ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 4
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement
HMA-01 9x9 Floor Tile HMA-02 12x12 Floor Tile HMA-03 Floor Adhesive
HMA-10 9x9 Floor Tile & Adhesive
HMA-04 Exterior Surfacing Material HMA-05 Pipe Insulation & Fittings
HMA-07 White duct Connector (Vibration Isolators)
HMA-08 Pipe Flange Gasket HMA-09 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9x9 Floor Tile
HMA-02 12x12 Floor Tile HMA-03 Floor Adhesive
HMA-04 Exterior Surfacing Material HMA-05 Pipe Insulation & Fittings HMA-07 White duct Connector
(Vibration Isolators) HMA-09 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
2 HMA-01 9x9 Floor Tile HMA-02 12x12 Floor Tile HMA-04 Exterior Surfacing Material HMA-05 Pipe Insulation & Fittings
HMA-07 White duct Connector (Vibration Isolators)
HMA-09 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Attic No ACM No ACM HMA-06 White Ductwork Material No ACM
Building 4 - Basement
Building 4 - 1st Floor
Building 4 - 2nd Floor
Building 4 - Attic
BASEMENT
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI G01-04-JB cardboard pipe lagging 25 lf 0 4.00 G01-04-JB magnesia pipe lagging 105 lf 0 4.00 G01-04-JB mudded joint ftg on cardboard lag 0 ea 5 4.00 G01-04-JB mudded joint ftg on mag pipe lagging 0 ea 42 4.00
G02-04-JB magnesia pipe lagging 90 lf 0 4.00 G02-04-JB magnesia pipe lagging 28 lf 0 6.00 G02-04-JB mudded joint ftg on fiberglass 0 ea 28 4.00 G02-04-JB mudded joint ftg on fiberglass 0 ea 15 6.00 G02-04-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00 G02-04-JB mudded joint ftg on mag pipe lagging 0 ea 6 6.00
G03-04-JB cardboard pipe lagging 10 lf 0 4.00 G03-04-JB magnesia pipe lagging 45 lf 0 4.00 G03-04-JB magnesia pipe lagging 20 lf 0 6.00 G03-04-JB mudded joint ftg on mag pipe lagging 0 ea 25 4.00 G03-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 6.00
G05-04-JB cardboard pipe lagging 40 lf 0 4.00 G05-04-JB magnesia pipe lagging 75 lf 0 4.00 G05-04-JB magnesia pipe lagging 20 lf 0 6.00 G05-04-JB mudded joint ftg on cardboard lag 0 ea 2 4.00 G05-04-JB mudded joint ftg on mag pipe lagging 0 ea 22 4.00 G05-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 6.00
G06-04-JB cardboard pipe lagging 20 lf 0 4.00 G06-04-JB magnesia pipe lagging 90 lf 0 4.00 G06-04-JB magnesia pipe lagging 28 lf 0 6.00 G06-04-JB mudded joint ftg on cardboard lag 0 ea 2 4.00 G06-04-JB mudded joint ftg on mag pipe lagging 0 ea 25 4.00 G06-04-JB mudded joint ftg on mag pipe lagging 0 ea 6 6.00
G10-04-JB cardboard pipe lagging 25 lf 0 4.00 G10-04-JB magnesia pipe lagging 35 lf 0 4.00 G10-04-JB magnesia pipe lagging 15 lf 0 6.00 G10-04-JB mudded joint ftg on cardboard lag 0 ea 9 4.00 G10-04-JB mudded joint ftg on mag pipe lagging 0 ea 15 4.00 G10-04-JB mudded joint ftg on mag pipe lagging 0 ea 1 6.00
G11-04-JB magnesia pipe lagging 45 lf 0 4.00 G11-04-JB magnesia pipe lagging 9 lf 0 6.00 G11-04-JB mudded joint ftg on mag pipe lagging 0 ea 16 4.00 G11-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 6.00
Building 4 - Basement
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
G12-04-JB magnesia pipe lagging 90 lf 0 4.00 G12-04-JB magnesia pipe lagging 10 lf 0 6.00 G12-04-JB mudded joint ftg on mag pipe lagging 0 ea 30 4.00 G12-04-JB mudded joint ftg on mag pipe lagging 0 ea 3 6.00
G13-04-JB cardboard pipe lagging 40 lf 0 4.00 G13-04-JB magnesia pipe lagging 40 lf 0 4.00 G13-04-JB magnesia pipe lagging 18 lf 0 6.00 G13-04-JB mudded joint ftg on cardboard lag 0 ea 17 4.00 G13-04-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00 G13-04-JB mudded joint ftg on mag pipe lagging 0 ea 1 6.00
G15-04-JB cardboard pipe lagging 10 lf 0 4.00 G15-04-JB magnesia pipe lagging 55 lf 0 4.00 G15-04-JB magnesia pipe lagging 15 lf 0 6.00 G15-04-JB mudded joint ftg on cardboard lag 0 ea 2 4.00 G15-04-JB mudded joint ftg on mag pipe lagging 0 ea 20 4.00
G16-01-JB cardboard pipe lagging 20 lf 0 4.00 G16-01-JB magnesia pipe lagging 35 lf 0 4.00 G16-01-JB magnesia pipe lagging 10 lf 0 6.00 G16-01-JB mudded joint ftg on cardboard lag 0 ea 10 4.00 G16-01-JB mudded joint ftg on mag pipe lagging 0 ea 12 4.00 G16-01-JB mudded joint ftg on mag pipe lagging 0 ea 1 6.00
G17-04-JB cardboard pipe lagging 40 lf 0 4.00 G17-04-JB magnesia pipe lagging 45 lf 0 4.00 G17-04-JB magnesia pipe lagging 15 lf 0 6.00 G17-04-JB mudded joint ftg on cardboard lag 0 ea 12 4.00 G17-04-JB mudded joint ftg on mag pipe lagging 0 ea 14 4.00 G17-04-JB mudded joint ftg on mag pipe lagging 0 ea 3 6.00
G18-04-JB cardboard pipe lagging 30 lf 0 4.00 G18-04-JB magnesia pipe lagging 115 lf 0 4.00 G18-04-JB magnesia pipe lagging 25 lf 0 6.00 G18-04-JB mudded joint ftg on mag pipe lagging 0 ea 33 4.00 G18-04-JB mudded joint ftg on mag pipe lagging 0 ea 5 6.00
G19-04-JB cardboard pipe lagging 22 lf 0 4.00 G19-04-JB magnesia pipe lagging 60 lf 0 4.00 G19-04-JB magnesia pipe lagging 25 lf 0 6.00 G19-04-JB mudded joint ftg on mag pipe lagging 0 ea 26 4.00 G19-04-JB mudded joint ftg on mag pipe lagging 0 ea 10 6.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
G20-04-JB magnesia pipe lagging 60 lf 0 4.00 G20-04-JB magnesia pipe lagging 35 lf 0 6.00 G20-04-JB mudded joint ftg on mag pipe lagging 0 ea 23 4.00 G20-04-JB mudded joint ftg on mag pipe lagging 0 ea 14 6.00
G22-04-JB cardboard pipe lagging 30 lf 0 4.00 G22-04-JB magnesia pipe lagging 55 lf 0 4.00 G22-04-JB magnesia pipe lagging 20 lf 0 6.00 G22-04-JB mudded joint ftg on mag pipe lagging 0 ea 18 4.00 G22-04-JB mudded joint ftg on mag pipe lagging 0 ea 5 6.00
G23-04-JB cardboard pipe lagging 45 lf 0 2.00 G23-04-JB cardboard pipe lagging 10 lf 0 4.00 G23-04-JB cardboard pipe lagging 5 lf 0 6.00 G23-04-JB magnesia pipe lagging 195 lf 0 4.00 G23-04-JB mudded joint ftg on cardboard lag 0 ea 16 2.00 G23-04-JB mudded joint ftg on cardboard lag 0 ea 7 4.00 G23-04-JB mudded joint ftg on cardboard lag 0 ea 9 6.00 G23-04-JB mudded joint ftg on mag pipe lagging 0 ea 47 4.00
G24-04-JB magnesia pipe lagging 75 lf 0 4.00 G24-04-JB mudded joint ftg on fiberglass 0 ea 35 10.00 G24-04-JB mudded joint ftg on mag pipe lagging 0 ea 36 4.00
G25-04-JB cardboard pipe lagging 65 lf 0 4.00 G25-04-JB magnesia pipe lagging 26 lf 0 4.00 G25-04-JB magnesia pipe lagging 17 lf 0 6.00 G25-04-JB mudded joint ftg on cardboard lag 0 ea 9 4.00 G25-04-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00 G25-04-JB mudded joint ftg on mag pipe lagging 0 ea 1 6.00
H006-04-JB cardboard pipe lagging 275 lf 0 4.00 H006-04-JB cardboard pipe lagging 17 lf 0 6.00 H006-04-JB magnesia pipe lagging 15 lf 0 4.00 H006-04-JB mudded joint ftg on cardboard lag 0 ea 28 4.00 H006-04-JB mudded joint ftg on fiberglass 0 ea 29 6.00 H006-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 4.00 H006-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 6.00
MF cardboard pipe lagging 70 lf 0 4.00 MF mudded joint ftg on cardboard lag 0 ea 13 4.00
WH cardboard pipe lagging 550 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI WH cardboard pipe lagging 30 lf 0 6.00 WH magnesia pipe lagging 50 lf 0 4.00 WH magnesia pipe lagging 60 lf 0 6.00 WH mudded joint ftg on cardboard lag 0 ea 63 4.00 WH mudded joint ftg on cardboard lag 0 ea 4 6.00 WH mudded joint ftg on mag pipe lagging 0 ea 12 4.00
3150 858TOTALS
1st FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 100-04-JB magnesia pipe lagging 6 lf 0 4.00 100-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
101-04-JB magnesia pipe lagging 4 lf 0 4.00 101-04-JB mudded joint ftg on mag pipe lagging 0 ea 1 4.00
102-04-JB magnesia pipe lagging 2 lf 0 4.00 102-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 4.00
103-04-JB magnesia pipe lagging 15 lf 0 4.00 103-04-JB mudded joint ftg on mag pipe lagging 0 ea 3 4.00
104-04-JB magnesia pipe lagging 8 lf 0 4.00 104-04-JB mudded joint ftg on mag pipe lagging 0 ea 7 4.00
104A-04-JB magnesia pipe lagging 10 lf 0 4.00 104A-04-JB mudded joint ftg on mag pipe lagging 0 ea 1 4.00
105-04-JB magnesia pipe lagging 39 lf 0 4.00 105-04-JB mudded joint ftg on mag pipe lagging 0 ea 10 4.00
106-04-JB magnesia pipe lagging 15 lf 0 4.00 106-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 4.00
108-04-JB magnesia pipe lagging 30 lf 0 4.00 108-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
110-04-JB magnesia pipe lagging 10 lf 0 4.00 110-04-JB mudded joint ftg on mag pipe lagging 0 ea 5 4.00
112-04-JB magnesia pipe lagging 16 lf 0 4.00 112-04-JB mudded joint ftg on mag pipe lagging 0 ea 3 4.00
113-04-JB magnesia pipe lagging 25 lf 0 4.00 113-04-JB mudded joint ftg on mag pipe lagging 0 ea 5 4.00
115-04-JB magnesia pipe lagging 6 lf 0 4.00 115-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
116-04-JB magnesia pipe lagging 30 lf 0 4.00 116-04-JB mudded joint ftg on fiberglass 0 ea 44 4.00 116-04-JB mudded joint ftg on mag pipe lagging 0 ea 8 4.00
Building 4 - 1st Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 118-04-JB magnesia pipe lagging 15 lf 0 4.00 118-04-JB mudded joint ftg on fiberglass 0 ea 10 4.00 118-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
128-04-JB magnesia pipe lagging 15 lf 0 4.00 128-04-JB mudded joint ftg on mag pipe lagging 0 ea 4 4.00
131-04-JB magnesia pipe lagging 15 lf 0 4.00 131-04-JB mudded joint ftg on mag pipe lagging 0 ea 6 4.00
261 127TOTALS
2ND FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 202-04-JB magnesia pipe lagging 8 lf 0 4.00
217-04-JB mudded joint ftg on fiberglass 0 ea 32 4.00
230-04-JB magnesia pipe lagging 15 lf 0 2.00 230-04-JB mudded joint ftg on mag pipe lagging 0 ea 2 2.00
23 34
Building 4 - 2nd Floor
TOTALS
ATTIC
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 4 Basement 9x9 Floor Tile No No 10 Intact 1 Access 9
HMA-02 4 Basement 12x12 Floor Tile No No 10 Intact 1 Access 9
HMA-03 4 Basement Floor Adhesive No No 10 Intact 1 Access 9
HMA-10 4 Basement 9x9 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 4 Basement Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 4 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-07 4 Basement White duct Connector (Vibration Isolators) No No 10 Intact 1 Access 10
HMA-08 4 Basement Pipe Flange Gasket No No 9 Intact 1 Maintenance 9
HMA-09 4 Basement Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-01 4 1 9x9 Floor Tile No No 10 Intact 1 Access 9
HMA-02 4 1 12x12 Floor Tile No No 10 Intact 1 Access 9
HMA-03 4 1 Floor Adhesive No No 10 Intact 1 Access 9
HMA-04 4 1 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 4 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
Bldg Floor Material Description Removal Priority 3
Building 4 - 1st Floor
Current Condition 1
Building 4 - Basement
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No.
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Bldg Floor Material Description Removal Priority 3
Current Condition 1Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No.
HMA-07 4 1 White duct Connector (Vibration Isolators) No No 10 Intact 1 Access 10
HMA-09 4 1 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-01 4 2 9x9 Floor Tile No No 10 Intact 1 Access 9
HMA-02 4 2 12x12 Floor Tile No No 10 Intact 1 Access 9
HMA-04 4 2 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-05 4 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-07 4 2 White duct Connector (Vibration Isolators) No No 10 Intact 1 Access 10
HMA-09 4 1 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-06 4 Attic Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
Building 4 - 2nd Floor
Building 4 - Attic
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB4 02 230 JB-4-02-T-230-21 Mudded joint fitting on magnesia pipe lagging JB4 00 G18 JB-4-00-T-G18-31 Mudded joint fitting on magnesia pipe lagging JB4 00 EH JB-4-00-T-EH-25 Mudded joint fitting on cardboard lag JB4 00 EH JB-4-00-T-EH-22 Mudded joint fitting on fiberglass JB4 00 G3 JB-4-00-T-G3-34 Magnesia pipe lagging JB4 00 EH JB-4-00-T-EH-28 Cardboard pipe lagging JB4 00 G2 JB-4-00-M-G2-05 White woven duct connector JB4 00 G10 JB-4-00-M-G10-06 Pipe flange gasket JB4 00 G14 JB-4-00-T-G14-12 Tank insulation JB4 01 104 JB-4-01-T-104-19 Mudded joint fitting on magnesia pipe lagging JB4 01 104 JB-4-01-T-104-16 Magnesia pipe lagging JB4 01 116 JB-4-01-T-116-10 White woven duct connector JB4 01 116 JB-4-01-T-116-22 Mudded joint fitting on fiberglass JB4 02 202 JB-4-02-T-202-18 Magnesia pipe lagging JB4 02 217 JB-4-02-M-217-24 White woven duct connector JB4 02 217 JB-4-02-T-217-15 Mudded joint fitting on fiberglass
JB4 00 G24 JB-04-00-F-G24-001A Black mastic JB4 00 H003 JB-04-00-F-H003-002A White 12x12 floor tile, yellow mastic JB4 00 G13 JB-04-00-F-G13-003A Layer 1 - Light white 12x12 floor tile JB4 00 G13 JB-04-00-F-G13-003A Layer 2 - Yellow mastic JB4 00 G23 JB-04-00-F-G23-004A Layer 1 - White 9x9 floor tile JB4 00 G23 JB-04-00-F-G23-004A Layer 2 - Black mastic JB4 00 G23 JB-04-00-F-G23-004A Layer 3 - Black 9x9 floor tile JB4 00 G23 JB-04-00-F-G23-004A Layer 4 - Black mastic JB4 00 G15 JB-04-00-F-G15-005A Layer 1 - White 9x9 floor tile JB4 00 G15 JB-04-00-F-G15-005A Layer 2 - Carpet adhesive, black mastic JB4 00 G15 JB-04-00-F-G15-005A Layer 3 - Black 9x9 floor tile JB4 00 G15 JB-04-00-F-G15-005A Layer 4 - Black mastic JB4 00 G22 JB-04-00-F-G22-006A Layer 1 - White 12x12 floor tile
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB4 00 G22 JB-04-00-F-G22-006A Layer 2 - Yellow mastic JB4 00 G22 JB-04-00-F-G22-006A Layer 3 - Black mastic JB4 00 H002 JB-04-00-F-H002-007A White 12x12 floor tile, yellow mastic, black mastic JB4 00 G12 JB-04-00-F-G12-008A Layer 1 - Red 9x9 floor tile JB4 00 G12 JB-04-00-F-G12-008A Layer 2 - Black mastic JB4 00 G12 JB-04-00-F-G12-009A Layer 1 - Red 9x9 floor tile JB4 00 G12 JB-04-00-F-G12-009A Layer 2 - Black mastic JB4 00 G10 JB-04-00-F-G10-010A Layer 1 - Gray 9x9 floor tile JB4 00 G10 JB-04-00-F-G10-010A Layer 2 - Black mastic JB4 00 G10 JB-04-00-F-G10-011A Layer 1 - Gray 9x9 floor tile JB4 00 G10 JB-04-00-F-G10-011A Layer 2 - Black mastic JB4 00 G2 JB-04-00-F-G2-012A Layer 1 - White 9x9 floor tile JB4 00 G2 JB-04-00-F-G2-012A Layer 2 - Black mastic JB4 00 G2 JB-04-00-T-G2-013A White wrap, white block insulation JB4 00 G4 JB-04-00-S-G4-014A Textured ceiling JB4 00 G4 JB-04-00-S-G4-015A Textured ceiling JB4 00 G4 JB-04-00-S-G4-016A Textured ceiling JB4 00 G29A JB-04-00-F-G29A-017A Layer 1 - White 9x9 floor tile JB4 00 G29A JB-04-00-F-G29A-017A Layer 2 - Black mastic JB4 00 G29A JB-04-00-F-G29A-017A Layer 3 - Black 9x9 floor tile JB4 00 G29A JB-04-00-F-G29A-017A Layer 4 - Black mastic JB4 01 112 JB-04-01-F-112-018A Layer 1 - Light white 12x12 floor tile JB4 01 112 JB-04-01-F-112-018A Layer 2 - Yellow mastic JB4 01 112 JB-04-01-F-112-018A Layer 3 - Felt JB4 01 112 JB-04-01-F-112-018A Layer 4 - Carpet adhesive JB4 01 104B JB-04-01-F-104B-019A Carpet adhesive, green 12x12 floor tile, yellow mastic JB4 01 104 JB-04-01-F-104-020A Carpet adhesive, green 9x9 floor tile, yellow mastic, felt JB4 01 105 JB-04-01-F-105-021A Layer 1 - Green 9x9 floor tile JB4 01 105 JB-04-01-F-105-021A Layer 2 - Black mastic JB4 01 105 JB-04-01-F-105-021A Layer 3 - Felt JB4 01 105 JB-04-01-F-105-021A Layer 4 - Carpet adhesive JB4 01 108 JB-04-01-F-108-022A Layer 1 - Green 9x9 floor tile
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB4 01 108 JB-04-01-F-108-022A Layer 2 - Black mastic JB4 01 108 JB-04-01-F-108-022A Layer 3 - Felt JB4 01 108 JB-04-01-F-108-022A Layer 4 - Carpet adhesive JB4 01 106A JB-04-01-F-106A-023A Carpet adhesive, green 12x12 floor tile, yellow mastic JB4 01 107 JB-04-01-F-107-024A Layer 1 - Green 9x9 floor tile JB4 01 107 JB-04-01-F-107-024A Layer 2 - Black mastic JB4 01 107 JB-04-01-F-107-024A Layer 3 - Felt JB4 01 107 JB-04-01-F-107-024A Layer 4 - Carpet adhesive JB4 01 H103 JB-04-01-M-H103-025A White 2x4 ceiling tile JB4 01 101 JB-04-01-M-101-026A White 2x4 ceiling tile JB4 01 H101A JB-04-01-M-H101A- White 2x4 ceiling tile JB4 01 116A JB-04-01-T-116A-028A Brown wrap, brown paper, foil backing, yellow fiberglass insulation JB4 01 100 JB-04-01-F-100-029A Layer 1 - Light white 12x12 floor tile JB4 01 100 JB-04-01-F-100-029A Layer 2 - Yellow mastic JB4 01 100 JB-04-01-F-100-029A Layer 3 - Gray 9x9 floor tile JB4 01 100 JB-04-01-F-100-029A Layer 4 - Black mastic JB4 01 100 JB-04-01-F-100-029A Layer 5 - felt JB4 01 128 JB-04-01-F-128-030A Layer 1 - Gray 9x9 floor tile JB4 01 128 JB-04-01-F-128-030A Layer 2 - Black mastic JB4 01 128 JB-04-01-F-128-030A Layer 3 - Felt JB4 02 230 JB-04-02-F-230-031A Brown flooring, cloth backing JB4 02 201 JB-04-02-F-201-032A Layer 1 - White 9x9 floor tile JB4 02 201 JB-04-02-F-201-032A Layer 2 - Black mastic JB4 02 H200 JB-04-02-F-H200-033A Layer 1 - Light white 12x12 floor tile JB4 02 H200 JB-04-02-F-H200-033A Layer 2 - Carpet adhesive, black mastic JB4 02 214 JB-04-02-F-214-034A Layer 1 - Light white 12x12 floor tile JB4 02 214 JB-04-02-F-214-034A Layer 2 - Yellow mastic JB4 02 214 JB-04-02-F-214-034A Layer 3 - Brown flooring JB4 02 214 JB-04-02-F-214-034A Layer 4 - Felt JB4 02 214 JB-04-02-F-214-034A Layer 5 - Carpet adhesive JB4 02 212 JB-04-02-F-212-035A Layer 1 - Light white 12x12 floor tile JB4 02 212 JB-04-02-F-212-035A Layer 2 - Carpet adhesive, black mastic
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB4 02 H202 JB-04-02-T-H202-036A Layer 1 - 3" elbow - black mastic JB4 02 H202 JB-04-02-T-H202-036A Layer 2 - 3" elbow - yellow fiberglass insulation, brown wrap JB4 02 H202 JB-04-02-T-H202-037A 3" horizontal - black mastic, brown wrap, white block insulation, yellow fiberglass insulation JB4 02 220 JB-04-02-F-220-038A Carpet adhesive, white 12x12 floor tile, yellow mastic, black mastic JB4 03 300 JB-04-03-M-300-039A Brown vibration isolator JB4 03 300 JB-04-03-T-300-040A White duct insulation JB4 03 301 JB-04-03-S-301-041A Roofing felt, roofing felt JB4 03 Roof JB-04-03-S-RF-042A Slate shingle, slate shingle JB4 00 Exterior JB-04-00-S-EXT-043A Tan textured material JB4 00 Exterior JB-04-00-S-EXT-044A Tan textured material JB4 00 Exterior JB-04-00-S-EXT-045A Tan textured material
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB4 02 230 JB-4-02-T-230-21 Mudded joint fitting on magnesia pipe lagging JB4 00 G18 JB-4-00-T-G18-31 Mudded joint fitting on magnesia pipe lagging JB4 00 EH JB-4-00-T-EH-25 Mudded joint fitting on cardboard lag JB4 00 EH JB-4-00-T-EH-22 Mudded joint fitting on fiberglass JB4 00 G3 JB-4-00-T-G3-34 Magnesia pipe lagging JB4 00 EH JB-4-00-T-EH-28 Cardboard pipe lagging JB4 00 G2 JB-4-00-M-G2-05 White woven duct connector JB4 00 G10 JB-4-00-M-G10-06 Pipe flange gasket JB4 00 G14 JB-4-00-T-G14-12 Tank insulation JB4 01 104 JB-4-01-T-104-19 Mudded joint fitting on magnesia pipe lagging JB4 01 104 JB-4-01-T-104-16 Magnesia pipe lagging JB4 01 116 JB-4-01-T-116-10 White woven duct connector JB4 01 116 JB-4-01-T-116-22 Mudded joint fitting on fiberglass JB4 02 202 JB-4-02-T-202-18 Magnesia pipe lagging JB4 02 217 JB-4-02-M-217-24 White woven duct connector JB4 02 217 JB-4-02-T-217-15 Mudded joint fitting on fiberglass
JB4 00 G13 JB-04-00-F-G13-003A Layer 1 - Light white 12x12 floor tile JB4 00 G23 JB-04-00-F-G23-004A Layer 1 - White 9x9 floor tile JB4 00 G23 JB-04-00-F-G23-004A Layer 2 - Black mastic JB4 00 G23 JB-04-00-F-G23-004A Layer 3 - Black 9x9 floor tile JB4 00 G15 JB-04-00-F-G15-005A Layer 1 - White 9x9 floor tile JB4 00 G15 JB-04-00-F-G15-005A Layer 3 - Black 9x9 floor tile JB4 00 G22 JB-04-00-F-G22-006A Layer 3 - Black mastic JB4 00 G12 JB-04-00-F-G12-008A Layer 1 - Red 9x9 floor tile JB4 00 G12 JB-04-00-F-G12-009A Layer 1 - Red 9x9 floor tile JB4 00 G10 JB-04-00-F-G10-010A Layer 1 - Gray 9x9 floor tile JB4 00 G10 JB-04-00-F-G10-011A Layer 1 - Gray 9x9 floor tile JB4 00 G2 JB-04-00-F-G2-012A Layer 1 - White 9x9 floor tile JB4 00 G29A JB-04-00-F-G29A-017A Layer 1 - White 9x9 floor tile JB4 00 G29A JB-04-00-F-G29A-017A Layer 3 - Black 9x9 floor tile
1994 Initial Asbestos Inspection
2008 Asbestos Reinspection
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB4 01 112 JB-04-01-F-112-018A Layer 1 - Light white 12x12 floor tile JB4 01 105 JB-04-01-F-105-021A Layer 1 - Green 9x9 floor tile JB4 01 108 JB-04-01-F-108-022A Layer 1 - Green 9x9 floor tile JB4 01 107 JB-04-01-F-107-024A Layer 1 - Green 9x9 floor tile JB4 01 100 JB-04-01-F-100-029A Layer 1 - Light white 12x12 floor tile JB4 01 100 JB-04-01-F-100-029A Layer 3 - Gray 9x9 floor tile JB4 01 128 JB-04-01-F-128-030A Layer 1 - Gray 9x9 floor tile JB4 02 201 JB-04-02-F-201-032A Layer 1 - White 9x9 floor tile JB4 02 H200 JB-04-02-F-H200-033A Layer 1 - Light white 12x12 floor tile JB4 02 214 JB-04-02-F-214-034A Layer 1 - Light white 12x12 floor tile JB4 02 212 JB-04-02-F-212-035A Layer 1 - Light white 12x12 floor tile JB4 02 H202 JB-04-02-T-H202-036A Layer 1 - 3" elbow - black mastic JB4 02 H202 JB-04-02-T-H202-037A 3" horizontal - black mastic, brown wrap, white block insulation, yellow fiberglass insulation JB4 03 300 JB-04-03-T-300-040A White duct insulation JB4 00 Exterior JB-04-00-S-EXT-043A Tan textured material JB4 00 Exterior JB-04-00-S-EXT-044A Tan textured material JB4 00 Exterior JB-04-00-S-EXT-045A Tan textured material
2008 Reinspection Inspection Logs
Client: Date: October 13, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-04-00-F-G24-001A Black mastic 00 G24 Southwest quadrant of room G24 beneath piping
JB-04-00-F-H003-002A White 12x12 floor tile, yellow mastic 00 H003 Southwest corner behind door
JB-04-00-F-G13-003A Layer 1 - Light white 12x12 floor tile 00 G13 Northeast corner by sink
JB-04-00-F-G13-003A Layer 2 - Yellow mastic 00 G13 Northeast corner by sink
JB-04-00-F-G23-004A Layer 1 - White 9x9 floor tile 00 G23 Northeast quadrant of room G23
JB-04-00-F-G23-004A Layer 2 - Black mastic 00 G23 Northeast quadrant of room G23
JB-04-00-F-G23-004A Layer 3 - Black 9x9 floor tile 00 G23 Northeast quadrant of room G23
JB-04-00-F-G23-004A Layer 4 - Black mastic 00 G23 Northeast quadrant of room G23
JB-04-00-F-G15-005A Layer 1 - White 9x9 floor tile 00 G15 Northwest corner under air conditioning unit
JB-04-00-F-G15-005A Layer 2 - Carpet adhesive, black mastic 00 G15 Northwest corner under air conditioning unit
JB-04-00-F-G15-005A Layer 3 - Black 9x9 floor tile 00 G15 Northwest corner under air conditioning unit
JB-04-00-F-G15-005A Layer 4 - Black mastic 00 G15 Northwest corner under air conditioning unit
JB-04-00-F-G22-006A Layer 1 - White 12x12 floor tile 00 G22 Northeast corner of room G22
JB-04-00-F-G22-006A Layer 2 - Yellow mastic 00 G22 Northeast corner of room G22
JB-04-00-F-G22-006A Layer 3 - Black mastic 00 G22 Northeast corner of room G22
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-00-F-H002-007A White 12x12 floor tile, yellow mastic, black mastic 00 H002 Middle of hall H002 in between G17 and G16
JB-04-00-F-G12-008A Layer 1 - Red 9x9 floor tile 00 G12 Middle of room G12 in front of shower
JB-04-00-F-G12-008A Layer 2 - Black mastic 00 G12 Middle of room G12 in front of shower
JB-04-00-F-G12-009A Layer 1 - Red 9x9 floor tile 00 G12 North wall below air conditioning unit
JB-04-00-F-G12-009A Layer 2 - Black mastic 00 G12 North wall below air conditioning unit
JB-04-00-F-G10-010A Layer 1 - Gray 9x9 floor tile 00 G10 Southeast corner of room G10
JB-04-00-F-G10-010A Layer 2 - Black mastic 00 G10 Southeast corner of room G10
JB-04-00-F-G10-011A Layer 1 - Gray 9x9 floor tile 00 G10 Northwest corner under heater
JB-04-00-F-G10-011A Layer 2 - Black mastic 00 G10 Northwest corner under heater
JB-04-00-F-G2-012A Layer 1 - White 9x9 floor tile 00 G2 Northwest corner of room G2
JB-04-00-F-G2-012A Layer 2 - Black mastic 00 G2 Northwest corner of room G2
JB-04-00-T-G2-013A White wrap, white block insulation 00 G2 Southeast quadrant of room G2
JB-04-00-S-G4-014A Textured ceiling 00 G4 Southwest quadrant on ceiling
JB-04-00-S-G4-015A Textured ceiling 00 G4 Southeast quadrant on ceiling
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-00-S-G4-016A Textured ceiling 00 G4 Northwest quadrant above door on heater
JB-04-00-F-G29A-017A Layer 1 - White 9x9 floor tile 00 G29A Southwest corner beside door
JB-04-00-F-G29A-017A Layer 2 - Black mastic 00 G29A Southwest corner beside door
JB-04-00-F-G29A-017A Layer 3 - Black 9x9 floor tile 00 G29A Southwest corner beside door
JB-04-00-F-G29A-017A Layer 4 - Black mastic 00 G29A Southwest corner beside door
JB-04-01-F-112-018A Layer 1 - Light white 12x12 floor tile 01 112 Northwest corner by air conditioning unit
JB-04-01-F-112-018A Layer 2 - Yellow mastic 01 112 Northwest corner by air conditioning unit
JB-04-01-F-112-018A Layer 3 - Felt 01 112 Northwest corner by air conditioning unit
JB-04-01-F-112-018A Layer 4 - Carpet adhesive 01 112 Northwest corner by air conditioning unit
JB-04-01-F-104B-019A Carpet adhesive, green 12x12 floor tile, yellow mastic 01 104B Northwest corner of room 104B
JB-04-01-F-104-020A Carpet adhesive, green 9x9 floor tile, yellow mastic, felt 01 104 Northwest corner of room 104 beside door
JB-04-01-F-105-021A Layer 1 - Green 9x9 floor tile 01 105 Northwest corner of room 105
JB-04-01-F-105-021A Layer 2 - Black mastic 01 105 Northwest corner of room 105
JB-04-01-F-105-021A Layer 3 - Felt 01 105 Northwest corner of room 105
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-01-F-105-021A Layer 4 - Carpet adhesive 01 105 Northwest corner of room 105
JB-04-01-F-108-022A Layer 1 - Green 9x9 floor tile 01 108 Southwest corner of room 108
JB-04-01-F-108-022A Layer 2 - Black mastic 01 108 Southwest corner of room 108
JB-04-01-F-108-022A Layer 3 - Felt 01 108 Southwest corner of room 108
JB-04-01-F-108-022A Layer 4 - Carpet adhesive 01 108 Southwest corner of room 108
JB-04-01-F-106A-023A Carpet adhesive, green 12x12 floor tile, yellow mastic 01 106A Southeast corner of room 106A
JB-04-01-F-107-024A Layer 1 - Green 9x9 floor tile 01 107 West wall by the door
JB-04-01-F-107-024A Layer 2 - Black mastic 01 107 West wall by the door
JB-04-01-F-107-024A Layer 3 - Felt 01 107 West wall by the door
JB-04-01-F-107-024A Layer 4 - Carpet adhesive 01 107 West wall by the door
JB-04-01-M-H103-025A White 2x4 ceiling tile 01 H103 West end of hall H103 above 102
JB-04-01-M-101-026A White 2x4 ceiling tile 01 101 West end above door to H101A
JB-04-01-M-H101A-027A White 2x4 ceiling tile 01 H101A East end of hall H101A in between 128 and 130
JB-04-01-T-116A-028A Brown wrap, brown paper, foil backing, yellow fiberglass insulation 01 116A Northwest quadrant on air handler
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-01-F-100-029A Layer 1 - Light white 12x12 floor tile 01 100 Northeast quadrant under light
JB-04-01-F-100-029A Layer 2 - Yellow mastic 01 100 Northeast quadrant under light
JB-04-01-F-100-029A Layer 3 - Gray 9x9 floor tile 01 100 Northeast quadrant under light
JB-04-01-F-100-029A Layer 4 - Black mastic 01 100 Northeast quadrant under light
JB-04-01-F-100-029A Layer 5 - felt 01 100 Northeast quadrant under light
JB-04-01-F-128-030A Layer 1 - Gray 9x9 floor tile 01 128 South wall under air conditioning unit
JB-04-01-F-128-030A Layer 2 - Black mastic 01 128 South wall under air conditioning unit
JB-04-01-F-128-030A Layer 3 - Felt 01 128 South wall under air conditioning unit
JB-04-02-F-230-031A Brown flooring, cloth backing 02 230 Northeast corner of room 230
JB-04-02-F-201-032A Layer 1 - White 9x9 floor tile 02 201 Northwest quadrant under air conditioning unit (hanging from ceiling)
JB-04-02-F-201-032A Layer 2 - Black mastic 02 201 Northwest quadrant under air conditioning unit (hanging from ceiling)
JB-04-02-F-H200-033A Layer 1 - Light white 12x12 floor tile 02 H200 West end of hall H200 in front of door
JB-04-02-F-H200-033A Layer 2 - Carpet adhesive, black mastic 02 H200 West end of hall H200 in front of door
JB-04-02-F-214-034A Layer 1 - Light white 12x12 floor tile 02 214 Northeast corner of room 214 beside air conditioning unit under window
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-02-F-214-034A Layer 2 - Yellow mastic 02 214 Northeast corner of room 214 beside air conditioning unit under window
JB-04-02-F-214-034A Layer 3 - Brown flooring 02 214 Northeast corner of room 214 beside air conditioning unit under window
JB-04-02-F-214-034A Layer 4 - Felt 02 214 Northeast corner of room 214 beside air conditioning unit under window
JB-04-02-F-214-034A Layer 5 - Carpet adhesive 02 214 Northeast corner of room 214 beside air conditioning unit under window
JB-04-02-F-212-035A Layer 1 - Light white 12x12 floor tile 02 212 Northeast corner by air conditioning unit
JB-04-02-F-212-035A Layer 2 - Carpet adhesive, black mastic 02 212 Northeast corner by air conditioning unit
JB-04-02-T-H202-036A Layer 1 - 3" elbow - black mastic 02 H202 East end of hall H202 by hall doorway above ceiling tile
JB-04-02-T-H202-036A Layer 2 - 3" elbow - yellow fiberglass insulation, brown wrap 02 H202 East end of hall H202 by hall doorway above ceiling tile
JB-04-02-T-H202-037A 3" horizontal - black mastic, brown wrap, white block insulation, yellow fiberglass insulation 02 H202 East end of hall H202 by hall doorway above ceiling tile
JB-04-02-F-220-038A Carpet adhesive, white 12x12 floor tile, yellow mastic, black mastic 02 220 Southeast corner of room 220
JB-04-03-M-300-039A Brown vibration isolator 03 300 West end of attic on air handler
JB-04-03-T-300-040A White duct insulation 03 300 Northwest quadrant of attic
JB-04-03-S-301-041A Roofing felt, roofing felt 03 301 East end of 301
JB-04-03-S-RF-042A Slate shingle, slate shingle 03 Roof In the middle of the south wall
Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 4 St. Louis V. A. Medical Center
JB-04-00-S-EXT-043A Tan textured material 00 Exterior Northern exterior wall in between windows
JB-04-00-S-EXT-044A Tan textured material 00 Exterior Eastern exterior wall in the middle by window
JB-04-00-S-EXT-045A Tan textured material 00 Exterior Southern exterior wall in between windows.
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
BASEMENT
1st FLOOR
2ND FLOOR
ATTIC
2008 Reinspection Photographs
BUILDING 4
sample does not contain asbestos
JB-04-00-F-G24-001A JB-04-00-F-H003-002A
JB-04-00-F-G13-003A JB-04-00-F-G23-004A
sample contains asbestos
JB-04-00-F-G15-005A JB-04-00-F-G22-006A
JB-04-00-F-H002-007A JB-04-00-F-G12-008A
JB-04-00-F-G12-009A JB-04-00-F-G10-010A
JB-04-00-F-G10-011A JB-04-00-F-G2-012A
JB-04-00-T-G2-013A JB-04-00-S-G4-014A
JB-04-00-S-G4-015A JB-04-00-S-G4-016A
JB-04-00-F-G29A-017A JB-04-01-F-112-018A
JB-04-01-F-104B-019A JB-04-01-F-104-020A
JB-04-01-F-105-021A JB-04-01-F-108-022A
JB-04-01-F-106A-023A JB-04-01-F-107-024A
JB-04-01-M-H103-025A JB-04-01-M-101-026A
JB-04-01-M-H101A-027A JB-04-01-T-116A-028A
JB-04-01-F-100-029A JB-04-01-F-128-030A
JB-04-02-F-230-031A JB-04-02-F-201-032A
JB-04-02-F-H200-033A JB-04-02-F-214-034A
JB-04-02-F-212-035A JB-04-02-T-H202-036A
JB-04-02-T-H202-037A JB-04-02-F-220-038A
JB-04-03-M-300-039A JB-04-03-T-300-040A
JB-04-03-S-301-041A JB-04-03-S-RF-042A
JB-04-00-S-EXT-043A JB-04-00-S-EXT-044A
JB-04-00-S-EXT-045A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805192
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/14/08 5:00 PM
08-14529 VAMC Reinspection JB Building 04 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/15/2008Analysis Date:
Report Date: 10/15/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-04-00-F-G24-
001A 390805192-0001 blk mastic on concrete
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-04-00-F-H003-
002A floortile 390805192-0002 wht 12x12/ylw mastic/concrete
White None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
JB-04-00-F-H003-
002A adhesive 390805192-0002A wht 12x12/ylw mastic/concrete
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)98%
JB-04-00-F-G13-
003A…