36C25518Q0169-00002050.pdf

PDF 9 MB Posted

Attached to
657-18-1-1582-0008 Asbestos Lead Survey - STL
Solicitation number
36C25518Q0169
Issued by

About this file

36C25518Q0169 00002 08-14529 JB Bldg 61 Report.pdf

View the file

Other files

File Type Posted
36C25518C0113-000.docx DOCX document
36C25518Q0169-00003004.pdf PDF
36C25518Q0169-00003005.pdf PDF
36C25518Q0169-00003007.pdf PDF
36C25518Q0169-00003010.pdf PDF
36C25518Q0169-00003008.pdf PDF
36C25518Q0169-00003000.docx DOCX document
36C25518Q0169-00003002.pdf PDF
36C25518Q0169-00003003.pdf PDF
36C25518Q0169-00003001.pdf PDF
36C25518Q0169-00003009.pdf PDF
36C25518Q0169-00003006.pdf PDF
36C25518Q0169-00002033.pdf PDF
36C25518Q0169-00002031.pdf PDF
36C25518Q0169-00002055.pdf PDF
36C25518Q0169-00002047.pdf PDF
36C25518Q0169-00002053.pdf PDF
36C25518Q0169-00002038.pdf PDF
36C25518Q0169-00002045.pdf PDF
36C25518Q0169-00002039.pdf PDF
36C25518Q0169-00002052.pdf PDF
36C25518Q0169-00002037.pdf PDF
36C25518Q0169-00002032.pdf PDF
36C25518Q0169-00002036.pdf PDF
36C25518Q0169-00002040.pdf PDF
36C25518Q0169-00002043.pdf PDF
36C25518Q0169-00002042.pdf PDF
36C25518Q0169-00002048.pdf PDF
36C25518Q0169-00002028.docx DOCX document
36C25518Q0169-00002054.pdf PDF
36C25518Q0169-00002035.pdf PDF
36C25518Q0169-00002041.pdf PDF
36C25518Q0169-00002058.pdf PDF
36C25518Q0169-00002030.pdf PDF
36C25518Q0169-00002049.pdf PDF
36C25518Q0169-00002046.pdf PDF
36C25518Q0169-00002044.pdf PDF
36C25518Q0169-00002057.pdf PDF
36C25518Q0169-00002029.pdf PDF
36C25518Q0169-00002051.pdf PDF
36C25518Q0169-00002034.pdf PDF
36C25518Q0169-00002056.pdf PDF
36C25518Q0169-00001000.docx DOCX document
36C25518Q0169-004.pdf PDF
36C25518Q0169-002.pdf PDF
36C25518Q0169-001.docx DOCX document
36C25518Q0169-003.pdf PDF
36C25518Q0169-000.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS ASSESSMENT

ASBESTOS REINSPECTION REPORT

Jefferson Barracks Division 1 Jefferson Barracks Drive

St. Louis, Missouri

Building 61

Prepared for:

St. Louis V. A. Medical Center 1 Jefferson Barracks Drive

St. Louis, Missouri

Prepared by:

1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867

(888) 776-0670 (318) 687-3771

INTRODUCTION

2008 ASBESTOS REINSPECTION REPORT

ST. LOUIS V. A. MEDICAL CENTER

JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS

SCOPE OF WORK

1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.

2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).

3. Each facility inspection was performed by an accredited inspector.

4. For each facility, the inspector performed the following tasks:

a. Visually reinspected and reassessed the condition of all friable known or assumed

ACBM.

b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.

c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.

d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.

e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.

f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.

g. Reassessed the condition of friable known or assumed ACBM previously identified.

h. Recorded above information on field inspection forms for each facility.

5. A Management Planner reviewed the above information and performed the following required functions:

a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.

b. Reviewed the results of each reinspection and assessment.

c. Recommended in writing, the appropriate response actions.

d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.

6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.

a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.

b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.

c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.

MANAGEMENT PLAN RECOMMENDATIONS

The following general notes are for all facilities inspected during the Asbestos Reinspection.

These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.

1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.

2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.

3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.

4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.

5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.

Provide a copy of the notification to each facility and include a copy in the Management Plan.

6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.

7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.

8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.

9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.

10. The existing Management Plan (original) is updated by this Three-Year Reinspection.

All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.

11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.

12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.

13. Notification should be provided to “outside contractors” about ACM within the facility.

This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.

14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.

A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.

15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.

REPORT SECTION

This report includes the following sections:

ACM Homogeneous Areas Summary Table and Drawings

This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.

Condition and Removal Priority Table

This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.

Master Summary Table – Asbestos Bulk Samples

This table provides a listing of all asbestos bulk samples taken to date.

Asbestos-Containing Bulk Samples

This table provides a listing of all asbestos-containing bulk samples.

2008 Reinspection – Inspection Logs

This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.

Bulk Sample Location Drawings

This section provides drawings with sample locations for all asbestos bulk samples.

2008 Reinspection – Photographs

This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.

2008 Reinspection – Laboratory Reports

This section provides all laboratory analytical results.

Certifications

This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.

Periodic Surveillance Forms

This section includes the forms completed during the periodic surveillance inspections required every six (6) months.

Management Plan Updates

This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.

Response Actions

This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.

Training Documents

This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.

Annual Notification Letters

This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.

Initial Inspection

This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.

CONTRACTORS

This 2008 Asbestos Reinspection was provided by:

Contractor: Subcontractor:

FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.

1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047

(888) 776-0670 (Office) (318) 687-3771 (Office)

(877) 776-0670 (Fax) (318) 687-9923 (Fax)

INSPECTORS:

Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348

Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589

Justin L. Holcomb LA Certificate No. 9I00306

MANAGEMENT PLANNER:

Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner

Accreditation Agency: Louisiana Department of Environmental Quality

ACM Homogeneous Areas Summary Table and Drawings

JEFFERSON BARRACKS DIVISION

2008 THREE-YEAR ASBESTOS REINSPECTION

ACM HOMOGENEOUS AREAS SUMMARY TABLE

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

Service Room & Pipe Space No ACM No ACM

HMA-07 Pipe Insulation & Fittings HMA-08 Gray/White Canvas Wrap

HMA-10 Black Tar on Ductwork No ACM

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

HMA-01 9x9 Floor Tile HMA-02 Black Mastic

HMA-03 12x12 Floor Tile & Adhesive HMA-04 12x12 Floor Tile

HMA-05 Transite Board HMA-07 Pipe Insulation & Fittings HMA-06 White Spray-On Ceiling Material HMA-11 Fire Door (Assumed)

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

2 No ACM HMA-05 Transite Board HMA-09 Mastic on Piping No ACM

Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials

Attic No ACM HMA-05 Transite Board HMA-07 Pipe Insulation & Fittings HMA-10 Black Tar on Ductwork HMA-12 Insulation on Spotlight Cords

Building 61 - Service Room & Pipe Space

Building 61 - 1st Floor

Building 61 - 2nd Floor

Building 61 - Attic

SERVICE ROOM AND PIPE SPACE

ST. LOUIS V.A. MEDICAL CENTER

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI G01-61-JB cardboard wrap pipe lagging 145 lf 0 2.00 G01-61-JB cardboard wrap pipe lagging 130 lf 0 4.00 G01-61-JB magnesia pipe lagging 155 lf 0 2.00 G01-61-JB magnesia pipe lagging 135 lf 0 6.00 G01-61-JB magnesia pipe lagging 130 lf 0 8.00 G01-61-JB magnesia pipe lagging 30 lf 0 12.00 G01-61-JB mudded joint fitting on mag pipe lag 0 ea 57 2.00 G01-61-JB mudded joint fitting on mag pipe lag 0 ea 57 4.00 G01-61-JB mudded joint fitting on mag pipe lag 0 ea 17 6.00 G01-61-JB mudded joint fitting on mag pipe lag 0 ea 20 8.00 G01-61-JB mudded joint fitting on mag pipe lag 0 ea 2 12.00 G01-61-JB tank insulation (hot water tank) 90 sf 0 2.00 G01-61-JB white canvas duct connector 18 sf 0 0.00

Z001-61-JB cardboard wrap pipe lagging 1125 lf 0 2.00 Z001-61-JB magnesia pipe lagging 675 lf 0 2.00 Z001-61-JB magnesia pipe lagging 475 lf 0 4.00 Z001-61-JB magnesia pipe lagging 650 lf 0 6.00 Z001-61-JB magnesia pipe lagging 600 lf 0 8.00 Z001-61-JB mudded joint fitting on mag pipe lag 0 ea 140 2.00 Z001-61-JB mudded joint fitting on mag pipe lag 0 ea 80 4.00 Z001-61-JB mudded joint fitting on mag pipe lag 0 ea 70 6.00 Z001-61-JB mudded joint fitting on mag pipe lag 0 ea 15 8.00 Z001-61-JB mudded joint tar ftg on fiberglas 0 ea 78 4.00 Z001-61-JB tar on fiberglas duct insulation 300 sf 0 2.00

4658 536

Building 61 - Service Room & Pipe Space

TOTALS

1st FLOOR

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI 101-61-JB cardboard wrap pipe lagging 3 lf 0 2.00 101-61-JB green canvas duct connector 10 sf 0 0.00 101-61-JB magnesia pipe lagging 10 lf 0 2.00 101-61-JB magnesia pipe lagging 7 lf 0 4.00 101-61-JB magnesia pipe lagging 18 lf 0 6.00 101-61-JB magnesia pipe lagging 23 lf 0 8.00 101-61-JB mudded joint fitting on mag pipe lag 0 ea 7 2.00 101-61-JB mudded joint fitting on mag pipe lag 0 ea 4 4.00 101-61-JB mudded joint fitting on mag pipe lag 0 ea 7 6.00

103-61-JB magnesia pipe lagging 1 lf 0 8.00 103-61-JB mudded joint fitting on mag pipe lag 0 ea 1 8.00

104-61-JB magnesia pipe lagging 20 lf 0 4.00

110-61-JB cardboard wrap pipe lagging 1 lf 0 2.00

114A-61-JB cardboard wrap pipe lagging 10 lf 0 2.00

121-61-JB magnesia pipe lagging 2 lf 0 6.00 121-61-JB mudded joint fitting on mag pipe lag 0 ea 1 6.00

128A-61-JB cardboard wrap pipe lagging 93 lf 0 2.00 128A-61-JB mudded joint tar ftg on fiberglas 0 ea 4 6.00

198 24

Building 61 - 1st Floor

2ND FLOOR

ATTIC

2008 THREE-YEAR REINSPECTION

THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE

Room # Description Qty S/LF Ftgs TH/DI A-61-JB cardboard wrap pipe lagging 40 lf 0 6.00 A-61-JB mudded joint tar ftg on fiberglas 0 ea 10 4.00 A-61-JB tar on fiberglas duct insulation 1000 sf 0 0.00 A-61-JB white canvas duct connector 2 sf 0 0.00

1042 10

Building 61 - Attic

Condition and Removal Priority Table

Qualitative Ranking Numerical Rating

Good 8, 9, 10

Fair 4, 5, 6, 7

Poor 1, 2, 3

Physical Disturbance Environmental Disturbance

Low 1, 2, 3

Medium 4, 5, 6, 7

High 8, 9, 10

Qualitative Ranking Numerical Rating High 1, 2, 3

Medium 4, 5, 6, 7

Low 8, 9, 10

1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition

2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance

Assessment FactorsQualitative Ranking Numerical Rating

Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.

Address with on-going maintenance procedures

Maintain in good condition

Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..

3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority

Description of Current Condition Address short-term

Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Accessibility: accessibility during normal operations

Activities: activities that people do and how often they do them

Vibration: vibration from operating machinery, HVAC equipment, and so forth

Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material

Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix

Water Damage: water damage from leaking roof, pipe or other source

2008 THREE-YEAR ASBESTOS REINSPECTION

CONDITION AND REMOVAL PRIORITY TABLE

Rating Based On Rating Based On

HMA-07 61 Service Room & Pipe Space Pipe Insulation & Fittings No Yes 10 Intact 2 Floor

Maintenance 7

HMA-08 61 Service Room & Pipe Space Gray/White Canvas Wrap Yes No 7 Damage 2 Access 6

HMA-10 61 Service Room & Pipe Space Black Tar on Ductwork No No 9 Condition 2 Access 9

HMA-01 61 1 9x9 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7

HMA-02 61 1 Black Mastic No No 10 Intact 1 Access 9

HMA-03 61 1 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7

HMA-04 61 1 12x12 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7

HMA-05 61 1 Transite Board No No 10 Intact 1 Access 9

HMA-07 61 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-06 61 1 White Spray-On Ceiling Material Yes No 10 Intact 2 Access 8

HMA-11 61 1 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10

HMA-05 61 2 Transite Board No No 10 Intact 1 Access 9

HMA-09 61 2 Mastic on Piping Yes No 7 Damage 2 Maintenance 6

Removal Priority 3

Building 61 - 1st Floor

Current Condition 1

Building 61 - Service Room & Pipe Space

Friable Yes/No

Accessibility Yes/No

Restricted

Potential for Disturbance 2

Homogeneous Area No. Bldg Floor Material Description

Building 61 - 2nd Floor

2008 THREE-YEAR ASBESTOS REINSPECTION

CONDITION AND REMOVAL PRIORITY TABLE

Removal Priority 3

Current Condition 1Friable Yes/No

Accessibility Yes/No

Restricted

Potential for Disturbance 2

Homogeneous Area No. Bldg Floor Material Description

HMA-05 61 Attic Transite Board No No 10 Intact 1 Access 9

HMA-07 61 Attic Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6

HMA-10 61 Attic Black Tar on Ductwork No No 9 Condition 2 Access 9

HMA-12 61 Attic Insulation on Spotlight Cords Yes No 8 Condition 1 Access 9

Building 61 - Attic

Master Summary Table Asbestos Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

JB61 01 128A JB-61-001-T-128A-19 Gray TSI JB61 01 104 JB-61-01-M-104-03 4" black cove base JB61 01 104 JB-61-01-M-104-04 2x2 gray worm ceiling tile JB61 01 104 JB-61-01-M-104-05 4" brown cove base JB61 01 108 JB-61-01-M-108-02 6" black cove base JB61 01 112 JB-61-01-M-112-07 2x2 gray rough textured ceiling tile JB61 01 112 JB-61-01-M-112-08 2x2 gray worm 2/pinholes ceiling tile JB61 01 113 JB-61-01-M-113A-06 Brown/white vinyl covered gypsum drywall partition JB61 01 121 JB-61-01-M-121-09 Gray cement asbestos pegboard JB61 01 121 JB-61-01-M-121-10 6" brown cove base JB61 01 131 JB-61-01-M-131-23 1x1 off-white coarse ceiling tile JB61 01 131 JB-61-01-M-131-24 1x1 gray worm w/pinhole ceiling tile JB61 01 H103 JB-61-01-M-H103-36 Brown batt insulation JB61 01 101 JB-61-01-S-101-01 White/off-white hardwall plaster JB61 01 121 JB-61-01-S-121-28 White spray-on surfacing material JB61 01 121 JB-61-01-S-121-29 White other JB61 01 121 JB-61-01-S-121-30 Off-white other JB61 01 132 JB-61-01-S-132-25 White dented surfacing material JB61 01 132 JB-61-01-S-132-26 White other JB61 01 132 JB-61-01-S-132-27 White other JB61 01 132 JB-61-01-S-132-31 White rough surfacing material JB61 01 132 JB-61-01-S-132-32 Off-white other JB61 01 132 JB-61-01-S-132-33 Off-white other JB61 01 132 JB-61-01-S-132-34 Off-white other JB61 01 132 JB-61-01-S-132-35 Off-white other JB61 01 101 JB-61-01-T-101-11 White/blue magnesia pipe lagging JB61 01 101 JB-61-01-T-101-12 White/blue TSI JB61 01 101 JB-61-01-T-101-13 White TSI JB61 01 101 JB-61-01-T-101-14 Gray/blue mudded joint fitting on magnesia pipe lagging JB61 01 101 JB-61-01-T-101-15 Gray TSI JB61 01 101 JB-61-01-T-101-16 Gray TSI JB61 01 101 JB-61-01-T-101-17 Gray cardboard wrap pipe lagging JB61 01 101 JB-61-01-T-101-20 Gray mudded joint fitting on cardboard lagging JB61 01 114A JB-61-01-T-114A-18 Gray TSI JB61 01 114A JB-61-01-T-114A-21 Gray TSI JB61 01 128A JB-61-01-T-128A-22 Gray TSI JB61 01 128A JB-61-01-T-128A-37 Black mudded joint tar fitting on fiberglass JB61 01 128A JB-61-01-T-128A-38 Black TSI JB61 01 128A JB-61-01-T-128A-39 Black TSI JB61 02 201 JB-61-02-M-201-05 1x1 black acoustical panel JB61 02 202 JB-61-02-M-202-02 6" black cove base JB61 02 207 JB-61-02-M-207-03 Gray cement asbestos pegboard JB61 02 H201 JB-61-02-M-H201-04 Brown batt insulation JB61 02 209 JB-61-02-S-209-01 Beige hardwall plaster

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

1994 Initial Asbestos Inspection

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

JB61 1 104 JB-61-01-F-104-001A Layer 1 - Green 9x9 floor tile JB61 1 104 JB-61-01-F-104-001A Layer 2 - Black mastic JB61 1 104 JB-61-01-F-104-002A Layer 1 - White 12x12 floor tile JB61 1 104 JB-61-01-F-104-002A Layer 2 - Black mastic JB61 1 104 JB-61-01-S-104-003A Black mastic JB61 1 107 JB-61-01-F-107-004A White 12x12 floor tile, black mastic JB61 1 104A JB-61-01-F-104A-005A Layer 1 - Green 9x9 floor tile JB61 1 104A JB-61-01-F-104A-005A Layer 2 - Black mastic JB61 1 104A JB-61-01-F-104A-006A Layer 1 - Green 9x9 floor tile JB61 1 104A JB-61-01-F-104A-006A Layer 2 - Black mastic JB61 1 H103 JB-61-01-F-H103-007A Layer 1 - Green 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-007A Layer 2 - Black mastic JB61 1 H103 JB-61-01-F-H103-008A Layer 1 -Black 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-008A Layer 2 - Black mastic JB61 1 H103 JB-61-01-F-H103-009A Layer 1 - Green 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-009A Layer 2 - Black mastic JB61 1 H103 JB-61-01-F-H103-010A Layer 1 - Black 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-010A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-011A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-011A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-012A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-012A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-013A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-013A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-014A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-014A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-015A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-015A Layer 2 - Black mastic JB61 1 131 JB-61-01-F-131-016A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-016A Layer 2 - Black mastic JB61 1 H101 JB-61-01-S-H101-017A White 2x2 peg board sheet of transite JB61 1 H101 JB-61-01-T-H101-018A Layer 1 - 3" vertical - black mastic JB61 1 H101 JB-61-01-T-H101-018A Layer 2 - 3" vertical - fiberglass insulation JB61 1 121 JB-61-01-F-121-019A Layer 1 - Brown 12x12 floor tile JB61 1 121 JB-61-01-F-121-019A Layer 2 - Black mastic JB61 1 125 JB-61-01-M-125-020A White vibration isolator JB61 1 132 JB-61-01-M-132-021A White spray-on material on ceiling JB61 1 133 JB-61-01-M-133-022A Green stage curtain JB61 1 133 JB-61-01-M-133-023A Brown stage curtain JB61 1 135 JB-61-01-F-135-024A Layer 1 - Red 9x9 floor tile JB61 1 135 JB-61-01-F-135-024A Layer 2 - Black mastic JB61 1 107A JB-61-01-F-107A-025A Black mastic JB61 1 101 JB-61-01-F-101-026A White 12x12 floor tile, yellow mastic JB61 1 103 JB-61-01-T-103-027A 6" elbow - white wrap, white block insulation JB61 1 101 JB-61-01-T-101-028A 2" elbow - black mastic, wrap

2008 Asbestos Reinspection

2008 THREE-YEAR ASBESTOS REINSPECTION

SUMMARY OF BULK SAMPLES TAKEN TO DATE

Building Floor Room Sample ID Material Description

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM

JB61 1 101 JB-61-01-M-101-029A White fabric JB61 1 101 JB-61-01-M-101-030A Green vibration isolator fabric JB61 0 G101 JB-61-00-T-G01-031A Layer 1 - Gray/white canvas wrap JB61 0 G101 JB-61-00-T-G01-031A Layer 2 - Yellow insulation JB61 0 G101 JB-61-00-M-G01-032A Green/white vibration isolator fabric JB61 2 206 JB-61-02-T-206-033A Black mastic on piping JB61 3 AS01 JB-61-03-T-AS01-034A 8" elbow - white wrap, white block insulation JB61 3 AS01 JB-61-03-T-AS01-035A Layer 1 - 8" horizontal - white wrap JB61 3 AS01 JB-61-03-T-AS01-035A Layer 2 - White block insulation JB61 3 AS01 JB-61-03-M-AS01-036A White insulation on spotlight cord JB61 2 Roof JB-61-02-S-RF-037A Gray roof flashing, black tar JB61 3 Roof JB-61-03-S-RF-038A Black roofing tar, felt

Asbestos-Containing Bulk Samples

2008 THREE-YEAR ASBESTOS REINSPECTION

LIST OF ASBESTOS-CONTAINING SAMPLES

Building Floor Room Sample ID Material Description

JB61 01 128A JB-61-001-T-128A-19 Gray TSI JB61 01 121 JB-61-01-M-121-09 Gray cement asbestos pegboard JB61 01 101 JB-61-01-T-101-11 White/blue magnesia pipe lagging JB61 01 101 JB-61-01-T-101-12 White/blue TSI JB61 01 101 JB-61-01-T-101-13 White TSI JB61 01 101 JB-61-01-T-101-16 Gray TSI JB61 01 101 JB-61-01-T-101-17 Gray cardboard wrap pipe lagging JB61 01 114A JB-61-01-T-114A-18 Gray TSI JB61 01 128A JB-61-01-T-128A-37 Black mudded joint tar fitting on fiberglass JB61 01 128A JB-61-01-T-128A-38 Black TSI JB61 01 128A JB-61-01-T-128A-39 Black TSI JB61 02 207 JB-61-02-M-207-03 Gray cement asbestos pegboard

JB61 1 104 JB-61-01-F-104-001A Layer 1 - Green 9x9 floor tile JB61 1 104 JB-61-01-F-104-002A Layer 1 - White 12x12 floor tile JB61 1 107 JB-61-01-F-107-004A White 12x12 floor tile, black mastic JB61 1 104A JB-61-01-F-104A-005A Layer 1 - Green 9x9 floor tile JB61 1 104A JB-61-01-F-104A-006A Layer 1 - Green 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-007A Layer 1 - Green 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-008A Layer 1 -Black 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-009A Layer 1 - Green 9x9 floor tile JB61 1 H103 JB-61-01-F-H103-010A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-011A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-012A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-013A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-014A Layer 1 - Black 9x9 floor tile JB61 1 131 JB-61-01-F-131-015A Layer 1 - White 9x9 floor tile JB61 1 131 JB-61-01-F-131-016A Layer 1 - Black 9x9 floor tile JB61 1 H101 JB-61-01-S-H101-017A White 2x2 peg board sheet of transite JB61 1 H101 JB-61-01-T-H101-018A Layer 1 - 3" vertical - black mastic JB61 1 121 JB-61-01-F-121-019A Layer 1 - Brown 12x12 floor tile JB61 1 132 JB-61-01-M-132-021A White spray-on material on ceiling JB61 1 135 JB-61-01-F-135-024A Layer 1 - Red 9x9 floor tile JB61 1 107A JB-61-01-F-107A-025A Black mastic JB61 0 G101 JB-61-00-T-G01-031A Layer 1 - Gray/white canvas wrap JB61 2 206 JB-61-02-T-206-033A Black mastic on piping JB61 3 AS01 JB-61-03-T-AS01-035A Layer 2 - White block insulation JB61 3 AS01 JB-61-03-M-AS01-036A White insulation on spotlight cord

1994 Initial Asbestos Inspection

2008 Asbestos Reinspection

2008 Reinspection Inspection Logs

Client: Date: September 18, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

JB-61-01-F-104-001A Layer 1 - Green 9x9 floor tile 1 104 Center of floor underneath access panel

JB-61-01-F-104-001A Layer 2 - Black mastic 1 104 Center of floor underneath access panel

JB-61-01-F-104-002A Layer 1 - White 12x12 floor tile 1 104 Northeast quadrant in front of door

JB-61-01-F-104-002A Layer 2 - Black mastic 1 104 Northeast quadrant in front of door

JB-61-01-S-104-003A Black mastic 1 104 Southeast quadrant above ceiling tile above window on brick wall

JB-61-01-F-107-004A White 12x12 floor tile, black mastic 1 107 Northwest corner of room 107 behind door

JB-61-01-F-104A-005A Layer 1 - Green 9x9 floor tile 1 104A South middle of wall in between both sets of windows

JB-61-01-F-104A-005A Layer 2 - Black mastic 1 104A South middle of wall in between both sets of windows

JB-61-01-F-104A-006A Layer 1 - Green 9x9 floor tile 1 104A Northwest corner of room 104A

JB-61-01-F-104A-006A Layer 2 - Black mastic 1 104A Northwest corner of room 104A

JB-61-01-F-H103-007A Layer 1 - Green 9x9 floor tile 1 H103 East end of hall H103 in corner by doors below pipes

JB-61-01-F-H103-007A Layer 2 - Black mastic 1 H103 East end of hall H103 in corner by doors below pipes

JB-61-01-F-H103-008A Layer 1 -Black 9x9 floor tile 1 H103 East end of hall H103 in corner by doors below pipes

JB-61-01-F-H103-008A Layer 2 - Black mastic 1 H103 East end of hall H103 in corner by doors below pipes

JB-61-01-F-H103-009A Layer 1 - Green 9x9 floor tile 1 H103 West end of hall H103 by doors to room 101

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 61 St. Louis V. A. Medical Center

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 61 St. Louis V. A. Medical Center

JB-61-01-F-H103-009A Layer 2 - Black mastic 1 H103 West end of hall H103 by doors to room 101

JB-61-01-F-H103-010A Layer 1 - Black 9x9 floor tile 1 H103 West end of H103 by the doors to room 101

JB-61-01-F-H103-010A Layer 2 - Black mastic 1 H103 West end of H103 by the doors to room 101

JB-61-01-F-131-011A Layer 1 - White 9x9 floor tile 1 131 Northeast corner by exit door

JB-61-01-F-131-011A Layer 2 - Black mastic 1 131 Northeast corner by exit door

JB-61-01-F-131-012A Layer 1 - Black 9x9 floor tile 1 131 Northeast corner by exit door

JB-61-01-F-131-012A Layer 2 - Black mastic 1 131 Northeast corner by exit door

JB-61-01-F-131-013A Layer 1 - White 9x9 floor tile 1 131 Southwest corner beside doors

JB-61-01-F-131-013A Layer 2 - Black mastic 1 131 Southwest corner beside doors

JB-61-01-F-131-014A Layer 1 - Black 9x9 floor tile 1 131 Southwest corner beside doors

JB-61-01-F-131-014A Layer 2 - Black mastic 1 131 Southwest corner beside doors

JB-61-01-F-131-015A Layer 1 - White 9x9 floor tile 1 131 East wall underneath water fountain

JB-61-01-F-131-015A Layer 2 - Black mastic 1 131 East wall underneath water fountain

JB-61-01-F-131-016A Layer 1 - Black 9x9 floor tile 1 131 East wall underneath water fountain

JB-61-01-F-131-016A Layer 2 - Black mastic 1 131 East wall underneath water fountain

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 61 St. Louis V. A. Medical Center

JB-61-01-S-H101-017A White 2x2 peg board sheet of transite 1 H101 On hallway wall straight across from entrance door

JB-61-01-T-H101-018A Layer 1 - 3" vertical - black mastic 1 H101 Above ceiling tile in H101 in front of entry door

JB-61-01-T-H101-018A Layer 2 - 3" vertical - fiberglass insulation 1 H101 Above ceiling tile in H101 in front of entry door

JB-61-01-F-121-019A Layer 1 - Brown 12x12 floor tile 1 121 Northwest corner of room 121 behind door

JB-61-01-F-121-019A Layer 2 - Black mastic 1 121 Northwest corner of room 121 behind door

JB-61-01-M-125-020A White vibration isolator 1 125 East wall behind HVAC

JB-61-01-M-132-021A White spray-on material on ceiling 1 132 Northeast corner above exit doors on ceiling in lobby

JB-61-01-M-133-022A Green stage curtain 1 133 South end of stage at the end of the curtain

JB-61-01-M-133-023A Brown stage curtain 1 133 South end of stage at the end of the curtain

JB-61-01-F-135-024A Layer 1 - Red 9x9 floor tile 1 135 South quadrant by middle of inside wall

JB-61-01-F-135-024A Layer 2 - Black mastic 1 135 South quadrant by middle of inside wall

JB-61-01-F-107A-025A Black mastic 1 107A Middle of room 107A

JB-61-01-F-101-026A White 12x12 floor tile, yellow mastic 1 101 Northwest corner beside water fountain

JB-61-01-T-103-027A 6" elbow - white wrap, white block insulation 1 103 Northeast corner of room 103 at ceiling

JB-61-01-T-101-028A 2" elbow - black mastic, wrap 1 101 South end of room 101 on HVAC unit - east side of unit

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 61 St. Louis V. A. Medical Center

JB-61-01-M-101-029A White fabric 1 101 South end of room 101 on pin setting machine #2

JB-61-01-M-101-030A Green vibration isolator fabric 1 101 South end of room 101 on HVAC unit

JB-61-00-T-G01-031A Layer 1 - Gray/white canvas wrap 0 G01 Northeast quadrant on airhandler unit S61-1

JB-61-00-T-G01-031A Layer 2 - Yellow insulation 0 G01 Northeast quadrant on airhandler unit S61-1

JB-61-00-M-G01-032A Green/white vibration isolator fabric 0 G01 Northeast quadrant inside airhandler unit S61-1

JB-61-02-T-206-033A Black mastic on piping 2 206 Southwest corner by door

JB-61-03-T-AS01-034A 8" elbow - white wrap, white block insulation 3 AS01 North wall above the end of catwalk

JB-61-03-T-AS01-035A Layer 1 - 8" horizontal - white wrap 3 AS01 North wall above the end of catwalk

JB-61-03-T-AS01-035A Layer 2 - White block insulation 3 AS01 North wall above the end of catwalk

JB-61-03-M-AS01-036A White insulation on spotlight cord 3 AS01 Southwest quadrant in attic above auditorium

JB-61-02-S-RF-037A Gray roof flashing, black tar 2 Roof Middle of building roof at base of roof vent

JB-61-03-S-RF-038A Black roofing tar, felt 3 Roof Northwest quadrant of roof by green tin roof

Address: 1 Jefferson Barracks Drive, St. Louis, Missouri

Note:

Sample ID Material Description Floor Room Location

ASBESTOS INSPECTION LOG

Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)

Jefferson Barracks Division - Building 61 St. Louis V. A. Medical Center

GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.

Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3

Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:

Bulk Sample Location Drawings

SERVICE ROOM AND PIPE SPACE

1st FLOOR

2ND FLOOR

ATTIC

2008 Reinspection Photographs

BUILDING 61

sample does not contain asbestos

JB-61-01-F-104-001A JB-61-01-F-104-002A

JB-61-01-S-104-003A JB-61-01-F-107-004A

sample contains asbestos

JB-61-01-F-104A-005A JB-61-01-F-104A-006A

JB-61-01-F-H103-007A JB-61-01-F-H103-008A

JB-61-01-F-H103-009A JB-61-01-F-H103-010A

JB-61-01-F-131-011A JB-61-01-F-131-012A

JB-61-01-F-131-013A JB-61-01-F-131-014A

JB-61-01-F-131-015A JB-61-01-F-131-016A

JB-61-01-S-H101-017A JB-61-01-T-H101-018A

JB-61-01-F-121-019A JB-61-01-M-125-020A

JB-61-01-S-132-021A JB-61-01-M-133-022A

JB-61-01-M-133-023A JB-61-01-F-135-024A

JB-61-01-F-107A-025A JB-61-01-F-101-026A

JB-61-01-T-103-027A JB-61-01-T-101-028A

JB-61-01-M-101-029A JB-61-01-M-101-030A

JB-61-00-T-G01-031A JB-61-00-M-G01-032A

JB-61-02-T-206-033A JB-61-03-T-A501-034A

JB-61-03-T-A501-035A JB-61-03-M-A501-036A

JB-61-03-S-RFT-037A

JB-61-03-S-RFT-038A

2008 Reinspection Laboratory Reports

Sample Location Appearance % Type

AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804635

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 09/19/08 4:15 PM

08-14529 VAMC Reinspection JB Building 61 1st floor (Corrected report issued 10/10/08.) (Corrected report issued 11/03/08) (Corrected report issued 11/21/08)

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/20/2008Analysis Date:

Report Date: 11/21/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-61-01-F-104-

001A floortile 390804635-0001

9x9 green fl tile w/black mastic over concrete

Green Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-104-

001A adhesive 390804635-0001A

9x9 green fl tile w/black mastic over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-104-

002A floortile 390804635-0002 white 12x12 ft w/black mastick over concrete

White Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-61-01-F-104-

002A adhesive 390804635-0002A white 12x12 ft w/black mastick over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-61-01-S-104-

003A 390804635-0003 black mastic on brick wall

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)96% Quartz4%

JB-61-01-F-107-

004A floortile 390804635-0004 white 12x12 ft w/black mastic over concrete

White Non-Fibrous

Heterogeneous

Chrysotile6%Non-fibrous (other)94%

JB-61-01-F-107-

004A adhesive 390804635-0004A white 12x12 ft w/black mastic over concrete

Black Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)79% Quartz2%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

Sue Ferrario (43) mailto:saintlouislab@emsl.com

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804635

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 09/19/08 4:15 PM

08-14529 VAMC Reinspection JB Building 61 1st floor (Corrected report issued 10/10/08.) (Corrected report issued 11/03/08) (Corrected report issued 11/21/08)

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/20/2008Analysis Date:

Report Date: 11/21/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-61-01-F-104A-

005A floortile 390804635-0005

9x9 green ft w/black mastic over concrete

Green Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-104A-

005A adhesive 390804635-0005A

9x9 green ft w/black mastic over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-104A-

006A floortile 390804635-0006

9x9 green ft w/black mastic over concrete

Green Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-104A-

006A adhesive 390804635-0006A

9x9 green ft w/black mastic over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-H103-

007A floortile 390804635-0007

9x9 green ft w/black mastic over concrete

Green Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-H103-

007A adhesive 390804635-0007A

9x9 green ft w/black mastic over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-H103-

008A floortile 390804635-0008

9x9 black ft w/black mastic over concrete

Black Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804635

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 09/19/08 4:15 PM

08-14529 VAMC Reinspection JB Building 61 1st floor (Corrected report issued 10/10/08.) (Corrected report issued 11/03/08) (Corrected report issued 11/21/08)

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/20/2008Analysis Date:

Report Date: 11/21/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-61-01-F-H103-

008A adhesive 390804635-0008A

9x9 black ft w/black mastic over concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-H103-

009A floortile 390804635-0009

9x9 green ft w/black mastic

Green Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-H103-

009A adhesive 390804635-0009A

9x9 green ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-H103-

010A floortile 390804635-0010

9x9 black ft w/black mastic

Black Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-61-01-F-H103-

010A adhesive 390804635-0010A

9x9 black ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-61-01-F-131-

011A floortile 390804635-0011 white 9x9 ft w/black mastic on concrete

White Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-131-

011A adhesive 390804635-0011A white 9x9 ft w/black mastic on concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804635

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 09/19/08 4:15 PM

08-14529 VAMC Reinspection JB Building 61 1st floor (Corrected report issued 10/10/08.) (Corrected report issued 11/03/08) (Corrected report issued 11/21/08)

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/20/2008Analysis Date:

Report Date: 11/21/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-61-01-F-131-

012A floortile 390804635-0012 black 9x9 ft w/black mastic on concrete

Black Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-61-01-F-131-

012A adhesive 390804635-0012A black 9x9 ft w/black mastic on concrete

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-F-131-

013A floortile 390804635-0013 white 9x9 ft w/black mastic

White Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-F-131-

013A adhesive 390804635-0013A white 9x9 ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)100%

JB-61-01-F-131-

014A floortile 390804635-0014 black 9x9 ft w/black mastic

Black Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-61-01-F-131-

014A adhesive 390804635-0014A black 9x9 ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-131-015A

floortile 390804635-0015 white 9x9 ft w/black mastic

White Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.

Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)

% Fibrous % Non-Fibrous

Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

390804635

Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.

10100 Woolworth Road Keithville, LA 71047

Customer PO:

Received: 09/19/08 4:15 PM

08-14529 VAMC Reinspection JB Building 61 1st floor (Corrected report issued 10/10/08.) (Corrected report issued 11/03/08) (Corrected report issued 11/21/08)

Customer ID: ALT50

Fax: (318) 687-9923 Phone: (318) 687-3771 Project:

EMSL Order:

EMSL Proj:

9/20/2008Analysis Date:

Report Date: 11/21/2008

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone: (314) 577-0150 Fax: (314) 776-3313 Email: saintlouislab@emsl.com

JB-61-01-131-015A

adhesive 390804635-0015A white 9x9 ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-131-016A

floortile 390804635-0016 black 9x9 ft w/black mastic

Black Non-Fibrous

Heterogeneous

Chrysotile9%Non-fibrous (other)91%

JB-61-01-131-016A

adhesive 390804635-0016A black 9x9 ft w/black mastic

Black None Detected

Non-Fibrous

Heterogeneous

Non-fibrous (other)98% Quartz2%

JB-61-01-S-H101-

017A 390804635-0017 white 2x2 pegboard sheets of transite

White Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

JB-61-01-T-H101-

018A adhesive 390804635-0018 black mastic on 3" pipe/white wrap/insulation

Black Non-Fibrous

Heterogeneous

Chrysotile12%Non-fibrous (other)88%

JB-61-01-T-H101-

018A insulation 390804635-0018A black mastic on 3" pipe/white wrap/insulation

White None Detected

Fibrous

Heterogeneous

Glass39% Min. Wool40%

Non-fibrous (other)21%

JB-61-01-F-121-

019A floortile 390804635-0019 brown 12x12 ft w/black mastic on concrete

Brown Non-Fibrous

Heterogeneous

Chrysotile19%Non-fibrous (other)81%

Jeff Siria, Laboratory Manager or other approved signatory

PLM-1

Analyst(s)

Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%.