36C25518Q0169-00002047.pdf
PDF 20 MB Posted
- Attached to
- 657-18-1-1582-0008 Asbestos Lead Survey - STL
- Solicitation number
- 36C25518Q0169
About this file
36C25518Q0169 00002 08-14529 JB Bldg 50 Report.pdf
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 50
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Ground Floor
HMA-01 Flooring Adhesive HMA-02 12"x12" Floor Tile & Adhesive
HMA-03 9"x9" Floor Tile HMA-04 9"x9" Floor Tile & Adhesive
HMA-06 Transite Panels HMA-07 Mastic on Ductwork
HMA-08 Pipe Insulation & Fittings HMA-12 Tank Insulation
HMA-09 Vibration Isolator (Duct Connector)
HMA-10 Fire Doors (Assumed) HMA-11 Transite Counter Tops
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
1 HMA-03 9"x9" Floor Tile HMA-05 12"x12" Floor Tile No ACM HMA-08 Pipe Insulation & Fittings
HMA-09 Vibration Isolator (Duct Connector)
HMA-10 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 Flooring Adhesive HMA-02 12"x12" Floor Tile & Adhesive
HMA-03 9"x9" Floor Tile HMA-04 9"x9" Floor Tile & Adhesive
No ACM HMA-08 Pipe Insulation & Fittings HMA-09 Vibration Isolator
(Duct Connector) HMA-10 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
3 HMA-02 12"x12" Floor Tile & Adhesive No ACM HMA-08 Pipe Insulation & Fittings HMA-09 Vibration Isolator
(Duct Connector) HMA-10 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
4 HMA-03 9"x9" Floor Tile HMA-05 12"x12" Floor Tile HMA-06 Transite Panels HMA-08 Pipe Insulation & Fittings
HMA-09 Vibration Isolator (Duct Connector)
HMA-10 Fire Doors (Assumed)
Building 50 - Ground Floor
Building 50 - 1st Floor
Building 50 - 2nd Floor
Building 50 - 3rd Floor
Building 50 - 4th Floor
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Penthouse No ACM No ACM No ACM HMA-10 Fire Doors (Assumed)
Building 50 - Penthouse
GROUND FLOOR
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GN24-50-JB cardboard wrap pipe lagging 60 lf 0 4.00 GN24-50-JB mudded joint fitting on cardboard 0 lf 16 4.00
GN25-50-JB mudded joint ftg on mag pipe lag 0 ea 2 2.00
GN27-50-JB cardboard wrap pipe lagging 50 lf 0 4.00 GN27-50-JB magnesia pipe lag 10 lf 0 4.00 GN27-50-JB mudded joint fitting on cardboard 0 ea 20 4.00 GN27-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
GN27A-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 GN27A-50-JB magnesia pipe lag 12 lf 0 4.00 GN27A-50-JB mudded joint fitting on cardboard 0 ea 20 4.00
GN28-50-JB cardboard wrap pipe lagging 70 lf 0 4.00 GN28-50-JB magnesia pipe lag 50 lf 0 4.00 GN28-50-JB mudded joint fitting on cardboard 0 ea 24 4.00 GN28-50-JB mudded joint ftg on mag pipe lag 0 ea 7 4.00
GN29-50-JB cardboard wrap pipe lagging 50 lf 0 4.00 GN29-50-JB magnesia pipe lag 25 lf 0 4.00 GN29-50-JB mudded joint fitting on cardboard 0 ea 17 4.00 GN29-50-JB mudded joint ftg on mag pipe lag 0 ea 11 4.00
GN32-50-JB magnesia pipe lag 8 lf 0 4.00 GN32-50-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00
GN34-50-JB cardboard wrap pipe lagging 17 lf 0 4.00 GN34-50-JB magnesia pipe lag 17 lf 0 4.00 GN34-50-JB mudded joint fitting on cardboard 0 ea 5 4.00 GN34-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
GN35-50-JB cardboard wrap pipe lagging 35 lf 0 4.00 GN35-50-JB mudded joint fitting on cardboard 0 ea 9 4.00
GN36-50-JB cardboard wrap pipe lagging 80 lf 0 4.00 GN36-50-JB magnesia pipe lag 35 lf 0 4.00 GN36-50-JB mudded joint fitting on cardboard 0 ea 25 4.00 GN36-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
GN38-50-JB magnesia pipe lag 8 lf 0 4.00 GN38-50-JB mudded joint ftg on mag pipe lag 0 ea 8 4.00
Building 50 - Ground
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
GN38B-50-JB magnesia pipe lag 20 lf 0 4.00 GN38B-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
GN38C-50-JB cardboard wrap pipe lagging 45 lf 0 4.00 GN38C-50-JB magnesia pipe lag 15 lf 0 4.00 GN38C-50-JB mudded joint fitting on cardboard 0 ea 17 4.00 GN38C-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 GN38C-50-JB tar joint ftg on fibglass pipe lag 0 ea 10 10.00
GN40-50-JB cardboard wrap pipe lagging 98 lf 0 4.00 GN40-50-JB duct insulation (kennard unit) 40 sf 0 0.00 GN40-50-JB magnesia pipe lag 48 lf 0 6.00 GN40-50-JB magnesia pipe lag 3 lf 0 12.00 GN40-50-JB mudded joint fitting on cardboard 0 ea 45 4.00 GN40-50-JB mudded joint ftg on mag pipe lag 0 ea 9 6.00 GN40-50-JB tar joint ftg on fibglass pipe lag 0 ea 4 6.00
GN41-50-JB magnesia pipe lag 35 lf 0 4.00 GN41-50-JB magnesia pipe lag 20 lf 0 6.00 GN41-50-JB mudded joint ftg on mag pipe lag 0 ea 14 4.00 GN41-50-JB mudded joint ftg on mag pipe lag 0 ea 8 6.00 GN41-50-JB tar joint ftg on fibglass pipe lag 0 ea 45 4.00
GS03-50-JB cardboard wrap pipe lagging 65 lf 0 4.00 GS03-50-JB magnesia pipe lag 70 lf 0 4.00 GS03-50-JB mudded joint fitting on cardboard 0 ea 25 4.00 GS03-50-JB mudded joint ftg on mag pipe lag 0 ea 41 4.00
GS11-50-JB cardboard wrap pipe lagging 22 lf 0 6.00 GS11-50-JB mudded joint fitting on cardboard 0 ea 5 6.00
GS13-50-JB cardboard wrap pipe lagging 10 lf 0 4.00 GS13-50-JB mudded joint fitting on cardboard 0 ea 3 4.00 GS13-50-JB mudded joint fitting on fiberglas lag 0 ea 4 14.00
GS14-50-JB cardboard wrap pipe lagging 19 lf 0 4.00 GS14-50-JB cardboard wrap pipe lagging 44 lf 0 6.00 GS14-50-JB cardboard wrap pipe lagging 22 lf 0 8.00 GS14-50-JB magnesia pipe lagging 75 lf 0 4.00 GS14-50-JB mudded joint fitting on cardboard 0 ea 8 4.00 GS14-50-JB mudded joint fitting on cardboard 0 ea 14 6.00 GS14-50-JB mudded joint fitting on cardboard 0 ea 5 8.00 GS14-50-JB mudded joint fitting on fiberglas lag 0 ea 9 6.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GS14-50-JB mudded joint fitting on fiberglas lag 0 ea 15 10.00 GS14-50-JB mudded joint fitting on fiberglas lag 0 ea 16 14.00 GS14-50-JB mudded joint ftg on mag pipe lag 0 ea 42 4.00 GS14-50-JB reservior tank 30 lf 0 2.00 GS14-50-JB white canvas duct insulation 155 sf 0 0.00
GS14B-50-JB magnesia pipe lagging 42 lf 0 4.00 GS14B-50-JB magnesia pipe lagging 75 lf 0 6.00 GS14B-50-JB magnesia pipe lagging 28 lf 0 8.00 GS14B-50-JB mudded joint ftg on mag pipe lag 0 ea 9 4.00 GS14B-50-JB mudded joint ftg on mag pipe lag 0 ea 18 6.00 GS14B-50-JB mudded joint ftg on mag pipe lag 0 ea 3 8.00
GS15-50-JB cardboard wrap pipe lagging 110 lf 0 4.00 GS15-50-JB magnesia pipe lagging 170 lf 0 4.00 GS15-50-JB magnesia pipe lagging 85 lf 0 8.00 GS15-50-JB mudded joint fitting on cardboard 0 ea 5 4.00 GS15-50-JB mudded joint fitting on fiberglas lag 0 ea 16 6.00 GS15-50-JB mudded joint fitting on fiberglas lag 0 ea 16 10.00 GS15-50-JB mudded joint fitting on fiberglas lag 0 ea 16 14.00 GS15-50-JB mudded joint ftg on mag pipe lag 0 ea 42 4.00 GS15-50-JB mudded joint ftg on mag pipe lag 0 ea 42 8.00 GS15-50-JB tank insulation (left) 200 sf 0 2.00 GS15-50-JB tank insulation (right side) 200 sf 0 2.00
GS15A-50-JB magnesia pipe lagging 55 lf 0 6.00 GS15A-50-JB mudded joint ftg on mag pipe lag 0 ea 17 6.00
GS16-50-JB magnesia pipe lagging 12 lf 0 4.00 GS16-50-JB magnesia pipe lagging 2 lf 0 6.00 GS16-50-JB magnesia pipe lagging 40 lf 0 8.00 GS16-50-JB magnesia pipe lagging 40 lf 0 10.00 GS16-50-JB mudded joint fitting on fiberglas lag 0 ea 15 4.00 GS16-50-JB mudded joint fitting on fiberglas lag 0 ea 8 6.00 GS16-50-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00 GS16-50-JB mudded joint ftg on mag pipe lag 0 ea 5 6.00 GS16-50-JB mudded joint ftg on mag pipe lag 0 ea 3 8.00 GS16-50-JB mudded joint ftg on mag pipe lag 0 ea 7 10.00
GS16A-50-JB magnesia pipe lagging 24 lf 0 8.00 GS16A-50-JB magnesia pipe lagging 24 lf 0 12.00 GS16A-50-JB mudded joint fitting on fiberglas lag 0 ea 41 3.00 GS16A-50-JB mudded joint fitting on fiberglas lag 0 ea 2 6.00 GS16A-50-JB mudded joint fitting on fiberglas lag 0 ea 3 8.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GS16A-50-JB mudded joint ftg on mag pipe lag 0 ea 1 12.00
GS16B-50-JB magnesia pipe lagging 55 lf 0 6.00 GS16B-50-JB mudded joint ftg on mag pipe lag 0 ea 14 6.00
GS16C-50-JB magnesia pipe lagging 6 lf 0 4.00 GS16C-50-JB magnesia pipe lagging 20 lf 0 8.00 GS16C-50-JB magnesia pipe lagging 20 lf 0 10.00 GS16C-50-JB mudded joint fitting on fiberglas lag 0 ea 24 4.00 GS16C-50-JB mudded joint fitting on fiberglas lag 0 ea 6 6.00 GS16C-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00 GS16C-50-JB mudded joint ftg on mag pipe lag 0 ea 1 8.00 GS16C-50-JB mudded joint ftg on mag pipe lag 0 ea 1 10.00
GS18-50-JB cardboard wrap pipe lagging 50 lf 0 4.00 GS18-50-JB magnesia pipe lagging 75 lf 0 4.00 GS18-50-JB magnesia pipe lagging 30 lf 0 6.00 GS18-50-JB magnesia pipe lagging 8 lf 0 8.00 GS18-50-JB magnesia pipe lagging 8 lf 0 10.00 GS18-50-JB mudded joint fitting on cardboard 0 ea 11 4.00 GS18-50-JB mudded joint ftg on mag pipe lag 0 ea 16 4.00 GS18-50-JB mudded joint ftg on mag pipe lag 0 ea 6 6.00
GS18A-50-JB cardboard wrap pipe lagging 40 lf 0 4.00 GS18A-50-JB magnesia pipe lagging 35 lf 0 4.00 GS18A-50-JB mudded joint fitting on cardboard 0 ea 18 4.00 GS18A-50-JB mudded joint ftg on mag pipe lag 0 ea 18 4.00
GS18B-50-JB cardboard wrap pipe lagging 20 lf 0 4.00 GS18B-50-JB magnesia pipe lagging 30 lf 0 4.00 GS18B-50-JB mudded joint fitting on cardboard 0 ea 7 4.00 GS18B-50-JB mudded joint fitting on fiberglas lag 0 ea 14 4.00 GS18B-50-JB mudded joint ftg on mag pipe lag 0 ea 7 4.00
GS18C-50-JB magnesia pipe lagging 60 lf 0 4.00 GS18C-50-JB mudded joint ftg on mag pipe lag 0 ea 24 4.00
GS18D-50-JB cardboard wrap pipe lagging 45 lf 0 4.00 GS18D-50-JB mudded joint fitting on cardboard 0 ea 15 4.00
GS18F-50-JB magnesia pipe lagging ** 10 lf 0 4.00
GS46-50-JB cardboard wrap pipe lagging 125 lf 0 4.00 GS46-50-JB magnesia pipe lagging 70 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GS46-50-JB magnesia pipe lagging 25 lf 0 8.00 GS46-50-JB magnesia pipe lagging 22 lf 0 10.00 GS46-50-JB mudded joint fitting on cardboard 0 ea 18 4.00 GS46-50-JB mudded joint ftg on mag pipe lag 0 ea 17 4.00 GS46-50-JB mudded joint ftg on mag pipe lag 0 ea 3 8.00 GS46-50-JB mudded joint ftg on mag pipe lag 0 ea 5 10.00
H001-50-JB cardboard wrap pipe lagging 60 lf 0 3.00 H001-50-JB cardboard wrap pipe lagging 50 lf 0 6.00 H001-50-JB magnesia pipe lagging 10 lf 0 6.00 H001-50-JB magnesia pipe lagging 30 lf 0 12.00 H001-50-JB mudded joint fitting on cardboard 0 ea 12 3.00 H001-50-JB mudded joint fitting on cardboard 0 ea 20 6.00 H001-50-JB mudded joint fitting on fiberglas lag 0 ea 6 6.00 H001-50-JB mudded joint ftg on mag pipe lag 0 ea 3 6.00 H001-50-JB mudded joint ftg on mag pipe lag 0 ea 5 12.00
H002-50-JB cardboard wrap pipe lagging 70 lf 0 4.00 H002-50-JB cardboard wrap pipe lagging 140 lf 0 6.00 H002-50-JB magnesia pipe lagging 175 lf 0 4.00 H002-50-JB magnesia pipe lagging 12 lf 0 12.00 H002-50-JB mudded joint fitting on cardboard lag 0 ea 14 4.00 H002-50-JB mudded joint fitting on cardboard lag 0 ea 29 6.00 H002-50-JB mudded joint fitting on tar paper lag 0 ea 6 6.00 H002-50-JB mudded joint ftg on mag pipe lag 0 ea 26 4.00 H002-50-JB mudded joint ftg on mag pipe lag 0 ea 2 12.00 H002-50-JB tar paper wrap pipe lagging 70 lf 0 6.00
H003-50-JB cardboard wrap pipe lagging 60 lf 0 4.00 H003-50-JB cardboard wrap pipe lagging 10 lf 0 6.00 H003-50-JB magnesia pipe lagging 85 lf 0 4.00 H003-50-JB magnesia pipe lagging 40 lf 0 6.00 H003-50-JB magnesia pipe lagging 20 lf 0 8.00 H003-50-JB mudded joint fitting on cardboard lag 0 ea 14 4.00 H003-50-JB mudded joint fitting on cardboard lag 0 ea 6 6.00 H003-50-JB mudded joint fitting on tar paper lag 0 ea 9 6.00 H003-50-JB mudded joint ftg on mag pipe lag 0 ea 22 4.00 H003-50-JB mudded joint ftg on mag pipe lag 0 ea 5 6.00 H003-50-JB mudded joint ftg on mag pipe lag 0 ea 5 8.00 H003-50-JB tar paper wrap pipe lagging 35 lf 0 6.00
H004-50-JB cardboard wrap pipe lagging 20 lf 0 4.00 H004-50-JB cardboard wrap pipe lagging 35 lf 0 6.00 H004-50-JB mudded joint fitting on cardboard lag 0 ea 3 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H004-50-JB mudded joint fitting on cardboard lag 0 ea 6 6.00
H005-50-JB cardboard wrap pipe lagging 535 lf 0 4.00 H005-50-JB mudded joint fitting on cardboard lag 0 ea 104 4.00 H005-50-JB mudded joint fitting on fiberglas lag 0 ea 2 4.00 H005-50-JB mudded joint fitting on tar paper lag 0 ea 9 4.00 H005-50-JB tar paper wrap pipe lagging 65 lf 0 4.00
S001-50-JB cardboard wrap pipe lagging 9 lf 0 4.00 S001-50-JB magnesia pipe lagging 1 lf 0 4.00 S001-50-JB mudded joint fitting on cardboard lag 0 ea 6 4.00 S001-50-JB mudded joint ftg on mag pipe lag 0 ea 2 4.00
S003-50-JB magnesia pipe lagging 8 lf 0 4.00 S003-50-JB mudded joint ftg on mag pipe lag 0 ea 1 4.00
S09-50-JB cardboard wrap pipe lagging 18 lf 0 3.00 S09-50-JB magnesia pipe lagging 25 lf 0 5.00 S09-50-JB magnesia pipe lagging 30 lf 0 10.00 S09-50-JB mudded joint fitting on cardboard 0 ea 6 3.00 S09-50-JB mudded joint ftg on mag pipe lag 0 ea 2 5.00 S09-50-JB mudded joint ftg on mag pipe lag 0 ea 5 10.00
Tunnel-50-JB cardboard wrap pipe lagging 85 lf 0 3.00 Tunnel-50-JB magnesia pipe lagging 550 lf 0 6.00 Tunnel-50-JB mudded joint fitting on cardboard lag 0 ea 35 3.00 Tunnel-50-JB mudded joint ftg on mag pipe lag 0 ea 215 6.00
Z001-50-JB magnesia pipe lagging 103 lf 0 4.00 Z001-50-JB magnesia pipe lagging 115 lf 0 6.00 Z001-50-JB magnesia pipe lagging 5 lf 0 10.00 Z001-50-JB mudded joint ftg on mag pipe lag 0 ea 65 4.00 Z001-50-JB mudded joint ftg on mag pipe lag 0 ea 3 6.00 Z001-50-JB mudded joint ftg on mag pipe lag 0 ea 4 10.00
Z002-50-JB cardboard wrap pipe lagging 175 lf 0 4.00 Z002-50-JB magnesia pipe lagging 150 lf 0 4.00 Z002-50-JB magnesia pipe lagging 20 lf 0 6.00 Z002-50-JB magnesia pipe lagging 75 lf 0 8.00 Z002-50-JB mudded joint fitting on cardboard lag 0 ea 50 4.00 Z002-50-JB mudded joint ftg on mag pipe lag 0 ea 43 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI Z002-50-JB mudded joint ftg on mag pipe lag 0 ea 6 6.00 Z002-50-JB mudded joint ftg on mag pipe lag 0 ea 9 8.00
6145 1811TOTALS
1st FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 1N61-50-JB cardboard wrap pipe lagging 25 lf 0 4.00 1N61-50-JB magnesia pipe lagging 8 lf 0 4.00 1N61-50-JB mudded joint fitting on cardboard lag 0 ea 8 4.00 1N61-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
1N66-50-JB cardboard wrap pipe lagging 20 lf 0 4.00
1N69-50-JB cardboard wrap pipe lagging 10 lf 0 4.00 1N69-50-JB magnesia pipe lagging 5 lf 0 4.00 1N69-50-JB mudded joint fitting on cardboard lag 0 ea 1 4.00 1N69-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00
1N70-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 1N70-50-JB magnesia pipe lagging 5 lf 0 4.00 1N70-50-JB mudded joint fitting on cardboard lag 0 ea 10 4.00 1N70-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
1N71-50-JB magnesia pipe lagging 15 lf 0 4.00 1N71-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
1N72-50-JB magnesia pipe lagging 20 lf 0 4.00 1N72-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
1N74-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 1N74-50-JB mudded joint fitting on cardboard lag 0 ea 12 4.00
1N75-50-JB magnesia pipe lagging 25 lf 0 4.00 1N75-50-JB mudded joint ftg on mag pipe lag 0 ea 14 4.00
1N76-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 1N76-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N77-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 1N77-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N80-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 1N80-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N81-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 1N81-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N82-50-JB cardboard wrap pipe lagging 5 lf 0 4.00
Building 50 - 1st Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 1N82-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N83-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 1N83-50-JB mudded joint fitting on cardboard lag 0 ea 5 4.00
1N84-50-JB cardboard wrap pipe lagging 18 lf 0 4.00 1N84-50-JB mudded joint fitting on cardboard lag 0 ea 8 4.00
1N85-50-JB cardboard wrap pipe lagging 25 lf 0 4.00 1N85-50-JB mudded joint fitting on cardboard lag 0 ea 7 4.00
1N86-50-JB cardboard wrap pipe lagging 90 lf 0 4.00 1N86-50-JB mudded joint fitting on cardboard lag 0 ea 21 4.00
1N88A-50-JB magnesia pipe lagging 35 lf 0 4.00 1N88A-50-JB mudded joint ftg on mag pipe lag 0 ea 17 4.00
1N89-50-JB magnesia pipe lagging 20 lf 0 4.00 1N89-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
1S02B-50-JB cardboard wrap pipe lagging 20 lf 0 4.00 1S02B-50-JB mudded joint fitting on cardboard lag 0 ea 12 4.00
1S04-50-JB cardboard wrap pipe lagging 60 lf 0 4.00 1S04-50-JB magnesia pipe lagging 25 lf 0 4.00 1S04-50-JB mudded joint fitting on cardboard lag 0 ea 16 4.00 1S04-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
1S06-50-JB mudded joint fitting on fiberglas lag 0 ea 15 4.00
1S07-50-JB mudded joint fitting on fiberglas lag 0 ea 28 4.00 1S07-50-JB mudded joint fitting on fiberglas lag 0 ea 10 6.00 1S07-50-JB white canvas duct connector, woven 20 sf 0 0.00
1S08-50-JB cardboard wrap pipe lagging 2 lf 0 4.00 1S08-50-JB mudded joint fitting on cardboard lag 0 ea 4 4.00
1S27-50-JB magnesia pipe lagging 70 lf 0 4.00 1S27-50-JB mudded joint ftg on mag pipe lag 0 ea 34 4.00
1S31-50-JB magnesia pipe lagging 20 lf 0 4.00 1S31-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
1S37-50-JB magnesia pipe lagging 20 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
1S38-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 1S38-50-JB mudded joint ftg on mag pipe lag 0 ea 7 4.00
1S40-50-JB magnesia pipe lagging 100 lf 0 4.00 1S40-50-JB mudded joint fitting on tar paper lag 0 ea 4 4.00 1S40-50-JB mudded joint ftg on mag pipe lag 0 ea 28 4.00
1S42A-50-JB cardboard wrap pipe lagging 55 lf 0 4.00 1S42A-50-JB mudded joint fitting on cardboard lag 0 ea 15 4.00
1S44-50-JB tar joint fitting on fiberglas lag 0 ea 2 4.00
1S48-50-JB cardboard wrap pipe lagging 60 lf 0 4.00 1S48-50-JB mudded joint fitting on cardboard lag 0 ea 13 4.00 1S48-50-JB mudded joint fitting on fiberglas lag 0 ea 22 4.00
1S50-50-JB cardboard wrap pipe lagging 29 lf 0 4.00 1S50-50-JB magnesia pipe lagging 5 lf 0 4.00 1S50-50-JB mudded joint fitting on cardboard lag 0 ea 14 4.00 1S50-50-JB mudded joint fitting on fiberglas lag 0 ea 5 4.00 1S50-50-JB mudded joint fitting on tar paper lag 0 ea 3 4.00
H101-50-JB mudded joint fitting on tar paper lag 0 ea 6 4.00 H101-50-JB tar joint fitting on fiberglas lag 0 ea 18 4.00 H101-50-JB tar joint fitting on fiberglas lag 0 ea 2 8.00
H103-50-JB magnesia pipe lagging 15 lf 0 4.00 H103-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 H103-50-JB tar joint fitting on fiberglas lag 0 ea 24 4.00
H104-50-JB tar joint fitting on fiberglas lag 0 ea 10 4.00
H105-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00 H105-50-JB tar joint fitting on fiberglas lag 0 ea 6 4.00
H106-50-JB magnesia pipe lagging 35 lf 0 4.00 H106-50-JB mudded joint ftg on mag pipe lag 0 ea 16 4.00 H106-50-JB tar joint fitting on fiberglas lag 0 ea 4 4.00
H107-50-JB tar joint fitting on fiberglas lag 0 ea 20 4.00
H108-50-JB magnesia pipe lagging 6 lf 0 4.00 H108-50-JB mudded joint fitting on fiberglas lag 0 ea 23 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H108-50-JB tar joint fitting on fiberglas lag 0 ea 12 4.00
H109-50-JB mudded joint fitting on tar paper lag 0 ea 8 4.00 H109-50-JB tar joint fitting on fiberglas lag 0 ea 30 4.00
H110-50-JB mudded joint fitting on cardboard lag 0 ea 3 4.00 H110-50-JB tar joint fitting on fiberglas lag 0 ea 20 4.00
S101-50-JB magnesia pipe lagging 1 lf 0 4.00 S101-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00
S103-50-JB magnesia pipe lagging 4 lf 0 4.00 S103-50-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00
1038 631TOTALS
2nd FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2N43-50-JB magnesia pipe lagging 6 lf 0 4.00 2N43-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 2N43-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
2N48-50-JB magnesia pipe lagging 5 lf 0 4.00 2N48-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00
2N49A-50-JB magnesia pipe lagging 12 lf 0 4.00 2N49A-50-JB mudded joint ftg on mag pipe lag 0 ea 7 4.00
2N51-50-JB cardboard wrap pipe lagging 30 lf 0 4.00
2N52-50-JB cardboard wrap pipe lagging 25 lf 0 4.00 2N52-50-JB mudded joint fitting on cardboard lag 0 ea 7 4.00
2N53-50-JB magnesia pipe lagging 75 lf 0 4.00 2N53-50-JB mudded joint ftg on mag pipe lag 0 ea 30 4.00 2N53-50-JB tar joint fitting on fiberglas lag 0 ea 4 4.00
2N56A-50-JB cardboard wrap pipe lagging 15 lf 0 4.00 2N56A-50-JB mudded joint fitting on cardboard lag 0 ea 11 4.00 2N56A-50-JB mudded joint fitting on tar wrap lag 0 ea 4 4.00 2N56A-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
2N57A-50-JB cardboard wrap pipe lagging 45 lf 0 4.00 2N57A-50-JB magnesia pipe lagging 12 lf 0 4.00 2N57A-50-JB mudded joint fitting on cardboard lag 0 ea 29 4.00 2N57A-50-JB mudded joint fitting on tar wrap lag 0 ea 1 4.00 2N57A-50-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00 2N57A-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
2N69-50-JB cardboard wrap pipe lagging 10 lf 0 4.00 2N69-50-JB magnesia pipe lagging 30 lf 0 4.00 2N69-50-JB mudded joint fitting on cardboard lag 0 ea 2 4.00 2N69-50-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00
2N71-50-JB mudded joint fitting on fiberglass lag 0 ea 24 4.00 2N71-50-JB mudded joint fitting on fiberglass lag 0 ea 19 6.00
2N72-50-JB magnesia pipe lagging 20 lf 0 4.00 2N72-50-JB mudded joint ftg on mag pipe lag 0 ea 8 4.00
Building 50 - 2nd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2N74-50-JB cardboard wrap pipe lagging 1 lf 0 4.00 2N74-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
2N77-50-JB cardboard wrap pipe lagging 22 lf 0 4.00 2N77-50-JB magnesia pipe lagging 15 lf 0 4.00 2N77-50-JB mudded joint fitting on cardboard lag 0 ea 11 4.00 2N77-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
2N80-50-JB magnesia pipe lagging 50 lf 0 4.00 2N80-50-JB mudded joint ftg on mag pipe lag 0 ea 14 4.00
2N81A-50-JB magnesia pipe lagging 4 lf 0 4.00 2N81A-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 2N81A-50-JB tar joint fitting on fiberglas lag 0 ea 6 4.00
2S01-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 2S01-50-JB magnesia pipe lagging 35 lf 0 4.00 2S01-50-JB mudded joint fitting on cardboard lag 0 ea 12 4.00 2S01-50-JB mudded joint ftg on mag pipe lag 0 ea 15 4.00
2S03-50-JB cardboard wrap pipe lagging 20 lf 0 4.00 2S03-50-JB mudded joint fitting on cardboard lag 0 ea 15 4.00
2S06-50-JB magnesia pipe lagging 70 lf 0 4.00 2S06-50-JB mudded joint fitting on tar wrap lag 0 ea 4 4.00 2S06-50-JB mudded joint ftg on mag pipe lag 0 ea 22 4.00 2S06-50-JB tar paper wrap pipe lagging 23 lf 0 4.00
2S07-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 2S07-50-JB magnesia pipe lagging 10 lf 0 4.00 2S07-50-JB mudded joint fitting on cardboard lag 0 ea 3 4.00 2S07-50-JB mudded joint ftg on mag pipe lag 0 ea 8 4.00
2S09-50-JB magnesia pipe lagging 15 lf 0 4.00 2S09-50-JB mudded joint fitting on fiberglass lag 0 ea 13 4.00 2S09-50-JB mudded joint fitting on fiberglass lag 0 ea 20 6.00 2S09-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
2S10-50-JB mudded joint fitting on fiberglass lag 0 ea 16 4.00
2S11-50-JB cardboard wrap pipe lagging 40 lf 0 4.00 2S11-50-JB mudded joint fitting on fiberglass lag 0 ea 12 2.00
2S18A-50-JB cardboard wrap pipe lagging 13 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2S18A-50-JB mudded joint fitting on cardboard lag 0 ea 4 4.00
2S20A-50-JB cardboard wrap pipe lagging 10 lf 0 4.00 2S20A-50-JB magnesia pipe lagging 3 lf 0 4.00 2S20A-50-JB mudded joint fitting on cardboard lag 0 ea 4 4.00 2S20A-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00 2S20A-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
2S26-50-JB magnesia pipe lagging 70 lf 0 4.00 2S26-50-JB mudded joint ftg on mag pipe lag 0 ea 36 4.00 2S26-50-JB tar joint fitting on fiberglas lag 0 ea 4 4.00
2S27-50-JB cardboard wrap pipe lagging 8 lf 0 4.00 2S27-50-JB mudded joint fitting on cardboard lag 0 ea 3 4.00
2S29-50-JB cardboard wrap pipe lagging 30 lf 0 4.00
2S30A-50-JB magnesia pipe lagging 15 lf 0 4.00 2S30A-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
2S31-50-JB magnesia pipe lagging 15 lf 0 4.00 2S31-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
2S35-50-JB magnesia pipe lagging 75 lf 0 4.00 2S35-50-JB mudded joint fitting on tar wrap lag 0 ea 7 4.00 2S35-50-JB mudded joint ftg on mag pipe lag 0 ea 26 4.00 2S35-50-JB tar paper wrap pipe lagging 30 lf 0 4.00
2S37-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 2S37-50-JB magnesia pipe lagging 75 lf 0 4.00 2S37-50-JB mudded joint ftg on mag pipe lag 0 ea 25 4.00
H201-50-JB cardboard wrap pipe lagging 75 lf 0 4.00 H201-50-JB mudded joint fitting on cardboard lag 0 ea 25 4.00 H201-50-JB tar joint fitting on fiberglas lag 0 ea 38 4.00 H201-50-JB tar joint fitting on fiberglas lag 0 ea 2 10.00 H201-50-JB tar paper on fiberglas duct insulation 100 sf 0 0.00
H204-50-JB tar joint fitting on fiberglas lag 0 ea 11 6.00 H204-50-JB tar joint fitting on fiberglas lag 0 ea 3 10.00
H205-50-JB cardboard wrap pipe lagging 25 lf 0 4.00 H205-50-JB mudded joint fitting on cardboard lag 0 ea 8 4.00 H205-50-JB tar joint fitting on fiberglas lag 0 ea 8 6.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
H206-50-JB tar joint fitting on fiberglas lag 0 ea 6 4.00
H206A-50-JB cardboard wrap pipe lagging 40 lf 0 4.00 H206A-50-JB mudded joint fitting on cardboard lag 0 ea 26 4.00
H207-50-JB mudded joint ftg on mag pipe lag 0 ea 3 4.00 H207-50-JB tar joint fitting on fiberglas lag 0 ea 38 4.00 H207-50-JB tar joint fitting on fiberglas lag 0 ea 5 8.00
S201-50-JB mudded joint fitting on tar wrap lag 0 ea 3 4.00 S201-50-JB tar paper wrap pipe lagging 12 lf 0 4.00
S203-50-JB mudded joint fitting on tar wrap lag 0 ea 4 4.00 S203-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
1336 659TOTALS
3rd FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 3N52A-50-JB magnesia pipe lagging 10 lf 0 4.00 3N52A-50-JB mudded joint ftg on mag pipe lag 0 ea 7 4.00
3N56-50-JB tar joint fitting on fiberglas lag 0 ea 2 4.00
3N62A-50-JB cardboard wrap pipe lagging 4 lf 0 4.00 3N62A-50-JB mudded joint fitting on cardboard lag 0 ea 1 4.00
3N73-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
3N75-50-JB mudded joint ftg on fiberglas lag 0 ea 23 4.00 3N75-50-JB mudded joint ftg on fiberglas lag 0 ea 12 6.00
3S03-50-JB magnesia pipe lagging 20 lf 0 4.00 3S03-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00 3S03-50-JB tar joint fitting on fiberglas lag 0 ea 6 4.00
3S04-50-JB magnesia pipe lagging 10 lf 0 4.00 3S04-50-JB mudded joint ftg on mag pipe lag 0 ea 1 4.00
3S08-50-JB cardboard wrap pipe lagging 55 lf 0 4.00 3S08-50-JB magnesia pipe lagging 60 lf 0 4.00 3S08-50-JB mudded joint fitting on cardboard lag 0 ea 8 4.00 3S08-50-JB mudded joint ftg on mag pipe lag 0 ea 22 4.00
3S11-50-JB cardboard wrap pipe lagging 40 lf 0 4.00 3S11-50-JB magnesia pipe lagging 5 lf 0 4.00 3S11-50-JB mudded joint fitting on cardboard lag 0 ea 3 4.00 3S11-50-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00 3S11-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
3S12-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 3S12-50-JB magnesia pipe lagging 8 lf 0 4.00 3S12-50-JB mudded joint ftg on mag pipe lag 0 ea 9 4.00
3S14-50-JB mudded joint ftg on fiberglas lag 0 ea 16 4.00 3S14-50-JB mudded joint ftg on fiberglas lag 0 ea 12 6.00
3S15-50-JB mudded joint ftg on fiberglas lag 0 ea 15 4.00
3S16-50-JB cardboard wrap pipe lagging 8 lf 0 4.00
Building 50 - 3rd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 3S19A-50-JB magnesia pipe lagging 20 lf 0 4.00 3S19A-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
3S19B-50-JB magnesia pipe lagging 20 lf 0 4.00 3S19B-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
3S19C-50-JB magnesia pipe lagging 20 lf 0 4.00 3S19C-50-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
3S19D-50-JB magnesia pipe lagging 20 lf 0 4.00 3S19D-50-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00
3S33-50-JB magnesia pipe lagging 70 lf 0 4.00 3S33-50-JB mudded joint ftg on mag pipe lag 0 ea 35 4.00 3S33-50-JB tar joint fitting on fiberglas lag 0 ea 4 6.00
3S36-50-JB cardboard wrap pipe lagging 20 lf 0 4.00
3S37A-50-JB magnesia pipe lagging 15 lf 0 4.00 3S37A-50-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00
3S41-50-JB magnesia pipe lagging 20 lf 0 4.00
3S44-50-JB cardboard wrap pipe lagging 30 lf 0 4.00 3S44-50-JB magnesia pipe lagging 154 lf 0 4.00
H301-50-JB cardboard wrap pipe lagging 80 lf 0 4.00 H301-50-JB mudded joint fitting on cardboard lag 0 ea 50 4.00
H301A-50-JB tar joint fitting on fiberglas lag 0 ea 39 4.00
H303-50-JB magnesia pipe lagging 15 lf 0 4.00 H303-50-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 H303-50-JB tar joint fitting on fiberglas lag 0 ea 10 4.00
H304-50-JB magnesia pipe lagging 12 lf 0 4.00 H304-50-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00 H304-50-JB tar joint fitting on fiberglas lag 0 ea 6 4.00
H305-50-JB tar joint fitting on fiberglas lag 0 ea 50 6.00
H305A-50-JB cardboard wrap pipe lagging 80 lf 0 4.00 H305A-50-JB mudded joint fitting on cardboard lag 0 ea 50 4.00 H305A-50-JB tar joint fitting on fiberglas lag 0 ea 5 8.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
S301-50-JB mudded joint fitting on tar paper lag 0 ea 3 4.00 S301-50-JB tar paper wrap pipe lagging 12 lf 0 4.00
S303-50-JB mudded joint fitting on tar paper lag 0 ea 1 4.00 S303-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
868 465TOTALS
4th FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 4N42-50-JB mudded joint fitting on tar paper lag 0 ea 3 4.00 4N42-50-JB tar joint fitting on fiberglas lag 0 ea 2 10.00 4N42-50-JB tar paper wrap pipe lagging 23 lf 0 4.00
4N52-50-JB tar joint fitting on fiberglas lag 0 ea 4 4.00
4N70-50-JB mudded joint ftg on fiberglas lag 0 ea 12 4.00 4N70-50-JB mudded joint ftg on fiberglas lag 0 ea 32 4.00
4N71-50-JB magnesia pipe lagging 30 lf 0 4.00 4N71-50-JB mudded joint ftg on mag pipe lag 0 ea 8 4.00
4S01A-50-JB cardboard wrap pipe lagging 18 lf 0 4.00 4S01A-50-JB mudded joint fitting on cardboard lag 0 ea 10 4.00
4S07-50-JB tar paper wrap pipe lagging 18 lf 0 4.00
4S10-50-JB mudded joint ftg on fiberglas lag 0 ea 40 4.00 4S10-50-JB mudded joint ftg on fiberglas lag 0 ea 14 6.00
4S19A-50-JB cardboard wrap pipe lagging 3 lf 0 4.00
4S21A-50-JB cardboard wrap pipe lagging 5 lf 0 4.00 4S21A-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
4S23A-50-JB cardboard wrap pipe lagging 3 lf 0 4.00
4S29-50-JB tar joint fitting on fiberglas lag 0 ea 4 4.00
4S40-50-JB mudded joint fitting on tar paper lag 0 ea 1 4.00 4S40-50-JB mudded joint ftg on fiberglas lag 0 ea 6 4.00 4S40-50-JB tar paper wrap pipe lagging 6 lf 0 4.00
H401A-50-JB cardboard wrap pipe lagging 125 lf 0 4.00 H401A-50-JB mudded joint fitting on cardboard lag 0 ea 60 4.00 H401A-50-JB mudded joint fitting on tar paper lag 0 ea 6 4.00 H401A-50-JB tar paper wrap pipe lagging 25 lf 0 4.00
H404-50-JB mudded joint fitting on tar paper lag 0 ea 13 4.00 H404-50-JB tar joint fitting on fiberglas lag 0 ea 10 6.00 H404-50-JB tar paper wrap pipe lagging 55 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H405-50-JB mudded joint fitting on tar paper lag 0 ea 45 4.00 H405-50-JB tar joint fitting on fiberglas lag 0 ea 38 6.00 H405-50-JB tar paper wrap pipe lagging 250 lf 0 4.00
S401-50-JB mudded joint fitting on tar paper lag 0 ea 3 4.00 S401-50-JB tar paper wrap pipe lagging 10 lf 0 4.00
S403-50-JB mudded joint fitting on tar paper lag 0 ea 4 4.00 S403-50-JB tar paper wrap pipe lagging 12 lf 0 4.00
593 315TOTALS
PENTHOUSE
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-01 50 Ground Floor Flooring Adhesive No No 10 Intact 1 Access 9
HMA-02 50 Ground Floor 12"x12" Floor Tile & Adhesive No Yes 10 Intact 2 Floor
Maintenance 7
HMA-03 50 Ground Floor 9"x9" Floor Tile No Yes 10 Intact 2 Floor
Maintenance 7
HMA-04 50 Ground Floor 9"x9" Floor Tile & Adhesive No Yes 10 Intact 2 Floor
Maintenance 7
HMA-06 50 Ground Floor Transite Panels No No 10 Intact 1 Access 9
HMA-07 50 Ground Floor Mastic on Ductwork No No 9 Condition 2 Access 9
HMA-08 50 Ground Floor Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-09 50 Ground Floor
Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
HMA-10 50 Ground Floor Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-11 50 Ground Floor Transite Counter Tops No No 10 Intact 1 Access 9
HMA-12 50 Ground Floor Tank Insulation Yes No 7 Damage 2 Maintenance 6
HMA-03 50 1 9"x9" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-05 50 1 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-08 50 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
Material Description Removal Priority 3
Building 50 - 1st Floor
Current Condition 1
Building 50 - Ground Floor
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Material Description Removal Priority 3
Current Condition 1Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor
HMA-09 50 1 Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
HMA-10 50 1 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-01 50 2 Flooring Adhesive No No 10 Intact 1 Access 9
HMA-02 50 2 12"x12" Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 50 2 9"x9" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 50 2 9"x9" Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-08 50 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-09 50 2 Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
HMA-10 50 2 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-02 50 3 12"x12" Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-08 50 3 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-09 50 3 Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
HMA-10 50 3 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-03 50 4 9"x9" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
Building 50 - 2nd Floor
Building 50 - 3rd Floor
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Material Description Removal Priority 3
Current Condition 1Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg Floor
HMA-05 50 4 12"x12" Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-06 50 4 Transite Panels No No 10 Intact 1 Access 9
HMA-08 50 4 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-09 50 4 Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
HMA-10 50 4 Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-10 50 Penthouse Fire Doors (Assumed) No Restricted 10 Intact 1 Maintenance 10
Building 50 - Penthouse
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB50 00 GN27 JB-50-00-GN27-14 TSI
JB50 00 GS15 JB-50-00-GS15-15 Off-white mudded joint fitting on cardboard lagging JB50 00 GN21 JB-50-00-M-GN21-50 6" brown cove base JB50 00 GN28 JB-50-00-M-GN28-65 4" mauve cove base JB50 00 GN28 JB-50-00-M-GN28-66 4" green cove base JB50 00 GN32 JB-50-00-M-GN32-52 1x1 acoustical panel JB50 00 GN36 JB-50-00-M-GN36-53 2x4 worm holes & worm width ceiling tile JB50 00 GN38 JB-50-00-M-GN38-54 2x2 rough textured ceiling tile JB50 00…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.