Z1DA--minor-const 528-809 new emergency department albany VAMC

Closed Solicitation Posted

Solicitation number
36C24224R0071
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Albany, New York 12208, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2 is seeking proposals for the construction of a new Emergency Department addition to the Stratton VA Medical Center in Albany, NY. The project requires the contractor to prepare the site, perform demolition and asbestos abatement, and construct the new facility including general construction, mechanical, electrical, plumbing, fire protection, and medical gas work. Key requirements include providing a dedicated full-time OSHA-certified superintendent, completing commissioning and a final punch list, and utilizing the VA's Autodesk Build construction management platform. Proposals will be evaluated on technical approach, past performance, schedule, and price. The solicitation has a due date of September 4, 2024.

This is a 100% small business set-aside procurement with an estimated value between $20-50 million. No incumbents are identified. The period of performance is 550 calendar days from the notice to proceed. The contractor must be able to begin work within 15 days of the notice to proceed and complete all work within the 550-day timeline. The place of performance is the Stratton VA Medical Center in Albany, NY.

Notice text

2 versions

Update #2 · Latest ·

STATEMENT OF WORK 528A8-809 Build New Emergency Department General Intention: The Stratton VA Medical Center in Albany, NY has a need for new Emergency Department to be added to the main hospital. The new addition will have connecting corridors to the main hospital core. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, significant excavation and site work, furnish all labor and materials, and perform work for construction of a New Emergency Department as required by the drawings and specifications. Work includes demolition, asbestos abatement, excavation, site work, exterior improvements, general construction, alterations, structural, mechanical, plumbing, electrical work, fire alarm and sprinkler work, medical gas work, lead shielding, installation of equipment provided by third-party vendors, low-voltage communications and controls work, and certain other items. Visits to the site by Contractors may be made as documented in the formal solicitation of the Project. Offices of Fellenzer Engineering LLP, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the Contracting Officer or duly authorized representative. Before placement and installation of Work subject to tests by a testing laboratory retained by Department of Veterans Affairs as required by the Drawings and Specifications, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspections. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Period of performance: The successful offeror shall begin performance within 15 calendar days after receiving the notice to proceed and complete all work within the 550 calendar days (time specified in the award). Calendar days means every day of the week. Superintendence: The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated to supervision and assigned to this project while work is being performed on site. If the originally assignment superintendent is not available for any reason then the offeror must notify the Government immediately and provide an alternate competent superintendent. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project. Commissioning: The commissioning of all required items shall be completed prior to the offeror providing any required training to government staff and the coordination/development of a Final Inspection and the resultant punch list. Punch list: The offeror must notify the Contracting Officer (CO) and Contracting Officer s Representative (COR) of the project s substantial completion. The offeror and Government must establish a date and time to perform a punch list walk through with all stake holders. The offeror is required to complete all punch list items during the established period of performance and not after the 550 calendar days. Autodesk build construction management platform: The Contractor shall utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts.  There is no user, license, or subscription fee to the contractor for using this cloud-based platform. The Contractor shall accomplish and complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR within 14 days of contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Contractor staff granted access to the ACC platform shall complete ACC training through ProductivityNOW eLearning platform and provide certificates of completion to COR within 12 Calendar days of access being granted. Initial access to ProductivityNOW eLearning platform shall expire after 12 Calendar days after online access is granted. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described in section B.1.3.1. C.. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Contractor shall inform the COR of any staff changes within 2 business days from the change. Staff changes pertains to staff granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.

Update #1 ·

STATEMENT OF WORK

528A8-809 Build New Emergency Department

General Intention:

The Stratton VA Medical Center in Albany, NY has a need for new Emergency Department to be added to the main hospital. The new addition will have connecting corridors to the main hospital core.

Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, significant excavation and site work, furnish all labor and materials, and perform work for construction of a New Emergency Department as required by the drawings and specifications. Work includes demolition, asbestos abatement, excavation, site work, exterior improvements, general construction, alterations, structural, mechanical, plumbing, electrical work, fire alarm and sprinkler work, medical gas work, lead shielding, installation of equipment provided by third-party vendors, low-voltage communications and controls work, and certain other items.

Visits to the site by Contractors may be made as documented in the formal solicitation of the Project.

Offices of Fellenzer Engineering LLP, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the Contracting Officer or duly authorized representative.

Before placement and installation of Work subject to tests by a testing laboratory retained by Department of Veterans Affairs as required by the Drawings and Specifications, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspections. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

Period of performance:

The successful offeror shall begin performance within 15 calendar days after receiving the notice to proceed and complete all work within the 550 calendar days (time specified in the award). Calendar days means every day of the week.

Superintendence:

The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated to supervision and assigned to this project while work is being performed on site. If the originally assignment superintendent is not available for any reason then the offeror must notify the Government immediately and provide an alternate competent superintendent. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.

Commissioning:

The commissioning of all required items shall be completed prior to the offeror providing any required training to government staff and the coordination/development of a Final Inspection and the resultant punch list.

Punch list:

The offeror must notify the Contracting Officer (CO) and Contracting Officer s Representative (COR) of the project s substantial completion. The offeror and Government must establish a date and time to perform a punch list walk through with all stake holders. The offeror is required to complete all punch list items during the established period of performance and not after the 550 calendar days.

Autodesk build construction management platform:

The Contractor shall utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC).

Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.

The Contractor shall accomplish and complete the following tasks upon award of contract:

Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR within 14 days of contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.

The access request shall be in writing and include a list of staff. The list shall include the following information:

Full Name

Company Name

Email Address

Role/Position on the project (i.e., Project manager, site super)

Contractor staff granted access to the ACC platform shall complete ACC training through ProductivityNOW eLearning platform and provide certificates of completion to COR within 12 Calendar days of access being granted. Initial access to ProductivityNOW eLearning platform shall expire after 12 Calendar days after online access is granted.

Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described in section B.1.3.1. C..

The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.

Contractor shall inform the COR of any staff changes within 2 business days from the change. Staff changes pertains to staff granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.

Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.

Files

File Type Posted
36C24224R0071 0008.docx DOCX document
36C24224R0071 0007.docx DOCX document
36C24224R0071 0006.docx DOCX document
1-SE-701.pdf PDF
SK-ES-802.1.pdf PDF
Albany VA ED Walk Through Sign in List.pdf PDF
36C24224R0071 0005.docx DOCX document
Albany VAMC Geotech Report for New ED.pdf PDF
36C24224R0071 0004.docx DOCX document
084113 Aluminum Framed Entrances and Storefront8-18-22.pdf PDF
Subbasement Structural Originals.pdf PDF
087100 Door hardware SET 14.pdf PDF
088000 Glazing-8-18-22.pdf PDF
055000 Metal Fabrications.pdf PDF
Q40 - 1-HA-100.pdf PDF
071352 Modified Bituminous Sheet Waterproofing.pdf PDF
Stratton ED_103177_SET.pdf PDF
36C24224R0071 0003.docx DOCX document
19-181 100 Specs VA 528-809 Volume I.pdf PDF
36C24224R0071 0002.docx DOCX document
19-181 100 Specs VA 528-809 Volume II.pdf PDF
36C24224R0071 0001.docx DOCX document
072400 EIFS.pdf PDF
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
Divisions 31-34 Specs.pdf PDF
FAR 52.225-2 BUY AMERICAN CERTIFICATE.pdf PDF
WD Albany NY20240002 07-12-2024.docx DOCX document
Division 8 Spec - Doors and windows.pdf PDF
Division 1 specs - General.pdf PDF
divisions 27-28 Specs.pdf PDF
Division 3 specs - concrete.pdf PDF
000115 List of Drawing Sheets.pdf PDF
Division 21-22 Specs.pdf PDF
Division 2 specs - existing conditions.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part6.pdf PDF
Division 7 Specs - Thermal and Moisture Protection.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part11.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part3.pdf PDF
Division 6 Specs - wood and plastics.pdf PDF
Division 26 Specs - electrical.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part5.pdf PDF
2022-02-22 VA 528-809 Submittal Register-Divisions 01 - 34 FE.xlsx XLSX spreadsheet
Division 23 Specs - HVAC.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part10.pdf PDF
Division 10-14 Specs.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part9.pdf PDF
Division 9 specs - Finishes.pdf PDF
1-22-24 - VA STRATTON NEW EMERGENCY DEPT SS_Part4.pdf PDF
Division 5 specs - Metals.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Z1DA--minor-const 528-809 new emergency department albany VAMC Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DA--528A8-22-814 Consolidate Primary Care Reception Albany VA Medical Center Albany, New York 12208, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Montrose, New York 10548, United States · NAICS 238210 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Y1DA--replace roofs and repair facades building 6 and 7 at the northport VA medical center project number: 632-23-112 NAICS 236220 Veterans Integrated Service Network 2 No set-aside
Building 13 Stair and Roof Replacement at Castle Point VAMC New York 12590, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
VA Canandaigua Phase III Presolicitation Notice 400 Fort Hill AveCanandaigua, NY 14424 14424 · NAICS 236220 ENDIST Buffalo No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors