EXHIBIT C - Past Performance Questionnaire.docx

DOCX document 545 KB Posted

Attached to
Z1DA--MINOR-CONST 528-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC
Solicitation number
36C24224R0071
Issued by

About this file

This document is a Past Performance Questionnaire related to a federal contract opportunity for the Department of Veterans Affairs to build a new Emergency Department at the Albany VAMC.

The key details are:

  • The contractor is requested to send this questionnaire to past performance references and have them complete and return it directly to the Contracting Officer by August 26, 2024. The questionnaire covers the contractor's quality of work, timeliness, business practices, compliance, safety, and overall customer satisfaction on a previous project.
  • The related federal contract opportunity is for the construction of a new Emergency Department at the Albany VAMC, with a period of performance of 550 calendar days. The contractor will be required to utilize the VISN 2 Autodesk Build construction management platform for all project communications and collaboration. There are detailed requirements for project staffing, scheduling, commissioning, and punch list completion.

View the file

Other files

File Type Posted
36C24224R0071 0008.docx DOCX document
36C24224R0071 0007.docx DOCX document
1-SE-701.pdf PDF
36C24224R0071 0006.docx DOCX document
SK-ES-802.1.pdf PDF
36C24224R0071 0005.docx DOCX document
Albany VA ED Walk Through Sign in List.pdf PDF
Albany VAMC Geotech Report for New ED.pdf PDF
087100 Door hardware SET 14.pdf PDF
071352 Modified Bituminous Sheet Waterproofing.pdf PDF
Stratton ED_103177_SET.pdf PDF
Q40 - 1-HA-100.pdf PDF
36C24224R0071 0004.docx DOCX document
055000 Metal Fabrications.pdf PDF
Subbasement Structural Originals.pdf PDF
084113 Aluminum Framed Entrances and Storefront8-18-22.pdf PDF
088000 Glazing-8-18-22.pdf PDF
36C24224R0071 0003.docx DOCX document
36C24224R0071 0002.docx DOCX document
19-181 100 Specs VA 528-809 Volume I.pdf PDF
19-181 100 Specs VA 528-809 Volume II.pdf PDF
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
36C24224R0071 0001.docx DOCX document
072400 EIFS.pdf PDF
divisions 27-28 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part1.pdf PDF
2022-02-22 VA 528-809 Submittal Register-Divisions 01 - 34 FE.xlsx XLSX spreadsheet
Division 3 specs - concrete.pdf PDF
000115 List of Drawing Sheets.pdf PDF
Division 26 Specs - electrical.pdf PDF
Division 23 Specs - HVAC.pdf PDF
Division 7 Specs - Thermal and Moisture Protection.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part7.pdf PDF
Division 5 specs - Metals.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part8.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part10.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part2.pdf PDF
000110 TOC.pdf PDF
Division 9 specs - Finishes.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
Division 6 Specs - wood and plastics.pdf PDF
Division 4 Specs - Masonry.pdf PDF
Division 2 specs - existing conditions.pdf PDF
Division 21-22 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part4.pdf PDF
Divisions 31-34 Specs.pdf PDF
Division 8 Spec - Doors and windows.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part5.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part11.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part9.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

Network Contracting Office 4 1010 Delafield Road Pittsburgh, PA 15215

Past Performance Questionnaire for: 528A8-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC

INSTRUCTIONS TO OFFEROR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

Company Name

Street Address

Point of Contact (POC)

City

POC Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box)
|_| Prime Contractor |_| Sub-contractor |_| Key Personnel

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named above is submitting a proposal for a United States Department of Veterans Affairs contract, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Officer by emailing directly to:

Michael.Spivack@va.gov

Please return the completed form ASAP, but no later than 12:00 pm local time, August 26, 2024.

If you have any questions, please contact the Contracting Officer: Elijah.mcintosh@va.gov

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Email

Zip Code

PERFORMANCE INFORMATION: Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.

0
1
2
3
4
5
NEUTRAL
UNACCEPTABLE
MARGINAL
ACCEPTABLE
VERY GOOD
OUTSTANDING
No record of past performance, or not applicable or the record is inconclusive.
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met most contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance exceeded all contract requirements. There were no problems.
The Contractor …
0
1
2
3
4
5

QUALITY – MANAGEMENT & WORKMANSHIP

1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
|_|
|_|
|_|
|_|
|_|
|_|
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.
|_|
|_|
|_|
|_|
|_|
|_|
3.
Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.
|_|
|_|
|_|
|_|
|_|
|_|
4.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
|_|
|_|
|_|
|_|
|_|
|_|
5.
Submittals clearly identified the proposed item IAW the specifications and drawings.
|_|
|_|
|_|
|_|
|_|
|_|
6.
Suggested alternative approaches to problems.
|_|
|_|
|_|
|_|
|_|
|_|

TIMELINESS AND ADHERENCE TO SCHEDULE

0
1
2
3
4
5
7.
Contractor provided timely notices of possible delays/schedule revisions.

REMARKS:

|_|
|_|
|_|
|_|
|_|
|_|
8.
Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.
|_|
|_|
|_|
|_|
|_|
|_|
9.
Developed realistic and met approved progress schedules.
|_|
|_|
|_|
|_|
|_|
|_|

BUSINESS PRACTICES/CUSTOMER RELATIONSHIP AND ABILITY TO PERFORM

10.
Displayed initiative to solve problems.
|_|
|_|
|_|
|_|
|_|
|_|
11.
How well did the contractor work independent of Government guidance, oversight and assistance?
|_|
|_|
|_|
|_|
|_|
|_|
12.
Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).
|_|
|_|
|_|
|_|
|_|
|_|
13.
For contract changes, contractor provided timely and realistic change order proposals.
|_|
|_|
|_|
|_|
|_|
|_|

COMPLIANCE & SAFETY

0
1
2
3
4
5
14.
Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.
|_|
|_|
|_|
|_|
|_|
|_|
15.
Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance; Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.
|_|
|_|
|_|
|_|
|_|
|_|
16.
Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.
|_|
|_|
|_|
|_|
|_|
|_|

INFECTION CONTROL

17.
Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements.
|_|
|_|
|_|
|_|
|_|
|_|

OVERALL CUSTOMER SATISFACTION

18.
Demonstrated reasonableness in modifications cost proposal.
|_|
|_|
|_|
|_|
|_|
|_|
19.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
|_|
YES
|_|
NO
20.
Would you award another contract to this contractor? If not, please explain in “remarks.”
|_|
YES
|_|
NO
OVERALL PERFORMANCE RATING:
|_|
|_|
|_|
|_|
|_|
|_|

REMARKS (Please use as much space as is needed – the box will expand as you type).

I hereby certify that the information that I have reported above is accurate to the best of my knowledge.

Printed Name

E-mail address

Business Title

Signature

Date