-4-13 2x2 rough w/worm & pinhole ceiling tile JB7 01 5 JB-7-01-M-5-14 2x4 rough w/worm & pinhole ceiling tile JB7 01 5 JB-7-01-M-5-15 4" brown cove base JB7 01 1 JB-7-01-S-1-07 White hardwall plaster JB7 01 1 JB-7-01-T-1-01 Cardboard wrap pipe lagging JB7 01 1 JB-7-01-T-1-02 Gray TSI JB7 01 1 JB-7-01-T-1-03 Gray TSI JB7 01 1 JB-7-01-T-1-04 Mudded joint fitting on cardboard lagging JB7 01 1 JB-7-01-T-1-05 Off-white TSI JB7 01 1 JB-7-01-T-1-06 White TSI JB7 01 2 JB-7-01-T-2-10 Mudded joint fitting on fiberglass JB7 01 2 JB-7-01-T-2-11 Gray TSI JB7 01 2 JB-7-01-T-2-12 Gray TSI

JB7 1 1A JB-07-01-F-1A-001A Layer 1 - Blue 9x9 floor tile JB7 1 1A JB-07-01-F-1A-001A Layer 2 - Black mastic JB7 1 1 JB-07-01-F-1-002A Layer 1 - Blue 9x9 floor tile JB7 1 1 JB-07-01-F-1-002A Layer 2 - Black mastic JB7 1 1 JB-07-01-F-1-003A Layer 1 - Blue 9x9 floor tile JB7 1 1 JB-07-01-F-1-003A Layer 2 - Black mastic JB7 1 1 JB-07-01-T-1-004A 10" horizontal - white wrap, foil backing JB7 1 2 JB-07-01-M-2-005A Gray transite panel JB7 1 4 JB-07-01-F-4-006A Tan 12x12 floor tile, yellow mastic, floor leveling compound JB7 1 6 JB-07-01-F-6-007A Tan 12x12 floor tile, yellow mastic, floor leveling compound JB7 1 6 JB-07-01-F-6-008A Tan 12x12 floor tile, yellow mastic JB7 1 7 JB-07-01-T-7-009A Cardboard wrap insulation JB7 1 7 JB-07-01-T-7-010A 2" horizontal - white wrap, white block insulation JB7 1 11A JB-07-01-T-11A-011A Layer 1 - Gray insulation JB7 1 11A JB-07-01-T-11A-011A Layer 2- White wrap JB7 1 11A JB-07-01-T-11A-012A White wrap, yellow fiberglass insulation JB7 1 Exterior JB-07-01-S-14-013A Tan plaster material and tape JB7 1 Exterior JB-07-01-S-14-014A Tan plaster material JB7 1 Exterior JB-07-01-S-14-015A Tan plaster material JB7 Roof Roof JB-07-01-S-14-016A Layer 1 - Black and gray flashing material JB7 Roof Roof JB-07-01-S-14-016A Layer 2- Black tar

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

1994 Initial Asbestos Inspection

2008 Asbestos Reinspection

Asbestos-Containing Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

LIST OF ASBESTOS-CONTAINING SAMPLES

Building Floor Room Sample ID Material Description

JB7 01 1 JB-7-01-T-1-01 Cardboard wrap pipe lagging JB7 01 1 JB-7-01-T-1-02 Gray TSI JB7 01 1 JB-7-01-T-1-03 Gray TSI JB7 01 1 JB-7-01-T-1-04 Mudded joint fitting on cardboard lagging JB7 01 1 JB-7-01-T-1-05 Off-white TSI JB7 01 1 JB-7-01-T-1-06 White TSI

JB7 1 1A JB-07-01-F-1A-001A Layer 1 - Blue 9x9 floor tile JB7 1 1 JB-07-01-F-1-002A Layer 1 - Blue 9x9 floor tile JB7 1 1 JB-07-01-F-1-003A Layer 1 - Blue 9x9 floor tile JB7 1 2 JB-07-01-M-2-005A Gray transite panel JB7 1 7 JB-07-01-T-7-009A Cardboard wrap insulation JB7 1 7 JB-07-01-T-7-010A 2" horizontal - white wrap, white block insulation JB7 1 11A JB-07-01-T-11A-011A Layer 1 - Gray insulation JB7 1 Exterior JB-07-01-S-14-013A Tan plaster material and tape JB7 1 Exterior JB-07-01-S-14-014A Tan plaster material JB7 1 Exterior JB-07-01-S-14-015A Tan plaster material JB7 Roof Roof JB-07-01-S-14-016A Layer 1 - Black and gray flashing material

2008 Asbestos Reinspection

1994 Initial Asbestos Inspection

2008 Reinspection Inspection Logs

Client: Date: September 9, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

JB-07-01-F-1A-001A Layer 1 - Blue 9x9 floor tile 1 1A West wall of room 1A under window

JB-07-01-F-1A-001A Layer 2 - Black mastic 1 1A West wall of room 1A under window

JB-07-01-F-1-002A Layer 1 - Blue 9x9 floor tile 1 1 Southeast quadrant by east wall

JB-07-01-F-1-002A Layer 2 - Black mastic 1 1 Southeast quadrant by east wall

JB-07-01-F-1-003A Layer 1 - Blue 9x9 floor tile 1 1 West wall outside room 1A under water fountain

JB-07-01-F-1-003A Layer 2 - Black mastic 1 1 West wall outside room 1A under water fountain

JB-07-01-T-1-004A 10" horizontal - white wrap, foil backing 1 1 East wall by double windows at ceiling

JB-07-01-M-2-005A Gray transite panel 1 2 Northwest quadrant by roll-up door west wall

JB-07-01-F-4-006A Tan 12x12 floor tile, yellow mastic, floor leveling compound 1 4 South end of room 4 west of bathroom door

JB-07-01-F-6-007A Tan 12x12 floor tile, yellow mastic, floor leveling compound 1 6 Northwest quadrant by lockers

JB-07-01-F-6-008A Tan 12x12 floor tile, yellow mastic 1 6 Southwest quadrant at door entrance

JB-07-01-T-7-009A Cardboard wrap insulation 1 7 Northeast corner of room 7 above plaster ceiling

JB-07-01-T-7-010A 2" horizontal - white wrap, white block insulation 1 7 Northeast corner of room 7 above plaster ceiling

JB-07-01-T-11A-011A Layer 1 - Gray insulation 1 11A In center of room at ceiling next to roll-up door machine

JB-07-01-T-11A-011A Layer 2 - White wrap 1 11A In center of room at ceiling next to roll-up door machine

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 7 St. Louis V. A. Medical Center

Client: Date: September 9, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 7 St. Louis V. A. Medical Center

JB-07-01-T-11A-012A White wrap, yellow fiberglass insulation 1 11A Center south wall at ceiling

JB-07-01-S-14-013A Tan plaster material and tape 1 Exterior Wall North exterior wall of room 13

JB-07-01-S-14-014A Tan plaster material 1 Exterior Wall In center of east wall exterior below double windows

JB-07-01-S-14-015A Tan plaster material 1 Exterior Wall Outside room 2 south of door west wall

JB-07-01-S-14-016A Layer 1 - Black and gray flashing material Roof Roof Southeast corner of roof of building 7 that is running north and south

JB-07-01-S-14-016A Layer 2 - Black tar Roof Roof Southeast corner of roof of building 7 that is running north and south

GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3

Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:

Bulk Sample Location Drawings

1st FLOOR

2008 Reinspection Photographs

BUILDING 7

sample does not contain asbestos

JB-07-01-F-1A-001A JB-07-01-F-1-002A

JB-07-01-F-1-003A JB-07-01-T-1-004A

sample contains asbestos

JB-07-01-M-2-005A JB-07-01-F-4-006A

JB-07-01-F-4-007A JB-07-01-F-6-008A

JB-07-01-T-7-009A and JB-07-01-T-7- 010A JB-07-01-T-11A-011A

JB-07-01-T-11A-012A JB-07-01-S-14-013A

JB-07-01-S-14-014A JB-07-01-S-14-015A

JB-07-01-S-14-016A

2008 Reinspection Laboratory Reports

Sample Location Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804541

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 09/16/08 5:00 PM

08-14529 VAMC Reinspection - JB - Building #7

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/17/2008Analysis Date:

Report Date: 9/17/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-07-01-F-1A-

001A Floortile 390804541-0001

BLUE 9X9 FT,

BLACK MASTIC

Blue Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-07-01-F-1A-

001A Adhesive 390804541-0001A

BLUE 9X9 FT,

BLACK MASTIC

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

JB-07-01-F-1-002A

Floortile 390804541-0002

BLUE 9X9 FT,

BLACK MASTIC

Blue Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-07-01-F-1-002A

Adhesive 390804541-0002A

BLUE 9X9 FT,

BLACK MASTIC

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

JB-07-01-F-1-003A

Floortile 390804541-0003

BLUE 9X9 FT,

BLACK MASTIC

Blue Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-07-01-F-1-003A

Adhesive 390804541-0003A

BLUE 9X9 FT,

BLACK MASTIC

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

Sue Ferrario (27) mailto:saintlouislab@emsl.com

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804541

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 09/16/08 5:00 PM

08-14529 VAMC Reinspection - JB - Building #7

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/17/2008Analysis Date:

Report Date: 9/17/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-07-01-T-1-004A

390804541-0004

WHITE WRAP,

FOIL BACKING,

WHITE TSI 10"

H2 PIPE

White None Detected

Non-Fibrous Heterogeneous

Cellulose24% Glass10% Synthetic2%

Non-fibrous (other)64%

JB-07-01-M-2-005A

390804541-0005

GRAY TRANSITE

PANEL

Gray Non-Fibrous Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-07-01-F-4-006A

Floortile 390804541-0006

12X12 TAN FT,

YELLOW

MASTIC, FL

LEVELING

COMPOUND

Tan None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-07-01-F-4-006A

Adhesive 390804541-0006A

12X12 TAN FT,

YELLOW

MASTIC, FL

LEVELING

COMPOUND

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

JB-07-01-F-4-007A

Floortile 390804541-0007

12X12 TAN FT,

YELLOW

MASTIC, FL

LEVELING

COMPOUND

Tan None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-07-01-F-4-007A

Adhesive 390804541-0007A

12X12 TAN FT,

YELLOW

MASTIC, FL

LEVELING

COMPOUND

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804541

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 09/16/08 5:00 PM

08-14529 VAMC Reinspection - JB - Building #7

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/17/2008Analysis Date:

Report Date: 9/17/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-07-01-F-6-008A

Floortile 390804541-0008

12X12 TAN FT,

YELLOW MASTIC

Tan None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-07-01-F-6-008A

Adhesive 390804541-0008A

12X12 TAN FT,

YELLOW MASTIC

Yellow None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-07-01-T-7-009A

Pipewrap 390804541-0009

CARDBOARD

WRAP

INSULATION

Gray Fibrous

Heterogeneous

Chrysotile59%Cellulose9% Non-fibrous (other)32%

JB-07-01-T-7-009A

Pipewrap 390804541-0009A

CARDBOARD

WRAP

INSULATION

Brown None Detected

Non-Fibrous

Heterogeneous

Cellulose40% Synthetic9%

Non-fibrous (other)51%

JB-07-01-T-7-010A

390804541-0010

2" HZ. PIPE

WHITE WRAP

WHITE BLOCK

INSULATION

White Non-Fibrous Heterogeneous

Chrysotile29%Gypsum69% Non-fibrous (other)2%

JB-07-01-T-11A-

011A Insulation 390804541-0011

WHITE WRAP

GRAY

INSULATION

Gray Fibrous

Heterogeneous

Chrysotile89%Non-fibrous (other)11%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804541

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 09/16/08 5:00 PM

08-14529 VAMC Reinspection - JB - Building #7

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/17/2008Analysis Date:

Report Date: 9/17/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-07-01-T-11A-

011A Flatwrap, Pipewrap 390804541-0011A

WHITE WRAP

GRAY

INSULATION

White None Detected

Fibrous

Heterogeneous

Cellulose80% Fibrous (other)6% Synthetic8%

Non-fibrous (other)6%

JB-07-01-T-11A-

012A 390804541-0012

WHITE WRAP,

YELLOW

FIBERGLASS

INSULATION

Various None Detected

Non-Fibrous

Heterogeneous

Cellulose16% Glass8% Min. Wool58%

Non-fibrous (other)18%

JB-07-01-S-14-

013A Wall Material 390804541-0013

PLASTER

MATERIAL AND

TAPE TAN

Tan Non-Fibrous

Heterogeneous

Chrysotile12%Fibrous (other)4% Mica4% Non-fibrous (other)80%

JB-07-01-S-14-

013A Insulation 390804541-0013A

PLASTER

MATERIAL AND

TAPE TAN

Tan None Detected

Fibrous

Homogeneous

Glass100%

JB-07-01-S-14-014A

390804541-0014

TAN PLASTER

MATERIAL

Tan Non-Fibrous Heterogeneous

Chrysotile12%Fibrous (other)4% Mica4% Non-fibrous (other)80%

JB-07-01-S-14-

015A Wall Material 390804541-0015

TAN PLASTER

MATERIAL

Tan Non-Fibrous

Heterogeneous

Chrysotile12%Fibrous (other)4% Mica4% Non-fibrous (other)80%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804541

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

2920 Truly Lane Shreveport, LA 71138

Customer PO:

Received: 09/16/08 5:00 PM

08-14529 VAMC Reinspection - JB - Building #7

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/17/2008Analysis Date:

Report Date: 9/17/2008

EMSL Analytical, Inc.

11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com

JB-07-01-S-14-

015A Insulation 390804541-0015A

TAN PLASTER

MATERIAL

Tan None Detected

Fibrous

Homogeneous

Glass100%

JB-07-01-S-14-

016A Flashing 390804541-0016

BLACK AND

GRAY FLASHING

MATERIAL AND

BLACK TAR

Gray Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-07-01-S-14-

016A Felt, Tar 390804541-0016A

BLACK AND

GRAY FLASHING

MATERIAL AND

BLACK TAR

Black None Detected

Non-Fibrous

Heterogeneous

Cellulose30% Synthetic5%

Non-fibrous (other)65%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

THIS IS THE LAST PAGE OF THE REPORT.

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

Certifications