ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 25
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement No ACM HMA-09 Exterior Surfacing Material HMA-04 Pipe Insulation & Fittings No ACM
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
1 HMA-01 12x12 Floor Tile & Adhesive HMA-08 Flooring Adhesive HMA-09 Exterior Surfacing Material HMA-04 Pipe Insulation & Fittings HMA-05 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 12x12 Floor Tile & Adhesive HMA-02 9x9 Floor Tile
HMA-03 12x12 Floor Tile HMA-08 Flooring Adhesive
HMA-09 Exterior Surfacing Material HMA-04 Pipe Insulation & Fittings HMA-05 Fire Door (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
3 HMA-02 9x9 Floor Tile HMA-03 12x12 Floor Tile HMA-09 Exterior Surfacing Material No ACM HMA-06 Black Mastic on Plaster Ceiling
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Attic No ACM No ACM No ACM HMA-07 Vibration Isolator (Duct Connector)
Building 25 - Basement
Building 25 - 1st Floor
Building 25 - 2nd Floor
Building 25 - Attic
Building 25 - 3rd Floor
BASEMENT
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI S002-25-JB magnesia pipe lag 16 lf 0 4.00 S002-25-JB mudded joint ftg on mag pipe lag 0 ea 2 4.00
Z003-25-JB magnesia pipe lag 75 lf 0 4.00 Z003-25-JB magnesia pipe lag 30 lf 0 6.00 Z003-25-JB mudded joint ftg on mag pipe lag 0 ea 26 4.00 Z003-25-JB mudded joint ftg on mag pipe lag 0 ea 8 6.00
121 36
Building 25 - Basement
TOTALS
1st FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 101-25-JB magnesia pipe lag 40 lf 0 4.00
103-25-JB magnesia pipe lag 20 lf 0 4.00
113-25-JB magnesia pipe lag 40 lf 0 4.00
119-25-JB magnesia pipe lag 20 lf 0 4.00
121-25-JB magnesia pipe lag 20 lf 0 4.00 121-25-JB mudded joint ftg on mag pipe lag 0 ea 6 6.00
140 6
Building 25 - 1st Floor
2nd FLOOR
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI S201-25-JB magnesia pipe lag 12 lf 0 6.00 S201-25-JB mudded joint ftg on mag pipe lag 0 ea 12 6.00
12 12
Building 25 - 2nd Floor
3rd FLOOR
ATTIC
Condition and Removal Priority Table
Qualitative Ranking Numerical Rating
Good 8, 9, 10
Fair 4, 5, 6, 7
Poor 1, 2, 3
Physical Disturbance Environmental Disturbance
Low 1, 2, 3
Medium 4, 5, 6, 7
High 8, 9, 10
Qualitative Ranking Numerical Rating High 1, 2, 3
Medium 4, 5, 6, 7
Low 8, 9, 10
1 Qualitative Rankings and Quantitative (Numerical) Ratings for Current Condition
2 Qualitative Rankings and Quantitative (Numerical) Ratings for Potential for Disturbance
Assessment FactorsQualitative Ranking Numerical Rating
Description of Current Condition Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris.
Address with on-going maintenance procedures
Maintain in good condition
Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris..
3 Qualitative Rankings and Quantitative (Numerical) Ratings for Removal Priority
Description of Current Condition Address short-term
Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damage; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Accessibility: accessibility during normal operations
Activities: activities that people do and how often they do them
Vibration: vibration from operating machinery, HVAC equipment, and so forth
Air/Dust: air currents strong enough to dislodge loose ACM; airborne dust that can erode material
Corrosive: corrosive atmosphere or liquids that can erode the covering or matrix
Water Damage: water damage from leaking roof, pipe or other source
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Rating Based On Rating Based On
HMA-04 25 Basement Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-09 25 Basement Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-01 25 1 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-08 25 1 Flooring Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 25 1 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-05 25 1 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-09 25 1 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-01 25 2 12x12 Floor Tile & Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-02 25 2 9x9 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 25 2 12x12 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-08 25 2 Flooring Adhesive No Yes 10 Intact 2 Floor Maintenance 7
HMA-04 25 2 Pipe Insulation & Fittings Yes No 7 Damage 2 Access 6
HMA-05 25 1 Fire Door (Assumed) No Restricted 10 Intact 1 Maintenance 10
HMA-09 25 2 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
Floor Material Description
Building 25 - 2nd Floor
Removal Priority 3
Building 25 - 1st Floor
Current Condition 1
Building 25 - Basement
Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg
2008 THREE-YEAR ASBESTOS REINSPECTION
CONDITION AND REMOVAL PRIORITY TABLE
Floor Material Description Removal Priority 3
Current Condition 1Friable Yes/No
Accessibility Yes/No
Restricted
Potential for Disturbance 2
Homogeneous Area No. Bldg
HMA-02 25 3 9x9 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-03 25 3 12x12 Floor Tile No Yes 10 Intact 2 Floor Maintenance 7
HMA-06 25 2 Black Mastic on Plaster Ceiling No No 10 Intact 1 Access 9
HMA-09 25 3 Exterior Surfacing Material No Yes 9 Condition 2 Accessibility 9
HMA-07 25 Attic Vibration Isolator (Duct Connector) No No 10 Intact 1 Access 10
Building 25 - 3rd Floor
Building 25 - Attic
Master Summary Table Asbestos Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
JB25 00 S002 JB-25-00-T-S002-1 Magnesia pipe lagging JB25 00 S002 JB-25-00-T-S002-2 Mudded joint fitting on magnesia pipe lagging JB25 00 Z002 JB-25-00-T-Z003-3 Off-white TSI JB25 00 Z002 JB-25-00-T-Z003-4 White TSI JB25 00 Z002 JB-25-00-T-Z003-5 White TSI JB25 00 Z002 JB-25-00-T-Z003-6 Off-white TSI JB25 00 S002 JB-25-00-S-S002-7 Off-white hardwall plaster JB25 00 S002 JB-25-00-M-S002-8 4" black cove base JB25 01 113A JB-25-01-M-113A-1 Gypsum drywall JB25 01 123 JB-25-01-M-123-2 2x4 white 2/pecks ceiling tile JB25 01 120 JB-25-01-M-120-3 4" gray cove base JB25 01 126 JB-25-01-S-126-4 Gray hardwall plaster JB25 02 H201 JB-25-02-M-H201-1 2x4 white w/pecks ceiling tile JB25 02 206 JB-25-02-M-206-2 4" gray cove base JB25 02 208B JB-25-02-M-208B-3 Gypsum drywall JB25 02 208B JB-25-02-S-208B-4 Blue/Brown hardwall Plaster JB25 03 305 JB-25-03-S-305-1 Gray hardwall plaster JB25 03 300 JB-25-03-M-300-2 2x4 white w/pecks ceiling tile JB25 03 307 JB-25-03-M-307-3 4" brown cove base JB25 03 301 JB-25-03-M-301-4 4" tan cove base JB25 03 311 JB-25-03-M-311-5 Gypsum drywall JB25 SW S202 JB-25-SW-M-S202-1 Cement board material JB25 SW S002 JB-25-SW-S-S002-2 Brown hardwall plaster JB25 SW S102 JB-25-SW-M-S102-3 4" black cove base JB25 SW S101 JB-25-SW-T-S101-4 Magnesia pipe lagging JB25 SW S101 JB-25-SW-T-S101-5 White TSI JB25 SW S101 JB-25-SW-T-S101-6 White TSI JB25 SW S101 JB-25-SW-T-S101-7 Mudded joint fitting on magnesia pipe lagging JB25 SW S101 JB-25-SW-T-S101-8 Gray TSI JB25 SW S101 JB-25-SW-T-S101-9 Gray TSI JB25 SW S101 JB-25-SW-T-S101-10 Cardboard wrap pipe lagging JB25 SW S201 JB-25-SW-T-S201-11 Brown TSI JB25 SW S201 JB-25-SW-T-S201-12 Brown TSI JB25 SW S101 JB-25-SW-T-S101-13 Mudded joint fitting on cardboard lagging JB25 SW S101 JB-25-SW-T-S101-14 Gray TSI JB25 SW S201 JB-25-SW-T-S201-15 Gray TSI JB25 00 Z002 JB-25-00-M-Z002-01A Black rubberized duct connector JB25 01 108 JB-25-01-M-108-01A Black rubberized duct connector JB25 02 210 JB-25-02-M-210-01A Black rubberized duct connector JB25 03 305 JB-25-03-M-305-01A Black rubberized duct connector
JB25 00 Z002 JB-25-00-S-Z002-001A Gray textured material JB25 00 Z002 JB-25-00-S-Z002-002A Black mastic JB25 01 S102 JB-25-01-F-S102-003A Layer 1 - White 12x12 floor tile
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
2008 Asbestos Reinspection
1994 Initial Asbestos Inspection
2008 THREE-YEAR ASBESTOS REINSPECTION
SUMMARY OF BULK SAMPLES TAKEN TO DATE
Building Floor Room Sample ID Material Description
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Purple = Abated ACM
JB25 01 S102 JB-25-01-F-S102-003A Layer 2 - Yellow mastic JB25 01 S102 JB-25-01-F-S102-003A Layer 3 - Black mastic JB25 01 S101 JB-25-01-F-S101-004A White 12x12 floor tile, black mastic JB25 02 S202 JB-25-02-F-S202-005A White 12x12 floor tile, black mastic JB25 02 210 JB-25-02-F-210-006A Layer 1 - Brown 9x9 floor tile JB25 02 210 JB-25-02-F-210-006A Layer 2 - Black mastic JB25 03 313 JB-25-03-F-313-007A Layer 1 - Green 9x9 floor tile JB25 03 313 JB-25-03-F-313-007A Layer 2 - Carpet adhesive, black mastic JB25 03 H301 JB-25-03-F-H301-008A Layer 1 - Brown 9x9 floor tile JB25 03 H301 JB-25-03-F-H301-008A Layer 2 - Carpet adhesive, black mastic JB25 03 316 JB-25-03-F-316-009A Layer 1 - Green 9x9 floor tile JB25 03 316 JB-25-03-F-316-009A Layer 2 - Carpet adhesive, black mastic JB25 03 308 JB-25-03-M-308-010A Black mastic, plaster ceiling JB25 03 S302 JB-25-03-F-S302-011A Layer 1 - Green 9x9 floor tile JB25 03 S302 JB-25-03-F-S302-011A Layer 2 - Black mastic JB25 03 302 JB-25-03-F-302-012A Layer 1 - Brown 9x9 floor tile JB25 03 302 JB-25-03-F-302-012A Layer 2 - Carpet adhesive, black mastic JB25 04 Attic JB-25-04-M-AT-013A White vibration isolator JB25 04 Attic JB-25-04-M-AT-014A Brown vibration isolator
Asbestos-Containing Bulk Samples
2008 THREE-YEAR ASBESTOS REINSPECTION
LIST OF ASBESTOS-CONTAINING SAMPLES
Building Floor Room Sample ID Material Description
JB25 00 S002 JB-25-00-T-S002-1 Magnesia pipe lagging JB25 00 S002 JB-25-00-T-S002-2 Mudded joint fitting on magnesia pipe lagging JB25 00 Z002 JB-25-00-T-Z003-3 Off-white TSI JB25 00 Z002 JB-25-00-T-Z003-4 White TSI JB25 00 Z002 JB-25-00-T-Z003-5 White TSI JB25 00 Z002 JB-25-00-T-Z003-6 Off-white TSI JB25 SW S101 JB-25-SW-T-S101-4 Magnesia pipe lagging JB25 SW S101 JB-25-SW-T-S101-5 White TSI JB25 SW S101 JB-25-SW-T-S101-6 White TSI JB25 SW S101 JB-25-SW-T-S101-7 Mudded joint fitting on magnesia pipe lagging JB25 SW S101 JB-25-SW-T-S101-8 Gray TSI JB25 SW S101 JB-25-SW-T-S101-9 Gray TSI
JB25 01 S102 JB-25-01-F-S102-003A Layer 1 - White 12x12 floor tile JB25 01 S102 JB-25-01-F-S102-003A Layer 3 - Black mastic JB25 01 S101 JB-25-01-F-S101-004A White 12x12 floor tile, black mastic JB25 02 S202 JB-25-02-F-S202-005A White 12x12 floor tile, black mastic JB25 02 210 JB-25-02-F-210-006A Layer 1 - Brown 9x9 floor tile JB25 03 313 JB-25-03-F-313-007A Layer 1 - Green 9x9 floor tile JB25 03 H301 JB-25-03-F-H301-008A Layer 1 - Brown 9x9 floor tile JB25 03 316 JB-25-03-F-316-009A Layer 1 - Green 9x9 floor tile JB25 03 308 JB-25-03-M-308-010A Black mastic, plaster ceiling JB25 03 S302 JB-25-03-F-S302-011A Layer 1 - Green 9x9 floor tile JB25 03 302 JB-25-03-F-302-012A Layer 1 - Brown 9x9 floor tile JB25 04 Attic JB-25-04-M-AT-013A White vibration isolator
2008 Asbestos Reinspection
1994 Initial Asbestos Inspection
2008 Reinspection Inspection Logs
Client: Date: October 17, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
JB-25-00-S-Z002-001A Gray textured material 00 Z002 Middle of room Z002 on column
JB-25-00-S-Z002-002A Black mastic 00 Z002 Corner where room turns 90° to the left (looking from entrance) on brick wall
JB-25-01-F-S102-003A Layer 1 - White 12x12 floor tile 01 S102 In the middle of room S102 right beside heater
JB-25-01-F-S102-003A Layer 2 - Yellow mastic 01 S102 In the middle of room S102 right beside heater
JB-25-01-F-S102-003A Layer 3 - Black mastic 01 S102 In the middle of room S102 right beside heater
JB-25-01-F-S101-004A White 12x12 floor tile, black mastic 01 S101 Northeast corner of hall behind fire door
JB-25-02-F-S202-005A White 12x12 floor tile, black mastic 02 S202 Southeast corner of room S202
JB-25-02-F-210-006A Layer 1 - Brown 9x9 floor tile 02 210 Southeast quadrant of room 210 under light
JB-25-02-F-210-006A Layer 2 - Black mastic 02 210 Southeast quadrant of room 210 under light
JB-25-03-F-313-007A Layer 1 - Green 9x9 floor tile 03 313 Southwest corner of room 313
JB-25-03-F-313-007A Layer 2 - Carpet adhesive, black mastic 03 313 Southwest corner of room 313
JB-25-03-F-H301-008A Layer 1 - Brown 9x9 floor tile 03 H301 Southeast corner of hall H301 beside vertical pipe
JB-25-03-F-H301-008A Layer 2 - Carpet adhesive, black mastic 03 H301 Southeast corner of hall H301 beside vertical pipe
JB-25-03-F-316-009A Layer 1 - Green 9x9 floor tile 03 316 Southeast corner of room 316
JB-25-03-F-316-009A Layer 2 - Carpet adhesive, black mastic 03 316 Southeast corner of room 316
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 25 St. Louis V. A. Medical Center
Client: Date: October 17, 2008 Location: Inspector(s): Donald Joiner and Joshua Anders Address: 1 Jefferson Barracks Drive, St. Louis, Missouri
Note:
Sample ID Material Description Floor Room Location
ASBESTOS INSPECTION LOG
Red = Asbestos-Containing Material (ACM) Blue = Non ACM Green = Non ACM (determined by Point Count analysis)
Jefferson Barracks Division - Building 25 St. Louis V. A. Medical Center
JB-25-03-M-308-010A Black mastic, plaster ceiling 03 308 Southeast quadrant above ceiling tile by vent
JB-25-03-F-S302-011A Layer 1 - Green 9x9 floor tile 03 S302 Northwest quadrant of room S302 in front of window
JB-25-03-F-S302-011A Layer 2 - Black mastic 03 S302 Northwest quadrant of room S302 in front of window
JB-25-03-F-302-012A Layer 1 - Brown 9x9 floor tile 03 302 Southeast corner of room 302
JB-25-03-F-302-012A Layer 2 - Carpet adhesive, black mastic 03 302 Southeast corner of room 302
JB-25-04-M-AT-013A White vibration isolator 04 Attic Northeast quadrant on air handler
JB-25-04-M-AT-014A Brown vibration isolator 04 Attic Southeast quadrant on air handler
GOOD = Surfacing material has no visible damage or small amounts of damage; covering on thermal system insulation is intact or has small amounts of damage; miscellaneous materials intact; no visible debris or small amounts of debris. FAIR = Surfacing material has moderate but not extensive amounts of visible damage; covering on thermal system insulation is cut or torn, exposing moderate but not extensive amounts of insulation; moderate but not extensive damage to miscellaneous materials such as floor tile; moderate but not extensive amounts of visible dust and debris. POOR = Extensive damage to surfacing material; covering on thermal system insulation is cut or torn extensively and insulation itself is damaged; miscellaneous materials such as floor tile extensively damaged and underlying mastic exposed; extensive amounts of dust and debris.
Material Category: F = Flooring S = Surfacing T = TSI M = Miscellaneous Friability: F=Friable NF=Non-Friable Condition: Good = 8, 9, 10 Fair = 4, 5, 6, 7 Poor = 1, 2, 3
Red = Asbestos-Containing Material Blue = Non Asbestos-Containing MaterialPlease use the following guidelines when reading this report:
Bulk Sample Location Drawings
BASEMENT
1st FLOOR
2nd FLOOR
3rd FLOOR
ATTIC
2008 Reinspection Photographs
BUILDING 25
sample does not contain asbestos
JB-25-00-S-Z002-001A JB-25-00-S-Z002-002A
JB-25-01-F-S102-003A JB-25-01-F-S101-004A
sample contains asbestos
JB-25-02-F-S202-005A JB-25-02-F-210-006A
JB-25-03-F-313-007A JB-25-03-F-H301-008A
JB-25-03-F-316-009A JB-25-03-M-308-010A
JB-25-03-F-S302-011A JB-25-03-F-302-012A
JB-25-04-M-AT-013A
JB-25-04-M-AT-014A
2008 Reinspection Laboratory Reports
Sample Location Appearance % Type
AsbestosNon-Asbestos
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805288
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 8:00 AM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 25 Basement
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 10/21/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-25-00-S-Z002-
001A 390805288-0001 grey textured material
Gray None Detected
Non-Fibrous
Heterogeneous
Cellulose19% Glass9%
Mica29% Non-fibrous (other)43%
JB-25-00-S-Z002-
002A 390805288-0002 blk mastic on brick wall
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)96% Quartz4%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (2) mailto:saintlouislab@emsl.com
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805307
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 5:30 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 25 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 11/3/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-25-01-F-S102-
003A floortile 390805307-0001 wht 12x12/ylw mastic/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile8%Non-fibrous (other)92%
JB-25-01-F-S102-
003A adhesive 390805307-0001A wht 12x12/ylw mastic/blk mastic
Yellow None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)96% Quartz2%
JB-25-01-F-S102-
003A adhesive 390805307-0001B wht 12x12/ylw mastic/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-25-01-F-S101-
004A floortile 390805307-0002 wht 12x12 w/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile8%Non-fibrous (other)92%
JB-25-01-F-S101-
004A adhesive 390805307-0002A wht 12x12 w/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-02-F-S202-
005A floortile 390805307-0003 wht 12x12 w/blk mastic
White Non-Fibrous
Heterogeneous
Chrysotile8%Non-fibrous (other)92%
JB-25-02-F-S202-
005A adhesive 390805307-0003A wht 12x12 w/blk mastic
Black Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
Sue Ferrario (20)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805307
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 5:30 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 25 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 11/3/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-25-02-F-210-
006A floortile 390805307-0004 brn 9x9 w/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-02-F-210-
006A adhesive 390805307-0004A brn 9x9 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Cellulose2% Non-fibrous (other)96% Quartz2%
JB-25-03-F-313-
007A floortile 390805307-0005 carpet glue/green 9x9/blk mastic
Green Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-03-F-313-
007A adhesive 390805307-0005A carpet glue/green 9x9/blk mastic
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-25-03-F-H301-
008A floortile 390805307-0006 carpet glue/brn 9x9/blk mastic
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-03-F-H301-
008A adhesive 390805307-0006A carpet glue/brn 9x9/blk mastic
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-25-03-F-316-
009A floortile 390805307-0007 carpet glue/green 9x9/blk mastic
Green Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805307
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 5:30 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 25 1st Floor
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 11/3/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-25-03-F-316-
009A adhesive 390805307-0007A carpet glue/green 9x9/blk mastic
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)98% Quartz2%
JB-25-03-M-308-
010A 390805307-0008 blk mastic on plaster ceiling
Black Non-Fibrous
Heterogeneous
Chrysotile9%Non-fibrous (other)91%
JB-25-03-F-S302-
011A floortile 390805307-0009 grn 9x9 w/blk mastic
Green Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-03-F-S302-
011A adhesive 390805307-0009A grn 9x9 w/blk mastic
Black None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)96% Quartz4%
JB-25-03-F-302-
012A floortile 390805307-0010 brn 9x9 w/blk mastic under carpet glue
Brown Non-Fibrous
Heterogeneous
Chrysotile12%Non-fibrous (other)88%
JB-25-03-F-302-
012A adhesive 390805307-0010A brn 9x9 w/blk mastic under carpet glue
Various None Detected
Non-Fibrous
Heterogeneous
Non-fibrous (other)100%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)
% Fibrous % Non-Fibrous
Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy
390805308
Attn: Roy W. Dowling ALTEC Environmental Consultants, Inc.
2920 Truly Lane Shreveport, LA 71138
Customer PO:
Received: 10/20/08 5:30 PM
VAMC Reinspection 08-14529 VAMC Reinspection JB Building 25 Attic
Customer ID: ALT50
Fax: (318) 687-9923 Phone: (318) 687-3771 Project:
EMSL Order:
EMSL Proj:
10/21/2008Analysis Date:
Report Date: 10/21/2008
EMSL Analytical, Inc.
11040A Lin-Valle Drive, Saint Louis, MO 63123 Phone: (314) 845-8910 Fax: (314) 845-6459 Email: saintlouislab@emsl.com
JB-25-04-M-AT-
013A 390805308-0001 wht vibration isolator
White Fibrous
Heterogeneous
Chrysotile58%Synthetic38% Non-fibrous (other)4%
JB-25-04-M-AT-
014A 390805308-0002 brn vibration isolator
Brown None Detected
Fibrous
Heterogeneous
Fibrous (other)89% Non-fibrous (other)11%
Jeff Siria, Laboratory Manager or other approved signatory
PLM-1
Analyst(s)
THIS IS THE LAST PAGE OF THE REPORT.
Due to magnification limitations inherent in PLM, asbestos fibers in dimensions below the resolution capability of PLM may not be detected. The limit of detection as stated in the method is 1%. The above test report relates only to the items tested and may not be reproduced in any form without the express written approval of EMSL Analytical, Inc. EMSL’s liability is limited to the cost of analysis. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted. This report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analysis performed by EMSL St. Louis (AIHA #102636, NVLAP # 200742-0, CA ELAP #2668)